CN207265417U - A kind of SVG reactive-load compensations are complete to use fixation kit - Google Patents

A kind of SVG reactive-load compensations are complete to use fixation kit Download PDF

Info

Publication number
CN207265417U
CN207265417U CN201721266525.5U CN201721266525U CN207265417U CN 207265417 U CN207265417 U CN 207265417U CN 201721266525 U CN201721266525 U CN 201721266525U CN 207265417 U CN207265417 U CN 207265417U
Authority
CN
China
Prior art keywords
complete
guide rail
air
svg reactive
fixation kit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721266525.5U
Other languages
Chinese (zh)
Inventor
吴世凯
肖魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konstanz Electric Co.,Ltd.
Original Assignee
Constance Electric (hangzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Constance Electric (hangzhou) Co Ltd filed Critical Constance Electric (hangzhou) Co Ltd
Priority to CN201721266525.5U priority Critical patent/CN207265417U/en
Application granted granted Critical
Publication of CN207265417U publication Critical patent/CN207265417U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]

Landscapes

  • Duct Arrangements (AREA)

Abstract

A kind of SVG reactive-load compensations of the utility model offer are complete to use fixation kit, the first supporting beam including the cabinet inner wall for being installed on convertor equipment, guide rail is installed in first supporting beam, guide rail extends along the set of installation direction of SVG reactive-load compensations, wherein, fixation kit further includes the first setting element being installed on the air-duct clapboard of convertor equipment, SVG reactive-load compensations are complete to be installed between guide rail and the first setting element, the one end of guide rail away from air-duct clapboard is set, guide rail has been detachably arranged the second setting element, after the complete installation of SVG reactive-load compensations is to designated position, SVG reactive-load compensations are complete to be fixed between the second setting element and air-duct clapboard, and SVG reactive-load compensations are complete that seal member is provided between air-duct clapboard.The SVG reactive-load compensations are complete can to realize complete positioning of the complete power module of SVG reactive-load compensations on six-freedom degree with fixation kit, improve the mounting stability of power module.

Description

A kind of SVG reactive-load compensations are complete to use fixation kit
Technical field
Current transformer technical field of auxiliary equipment is the utility model is related to, more particularly to a kind of complete use of SVG reactive-load compensations is admittedly Determine component.
Background technology
With the continuous development of industrial frequency conversion field technology, high voltage, the current transformer of large capacity are designed to mainly to send out Direction is opened up, the characteristics of its main topology realized by the way of cascade connection type power unit module, unit module is electric And mechanical performance is completely the same, in that context it may be convenient to is used interchangeably, SVG power modules are large number of in device, SVG power modules Installation positioning directly affects the performance of whole current transformer, and the mounting and positioning device of SVG power modules is most important.
The content of the invention
The main purpose of the utility model is to provide that a kind of SVG reactive-load compensations are complete to use fixation kit, it can realize SVG Complete positioning of the complete power module of reactive-load compensation on six-freedom degree, improves the mounting stability of power module.
In order to realize the main purpose of the utility model, the utility model provides a kind of SVG reactive-load compensations complete fixation Component, including the first supporting beam of the cabinet inner wall of convertor equipment is installed on, guide rail, guide rail edge are installed in the first supporting beam The set of installation direction extension of SVG reactive-load compensations, wherein, fixation kit, which further includes, to be installed on the air-duct clapboard of convertor equipment First setting element, SVG reactive-load compensations are complete to be installed between guide rail and the first setting element, guide rail away from air-duct clapboard one End is set, and guide rail has been detachably arranged the second setting element, after the complete installation of SVG reactive-load compensations is to designated position, SVG without Work(compensation is complete to be fixed between the second setting element and air-duct clapboard, and SVG reactive-load compensations are complete is set between air-duct clapboard It is equipped with seal member.
Further scheme is that seal member is sponge sealing strip, and sponge sealing strip is fixedly installed in SVG reactive-load compensations The set of side towards air-duct clapboard.
Further scheme is that the inner face of guide rail is resisted against the side of air-duct clapboard.
Further scheme is that fixation kit further includes the second supporting beam being installed on air-duct clapboard, the first positioning Element is installed on air-duct clapboard by the second supporting beam.
Further scheme is that the second supporting beam is parallel with the first supporting beam.
Further scheme is that the material of the first setting element is spring steel.
Further scheme is, the second setting element is complete with the bolt of guide rail for connection SVG reactive-load compensations.
By such scheme as it can be seen that in the set of installation process of SVG reactive-load compensations, guide rail is fixed on the first support first Liang Shang, and closed wind cabin will be formed on glass gooseneck that air-duct clapboard is installed in cabinet, then the first setting element is consolidated Surely air-duct clapboard is arrived.Then, complete be oriented to by guide rail of SVG reactive-load compensations is slided at cabinet air-duct clapboard, its contact surface By sponge sealing strip elastic packing, ensure air passage seal, the first setting element and SVG reactive-load compensations at the top of air passage are complete Top contact is spacing, SVG reactive-load compensations are complete reach installation site after, by SVG reactive-load compensations it is complete on the location hole that opens up Bolt is carried out with the pressing-riveting bolt of guide rail lower surface to be fixedly connected.Can be complete group by SVG reactive-load compensations by above operating procedure Dress reaches complete positioning requirements, realizes that the air passage leakproofness of module and unit connects, meets vibrations mark of the product in lifting, transport Standard is connected with the air passage of field application link, it can be achieved that conveniently installing and replacing module.So as to realize that SVG is idle Complete positioning of the complete power module on six-freedom degree is compensated, improves the mounting stability of power module.
Brief description of the drawings
Fig. 1 is the complete structure chart with fixation kit embodiment of the utility model SVG reactive-load compensations.
Fig. 2 is the structure under complete the first working status with fixation kit embodiment of the utility model SVG reactive-load compensations Figure.
Fig. 3 is the structure under complete the second working status with fixation kit embodiment of the utility model SVG reactive-load compensations Figure.
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Embodiment
Referring to Fig. 1 to Fig. 3, SVG reactive-load compensations provided by the utility model are complete to be used for convertor equipment with fixation kit, The fixation kit includes the first supporting beam 21,22 and first setting element 25 of guide rail, wherein, the first supporting beam 21 is installed on the change The cabinet inner wall of flow device, guide rail 22 are installed in the first supporting beam 21, and installation of the guide rail 22 along SVG reactive-load compensations complete 23 Direction extends, and the first setting element 25 is installed on air-duct clapboard 24, and the top of SVG reactive-load compensations complete 23 is resisted against first and determines The lower surface of bit unit 25, and the set of bottom of SVG reactive-load compensations is supported in the guide surface of guide rail 22, so as to SVG reactive-load compensations Complete 23 are installed between 22 and first setting element 25 of guide rail.The one end of guide rail 22 away from air-duct clapboard 24 is detachably arranged There is the second setting element 26, and behind complete 23 installation to the designated position of SVG reactive-load compensations, SVG reactive-load compensations complete 23 are fixed on Between second setting element 26 and air-duct clapboard 24.
Seal member 27 is provided between SVG reactive-load compensations complete 23 and air-duct clapboard 24, to ensure work(SVG reactive-load compensations Sealing reliability between complete 23 radiator air passage and the wind cabin of convertor equipment.The present embodiment seal member 27 is close for sponge Strip of paper used for sealing, the sponge sealing strip are fixedly installed in the side towards air-duct clapboard 24 of SVG reactive-load compensations complete 23.Seal member 27 It is also not limited to sponge sealing strip, or other conventional use of sealing elements in this area, such as foaming sealing strip etc..
The first supporting beam of the present embodiment 21 can set two, and two the first supporting beams 21 are respectively arranged at the two of guide rail 22 End, so as to preferably supporting guide 22.It is apparent that the setting position of two the first supporting beams 21 is also not limited to the two of guide rail 22 End, can also be arranged on the other positions of guide rail 22, such as middle part and one end.Meanwhile first supporting beam 21 be also not limited to two It is a, can also set one, three or more, the number of the first supporting beam 21, the width of beam and adjacent supports beam it Between distance should be determined according to the actual use situation such as the length of guide rail 22 and weight, be not limited thereto.In the specific implementation In mode, the first setting element 25 can be specially locating piece, and the length of locating piece can be complete according to SVG reactive-load compensations to be installed The particular condition in use such as 23 specification determine.First setting element 25 is also not limited to as locating piece, it can also be other It can realize the element for clamping positioning, such as can be designed as the structures such as the longer track of length in the mounting direction.
It is used for power equipment with fixation kit since the SVG reactive-load compensations involved by the utility model are complete, according to use Need, the first supporting beam 21 and the second supporting beam should be insulating materials.
First setting element 25 can be fixed on air-duct clapboard 24 by bolted connection, can also pass through this area In conventional use of other be fixedly connected with mode and realize installation with air-duct clapboard 24, such as welding etc..First setting element 25 Material can be spring steel, spring steel has certain elasticity, can clamp while increase complete to SVG reactive-load compensations 23 Clamping force, improve reliability of positioning.First setting element 25 is also not limited to as spring steel, its can also be other metals or Person's nonmetallic materials, such as resin material or steel disc etc..
Second setting element 26 is specifically as follows connection SVG reactive-load compensations complete 23 and the bolt of guide rail 22, when SVG is idle After compensating complete 23 arrival designated mounting position, SVG reactive-load compensations complete 23 are fixed with guide rail 22 by bolt, were being dismounted Bolt is screwed out in journey.It is apparent that in said structure, should on the relevant position of SVG reactive-load compensations complete 23 and guide rail 22 Bolt mounting holes are offered respectively.Second setting element 26 is also not limited to bolt, as long as guide rail can be removably mountable to In 22 and/or SVG reactive-load compensations complete 23, and SVG reactive-load compensations complete 23 are limited in the mounting direction after installing The free degree, for example, it can be positioning pin or locating piece etc..
The inner face of guide rail 22 can be resisted against air-duct clapboard 24, more to hold in complete 23 installation of SVG reactive-load compensations It is easily tight against air-duct clapboard 24.It is apparent that the inner face of guide rail 22 is also not limited to be resisted against air-duct clapboard 24, can also It is suitably distant from air-duct clapboard 24.
SVG reactive-load compensations are complete to further include the second supporting beam with fixation kit, which is installed on air-duct clapboard 24, the first setting element 25 is installed on air-duct clapboard 24 by the second supporting beam, to improve the installation of the first setting element 25 Convenience.Second supporting beam can be parallel with the first supporting beam 21, to ensure the accuracy of clamping position.
In the installation process of SVG reactive-load compensations complete 23, guide rail 22 is fixed in the first supporting beam 21 first, and will Closed wind cabin is formed on the glass gooseneck that air-duct clapboard 24 is installed in cabinet, the first setting element 25 is then fixed to wind Road partition plate 24.Then, SVG reactive-load compensations complete 23 are oriented to by guide rail 22 and slided at cabinet air-duct clapboard 24, it is contacted Face ensures air passage seal by sponge sealing strip elastic packing, the first setting element 25 and SVG reactive-load compensations at the top of air passage Complete 23 top contact is spacing, after SVG reactive-load compensations complete 23 reach installation site, by being opened in SVG reactive-load compensations complete 23 If the pressing-riveting bolt of location hole and 22 lower surface of guide rail carry out bolt and be fixedly connected.By above operating procedure can by SVG without Complete 23 assembling of work(compensation reaches complete positioning requirements, realizes that the air passage leakproofness of module and unit connects, meets that product is being hung Dress, the vibrations standard of transport are connected with the air passage of field application link, it can be achieved that conveniently installing and replacing module.
Embodiment described above, simply the utility model preferred embodiments, be not to limit the utility model practical range, Therefore the equivalent change or modification that all construction, feature and principles according to described in present utility model application the scope of the claims are done, it should all wrap Include in the utility model patent application range.

Claims (7)

1. a kind of complete the first supporting beam used fixation kit, including be installed on the cabinet inner wall of convertor equipment of SVG reactive-load compensations, Guide rail is installed, the guide rail extends along the set of installation direction of the SVG reactive-load compensations, its feature in first supporting beam It is:
The fixation kit further includes the first setting element being installed on the air-duct clapboard of the convertor equipment, the SVG without Work(compensation is complete to be installed between the guide rail and first setting element;
The one end of the guide rail away from the air-duct clapboard is set, and the guide rail has been detachably arranged the second setting element;
After the complete installation of SVG reactive-load compensations is to designated position, the SVG reactive-load compensations are complete to be fixed on the second positioning member Between part and the air-duct clapboard, and the SVG reactive-load compensations are complete is provided with seal member between the air-duct clapboard.
2. fixation kit according to claim 1, it is characterised in that:
The seal member is sponge sealing strip, and the sponge sealing strip is fixedly installed in the set of court of SVG reactive-load compensations To the side of the air-duct clapboard.
3. fixation kit according to claim 2, it is characterised in that:
The inner face of the guide rail is resisted against the side of the air-duct clapboard.
4. fixation kit according to claim 3, it is characterised in that:
The fixation kit further includes the second supporting beam being installed on the air-duct clapboard, and first setting element passes through institute The second supporting beam is stated to be installed on the air-duct clapboard.
5. fixation kit according to claim 4, it is characterised in that:
Second supporting beam is parallel with first supporting beam.
6. fixation kit according to any one of claims 1 to 5, it is characterised in that:
The material of first setting element is spring steel.
7. fixation kit according to any one of claims 1 to 5, it is characterised in that:
Second setting element is complete with the bolt of the guide rail to connect the SVG reactive-load compensations.
CN201721266525.5U 2017-09-29 2017-09-29 A kind of SVG reactive-load compensations are complete to use fixation kit Active CN207265417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721266525.5U CN207265417U (en) 2017-09-29 2017-09-29 A kind of SVG reactive-load compensations are complete to use fixation kit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721266525.5U CN207265417U (en) 2017-09-29 2017-09-29 A kind of SVG reactive-load compensations are complete to use fixation kit

Publications (1)

Publication Number Publication Date
CN207265417U true CN207265417U (en) 2018-04-20

Family

ID=61919903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721266525.5U Active CN207265417U (en) 2017-09-29 2017-09-29 A kind of SVG reactive-load compensations are complete to use fixation kit

Country Status (1)

Country Link
CN (1) CN207265417U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112769048A (en) * 2019-11-05 2021-05-07 河南森源电气股份有限公司 Low-voltage circuit breaker locking structure of switch cabinet for nuclear power

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112769048A (en) * 2019-11-05 2021-05-07 河南森源电气股份有限公司 Low-voltage circuit breaker locking structure of switch cabinet for nuclear power

Similar Documents

Publication Publication Date Title
CN207265417U (en) A kind of SVG reactive-load compensations are complete to use fixation kit
CN102502080A (en) Vibration damping box with adjustable rigidity and damping
CN208442968U (en) A kind of air-conditioning installation support frame
CN206742321U (en) A kind of mounting structure of battery modules bus-bar changeover base
CN210678669U (en) Standby device storage device for power supply station
CN201869461U (en) Case suitable for cabinet mounting and wall mounting
CN207491381U (en) A kind of movable cabinet for carrier rocket TT&C system
CN101858944A (en) Special container for large-sized transformer on-site test system
CN202216821U (en) Clamp for vibration testing of vehicle-mounted stereo components
CN207624892U (en) A kind of GPS antenna mounting structure for outdoor cabinet
CN201309399Y (en) Skylight structure
CN201629931U (en) Special container for site test system for large-size transformer
CN208939432U (en) A kind of clamping fixture for positioning and installing frame of switch cabinet body
CN203771333U (en) Lamp box and lamp box support
CN205677094U (en) A kind of steel structure connecting member
CN204905686U (en) Railway carriage or compartment body of outdoor type view formula van -type transformer substation
CN202295790U (en) Vibration reduction box with adjustable stiffness damp
CN220016250U (en) Anti-collision pressure compensation anti-collision flow valve
CN211196381U (en) Automobile trunk support
CN220710984U (en) Concatenation formula container for transformer substation
CN220673279U (en) Portable cable duct support
CN206962405U (en) A kind of Metro Cable mounting bracket
CN216891791U (en) Switch structure and aerial track
CN205808815U (en) A kind of test stand of composite board
CN205379233U (en) A mounting rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310030 room 402, 4th floor, building 2, 8 xiyuanjiu Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee after: Konstanz Electric Co.,Ltd.

Address before: 310030 room 402, 4th floor, building 2, 8 xiyuanjiu Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: KONSTANZ ELECTRIC (HANGZHOU) Co.,Ltd.