CN207263598U - Subgrade soils dry method and wet compaction test device - Google Patents
Subgrade soils dry method and wet compaction test device Download PDFInfo
- Publication number
- CN207263598U CN207263598U CN201721218482.3U CN201721218482U CN207263598U CN 207263598 U CN207263598 U CN 207263598U CN 201721218482 U CN201721218482 U CN 201721218482U CN 207263598 U CN207263598 U CN 207263598U
- Authority
- CN
- China
- Prior art keywords
- soil
- mould
- compacting
- compacted
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002689 soil Substances 0.000 title claims abstract description 75
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000005056 compaction Methods 0.000 title claims abstract description 10
- 239000004927 clay Substances 0.000 claims abstract description 13
- 238000005485 electric heating Methods 0.000 claims abstract description 9
- 238000010438 heat treatment Methods 0.000 claims abstract description 7
- 239000011521 glass Substances 0.000 claims abstract description 6
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000002474 experimental method Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000011020 pilot scale process Methods 0.000 description 2
- 238000007605 air drying Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Landscapes
- Sampling And Sample Adjustment (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses subgrade soils dry method and wet compaction test device, which includes sample original soil mould, heating clay model tool, compacted soil mould, electric heating wire, driving motor, screw rod, compacting base, contiguous block, compacting block, clump weight, spillway hole and test stand;Heat clay model tool and temperature control is carried out to the original soil in mould using electrically heated mode, the temperature in mould is ensured by electric heating wire;Original soil in sample original soil mould is used as with reference to control;Test the screw rod that soil is motor driven in compacted soil mould to drive, screw rod drives contiguous block, compacting block to carry out pressure to compacted soil die test soil and applies, and clump weight can adjust the pressure size of compacting block;Spillway hole can ensure that moisture content overflows when compacted soil die test soil is pressurized;The situation of change of three groups of experiment soil of the convenient observation of test stand made of hard glass material.
Description
Technical field
Subgrade soils dry method and wet compaction test device are the utility model is related to, belongs to road construction experimental technique field.
Background technology
Traditional subgrade soils Indoor Impaction Test generally hits reality using dry method, i.e.,:Nature soil sample is first dried
It is dry, then different water cut proportioning, shelving are carried out, finally carry out hitting reality.In some damp-heat area surroundings weathers, soil property and hydrology bar
Part is complicated, and the state of subgrade soils interior humidity changes with the change in time and space, under the influence of local climate environment, after work
Roadbed soil's water content can be adopted subgrade soils close to a kind of equilibrium state that the conditions such as local climate, soil property, the hydrology are adapted
With the more close this equilibrium state of wet compaction test, also more meet engineering reality.During roadbed site operation, usual roadbed
Soil's water content is higher compared to optimum moisture content, thus it is more in the case of, need during subgrade construction using it from
The method for so air-drying or drying, makes the reduction of its moisture content, it is exactly such a simulation process that wet method, which is hit real,.According to conventional research
Achievement understands, dry method and wet method hit the construction moisture content at real obtained optimum moisture content and scene also there is certain area
Not.It is distinguished and the scope of application is studied, it appears it is particularly important that.Each result of the test is subjected to longitudinal contrast at the same time, with
Meet that the sample soil under equal conditions compares.
Utility model content
The purpose of this utility model is that devising subgrade soils dry method and wet compaction test device, pass through the experimental rig
Effectively the sample soil under equal conditions can be compacted or be heated, to improve the construction quality of subgrade soils.
To achieve the above object, the technical solution adopted in the utility model fills for subgrade soils dry method and wet compaction test
Put, which includes sample original soil mould 1, heating clay model tool 2, compacted soil mould 3, electric heating wire 4, driving motor 5, spiral shell
Bar 6, compacting base 7, contiguous block 8, compacting block 9, clump weight 10, spillway hole 11 and test stand 12;It is former to heat clay model tool 2, sample
Clay model tool 1 and 3 three test moulds of compacted soil mould are arranged side by side in test stand 12;The both sides of compacted soil mould 3 are symmetrically set
There are two driving motors 5, driving motor 5 is connected with screw rod 6, and screw rod 6 is connected through a screw thread assembling with contiguous block 8;Contiguous block 8 with
Compacting block 9 connects, and compacting block 9 is arranged on the top of compacted soil mould 3, and the top of compacting block 9 is provided with clump weight 10, compacted soil
The bottom of mould 3 is equipped with compacting base 7, and 3 sidepiece of compacted soil mould at 7 top of compacting base is equipped with horizontal spillway hole 11;Electricity
Disposed inboard of the heater strip 4 along heating clay model tool 2.
Test stand 12 is made of hard glass material.
Compared with prior art, the utility model has the advantages that.
The heating clay model tool that the utility model is related to carries out temperature control using electrically heated mode to the original soil in mould,
Temperature in mould is ensured by electric heating wire;Original soil in sample original soil mould is used as with reference to control;Compacted soil mould pilot scale
The screw rod that soil is motor driven to be tested to drive, screw rod drives contiguous block, compacting block to carry out pressure to compacted soil die test soil and applies,
Clump weight can adjust the pressure size of compacting block;Spillway hole can ensure that moisture content overflows when compacted soil die test soil is pressurized
Go out;The situation of change of three groups of experiment soil of the convenient observation of test stand made of hard glass material.
Brief description of the drawings
Fig. 1 is the structure chart of the utility model.
Embodiment
As shown in Figure 1, subgrade soils dry method and wet compaction test device, which includes sample original soil mould 1, adds
Hometown mould 2, compacted soil mould 3, electric heating wire 4, driving motor 5, screw rod 6, compacting base 7, contiguous block 8, compacting block 9, match somebody with somebody
Pouring weight 10, spillway hole 11 and test stand 12;Heat 3 three clay model tool 2, sample original soil mould 1 and compacted soil mould test moulds
It is arranged side by side in test stand 12;The both sides of compacted soil mould 3 are arranged with two driving motors 5, driving motor 5 and screw rod 6
Connection, screw rod 6 are connected through a screw thread assembling with contiguous block 8;Contiguous block 8 is connected with compacting block 9, and compacting block 9 is arranged on compacted soil
The top of mould 3, the top of compacting block 9 are provided with clump weight 10, and the bottom of compacted soil mould 3 is equipped with compacting base 7, is compacted bottom
3 sidepiece of compacted soil mould at the top of seat 7 is equipped with horizontal spillway hole 11;Disposed inboard of the electric heating wire 4 along heating clay model tool 2.
Test stand 12 is made of hard glass material.
The heating clay model tool that the utility model is related to carries out temperature control using electrically heated mode to the original soil in mould,
Temperature in mould is ensured by electric heating wire;Original soil in sample original soil mould is used as with reference to control;Compacted soil mould pilot scale
The screw rod that soil is motor driven to be tested to drive, screw rod drives contiguous block, compacting block to carry out pressure to compacted soil die test soil and applies,
Clump weight can adjust the pressure size of compacting block;Spillway hole can ensure that moisture content overflows when compacted soil die test soil is pressurized
Go out;The situation of change of three groups of experiment soil of the convenient observation of test stand made of hard glass material.
Claims (2)
1. subgrade soils dry method and wet compaction test device, it is characterised in that:The experimental rig include sample original soil mould (1),
Heat clay model tool (2), compacted soil mould (3), electric heating wire (4), driving motor (5), screw rod (6), compacting base (7), connection
Block (8), compacting block (9), clump weight (10), spillway hole (11) and test stand (12);Heat clay model tool (2), sample original soil mould
(1) it is arranged side by side with (3) three test moulds of compacted soil mould in test stand (12);The both sides of compacted soil mould (3) are symmetrical
Equipped with two driving motors (5), driving motor (5) is connected with screw rod (6), and screw rod (6) is connected through a screw thread dress with contiguous block (8)
Match somebody with somebody;Contiguous block (8) is connected with compacting block (9), and compacting block (9) is arranged on the top of compacted soil mould (3), the top of compacting block (9)
Portion is provided with clump weight (10), and the bottom of compacted soil mould (3) is equipped with compacting base (7), the compacted soil being compacted at the top of base (7)
Mould (3) sidepiece is equipped with horizontal spillway hole (11);Disposed inboard of the electric heating wire (4) along heating clay model tool (2).
2. subgrade soils dry method according to claim 1 and wet compaction test device, it is characterised in that:Test stand (12) by
Hard glass material is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721218482.3U CN207263598U (en) | 2017-09-22 | 2017-09-22 | Subgrade soils dry method and wet compaction test device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721218482.3U CN207263598U (en) | 2017-09-22 | 2017-09-22 | Subgrade soils dry method and wet compaction test device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207263598U true CN207263598U (en) | 2018-04-20 |
Family
ID=61918734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721218482.3U Expired - Fee Related CN207263598U (en) | 2017-09-22 | 2017-09-22 | Subgrade soils dry method and wet compaction test device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207263598U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114674737A (en) * | 2022-04-02 | 2022-06-28 | 西南交通大学 | Roadbed filling compaction characteristic analysis device and method |
-
2017
- 2017-09-22 CN CN201721218482.3U patent/CN207263598U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114674737A (en) * | 2022-04-02 | 2022-06-28 | 西南交通大学 | Roadbed filling compaction characteristic analysis device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205826656U (en) | A kind of frozen soil freeze thawing laboratory testing rig | |
CN105784935B (en) | A kind of multi-functional ice-melt snow pavement test device and evaluation method | |
CN107063884A (en) | A kind of lower experimental provision and test method for evaluating porous asphalt pavement high-temperature behavior of multi- scenarios method effect | |
CN106485975B (en) | A kind of tunnel in cold area temperature field laboratory experiment system | |
CN106501089A (en) | Simulate the experimental rig of concrete hydraulic fracture and method under high hydraulic pressure | |
CN108169044A (en) | Composite recycled material road surface full scale structure antiscour experimental rig and test method | |
CN207263598U (en) | Subgrade soils dry method and wet compaction test device | |
CN111474323A (en) | Model test system for simulating soil slope collapse process | |
CN109440837A (en) | A kind of analog drying and watering cycle and the coefficient retaining wall model test apparatus of underground water and method | |
CN107796714A (en) | Simulate the asphalt mixture shearing strength tester of actual wheel load | |
CN203849117U (en) | Unsaturated soil side slope device for measuring soil deformation and suction | |
CN110132965A (en) | Coupled heat-moisture-stress acts on lower swelled ground external crack test device and application method | |
CN206292085U (en) | It is a kind of to simulate the maintenance mould that external load constrains soil expansion | |
CN108196039A (en) | Characteristic of crack and its simulator and method on overlay influence between broken block | |
CN106501099A (en) | Emulsified asphalt cold in place recycling compound high-temerature creep test method | |
CN205280481U (en) | Accuse temperature marshall hits real appearance | |
CN106680315A (en) | Compactness detection method of steel pipe concrete | |
CN104964836A (en) | Model test apparatus and method of simulating shield tunnel anti-buoyancy | |
CN104990839B (en) | A kind of sealing material permeability test device of mist containing sand | |
CN204027838U (en) | The Tire testing device on simulation hot environment road surface | |
CN202583011U (en) | Vibrating compacting forming machine | |
CN204177353U (en) | A kind of asphalt surface texture depth tester | |
CN107607471A (en) | The aqueous oilstone interface consolidation strength test method of bituminous paving | |
CN104330047A (en) | Surface structure depth tester and testing method for asphalt mixture | |
CN109507226A (en) | A kind of experimental rig and its test method of concrete bridge deck thermal method deicing or snow melting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |