CN207272627U - A kind of Special plastic part endoporus O-ring installs testing agency automatically - Google Patents

A kind of Special plastic part endoporus O-ring installs testing agency automatically Download PDF

Info

Publication number
CN207272627U
CN207272627U CN201721360941.1U CN201721360941U CN207272627U CN 207272627 U CN207272627 U CN 207272627U CN 201721360941 U CN201721360941 U CN 201721360941U CN 207272627 U CN207272627 U CN 207272627U
Authority
CN
China
Prior art keywords
main body
ring
body rack
cylinder
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721360941.1U
Other languages
Chinese (zh)
Inventor
杨晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Multi Crystal Technology Co Ltd
Original Assignee
Suzhou Multi Crystal Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Multi Crystal Technology Co Ltd filed Critical Suzhou Multi Crystal Technology Co Ltd
Priority to CN201721360941.1U priority Critical patent/CN207272627U/en
Application granted granted Critical
Publication of CN207272627U publication Critical patent/CN207272627U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Special plastic part endoporus O-ring to install testing agency automatically,Including main body rack,It is arranged on the base platform of main body rack bottom and is arranged on the reference platform of main body rack interior side,The base platform is welded with main body rack,The reference platform insertion is arranged on the inner wall of main body rack,And it is fixed by screws with main body rack,This kind of Special plastic part endoporus O-ring installs testing agency automatically,Mainly realize that O-ring loads and carries out detection function on the basis of traditional O-ring installs testing agency automatically,Assembled for automatic charging,Production efficiency is high,Participated in whole process completely without personnel,Human cost can be saved,The surface cleanness of part can be ensured at the same time,In assembling process,O-ring passes through vibrating disk automatic charging,O-ring is pushed into part by push rod,Detect whether O-ring is installed in place by detection sensor.

Description

A kind of Special plastic part endoporus O-ring installs testing agency automatically
Technical field
Testing agency's technical field is the utility model is related to, is specially that a kind of Special plastic part endoporus O-ring is installed automatically Testing agency.
Background technology
Live manual assembly, often requires to use gauge by O-ring loading portion inside parts.
But existing O-ring installs testing agency automatically, and manual assembly efficiency is low, produce in enormous quantities of high cost using manpower And manual assembly quality is related with assembly crewman's experience, part product assembly quality inequality at the same time, assembling when personnel Contacted with workpiece, workpiece surface cleannes are not high.
So how to design a kind of Special plastic part endoporus O-ring installs testing agency automatically, becoming us will currently solve Certainly the problem of.
Utility model content
The purpose of this utility model is to provide a kind of Special plastic part endoporus O-ring to install testing agency automatically, with solution Problem certainly proposed in the above background technology.
To achieve the above object, the utility model provides following technical solution:A kind of Special plastic part endoporus O-ring is automatic Testing agency is installed, including main body rack, is arranged on the base platform of main body rack bottom and is arranged on one inside main body rack The reference platform of side, the base platform are welded with main body rack, and the reference platform insertion is arranged on the inner wall of main body rack On, and be fixed by screws with main body rack;
The bottom of the reference platform is equipped with positioning cylinder, and the positioning cylinder is bolted company with reference platform Connect, the top of the reference platform is equipped with part support station, and part support station is welded with reference platform, the master The top of body support frame is equipped with pre- air cylinder, and pre- air cylinder insertion is arranged in main body rack, the bottom of the pre- air cylinder Portion is equipped with precompressed guide rod, and the precompressed guide rod fits closely fixation, the top of the part support station with pre- air cylinder Portion is equipped with part, and the top of the part is equipped with preloading block, and the precompressed block nesting is arranged on part, the preloading block with O-ring station to be installed is formed between precompressed guide rod, the side of the part support station is equipped with oil buffer, the oil pressure Buffer is fixed by screws with part support station, and the side of the main body rack is equipped with detection sensor, and described Detection sensor is fixed by screws with main body rack, and the bottom side of the pre- air cylinder is equipped with O-ring separation cylinder, And the O-ring separation cylinder is bolted to connection with pre- air cylinder;
The side of the main body rack is equipped with O-ring assembling guide pad, and O-ring assembling guide pad and main body rack It is vertically arranged, and is fixed by screws with main body rack, the side of the main body rack is equipped with push rod cylinder, and described pushes away Bar cylinder is welded with main body rack, and the bottom of the push rod cylinder is equipped with locating platform, and the locating platform leads to push rod cylinder Cross screw to be fixedly connected, the side of the push rod cylinder is equipped with push rod, and the push rod fits closely fixation with push rod cylinder, institute The side for stating O-ring station to be installed is equipped with O-ring charging guide pad, and the O-ring charging guide pad is lived with O-ring station to be installed Dynamic connection.
Further, the O-ring assembling guide pad side is equipped with spacing jackscrew, and the spacing jackscrew is filled with O-ring Fixation is fitted closely with guide pad.
Further, the side of the main body rack is equipped with oil buffer fixed plate, and the oil buffer is fixed Plate is welded with main body rack.
Further, the side of the main body rack is equipped with guide rail, and the guide rail is screwed company with main body rack Connect.
Further, the side of the locating platform is equipped with positioning cylinder connecting plate, and the positioning cylinder connecting plate is with determining Bit platform welds.
Further, the thickness of the base platform is 150 millimeters.
Compared with prior art, the beneficial effects of the utility model are:This kind of Special plastic part endoporus O-ring is installed automatically Testing agency, mainly realizes that O-ring loads and carries out detection function on the basis of traditional O-ring installs testing agency automatically, Assembled for automatic charging, production efficiency is high, is participated in whole process completely without personnel, can save human cost, together When can ensure the surface cleanness of part, in assembling process, O-ring is by vibrating disk automatic charging, by push rod by O-ring It is pushed into part, detects whether O-ring is installed in place by detection sensor, can differentiate Product Assembly matter by detecting Amount.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the front sectional view of the utility model;
Fig. 3 is the left view sectional view of the utility model;
Fig. 4 is the vertical view cutaway drawing of the utility model;
In figure:1- main body racks;2-O types circle separates cylinder;3- detection sensors;4- oil buffers;5- reference platforms; 6- base platforms;7- positioning cylinders;8- positioning cylinder connecting plates;9- locating platforms;10- parts support station;11- parts;12- Push rod cylinder;13- preloading blocks;14-O type circles station to be installed;15- precompressed guide rods;16- pre- air cylinders;The assembling of 17-O types circle is led To block;The spacing jackscrews of 18-;19- oil buffer fixed plates;20- guide rails;21- push rods;22-O types circle feeds guide pad.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Special plastic part endoporus O-ring is pacified automatically Testing agency is filled, including main body rack 1, is arranged on the base platform 6 of 1 bottom of main body rack and is arranged on inside main body rack 1 The reference platform 5 of side, the base platform 6 are welded with main body rack 1, and the insertion of reference platform 5 is arranged on main body rack 1 Inner wall on, and be fixed by screws with main body rack 1;
The bottom of the reference platform 5 is equipped with positioning cylinder 7, and the positioning cylinder 7 is bolted with reference platform 5 Connection, the top of the reference platform 5 is equipped with part support station 10, and part support station 10 is welded with reference platform 5 Connect, the top of the main body rack 1 is equipped with pre- air cylinder 16, and the insertion of the pre- air cylinder 16 is arranged in main body rack 1, institute The bottom for stating pre- air cylinder 16 is equipped with precompressed guide rod 15, and the precompressed guide rod 15 fits closely admittedly with pre- air cylinder 16 Fixed, the top of the part support station 10 is equipped with part 11, and the top of the part 11 is equipped with preloading block 13, and the precompressed 13 nesting of block is arranged on part 11, and O-ring station 14 to be installed is formed between the preloading block 13 and precompressed guide rod 15, described The side of part support station 10 is equipped with oil buffer 4, and the oil buffer 4 is consolidated with part support station 10 by screw Fixed connection, the side of the main body rack 1 is equipped with detection sensor 3, and the detection sensor 3 passes through spiral shell with main body rack 1 Silk is fixedly connected, and the bottom side of the pre- air cylinder 16 is equipped with O-ring separation cylinder 2, and O-ring separation cylinder 2 with Pre- air cylinder 16 is bolted to connection;
The side of the main body rack 1 is equipped with O-ring assembling guide pad 17, and O-ring assembling guide pad 17 and master Body support frame 1 is vertically arranged, and is fixed by screws with main body rack 1, and the side of the main body rack 1 is equipped with push rod cylinder 12, and the push rod cylinder 12 is welded with main body rack 1, the bottom of the push rod cylinder 12 is equipped with locating platform 9, the positioning Platform 9 is fixed by screws with push rod cylinder 12, and the side of the push rod cylinder 12 is equipped with push rod 21, and the push rod 21 Fixation is fitted closely with push rod cylinder 12, the side of the O-ring station 14 to be installed is equipped with O-ring charging guide pad 22, the O The type circle charging station 14 to be installed with O-ring of guide pad 22 is flexibly connected.
Further, 17 side of O-ring assembling guide pad is equipped with spacing jackscrew 18, and the spacing jackscrew 18 and O Type circle assembling guide pad 17 fits closely fixation, and spacing work is played by setting spacing jackscrew 18 to assemble guide pad 17 to O-ring With.
Further, the side of the main body rack 1 is equipped with oil buffer fixed plate 19, and the oil buffer is consolidated Fixed board 19 is welded with main body rack 1, by setting oil buffer fixed plate 19 to be conducive to fixed oil buffer 4.
Further, the side of the main body rack 1 is equipped with guide rail 20, and the guide rail 20 passes through screw with main body rack 1 It is fixedly connected, by setting guide rail 20 to facilitate push rod 21 to be moved.
Further, the side of the locating platform 9 is equipped with positioning cylinder connecting plate 8, the positioning cylinder connecting plate 8 with Locating platform 9 welds, and by setting positioning cylinder connecting plate 8, is conducive to connect positioning cylinder 16 and push rod cylinder 12.
Further, the thickness of the base platform 6 is 150 millimeters, by the way that the thickness of base platform 6 is set to 150 millimeters, improve the coefficient of stability of base platform 6.
Operation principle:Firstly, it is necessary to when use, after O-ring enters O-ring station 14 to be installed, assembled by O-ring Guide pad 17 and be arranged on O-ring assembling guide pad 17 side spacing jackscrew 18 O-ring is carried out it is spacing, by being arranged on The detection sensor 3 of 1 side of main body rack transmits O-ring by infomation detection and separates the drive O-ring vertical drop of cylinder 2 To the position of reference platform 5, after then detection sensor 3 detects O-ring, O-ring is placed on O-ring station to be installed, Part 11 is then charged into, pre- air cylinder 16 is begun to decline so that 13 compressing component 11 of preloading block, it is dynamic to complete the positioning of positioning cylinder 7 Make, at the same time O-ring assembles guide pad 17 close to workpiece, and push rod cylinder 12 is started to work at this time, by push rod 21 by O-ring It is re-introduced into by pushing in part 11.Detection sensor 3 detects O-ring position, assembles quality, and separate in O-ring When cylinder 2 and pre- air cylinder 16 work, be arranged on the oil buffer 4 of 16 side of pre- air cylinder cylinder can be played it is slow Punching acts on.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Special plastic part endoporus O-ring installs testing agency automatically, including main body rack (1), it is arranged on main body rack (1) base platform (6) of bottom and it is arranged on the reference platform (5) of main body rack (1) interior side, it is characterised in that:It is described Base platform (6) is welded with main body rack (1), and reference platform (5) insertion is arranged on the inner wall of main body rack (1), and It is fixed by screws with main body rack (1);
The bottom of the reference platform (5) is equipped with positioning cylinder (7), and the positioning cylinder (7) passes through bolt with reference platform (5) It is fixedly connected, the top of the reference platform (5) is equipped with part support station (10), and part support station (10) and base Quasi- platform (5) welding, the top of the main body rack (1) is equipped with pre- air cylinder (16), and the pre- air cylinder (16) insertion is set Put in main body rack (1), the bottom of the pre- air cylinder (16) is equipped with precompressed guide rod (15), and the precompressed guide rod (15) fixation is fitted closely with pre- air cylinder (16), the top of the part support station (10) is equipped with part (11), and described zero The top of part (11) is equipped with preloading block (13), and the preloading block (13) nesting is arranged on part (11), the preloading block (13) O-ring station to be installed (14) is formed between precompressed guide rod (15), the side of the part support station (10) is equipped with Oil buffer (4), the oil buffer (4) are fixed by screws with part support station (10), the main body branch The side of frame (1) is equipped with detection sensor (3), and the detection sensor (3) and main body rack (1) company of being screwed Connect, the bottom side of the pre- air cylinder (16) is equipped with O-ring separation cylinder (2), and O-ring separation cylinder (2) with it is pre- Air cylinder (16) is bolted to connection;
The side of the main body rack (1) be equipped with O-ring assembling guide pad (17), and the O-ring assembling guide pad (17) with Main body rack (1) is vertically arranged, and is fixed by screws with main body rack (1), and the side of the main body rack (1) is equipped with Push rod cylinder (12), and the push rod cylinder (12) is welded with main body rack (1), the bottom of the push rod cylinder (12), which is equipped with, determines Bit platform (9), the locating platform (9) are fixed by screws with push rod cylinder (12), and the one of the push rod cylinder (12) Side is equipped with push rod (21), and the push rod (21) fits closely fixation, the O-ring station to be installed (14) with push rod cylinder (12) Side be equipped with O-ring charging guide pad (22), O-ring charging guide pad (22) and O-ring station to be installed (14) activity Connection.
2. a kind of Special plastic part endoporus O-ring according to claim 1 installs testing agency automatically, it is characterised in that: Described O-ring assembling guide pad (17) side is equipped with spacing jackscrew (18), and the spacing jackscrew (18) is oriented to O-ring assembling Block (17) fits closely fixation.
3. a kind of Special plastic part endoporus O-ring according to claim 1 installs testing agency automatically, it is characterised in that: The side of the main body rack (1) is equipped with oil buffer fixed plate (19), and the oil buffer fixed plate (19) and master Body support frame (1) welds.
4. a kind of Special plastic part endoporus O-ring according to claim 1 installs testing agency automatically, it is characterised in that: The side of the main body rack (1) is equipped with guide rail (20), and the guide rail (20) is fixed by screws with main body rack (1).
5. a kind of Special plastic part endoporus O-ring according to claim 1 installs testing agency automatically, it is characterised in that: The side of the locating platform (9) is equipped with positioning cylinder connecting plate (8), the positioning cylinder connecting plate (8) and locating platform (9) Welding.
6. a kind of Special plastic part endoporus O-ring according to claim 1 installs testing agency automatically, it is characterised in that: The thickness of the base platform (6) is 150 millimeters.
CN201721360941.1U 2017-10-22 2017-10-22 A kind of Special plastic part endoporus O-ring installs testing agency automatically Expired - Fee Related CN207272627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721360941.1U CN207272627U (en) 2017-10-22 2017-10-22 A kind of Special plastic part endoporus O-ring installs testing agency automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721360941.1U CN207272627U (en) 2017-10-22 2017-10-22 A kind of Special plastic part endoporus O-ring installs testing agency automatically

Publications (1)

Publication Number Publication Date
CN207272627U true CN207272627U (en) 2018-04-27

Family

ID=61979869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721360941.1U Expired - Fee Related CN207272627U (en) 2017-10-22 2017-10-22 A kind of Special plastic part endoporus O-ring installs testing agency automatically

Country Status (1)

Country Link
CN (1) CN207272627U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110253009A (en) * 2019-08-01 2019-09-20 湖南镭目科技有限公司 A kind of sealing ring automatic separating apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110253009A (en) * 2019-08-01 2019-09-20 湖南镭目科技有限公司 A kind of sealing ring automatic separating apparatus

Similar Documents

Publication Publication Date Title
CN207163833U (en) One kind is easy to nut hardness detection means
CN203081904U (en) Hydraulic cylinder testing bed
CN109941936A (en) A kind of can sealing device with automatic charging function
CN207272627U (en) A kind of Special plastic part endoporus O-ring installs testing agency automatically
CN108971024A (en) A kind of air-leakage test equipment
CN206084334U (en) Magnetic sheet automatic assembly device
CN107816962B (en) A kind of detector packaged type plate body sleeve testing agency
CN202146872U (en) Detecting and sorting mechanism for buzzer
CN205317962U (en) Detect valve body product inner spring assembly quality's device
CN201792310U (en) Manual pressing-in and detecting machine for shaft sleeve and bearing
CN206898741U (en) A kind of bent plate selling sheet assembles device
CN208866732U (en) A kind of bolt binder mounting device
CN205718917U (en) Detection device
CN107855286B (en) A kind of device for detecting length
CN209578702U (en) One kind being used for plunges pump body copper sheathing mounting device
CN208952818U (en) Liquid container assembly synthesis tests tool
CN203551103U (en) Bearing lifting and loading mechanism
CN208984325U (en) A kind of cover board loading test device
CN109878141A (en) Three-dimensional carrier press
CN105865391B (en) Detection device
CN205561795U (en) Mechanism is highly checked to terminal of butt fusion transfer machine
CN206421039U (en) Thread mechanism is surveyed in a kind of cover plate shaping automatically
CN212779871U (en) Retarder nitrogen pressure detection machine
CN109506923A (en) A kind of bogie cartridge and side bearing press ton detection device
CN205915247U (en) Shaft -cup finished product three -coordinates measuring anchor clamps

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20191022