CN207265417U - A kind of SVG reactive-load compensations are complete to use fixation kit - Google Patents
A kind of SVG reactive-load compensations are complete to use fixation kit Download PDFInfo
- Publication number
- CN207265417U CN207265417U CN201721266525.5U CN201721266525U CN207265417U CN 207265417 U CN207265417 U CN 207265417U CN 201721266525 U CN201721266525 U CN 201721266525U CN 207265417 U CN207265417 U CN 207265417U
- Authority
- CN
- China
- Prior art keywords
- complete
- guide rail
- air
- svg reactive
- fixation kit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/10—Flexible AC transmission systems [FACTS]
Landscapes
- Duct Arrangements (AREA)
Abstract
A kind of SVG reactive-load compensations of the utility model offer are complete to use fixation kit, the first supporting beam including the cabinet inner wall for being installed on convertor equipment, guide rail is installed in first supporting beam, guide rail extends along the set of installation direction of SVG reactive-load compensations, wherein, fixation kit further includes the first setting element being installed on the air-duct clapboard of convertor equipment, SVG reactive-load compensations are complete to be installed between guide rail and the first setting element, the one end of guide rail away from air-duct clapboard is set, guide rail has been detachably arranged the second setting element, after the complete installation of SVG reactive-load compensations is to designated position, SVG reactive-load compensations are complete to be fixed between the second setting element and air-duct clapboard, and SVG reactive-load compensations are complete that seal member is provided between air-duct clapboard.The SVG reactive-load compensations are complete can to realize complete positioning of the complete power module of SVG reactive-load compensations on six-freedom degree with fixation kit, improve the mounting stability of power module.
Description
Technical field
Current transformer technical field of auxiliary equipment is the utility model is related to, more particularly to a kind of complete use of SVG reactive-load compensations is admittedly
Determine component.
Background technology
With the continuous development of industrial frequency conversion field technology, high voltage, the current transformer of large capacity are designed to mainly to send out
Direction is opened up, the characteristics of its main topology realized by the way of cascade connection type power unit module, unit module is electric
And mechanical performance is completely the same, in that context it may be convenient to is used interchangeably, SVG power modules are large number of in device, SVG power modules
Installation positioning directly affects the performance of whole current transformer, and the mounting and positioning device of SVG power modules is most important.
The content of the invention
The main purpose of the utility model is to provide that a kind of SVG reactive-load compensations are complete to use fixation kit, it can realize SVG
Complete positioning of the complete power module of reactive-load compensation on six-freedom degree, improves the mounting stability of power module.
In order to realize the main purpose of the utility model, the utility model provides a kind of SVG reactive-load compensations complete fixation
Component, including the first supporting beam of the cabinet inner wall of convertor equipment is installed on, guide rail, guide rail edge are installed in the first supporting beam
The set of installation direction extension of SVG reactive-load compensations, wherein, fixation kit, which further includes, to be installed on the air-duct clapboard of convertor equipment
First setting element, SVG reactive-load compensations are complete to be installed between guide rail and the first setting element, guide rail away from air-duct clapboard one
End is set, and guide rail has been detachably arranged the second setting element, after the complete installation of SVG reactive-load compensations is to designated position, SVG without
Work(compensation is complete to be fixed between the second setting element and air-duct clapboard, and SVG reactive-load compensations are complete is set between air-duct clapboard
It is equipped with seal member.
Further scheme is that seal member is sponge sealing strip, and sponge sealing strip is fixedly installed in SVG reactive-load compensations
The set of side towards air-duct clapboard.
Further scheme is that the inner face of guide rail is resisted against the side of air-duct clapboard.
Further scheme is that fixation kit further includes the second supporting beam being installed on air-duct clapboard, the first positioning
Element is installed on air-duct clapboard by the second supporting beam.
Further scheme is that the second supporting beam is parallel with the first supporting beam.
Further scheme is that the material of the first setting element is spring steel.
Further scheme is, the second setting element is complete with the bolt of guide rail for connection SVG reactive-load compensations.
By such scheme as it can be seen that in the set of installation process of SVG reactive-load compensations, guide rail is fixed on the first support first
Liang Shang, and closed wind cabin will be formed on glass gooseneck that air-duct clapboard is installed in cabinet, then the first setting element is consolidated
Surely air-duct clapboard is arrived.Then, complete be oriented to by guide rail of SVG reactive-load compensations is slided at cabinet air-duct clapboard, its contact surface
By sponge sealing strip elastic packing, ensure air passage seal, the first setting element and SVG reactive-load compensations at the top of air passage are complete
Top contact is spacing, SVG reactive-load compensations are complete reach installation site after, by SVG reactive-load compensations it is complete on the location hole that opens up
Bolt is carried out with the pressing-riveting bolt of guide rail lower surface to be fixedly connected.Can be complete group by SVG reactive-load compensations by above operating procedure
Dress reaches complete positioning requirements, realizes that the air passage leakproofness of module and unit connects, meets vibrations mark of the product in lifting, transport
Standard is connected with the air passage of field application link, it can be achieved that conveniently installing and replacing module.So as to realize that SVG is idle
Complete positioning of the complete power module on six-freedom degree is compensated, improves the mounting stability of power module.
Brief description of the drawings
Fig. 1 is the complete structure chart with fixation kit embodiment of the utility model SVG reactive-load compensations.
Fig. 2 is the structure under complete the first working status with fixation kit embodiment of the utility model SVG reactive-load compensations
Figure.
Fig. 3 is the structure under complete the second working status with fixation kit embodiment of the utility model SVG reactive-load compensations
Figure.
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Embodiment
Referring to Fig. 1 to Fig. 3, SVG reactive-load compensations provided by the utility model are complete to be used for convertor equipment with fixation kit,
The fixation kit includes the first supporting beam 21,22 and first setting element 25 of guide rail, wherein, the first supporting beam 21 is installed on the change
The cabinet inner wall of flow device, guide rail 22 are installed in the first supporting beam 21, and installation of the guide rail 22 along SVG reactive-load compensations complete 23
Direction extends, and the first setting element 25 is installed on air-duct clapboard 24, and the top of SVG reactive-load compensations complete 23 is resisted against first and determines
The lower surface of bit unit 25, and the set of bottom of SVG reactive-load compensations is supported in the guide surface of guide rail 22, so as to SVG reactive-load compensations
Complete 23 are installed between 22 and first setting element 25 of guide rail.The one end of guide rail 22 away from air-duct clapboard 24 is detachably arranged
There is the second setting element 26, and behind complete 23 installation to the designated position of SVG reactive-load compensations, SVG reactive-load compensations complete 23 are fixed on
Between second setting element 26 and air-duct clapboard 24.
Seal member 27 is provided between SVG reactive-load compensations complete 23 and air-duct clapboard 24, to ensure work(SVG reactive-load compensations
Sealing reliability between complete 23 radiator air passage and the wind cabin of convertor equipment.The present embodiment seal member 27 is close for sponge
Strip of paper used for sealing, the sponge sealing strip are fixedly installed in the side towards air-duct clapboard 24 of SVG reactive-load compensations complete 23.Seal member 27
It is also not limited to sponge sealing strip, or other conventional use of sealing elements in this area, such as foaming sealing strip etc..
The first supporting beam of the present embodiment 21 can set two, and two the first supporting beams 21 are respectively arranged at the two of guide rail 22
End, so as to preferably supporting guide 22.It is apparent that the setting position of two the first supporting beams 21 is also not limited to the two of guide rail 22
End, can also be arranged on the other positions of guide rail 22, such as middle part and one end.Meanwhile first supporting beam 21 be also not limited to two
It is a, can also set one, three or more, the number of the first supporting beam 21, the width of beam and adjacent supports beam it
Between distance should be determined according to the actual use situation such as the length of guide rail 22 and weight, be not limited thereto.In the specific implementation
In mode, the first setting element 25 can be specially locating piece, and the length of locating piece can be complete according to SVG reactive-load compensations to be installed
The particular condition in use such as 23 specification determine.First setting element 25 is also not limited to as locating piece, it can also be other
It can realize the element for clamping positioning, such as can be designed as the structures such as the longer track of length in the mounting direction.
It is used for power equipment with fixation kit since the SVG reactive-load compensations involved by the utility model are complete, according to use
Need, the first supporting beam 21 and the second supporting beam should be insulating materials.
First setting element 25 can be fixed on air-duct clapboard 24 by bolted connection, can also pass through this area
In conventional use of other be fixedly connected with mode and realize installation with air-duct clapboard 24, such as welding etc..First setting element 25
Material can be spring steel, spring steel has certain elasticity, can clamp while increase complete to SVG reactive-load compensations 23
Clamping force, improve reliability of positioning.First setting element 25 is also not limited to as spring steel, its can also be other metals or
Person's nonmetallic materials, such as resin material or steel disc etc..
Second setting element 26 is specifically as follows connection SVG reactive-load compensations complete 23 and the bolt of guide rail 22, when SVG is idle
After compensating complete 23 arrival designated mounting position, SVG reactive-load compensations complete 23 are fixed with guide rail 22 by bolt, were being dismounted
Bolt is screwed out in journey.It is apparent that in said structure, should on the relevant position of SVG reactive-load compensations complete 23 and guide rail 22
Bolt mounting holes are offered respectively.Second setting element 26 is also not limited to bolt, as long as guide rail can be removably mountable to
In 22 and/or SVG reactive-load compensations complete 23, and SVG reactive-load compensations complete 23 are limited in the mounting direction after installing
The free degree, for example, it can be positioning pin or locating piece etc..
The inner face of guide rail 22 can be resisted against air-duct clapboard 24, more to hold in complete 23 installation of SVG reactive-load compensations
It is easily tight against air-duct clapboard 24.It is apparent that the inner face of guide rail 22 is also not limited to be resisted against air-duct clapboard 24, can also
It is suitably distant from air-duct clapboard 24.
SVG reactive-load compensations are complete to further include the second supporting beam with fixation kit, which is installed on air-duct clapboard
24, the first setting element 25 is installed on air-duct clapboard 24 by the second supporting beam, to improve the installation of the first setting element 25
Convenience.Second supporting beam can be parallel with the first supporting beam 21, to ensure the accuracy of clamping position.
In the installation process of SVG reactive-load compensations complete 23, guide rail 22 is fixed in the first supporting beam 21 first, and will
Closed wind cabin is formed on the glass gooseneck that air-duct clapboard 24 is installed in cabinet, the first setting element 25 is then fixed to wind
Road partition plate 24.Then, SVG reactive-load compensations complete 23 are oriented to by guide rail 22 and slided at cabinet air-duct clapboard 24, it is contacted
Face ensures air passage seal by sponge sealing strip elastic packing, the first setting element 25 and SVG reactive-load compensations at the top of air passage
Complete 23 top contact is spacing, after SVG reactive-load compensations complete 23 reach installation site, by being opened in SVG reactive-load compensations complete 23
If the pressing-riveting bolt of location hole and 22 lower surface of guide rail carry out bolt and be fixedly connected.By above operating procedure can by SVG without
Complete 23 assembling of work(compensation reaches complete positioning requirements, realizes that the air passage leakproofness of module and unit connects, meets that product is being hung
Dress, the vibrations standard of transport are connected with the air passage of field application link, it can be achieved that conveniently installing and replacing module.
Embodiment described above, simply the utility model preferred embodiments, be not to limit the utility model practical range,
Therefore the equivalent change or modification that all construction, feature and principles according to described in present utility model application the scope of the claims are done, it should all wrap
Include in the utility model patent application range.
Claims (7)
1. a kind of complete the first supporting beam used fixation kit, including be installed on the cabinet inner wall of convertor equipment of SVG reactive-load compensations,
Guide rail is installed, the guide rail extends along the set of installation direction of the SVG reactive-load compensations, its feature in first supporting beam
It is:
The fixation kit further includes the first setting element being installed on the air-duct clapboard of the convertor equipment, the SVG without
Work(compensation is complete to be installed between the guide rail and first setting element;
The one end of the guide rail away from the air-duct clapboard is set, and the guide rail has been detachably arranged the second setting element;
After the complete installation of SVG reactive-load compensations is to designated position, the SVG reactive-load compensations are complete to be fixed on the second positioning member
Between part and the air-duct clapboard, and the SVG reactive-load compensations are complete is provided with seal member between the air-duct clapboard.
2. fixation kit according to claim 1, it is characterised in that:
The seal member is sponge sealing strip, and the sponge sealing strip is fixedly installed in the set of court of SVG reactive-load compensations
To the side of the air-duct clapboard.
3. fixation kit according to claim 2, it is characterised in that:
The inner face of the guide rail is resisted against the side of the air-duct clapboard.
4. fixation kit according to claim 3, it is characterised in that:
The fixation kit further includes the second supporting beam being installed on the air-duct clapboard, and first setting element passes through institute
The second supporting beam is stated to be installed on the air-duct clapboard.
5. fixation kit according to claim 4, it is characterised in that:
Second supporting beam is parallel with first supporting beam.
6. fixation kit according to any one of claims 1 to 5, it is characterised in that:
The material of first setting element is spring steel.
7. fixation kit according to any one of claims 1 to 5, it is characterised in that:
Second setting element is complete with the bolt of the guide rail to connect the SVG reactive-load compensations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721266525.5U CN207265417U (en) | 2017-09-29 | 2017-09-29 | A kind of SVG reactive-load compensations are complete to use fixation kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721266525.5U CN207265417U (en) | 2017-09-29 | 2017-09-29 | A kind of SVG reactive-load compensations are complete to use fixation kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207265417U true CN207265417U (en) | 2018-04-20 |
Family
ID=61919903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721266525.5U Active CN207265417U (en) | 2017-09-29 | 2017-09-29 | A kind of SVG reactive-load compensations are complete to use fixation kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207265417U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112769048A (en) * | 2019-11-05 | 2021-05-07 | 河南森源电气股份有限公司 | Low-voltage circuit breaker locking structure of switch cabinet for nuclear power |
-
2017
- 2017-09-29 CN CN201721266525.5U patent/CN207265417U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112769048A (en) * | 2019-11-05 | 2021-05-07 | 河南森源电气股份有限公司 | Low-voltage circuit breaker locking structure of switch cabinet for nuclear power |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207265417U (en) | A kind of SVG reactive-load compensations are complete to use fixation kit | |
CN102502080A (en) | Vibration damping box with adjustable rigidity and damping | |
CN208442968U (en) | A kind of air-conditioning installation support frame | |
CN206742321U (en) | A kind of mounting structure of battery modules bus-bar changeover base | |
CN210678669U (en) | Standby device storage device for power supply station | |
CN201869461U (en) | Case suitable for cabinet mounting and wall mounting | |
CN207491381U (en) | A kind of movable cabinet for carrier rocket TT&C system | |
CN101858944A (en) | Special container for large-sized transformer on-site test system | |
CN202216821U (en) | Clamp for vibration testing of vehicle-mounted stereo components | |
CN207624892U (en) | A kind of GPS antenna mounting structure for outdoor cabinet | |
CN201309399Y (en) | Skylight structure | |
CN201629931U (en) | Special container for site test system for large-size transformer | |
CN208939432U (en) | A kind of clamping fixture for positioning and installing frame of switch cabinet body | |
CN203771333U (en) | Lamp box and lamp box support | |
CN205677094U (en) | A kind of steel structure connecting member | |
CN204905686U (en) | Railway carriage or compartment body of outdoor type view formula van -type transformer substation | |
CN202295790U (en) | Vibration reduction box with adjustable stiffness damp | |
CN220016250U (en) | Anti-collision pressure compensation anti-collision flow valve | |
CN211196381U (en) | Automobile trunk support | |
CN220710984U (en) | Concatenation formula container for transformer substation | |
CN220673279U (en) | Portable cable duct support | |
CN206962405U (en) | A kind of Metro Cable mounting bracket | |
CN216891791U (en) | Switch structure and aerial track | |
CN205808815U (en) | A kind of test stand of composite board | |
CN205379233U (en) | A mounting rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 310030 room 402, 4th floor, building 2, 8 xiyuanjiu Road, Xihu District, Hangzhou City, Zhejiang Province Patentee after: Konstanz Electric Co.,Ltd. Address before: 310030 room 402, 4th floor, building 2, 8 xiyuanjiu Road, Xihu District, Hangzhou City, Zhejiang Province Patentee before: KONSTANZ ELECTRIC (HANGZHOU) Co.,Ltd. |