Utility model content
The main purpose of the utility model solves power grid energy-storage box and is safeguarding cell tube to provide a kind of power grid energy-storage box
The problem of difficulty is big during reason system.
The utility model proposes a kind of power grid energy-storage box, including energy-storage box body, cell managing device, installation panel, face
Board connecting equipment and placed hole, above-mentioned panel connector are tubular structure, and one end of above-mentioned panel connector is fixed in
The lateral wall of energy-storage box body is stated, and above-mentioned placed hole is arranged on the connection of above-mentioned energy-storage box body and above-mentioned panel connector
Place;Above-mentioned cell managing device is detachably affixed by above-mentioned installation panel and the other end of above-mentioned panel connector, and with
Above-mentioned energy-storage box body is electrically connected.
Further, in above-mentioned power grid energy-storage box, the first connector, fixing piece and the first mounting hole are further included, on
State the other end that fixing piece is fixedly arranged on above-mentioned panel connector;Above-mentioned fixing piece is equipped with above-mentioned first mounting hole;Above-mentioned installation
Panel is equipped with the second mounting hole, and above-mentioned first connector is arranged in above-mentioned second mounting hole and above-mentioned first mounting hole, and on
It is affixed by above-mentioned first connector and above-mentioned fixing piece to state installation panel.
Further, in above-mentioned power grid energy-storage box, mounting bar, the first mounting hole and wire harness port are further included, it is above-mentioned
Above-mentioned wire harness port is respectively equipped with a pair of of opposing sidewalls of cell managing device, is respectively equipped with another pair opposing sidewalls above-mentioned
Mounting bar, above-mentioned cell managing device are affixed by above-mentioned mounting bar and above-mentioned installation panel.
Further, in above-mentioned power grid energy-storage box, the second connector, the first mounting hole and the second installation are further included
Hole, above-mentioned mounting bar are equipped with above-mentioned first mounting hole, and above-mentioned installation panel is equipped with the second mounting hole, and above-mentioned second connector is worn
In above-mentioned second mounting hole and above-mentioned first mounting hole, and above-mentioned installation panel passes through above-mentioned second connector and above-mentioned installation
Bar is affixed.
Further, in above-mentioned power grid energy-storage box, heat emission hole is further included, above-mentioned heat emission hole is arranged on above-mentioned installation panel
On.
Further, above-mentioned fixing piece includes four or more, and is equidistantly fixed in the above-mentioned connecting tube other end.
The utility model between installation panel and energy-storage box body by adding panel connector so that power grid energy storage
Case can easily find installation site accurately when installing installation panel;By adding fixing piece, the first connector, the first mounting hole
With the second mounting hole so that the dismounting of installation panel is more convenient;By adding the second connector, the first mounting hole and the second installation
Hole so that the dismounting between cell managing device and installation panel is more convenient, reduces activity time, improves the maintenance effect of maintenance personal
Rate.
Embodiment
It should be appreciated that specific embodiment described herein is not used to limit this only to explain the utility model
Utility model.
With reference to Fig. 1-Fig. 4, the utility model provides the power grid energy storage tank arrangement structure of an embodiment, including energy-storage box body
1st, cell managing device 2, installation panel 3, panel connector 6, placed hole 11, above-mentioned panel connector 6 are tubular structure,
Its one end is fixed in the lateral wall of above-mentioned energy-storage box body 1, and above-mentioned placed hole 11 is arranged on above-mentioned energy-storage box body 1 and above-mentioned face
The junction of board connecting equipment 6;Above-mentioned cell managing device 2 is another by above-mentioned installation panel 3 and above-mentioned panel connector 6
One end is detachably affixed, and is electrically connected with above-mentioned energy-storage box body 1.It is first, above-mentioned cell managing device 2 is affixed during installation
In installation panel 3;Then, cell managing device 2 is electrically connected with energy-storage box body 1;Finally, by above-mentioned installing plate 3 with
Above-mentioned panel connector 6 is affixed.Process during installation is easy, it is easy to accomplish.When safeguarding or replacing, first, by above-mentioned installation
Plate 3 is disassembled from above-mentioned panel connector 6;Then, being electrically connected for cell managing device 2 and energy-storage box body 1 is disconnected;
Finally, cell managing device 2 is disassembled from installation panel 3.Maintenance process is easy, and without power grid energy-storage box is overall
Disassemble out, can effectively reduce the workload dismantled when safeguarding, reduce time and the human cost of maintenance so that safeguard more
It is convenient.
In the present embodiment, above-mentioned power grid energy-storage box, further includes the first connector 4,61 and first mounting hole 62 of fixing piece, on
State the other end that fixing piece 61 is fixedly arranged on above-mentioned panel connector 6;Above-mentioned fixing piece 61 is equipped with above-mentioned first mounting hole 62;On
State installation panel 3 and be equipped with the second mounting hole 31, above-mentioned first connector 4 is arranged in above-mentioned second mounting hole 31 and above-mentioned first
In mounting hole 62, and above-mentioned installation panel 3 is affixed by above-mentioned first connector 4 and above-mentioned fixing piece 61.Wherein, above-mentioned first
Connector 4 is generally spring self-clinching stud, in installation or when safeguarding, it is only necessary to manually tighten or unscrew spring self-clinching stud, just
It can realize above-mentioned installation panel 3 and the affixed of above-mentioned fixing piece 61 or dismounting so that installation and maintenance procedures are more convenient.
In the present embodiment, above-mentioned power grid energy-storage box, further includes the second connector 5, mounting bar 21, the first mounting hole, harness
22 and second mounting hole of port.Above-mentioned wire harness port 22 is respectively equipped with a pair of of opposing sidewalls of above-mentioned cell managing device 2, on
Wire harness port 22 is stated by being connected with the harness reserved in energy-storage box body 1, realizes cell managing device 2 and energy-storage box body 1
Between electrical connection, harness length is typically greater than or equal to 50 millimeters;Above-mentioned mounting bar is respectively equipped with another pair opposing sidewalls
21, and above-mentioned mounting bar 21 is equipped with above-mentioned first mounting hole, the correspondence position of above-mentioned installation panel 3 is then equipped with the above-mentioned second peace
Fill hole.Above-mentioned second connector 5 is arranged in the first mounting hole and the second mounting hole, and above-mentioned installation panel 3 passes through above-mentioned
Two connectors 5 and above-mentioned mounting bar 21 are affixed.Above-mentioned second connector 5 be generally self-clinching stud, and with plain washer, spring washer
And nut matches.During installation, first, cell managing device 2 is fixed in installation panel 3, for example, will can press
Screw passes through above-mentioned first mounting hole and above-mentioned second mounting hole, and plain washer, spring washer and nut are inserted in successively and pressed
Screw, and tighten nut, realizes the affixed of above-mentioned cell managing device 2 and above-mentioned installation panel 3;Then, above-mentioned harness is inserted
Enter corresponding wire harness port 22.During dismounting, then carry out in a reverse order, first, extract harness, disconnect above-mentioned battery management
Device 2 is electrically connected with above-mentioned energy-storage box body 1;Then, cell managing device 2 is disassembled from installation panel 3.Upper
During stating installation or removal, user can easily realize connection or disconnect cell managing device 2 and energy-storage box body 1
Between electrical connection, can also easily realize installation or removal of the cell managing device 2 in installation panel 3, reach installation
With the effect of maintenance procedures simplicity.
In the present embodiment, heat emission hole 33 is distributed with above-mentioned installation panel 3 so that power grid energy-storage box possesses heat sinking function.
In the present embodiment, above-mentioned fixing piece 61 generally comprises four or more, and is equidistantly fixedly arranged on above-mentioned panel and connects
The other end of connection device 6, when the cross sectional shape of above-mentioned panel connector 6 is rectangle, above-mentioned fixing piece 61 is preferably fixedly arranged on
The wall angle of above-mentioned panel connector 6, had both facilitated the placement of above-mentioned cell managing device 2, also so that above-mentioned installation panel 3 with
Above-mentioned energy-storage box body 1 can be stably affixed.
In a specific embodiment, power grid energy-storage box include energy-storage box body 1, cell managing device 2, installation panel 3,
First connector 4, the second connector 5, panel connector 6, placed hole 11, mounting bar 21, wire harness port 22, first are installed
Hole, the second mounting hole 31, the second mounting hole, heat emission hole 33,61 and first mounting hole 62 of fixing piece, above-mentioned panel connector 6
For tubular structure, its one end is fixed in the lateral wall of above-mentioned energy-storage box body 1, wherein, above-mentioned panel connector 6 is preferably side
Shape pipe, and above-mentioned placed hole 11 is arranged on the junction of above-mentioned energy-storage box body and above-mentioned panel connector 6, above-mentioned panel connection
6 opening of device is equidistantly equipped with four fixing pieces 61, is preferably provided at the wall angle of above-mentioned panel connector 6;Above-mentioned fixing piece
61 are equipped with the first mounting hole 62, and above-mentioned installation panel 3 is equipped with the second mounting hole 31, and above-mentioned first connector 4 is arranged in above-mentioned
In second mounting hole 31 and above-mentioned first mounting hole 62, and above-mentioned installation panel 3 passes through above-mentioned first connector 4 and above-mentioned fixation
Part 61 is affixed, wherein, above-mentioned first connector 4 is preferably spring self-clinching stud, when tightening or unscrewing spring self-clinching stud, i.e.,
It can easily realize connection or partition of the above-mentioned installation panel 3 between above-mentioned fixing piece 61;Above-mentioned installation panel 3 is equipped with second
Mounting hole, the one side wall of above-mentioned cell managing device 2 are equipped with above-mentioned mounting bar 21, and above-mentioned mounting bar 21 is equipped with above-mentioned the
One mounting hole, above-mentioned second connector 5 is arranged in above-mentioned second mounting hole and above-mentioned first mounting hole, and above-mentioned installation panel
3 is affixed by above-mentioned second connector 5 and above-mentioned cell managing device 2, wherein, above-mentioned second connector 5 is preferably the spiral shell that presses
Matched during nail, generally installation with plain washer, spring washer and nut, when tightening or unscrewing nut, you can easily
Realize the connection or partition between above-mentioned cell managing device 2 and above-mentioned installation panel 3;Above-mentioned cell managing device 2 it is another
Side wall is equipped with wire harness port 22, and above-mentioned wire harness port 22 realizes battery by being connected with the harness reserved in energy-storage box body 1
Being electrically connected between managing device 2 and energy-storage box body 1, harness length are preferably 50 millimeters;Above-mentioned installation panel 3, which is equipped with, to be dissipated
Hot hole 33, makes power grid energy-storage box possess heat sinking function.
During installation:
First, self-clinching stud is passed through into above-mentioned first mounting hole and above-mentioned second mounting hole, and is inserted in above-mentioned plain cushion successively
Circle, spring washer and nut, tighten above-mentioned nut, above-mentioned cell managing device 2 are fixed in above-mentioned installation panel 3;Then,
The harness reserved in above-mentioned energy-storage box body 1 is inserted into above-mentioned wire harness port 22, realizes above-mentioned energy-storage box body 1 and above-mentioned battery
Electrical connection between managing device 2, for convenience of installing, harness length is preferably 50 millimeters;Finally, spring self-clinching stud is passed through
Above-mentioned second mounting hole 31, penetrates above-mentioned first mounting hole 62, and tightens spring self-clinching stud, realizes that above-mentioned installation panel 3 is solid
Connect affixed with above-mentioned fixing piece 13.The required instrument that uses is few in installation process, and from power grid energy-storage box inner space
Limitation, installation procedure are easy, it is easy to accomplish.
When safeguarding or replacing:
First, above-mentioned installation panel 3 is disassembled from above-mentioned energy-storage box body 1;Then, above-mentioned harness is extracted, is broken
Being electrically connected between above-mentioned cell managing device 2 and above-mentioned energy-storage box body 1 is opened, finally by above-mentioned cell managing device 2 from upper
State and disassembled in installation panel 3.The instrument used needed for maintenance or replacement process is few, without power grid energy-storage box is integrally disassembled
Open, can effectively reduce the workload dismantled when safeguarding, while from the limitation of power grid energy-storage box inner space, reduce and safeguard
Difficulty and maintenance cost.
The utility model is made by adding above-mentioned connecting tube 6 between above-mentioned installation panel 3 and above-mentioned energy-storage box body 1
Installation site can easily be found accurately when installing above-mentioned installation panel 3 by obtaining power grid energy-storage box;By add above-mentioned fixing piece 61,
Above-mentioned first connector 4, above-mentioned first mounting hole 62 and above-mentioned second mounting hole 31 so that the dismounting of above-mentioned installation panel 3 is more
It is convenient;By adding above-mentioned second connector 5, above-mentioned first mounting hole and above-mentioned second mounting hole so that above-mentioned battery management
Dismounting between device 2 and above-mentioned installation panel 3 is more convenient, reduces activity time, improves the maintenance efficiency of maintenance personal.
The above is only the preferred embodiment of the present invention, and it does not limit the scope of the patent of the present invention,
Every equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly transported
Used in other related technical areas, it is equally included in the patent within the scope of the utility model.