CN207260740U - Board Fence structure - Google Patents
Board Fence structure Download PDFInfo
- Publication number
- CN207260740U CN207260740U CN201720844977.0U CN201720844977U CN207260740U CN 207260740 U CN207260740 U CN 207260740U CN 201720844977 U CN201720844977 U CN 201720844977U CN 207260740 U CN207260740 U CN 207260740U
- Authority
- CN
- China
- Prior art keywords
- tie
- board
- fence structure
- component
- bottom end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Fencing (AREA)
Abstract
The purpose of the application is to provide a kind of board Fence structure, including:Upper beam component, for being detachably connected with ceiling;Bottom end rail component, cooperates with upper beam component, for being detachably connected with floor;Several tie-beams, are arranged between upper beam component and bottom end rail component, and the both ends of each tie-beam are respectively detachably connected with upper beam component and bottom end rail component;Several reinforcing beams, are arranged between upper beam component and bottom end rail component, and each reinforcing beam is respectively detachably connected with each tie-beam.Wherein, the accommodation space for being used for installing isolation board is formed between each tie-beam and each reinforcing beam, upper beam component, bottom end rail component.Compared with prior art, the utility model board Fence structure can facilitate the disassembly and installation of user, and the board Fence structure possesses preferable fastness, can be not likely to produce and rock in production of machinery.
Description
Technical field
It the utility model is related to a kind of Fence structure, more particularly to a kind of board Fence structure.
Background technology
Toilet (Clean Room), also known as dust-free workshop, dust free room or clean room.The major function of toilet is interior
Contamination control, without toilet, pollution sensibility part can not can manufacture.
At present, toilet's generally use board Fence structure is constructed and arranged, to form closed clean room.So
And in the prior art, board Fence structure is all that the square tube of lightweight is raw material, and using welding, the individually side such as drilling, spraying
Formula, builds general frame, and is sealed by silica gel, its installation is complex, and integrated artistic is more coarse.Also, machine
Platform Fence structure also has the following disadvantages, such as shake because fastness is relatively low, easily in production of machinery when produce and rock, be not easy
Dismounting, poor sealing etc..
Utility model content
The shortcomings that for the above-mentioned prior art or deficiency, the technical problem to be solved by the present invention is to provide a kind of board
Fence structure, facilitates the disassembly and installation of user, and it possesses preferable fastness, and rolling can be not likely to produce in production of machinery
It is dynamic.
In order to solve the above technical problems, the utility model provides a kind of board Fence structure, including:
Upper beam component, for being detachably connected with ceiling;
Bottom end rail component, cooperates with the upper beam component, for being detachably connected with floor;
Several tie-beams, are arranged between the upper beam component and the bottom end rail component, and the two of each tie-beam
End is respectively detachably connected with the upper beam component and the bottom end rail component;
Several reinforcing beams, are arranged between the upper beam component and the bottom end rail component, and each reinforcing beam is divided equally
It is not detachably connected with each tie-beam;
Wherein, formed between each tie-beam and each reinforcing beam, the upper beam component, the bottom end rail component and be used to install
The accommodation space of isolation board.
Compared with prior art, the board Fence structure of the utility model using the above structure, due to its be by respectively with
Upper beam component and bottom end rail component that ceiling and floor are detachably connected, be removably arranged on upper beam component and lower horizontal stroke
Tie-beam between beam assembly is formed, hence in so that user easily can carry out it assembly and disassembly, and since it is also logical
Cross multiple reinforcing beams to be connected with each tie-beam, therefore ensure that the fastness of board Fence structure, and reinforcing beam and connection can be passed through
Mutual constraint between beam, prevents board Fence structure is produced in production of machinery from rocking.
Further, in order to meet the assembly or disassembly in practical application, board Fence structure is ensured in an assembling process
Sealing performance, the upper beam component includes:It is the day rail that is detachably connected with the ceiling, N number of removable with the day rail
The upper beam of connection, the upper sealing strip being arranged between the day rail and the upper beam are unloaded, and the N is positive integer;It is described
Bottom end rail component includes:Bottom end rails that the track that is detachably connected with the floor, M are detachably connected with the track, set
The lower sealing strip between the day rail and the upper beam is put, and the M is positive integer;Wherein, the upper beam with it is described
Bottom end rail cooperates, and position relationship corresponds.
Further, in order to while user assembled and dismounting is facilitated, be lifted in board Fence structure between each component
Bonding strength, between each tie-beam, each reinforcing beam, the upper beam component, the bottom end rail component pass through several connection
Part is detachably connected;Wherein, each tie-beam is mutually perpendicular to the upper beam component and the bottom end rail component, and each tie-beam
It is mutually connected vertically with corresponding reinforcing beam by connector.
Further, each tie-beam and the distribution of each reinforcing beam equi-spaced apart, and formed single by the identical space of multiple sizes
The accommodation space that member collectively forms;Also, the board Fence structure further includes the isolation being arranged on every in the unit of space
Plate.So that the overall distribution of force of board Fence structure is more uniform, thus further it is unlikely to deform, and due to passing through this
Kind spaced mode so that it is identical to form the size and shape of the space unit of accommodation space, user-friendly equal
The isolation board of specification is installed, and reduces production cost and installation difficulty.At the same time so that the stress of each isolation board is more equal
It is even, it is not likely to produce rupture.
Further, the inclined plate that the connector is two connection sheets connected vertically, is connected respectively with two connection sheets;
Wherein, each connection sheet offers the pilot hole for being inserted into fastener, and the length direction of the pilot hole is parallel to described
The length direction of connection sheet.So as to while convenient for assembly and dismounting, lift the strong degree of connector, and connecting it
During be not susceptible to deformation so that the overall structure of board Fence structure is not susceptible to deformation.
Further, isolation board is easily mounted and dismounted for the ease of user, the board Fence structure is also
Including:Multiple the first cover boards being detachably connected with the tie-beam and the reinforcing beam, for covering the tie-beam or adding
Any one side wall of brutal, and the fixed isolation board;Wherein, the tie-beam and the reinforcing beam are opened for any one side wall
If reeded aluminium alloy extrusions, and first cover board includes:The aluminium alloy extrusions side wall is coordinated to engage the isolation
The horizontal part of plate, be connected and be used for the bending part being connected with the groove with the horizontal part;The shape of the bending part
It is identical with the cross sectional shape of the groove, and size is adapted, while the horizontal part is in the bending part and the groove card
When closing connection, the gap for being used for installing the isolation board is formed between the side wall of the aluminium alloy extrusions.
Further, when the M and the N are all higher than 1, and at least two upper beams are mutually perpendicular to and form turnover
Qu Shi, there is a tie-beam and the upper beam vertical connection in the break over region in the board Fence structure;Also, the board
Fence structure further includes the second cover board, is connected with the tie-beam in the break over region, for covering in the bonding pad
The lateral wall of tie-beam, and cooperate with it, to fix two isolation in being located at respectively in orthogonal two regions
Plate.To fix two isolation boards in being located at respectively in orthogonal two regions, so that board Fence structure can be realized
Assembly connection beam and linking transition during sound panel, ensure its overall tightness in break over region.
Further, second cover board includes:It is mutually connected vertically and integrally formed two the first cover boards, and each
Bending part on one cover board when second cover board is bonded to each other, groove corresponding with two side adjacent in tie-beam
Synchronous matching connects.
Further, when the M and the N are all higher than 1, and at least two upper beams are mutually perpendicular to and form turnover
Qu Shi, have in the board Fence structure head ends of two tie-beams respectively with two connected vertically in the break over region upper horizontal strokes
Beam vertical connection, and its tail end while is each other respectively with corresponding and orthogonal two bottom end rail vertical connections
It is disposed adjacent, and in orthogonal two regions in the break over region;The board Fence structure further includes:3rd lid
Plate, respectively with the break over region two tie-beams be connected, for cover two tie-beams in the break over region it
Between two side adjacent to each other, and cooperate with it, with the fixed isolation board being located at respectively in orthogonal two plane.From
And linking transition when can realize assembly connection beam in the break over region of board Fence structure and sound panel, and ensure that it is overall close
Feng Xing.
Further, the 3rd cover board includes:It is mutually connected vertically and integrally formed two the first cover boards, and each
When two tie-beams of bending part on one cover board in the 3rd cover board and the break over region are bonded to each other, respectively with two
The synchronous matching of corresponding groove connects on two side adjacent to each other between tie-beam.
Brief description of the drawings
By reading the detailed description made to non-limiting example made with reference to the following drawings, the application's is other
Feature, objects and advantages will become more apparent upon:
Fig. 1:The structure diagram of board Fence structure in the utility model first embodiment;
Fig. 2:Schematic cross-section in Fig. 1 at B-B;
Fig. 3:Schematic cross-section in Fig. 1 at A-A;
Fig. 4:Close-up schematic view in Fig. 2 shown in E;
Fig. 5:Close-up schematic view in Fig. 2 shown in F;
Fig. 6:Close-up schematic view in Fig. 2 shown in G;
Fig. 7:Structure diagram when tie-beam is connected with reinforcing beam;
Fig. 8:Schematic diagram of the section in the second embodiment of the utility model in Fig. 1 at B-B;
Fig. 9:Close-up schematic view in Fig. 8 shown in C;
Figure 10:Schematic diagram of the section in the 3rd embodiment of the utility model in Fig. 1 at B-B;
Figure 11:Close-up schematic view in Figure 10 shown in D;
Description of reference numerals:Upper beam -1;Bottom end rail -2;Tie-beam -3;Reinforcing beam -4;Connector -5;Isolation board -6;The
One cover board -7;Second cover board -8;3rd cover board -9;Its rail -10;Track -11;Upper sealing strip -12;Lower sealing strip -13;Connection
Piece -51;Inclined plate -52;Pilot hole -53;Bending part -71;Horizontal part -72;Headed self-tapping self-drilling screw -14;Plastic layer -15.
Embodiment
Make furtherly below with reference to the technique effect of design of the attached drawing to the utility model, concrete structure and generation
It is bright, to be fully understood from the purpose of this utility model, feature and effect.
As shown in Figure 1, the first embodiment of the utility model provides a kind of board Fence structure, mainly by upper beam group
Part, bottom end rail component, several tie-beams 3, several reinforcing beams 4 are formed.Wherein, upper beam component detachably connects with ceiling
Connect.Bottom end rail component, cooperates with upper beam component, and is detachably connected with floor.
Also, each tie-beam 3 is arranged between upper beam component and bottom end rail component, and its both ends respectively with upper beam group
Part and bottom end rail component are detachably connected.Meanwhile each reinforcing beam 4, it is arranged between upper beam component and bottom end rail component, and with
Each tie-beam 3 is detachably connected.Wherein, formd between each tie-beam 3 and each reinforcing beam 4, upper beam component, bottom end rail component
For installing the accommodation space of isolation board 6, therefore, in practical applications, user can install the isolation boards such as glass, composite plate 6
In the accommodation space of board Fence structure, ensure the cleaning of clean indoor environment, prevent dust in external environment condition etc. into
Enter indoor and pollute.
Board Fence structure using the above structure, due to its be detachably connected by respectively with ceiling and floor it is upper
Transverse beam assembly and bottom end rail component, dismountable tie-beam 3 being arranged between upper beam component and bottom end rail component are formed, because
This causes user easily to carry out assembly and disassembly to it, and since it is also connected by multiple reinforcing beams 4 and each tie-beam 3
Connect, therefore ensure that the fastness of board Fence structure, and machine can be prevented by the mutual constraint between reinforcing beam 4 and tie-beam 3
Platform Fence structure is produced in production of machinery and rocked.
Specifically, as shown in Figures 2 to 6, in order to meet the assembly or disassembly in practical application, board Fence structure is ensured
Sealing performance in an assembling process, upper beam component are mainly day rail 10, the multiple and day by being detachably connected with ceiling
Upper beam 1 that rail 10 is detachably connected, the upper sealing strip 12 being arranged between day rail 10 and upper beam are formed.Correspondingly, such as Fig. 4
Shown in Fig. 5, bottom end rail component is mainly detachably connected down by the track 11, the multiple and track 11 that are detachably connected with floor
Crossbeam 2, the lower sealing strip 13 being arranged between day rail 10 and upper beam are formed.Also, upper beam 1 and 2 phase interworking of bottom end rail
Close, and position relationship corresponds.
From Fig. 1 and Fig. 7, in order to while user assembled and dismounting is facilitated, lift each portion in board Fence structure
Bonding strength between part, each tie-beam 3 are connected with each other by connector 5 and each reinforcing beam 4.Also, in the present embodiment, make
For a kind of preferable assembly method, each tie-beam 3 is mutually perpendicular to ceiling and floor, and each tie-beam 3 and corresponding reinforcement
Beam 4 is mutually connected vertically by connector 5.Meanwhile each tie-beam 3 and the distribution of 4 equi-spaced apart of each reinforcing beam, and formed by multiple
The above-mentioned accommodation space that the identical space unit of size collectively forms.Wherein, each tie-beam 3 is along length direction of upper beam 1 etc.
Away from interval setting, each reinforcing beam 4 is arranged at intervals along the length direction of tie-beam 3, so that the overall stress of board Fence structure
Distribution is more uniform, thus is further unlikely to deform, and due to passing through this spaced mode so that form and accommodate sky
Between space unit size and shape it is identical, the isolation board 6 of user-friendly equivalent specifications is installed, and reduces production
Cost and installation difficulty.At the same time so that the stress of each isolation board 6 is more uniform, is not likely to produce rupture.
As shown in Figure 7, above-mentioned connector 5 mainly by two connection sheets 51 connected vertically, respectively with two connection sheets 51
The inclined plate 52 of connection is formed.Wherein, each connection sheet 51 is used for the surface for being adjacent to tie-beam 3 or reinforcing beam 4, and offers and be used for
The pilot hole 53 of fastener is inserted into, and the length of pilot hole 53 is parallel to the length direction of connection sheet 51.Therefore, in practical application
When, corresponding fastener, such as headed self-tapping self-drilling screw 14 can be inserted into corresponding pilot hole 53, realize connection sheet 51 and tie-beam
3 or reinforcing beam 4 on be fixedly connected, so as to fulfill being fixedly connected between tie-beam 3 and reinforcing beam 4.Simultaneously because connector 5
In two connection sheets 51 be to be connected by inclined plate 52, therefore strong degree is higher, and deformation is not susceptible in connection procedure so that
The overall structure for obtaining board Fence structure is not susceptible to deformation.
Further, since the pilot hole 53 opened up in connection sheet 51 is preferably bar hole, and its length direction is parallel to connection
The length direction of piece 51, therefore may be such that user selects suitable position insertion fastener, lead to so as to further facilitate user
Cross 5 assembly connection beam 3 of connector and reinforcing beam 4.
In detail, as shown in Figures 1 to 7, isolation board 6 is easily mounted and dismounted for the ease of user, as
Preferably, tie-beam 3 and reinforcing beam 4 open up reeded aluminium alloy extrusions, also, board Fence structure for any one side wall
Further include:Multiple the first cover boards 7 to cooperate with tie-beam 3 and reinforcing beam 4, wherein, which, which is used to cover, connects
Any one side wall of beam 3 and reinforcing beam 4, and fixed above-mentioned isolation board 6.
As shown in B-B sections in Fig. 4, the first cover board 7 is mainly by horizontal part 72,71 structure of bending part being connected with horizontal part 72
Into, also, the first cover board 7 in Fig. 1 shown in A-A sections is also to use same structure.Wherein, in practical application, bending
Portion 71 can be on side wall corresponding with aluminium alloy extrusions groove be connected, and horizontal part 72 engages in bending part 71 with groove
During connection, the gap for being used for installing isolation board 6 is formed between the side wall of aluminium alloy extrusions, to coordinate aluminium alloy extrusions side wall
Engage isolation board 6.Meanwhile during actual design and assembling, it may be such that horizontal part 72 is completely covered by aluminium alloy extrusions
Side wall, to increase the contact area between horizontal part 72, the side wall of aluminium alloy extrusions and isolation board 6, lift board fence knot
The overall installation fastness to isolation board 6 of structure.
Also, in the present embodiment, as preference, the cross sectional shape phase of the cross sectional shape of bending part 71 and corresponding groove
Together, and size is adapted, so that bending part 71 can be preferably inserted into the groove of aluminium alloy extrusions, and by multiple self tappings certainly
Auger shell silk 14 realizes consolidating between bending part 71 and aluminium alloy extrusions through the cell wall of bending part 71 and the groove of aluminium alloy extrusions
Fixed connection, and need not be punched in advance.Wherein, can be by headed self-tapping self-drilling screw 14 along the first cover board 7 during assembling
Equidistant arrangement is set length direction successively.Meanwhile the bending part 71 uses this kind of structure, the weight of the first cover board 7 can be mitigated, prevented
Only the self gravitation of the first cover board 7 is excessive and cause the phenomenon of deformation.Obviously, in the present embodiment, the material of the first cover board 7 is height
The aluminum alloy material of intensity, while weight is mitigated, to ensure its intensity.Also, the cross sectional shape in the first cover board is preferred
For "Ji" type, it is engaged with the cross sectional shape with aluminium alloy extrusions in the present embodiment, and in practical applications, in the first cover board
Cross sectional shape can also be other shapes, this is not made specifically to limit for the present embodiment and explanation.
It is used in combination in addition, above-mentioned board Fence structure further includes to be detachably connected and be bonded along its length with bending part 71
In the plastic layer 15 for covering in bending part 71, while to ensure to protect the fastener being arranged on bending part 71,
It is covered, keeps the clean and tidy and beautiful of board Fence structure entirety.
In addition, it is necessary to explanation, in the present embodiment, above-mentioned tie-beam 3 and reinforcing beam 4 using equivalent specifications and have
The aluminium alloy extrusions of standby high intensity.In order to which user is assembled, and ensure that the intensity of aluminium alloy extrusions can meet actual design
Demand.
Also, from Fig. 1 and Fig. 5, above-mentioned each first cover board 7 can use different length, in order to 3 He of tie-beam
Reinforcing beam 4 is assembled, wherein, as preference, for the tie-beam 3 for the beam 3 that is connected the first cover board 7 length compared with
Long, its distance is equal to the distance between upper rail and lower rail.And the length of the first cover board 7 of the reinforcing beam 4 that is used to being connected is shorter,
Its distance is equal to the distance between two adjacent tie-beams 3, so that the first cover board 7 can carry out glass plate comprehensive patch
Close, ensure the sealing performance of board Fence structure entirety.
The second embodiment of the utility model provides a kind of board Fence structure, and the present embodiment is implemented to above-mentioned first
The further improvement of example, it is improved in that as shown in Figure 8 and Figure 9, it is in the present embodiment, upper in board Fence structure
Transverse beam assembly is made of multiple upper beams 1, correspondingly, bottom end rail component is also made of multiple bottom end rails 2, and board fence knot
At least two upper beams 1 are mutually perpendicular to and form break over region in structure, i.e., corresponding and so on, with the two 1 phases of upper beam
Corresponding bottom end rail 2 be also be mutually perpendicular to, the day rail 10 that is detachably connected with upper beam component and removable with bottom end rail component
When unloading that corresponding part is also vertical connection in the track 11 of connection.Have in board Fence structure in a tie-beam 3 and break over region
1 vertical connection of upper beam.Therefore, in the present embodiment, board Fence structure further includes the second cover board 8, in break over region
Tie-beam 3 is connected, for covering the lateral wall of the tie-beam 3 in bonding pad, i.e., at the external corner of board Fence structure, and with
It cooperates, to fix two isolation boards 6 in being located at respectively in orthogonal two regions, so as to can realize that board encloses
Assembly connection beam 3 and linking transition during sound panel, ensure its overall tightness in the break over region of column structure.
Specifically, above-mentioned second cover board 8 is mainly by being mutually connected vertically and 7 structure of integrally formed two the first cover boards
Into and the bending part 71 on each first cover board 7 is when the second cover board 8 is bonded to each other, and right on two side adjacent in tie-beam 3
The groove synchronous answered is connected.Also, in practical set, the grade fastener of headed self-tapping self-drilling screw 14 can be used, by above-mentioned
Assembly method in first embodiment, the groove of each bending part 71 and tie-beam 3 is fixed together, and is used so as to convenient
Family is to the assembly or disassembly between the tie-beam 3 in the second cover board 8 and break over region.Similarly, further include and be arranged in the present embodiment
Each bending part 71 is detachably connected, and is bonded and is used for the plastic layer 15 for covering in bending part 71 along its length, with reality
The now purpose same with above-described embodiment.Meanwhile in the present embodiment, as a kind of preferable mode, form the second cover board 8
Two the first cover boards 7 are symmetrical arranged using the diagonal of the second cover board 8 as symmetry axis.
It is detachably connected and is bonded along its length simultaneously with each bending part 71 in addition, above-mentioned board Fence structure is further included
It is same to ensure to protect the fastener being arranged on bending part 71 for covering in the plastic layer 15 of bending part 71
When, it is covered, keeps the clean and tidy and beautiful of board Fence structure entirety.
The 3rd embodiment of the utility model provides a kind of board Fence structure, the present embodiment and above-mentioned second embodiment
Roughly the same, its difference is, as shown in Figure 10 and Figure 11, there is two in the break over region referred in above-mentioned second embodiment
Tie-beam 3 in the present embodiment, its head end respectively with two upper beams connected vertically, 1 vertical connection in break over region, and its tail
End respectively with corresponding and 2 vertical connection of orthogonal two bottom end rails, while each other to be disposed adjacent, and positioned at turning
In folding area in orthogonal two regions, to form at the inner corner trim of board Fence structure.Therefore, board Fence structure also wraps
Include:3rd cover board 9, is connected with two tie-beams 3 in break over region respectively, for covering two tie-beams in break over region
Two side adjacent to each other between 3, i.e., at the inner corner trim of board Fence structure, and cooperate with it, is located at phase respectively with fixation
The mutually isolation board 6 in two vertical planes.So as to realize assembly connection beam 3 and sound insulation in the break over region of board Fence structure
Linking transition during plate, and ensure its overall tightness.
Specifically, the 3rd cover board 9 is mainly by being mutually connected vertically and integrally formed two the first cover boards 7 are formed, and respectively
When two tie-beams 3 of bending part 71 on first cover board 7 in the 3rd cover board 9 with break over region are bonded to each other, respectively with this turn
The synchronous matching of corresponding groove connects on two side adjacent to each other between two tie-beams 3 in folding area.Also, in actual dress
Timing, can use the grade fastener of headed self-tapping self-drilling screw 14, by the assembly method in above-mentioned first embodiment, by each bending part 71
It is fixed together with the groove of corresponding tie-beam 3, so as to facilitate user to being located in the 3rd cover board 9 and break over region
The assembly or disassembly between two tie-beams 3 at inner corner trim.Similarly, further include that to be arranged on each bending part 71 removable in the present embodiment
Connection is unloaded, and is bonded and is used for the plastic layer for covering in bending part 71 along its length, it is same with above-described embodiment to realize
The purpose of sample.Meanwhile in the present embodiment, as a kind of preferable mode, form two the first cover boards 7 of the 3rd cover board 9 with
The diagonal of second cover board 8 is symmetrical arranged for symmetry axis.
It is detachably connected and is bonded along its length simultaneously with each bending part 71 in addition, above-mentioned board Fence structure is further included
It is same to ensure to protect the fastener being arranged on bending part 71 for covering in the plastic layer 15 of bending part 71
When, it is covered, keeps the clean and tidy and beautiful of board Fence structure entirety.
The fourth embodiment of the utility model provides a kind of board Fence structure, this fourth embodiment is to above-mentioned second
The further improvement of embodiment or 3rd embodiment, it is improved in that break over region in the present embodiment is both comprising above-mentioned the
At external corner in one embodiment, also comprising the inner corner trim in above-mentioned second embodiment at, therefore, board Fence structure in the present embodiment
The second cover board 8 for being used for being connected to the tie-beam 3 at external corner is included, also includes and is used for two tie-beams at inner corner trim
3 the 3rd cover boards 9 being connected, to realize transition and linkage of the board Fence structure at its inner corner trim and external corner, and ensure that its is whole
Body leakproofness.
Above example is only to illustrate the technical solution of the utility model and non-limiting, reference only to preferred embodiment pair
The utility model is described in detail.It will be understood by those of ordinary skill in the art that can be to the technology of the utility model
Scheme is modified or equivalent substitution, without departing from the spirit and scope of technical solutions of the utility model, should all cover in this reality
With new right.
Claims (10)
- A kind of 1. board Fence structure, it is characterised in that including:Upper beam component, for being detachably connected with ceiling;Bottom end rail component, cooperates with the upper beam component, for being detachably connected with floor;Several tie-beams, are arranged between the upper beam component and the bottom end rail component, and the both ends of each tie-beam are equal It is detachably connected respectively with the upper beam component and the bottom end rail component;Several reinforcing beams, are arranged between the upper beam component and the bottom end rail component, and each reinforcing beam respectively with Each tie-beam is detachably connected;Wherein, formed to be used to install between each tie-beam and each reinforcing beam, the upper beam component, the bottom end rail component and isolated The accommodation space of plate.
- 2. board Fence structure according to claim 1, it is characterised in that the upper beam component includes:With the day Day rail that card is detachably connected, N number of upper beam being detachably connected with the day rail, be arranged on the day rail and the upper horizontal stroke Upper sealing strip between beam, and the N is positive integer;The bottom end rail component includes:The track that is detachably connected with the floor, M are detachably connected down with the track Crossbeam, the lower sealing strip being arranged between the day rail and the upper beam, and the M is positive integer;Wherein, the upper beam cooperates with the bottom end rail, and position relationship corresponds.
- 3. board Fence structure according to claim 1, it is characterised in that each tie-beam, each reinforcing beam, the upper beam It is detachably connected between component, the bottom end rail component by several connectors;Wherein, each tie-beam is mutually perpendicular to the upper beam component and the bottom end rail component, and each tie-beam with it is corresponding Reinforcing beam is mutually connected vertically by connector.
- 4. board Fence structure according to claim 3, it is characterised in that each tie-beam and each reinforcing beam equi-spaced apart point Cloth, and form the accommodation space collectively formed by the identical space unit of multiple sizes;Also, the board Fence structure Further include the isolation board being arranged on every in the unit of space.
- 5. board Fence structure according to claim 3, it is characterised in that the connector is two companies connected vertically Contact pin, the inclined plate being connected respectively with two connection sheets;Wherein, each connection sheet offers the pilot hole for being inserted into fastener, and the length direction of the pilot hole parallel to The length direction of the connection sheet.
- 6. board Fence structure according to claim 2, it is characterised in that the board Fence structure further includes:It is multiple The first cover board being detachably connected with the tie-beam and the reinforcing beam, for covering any of the tie-beam or reinforcing beam One side wall, and the fixed isolation board;Wherein, the tie-beam and the reinforcing beam open up reeded aluminium alloy extrusions for any one side wall, and described the One cover board includes:Coordinate the aluminium alloy extrusions side wall to engage the horizontal part of the isolation board, be connected simultaneously with the horizontal part For the bending part being connected with the groove;The shape of the bending part is identical with the cross sectional shape of the groove, and size is adapted, while the horizontal part is in institute When stating bending part and the groove and being connected together, formed between the side wall of the aluminium alloy extrusions and be used to the isolation board be installed Gap.
- 7. board Fence structure according to claim 6, it is characterised in that when the M and the N are all higher than 1, and extremely When rare two upper beams are mutually perpendicular to and form break over region, there are a tie-beam and the break over region in the board Fence structure Interior upper beam vertical connection;Also, the board Fence structure further includes the second cover board, it is connected with the tie-beam in the break over region, for hiding The lateral wall of the tie-beam in the bonding pad is covered, and is cooperated with it, orthogonal Liang Ge areas are located at fixation respectively Two isolation boards in domain.
- 8. board Fence structure according to claim 7, it is characterised in that second cover board includes:The company of being mutually perpendicular to Connect and integrally formed two the first cover boards, and the bending part on each first cover board is when second cover board is bonded to each other, with The synchronous matching of corresponding groove connects on adjacent two side in tie-beam.
- 9. board Fence structure according to claim 6, it is characterised in that when the M and the N are all higher than 1, and extremely When rare two upper beams are mutually perpendicular to and form break over region, there is the head end difference of two tie-beams in the board Fence structure With two upper beam vertical connections connected vertically in the break over region, and its tail end respectively with it is corresponding and orthogonal two A bottom end rail vertical connection, while each other to be disposed adjacent, and positioned at orthogonal two regions in the break over region It is interior;The board Fence structure further includes:3rd cover board, is connected with two tie-beams in the break over region respectively, uses The two side adjacent to each other between two tie-beams in the break over region are covered, and cooperate with it, distinguished with fixed Isolation board in orthogonal two plane.
- 10. board Fence structure according to claim 9, it is characterised in that the 3rd cover board includes:The company of being mutually perpendicular to Connect and integrally formed two the first cover boards, and the bending part on each first cover board is in the 3rd cover board and the break over region Two tie-beams when being bonded to each other, respectively on two side adjacent to each other between two tie-beams corresponding groove it is synchronous It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844977.0U CN207260740U (en) | 2017-07-12 | 2017-07-12 | Board Fence structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844977.0U CN207260740U (en) | 2017-07-12 | 2017-07-12 | Board Fence structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207260740U true CN207260740U (en) | 2018-04-20 |
Family
ID=61926581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720844977.0U Active CN207260740U (en) | 2017-07-12 | 2017-07-12 | Board Fence structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207260740U (en) |
-
2017
- 2017-07-12 CN CN201720844977.0U patent/CN207260740U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284779B (en) | A kind of bright hidden frame connection auxiliary frame of curtain wall, curtain wall system and its construction method | |
CN207776110U (en) | A kind of dismountable steel house | |
CN103437475A (en) | Construction method of architectural structure gypsum board with paper surface hung ceiling | |
CN207314605U (en) | A kind of fish scale-shaped cell curtain wall and building | |
CN207260740U (en) | Board Fence structure | |
CN206337686U (en) | A kind of bright hidden frame connection auxiliary frame of curtain wall and its curtain wall system | |
CN107965161A (en) | A kind of packaging board house | |
CN201614659U (en) | Scalable split-mounting container type prefabricated house | |
CN207314613U (en) | Curtain wall briquetting | |
CN203066309U (en) | Hidden frame heat-insulation curtain wall | |
CN108661179A (en) | A kind of container house bottom | |
CN207314615U (en) | A kind of horizontal bright perpendicular hidden glass curtain wall | |
CN207332054U (en) | Concealed curtain wall joint structure | |
CN209990001U (en) | Assembled building curtain | |
CN207107451U (en) | Container special-purpose section | |
CN107152108A (en) | A kind of assembling type partition wall system | |
CN207314612U (en) | It is a kind of can indoor replacement curtain wall joint structure and curtain wall | |
CN208486407U (en) | A kind of partition wall board of ease of assembly | |
CN208830479U (en) | A kind of tarpaulin composite plate and its connection structure | |
CN207296086U (en) | All steel section bar cassette partition-type structures | |
CN207453218U (en) | The node structure of frame concealed curtain wall bottom plate and frame concealed curtain wall | |
CN207332056U (en) | Full concealed frame glass curtain wall | |
CN207513040U (en) | Waterproof heat insulating roof | |
CN209620355U (en) | Glass curtain wall long-span beam connection structure | |
CN206428997U (en) | Container-type flowing fast food room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |