CN207249387U - Enterprise's energy efficiency management terminal - Google Patents

Enterprise's energy efficiency management terminal Download PDF

Info

Publication number
CN207249387U
CN207249387U CN201721274920.8U CN201721274920U CN207249387U CN 207249387 U CN207249387 U CN 207249387U CN 201721274920 U CN201721274920 U CN 201721274920U CN 207249387 U CN207249387 U CN 207249387U
Authority
CN
China
Prior art keywords
controller
ammeter
enterprise
electrically connected
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721274920.8U
Other languages
Chinese (zh)
Inventor
刘国珍
孟超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Anxiang Technology Development Co Ltd
Original Assignee
Jiangxi Anxiang Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Anxiang Technology Development Co Ltd filed Critical Jiangxi Anxiang Technology Development Co Ltd
Priority to CN201721274920.8U priority Critical patent/CN207249387U/en
Application granted granted Critical
Publication of CN207249387U publication Critical patent/CN207249387U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

It the utility model is related to energy efficiency management,Especially a kind of enterprise's energy efficiency management terminal,In order to solve the problems, such as existing management terminal, there are waist performance,One kind is provided and is directed to enterprise,Make the management terminal of performance optimization,A kind of enterprise's energy efficiency management terminal,Including ammeter,Power distributor,Controller and terminating machine,The ammeter includes total ammeter and divides ammeter,Total ammeter house lead in side is electrically connected with external electrical network and internal electric network,User side and power distributor are electrically connected,The timing controller of control power distributor work is electrically connected with the power distributor,The power distributor and multiple user groups are electrically connected,It is in parallel between user group,The user group has what is be sequentially connected electrically to divide ammeter,Controller and power unit,The sensor of control controller work is electrically connected with the controller,Script is allowed only to make the terminating machine of Data acquisition and issuance,Participate in enterprise's control,Each control with electric unit is accurately completed by its powerful data volume.

Description

Enterprise's energy efficiency management terminal
Technical field
Energy efficiency management is the utility model is related to, especially a kind of enterprise's energy efficiency management terminal.
Background technology
Energy efficiency management is to allow enterprise, user to manage the electricity consumption feelings of oneself enterprise by building electric energy fine-grained management platform Condition, enterprise carry out the technical measures such as scrap build, global optimization by electric energy fine-grained management platform, improve itself electricity consumption feelings Condition, so as to achieve the purpose that energy-saving and emission-reduction, power saving saves money reduces cost;Under government regulation and policy support, take effective Excitation and guiding measure and suitable function mode, are assisted jointly by power grid enterprises, energy services enterprise, power consumer etc. Power, improves terminal power consumption efficiency and changes power mode, power consumption and electric power are reduced while meeting equally to use Electricity Functional Demand, economizes on resources and environmental protection to reach, realizes the energy services that social benefit is optimal, each side is benefited, cost is minimum, right For enterprise, power consumption can be reduced by implementing energy efficiency management, reduced electric cost expenditure, reduced the operating cost of enterprise, be improved Product competitiveness, energy efficiency management terminal on sale is to accomplish collecting and analyzing data for data mostly on the market, not complete Complete participates in corporate operation, and the performance of management terminal, which exists, to be wasted.
Utility model content
The technical problems to be solved in the utility model is:In order to solve existing management terminal asking there are waist performance A kind of topic, there is provided management terminal for being directed to enterprise, making performance optimization.
Technical solution is used by the utility model solves its technical problem:A kind of enterprise's energy efficiency management terminal, bag Include ammeter, power distributor, controller and terminating machine, the ammeter includes total ammeter and divides ammeter, total ammeter house lead in side with External electrical network and internal electric network are electrically connected, user side and power distributor are electrically connected, and are electrically connected with the power distributor The timing controller of power distributor work is controlled, the power distributor and multiple user groups are electrically connected, between user group simultaneously Connection, the user group have what is be sequentially connected electrically to divide ammeter, controller and power unit, control are electrically connected with the controller The sensor of controller work.
In order to facilitate control, the controller is default value controller.
As preference, the sensor is temperature sensor, humidity sensor, gas concentration sensor, infrared ray pass Sensor, current sensor, voltage sensor or flow sensor.
The beneficial effects of the utility model are enterprise's energy efficiency management terminals of the utility model, allow and only do data originally Collection and the terminating machine of analysis, participate in enterprise's control, each use are accurately completed by the powerful data volume of terminating machine The control of electric unit, saves manually and does not increase too many workload for terminating machine, energy is reduced from use habit The waste in source, for enterprise while efficiency greatly promotes, also a saving electric cost.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the simple circuit figure of the utility model.
Embodiment
The utility model is described in further detail presently in connection with attached drawing.These attached drawings are simplified schematic diagram, Only illustrate the basic structure of the utility model in a schematic way, therefore it only shows the composition related with the utility model.
A kind of enterprise's energy efficiency management terminal shown in Fig. 1, including ammeter, power distributor, controller and terminating machine, eventually Terminal control controller work, terminating machine recording electrical meter reading, terminating machine record electricity distributor working condition, terminating machine are selected Common PC hosts;The ammeter includes total ammeter and divides ammeter, total ammeter house lead in side and external electrical network and internal electric network electricity Connection, user side and power distributor are electrically connected, and external electrical network is exactly municipal administration power supply, and internal electric network is the power generation of enterprise oneself Device, such as solar power generation or electrical power generators, control power distributor work is electrically connected with the power distributor Timing controller, specifically timing controller have year, month, day, hour, min and second, accurately show current time, power distributor The power consumption of each user group is distributed according to the residing time, even shuts off the power supply of certain user group, the power distributor and multiple User group is electrically connected, and is connected in parallel between each user group, each user group have be sequentially connected electrically divide ammeter, controller and Power unit, the sensor of control controller work is electrically connected with the controller, the controller is preferably preset value control Device processed, certain relay, point off formula controller or countdown controller are also possible, and default value controller is applicable in more extensively, The sensor is temperature sensor, humidity sensor, gas concentration sensor, infrared ray sensor, current sensor, voltage Sensor or flow sensor;The data that sensor detects are passed controller back and are started when detection data are more than default value controller Power unit is opened, otherwise power unit is closed less than default value controller.
In actual use, power distributor distributes the power consumption of each user group according to the residing time, as power distributor exists 7 points of morning cut-out outdoor lightings, such as the illumination of unit road, at eight when cut off the illumination of porch again, to 9 families Outer illumination and part room lighting are in not power supply state, run into special circumstances if any leader arrive that needs illuminate can be at end The illumination in enforced opening region on end;Being turned on and off of 9 front lit equipment completes control by current sensor and controller Make, be used to generate electricity equipped with solar panel mostly on the road lighting apparatus of present enterprise, current sensor and solar-electricity Pond plate series connection, when illumination abundance solar panel produces electric current, current sensor detects that magnitude of current size feeds back to control Device, controller make action according to size of current, and when electric current is more than preset value, controller closes lighting apparatus, such as fine The time that the sun rises is early, and outdoor illumination equipment is shut off before 7 points, using electricity wisely, and timer showed that the time exceeded at that time User group where 9 points will be in off-position;Power distributor in the afternoon 5 points are powered again, still according to electricity after power supply The size of current that flow sensor detects controls the unlatching of lighting apparatus to excite controller, that is to say, that even if in summer electricity Power distributor gives user group power supply after 5 points, and lighting apparatus will not open at once, until the sun sets solar panel There is no lighting apparatus when electric current generation or less generation electric current just to open, achieve the purpose that power saving.
Or such as power distributor gives air-conditioning equipment to power, the period of setting arrives 5 PM for 9 points of morning, Air-conditioning under this period is in "on" position, temperature sensor detection indoor temperature, the temperature feedback that will be detected To controller, air-conditioning is opened when temperature is more than default value controller, usual air-conditioner temperature is arranged on 26 degrees Celsius, present Air-conditioning has frequency conversion function mostly, and often switch can reduce service life of air-conditioning, thus controller will not frequently switch air-conditioning and It is to be closed when 5 PM is unified, as certain area people goes out that controller can be controlled by terminating machine to terminal personnel report The air-conditioning in this region of positive closing, power-off causes air-conditioning to damage suddenly in order to prevent, power distributor 4: 5 or in the afternoon When all air-conditionings of signal positive closing can be sent to controller, air-conditioning all powers off after 5 points in the afternoon, as some offices Area can save completely installs air-conditioner controller in metope, or even remote controler is all not required all manipulations to be manipulated by terminating machine, No longer worry that After Hours someone is not related to the thing that air-conditioning or remote controler can not find.
When sensor is humidity sensor, in space, humidity, which reaches default value controller and starts power unit i.e. dehumidifier, takes out Wet, humidity sensor detects closes dehumidifier when humidity is reduced to preset value lower limit;When sensor is gas concentration sensor, Gas concentration reaches default value controller startup power unit i.e. air regenerating device and takes a breath in space, gas concentration sensor inspection Measure when gas concentration in space is reduced to preset value lower limit and close air regenerating device;When sensor passes for voltage sensor or flow The course of work is similar to the above case during sensor just repeats no more;When sensor is infrared ray sensor, infrared ray sensor is examined Human body is measured to stop more than three seconds, controller starts power unit such as lighting apparatus, fan or other corollary equipments, during startup Stop can set three seconds solely for the purpose of illustration often, can actually set any number.
Need to open some power unit temporarily in special circumstances, such as current user group is in "on" position so at end End hands- operation operates on PC, remote start controller enforced opening power unit, and such as current user group is in power-off State is so operated in terminal hands- operation on PC, allows power distributor to be supplied to the user group where power unit first Electricity, then remote start controller enforced opening power unit.
Each user group has a Ge Fen ammeters enterprise to be compared according to each point of ammeter reading and total ammeter reading, sees See which link loss is excessive;Secondly user group is two in figure, and reality can be more according to the ability of power distributor.
Using the above-mentioned desirable embodiment according to the utility model as enlightenment, pass through above-mentioned description, related work people Member can carry out various changes and amendments in the range of without departing from this item utility model technological thought completely.This item is real The content being not limited to new technical scope on specification, it is necessary to which its technology is determined according to right Property scope.

Claims (3)

1. a kind of enterprise's energy efficiency management terminal, including ammeter, power distributor, controller and terminating machine, it is characterised in that:Institute Stating ammeter includes total ammeter and dividing ammeter, total ammeter house lead in side is electrically connected with external electrical network and internal electric network, user side and Power distributor is electrically connected, and the timing controller of control power distributor work is electrically connected with the power distributor, described Power distributor and multiple user groups are electrically connected, in parallel between user group, the user group have be sequentially connected electrically divide ammeter, Controller and power unit, the sensor of control controller work is electrically connected with the controller.
2. enterprise's energy efficiency management terminal according to claim 1, it is characterised in that:The controller controls for preset value Device.
3. enterprise's energy efficiency management terminal according to claim 1, it is characterised in that:The sensor is temperature sensing Device, humidity sensor, gas concentration sensor, infrared ray sensor, current sensor, voltage sensor or flow sensor.
CN201721274920.8U 2017-09-30 2017-09-30 Enterprise's energy efficiency management terminal Expired - Fee Related CN207249387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721274920.8U CN207249387U (en) 2017-09-30 2017-09-30 Enterprise's energy efficiency management terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721274920.8U CN207249387U (en) 2017-09-30 2017-09-30 Enterprise's energy efficiency management terminal

Publications (1)

Publication Number Publication Date
CN207249387U true CN207249387U (en) 2018-04-17

Family

ID=61889713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721274920.8U Expired - Fee Related CN207249387U (en) 2017-09-30 2017-09-30 Enterprise's energy efficiency management terminal

Country Status (1)

Country Link
CN (1) CN207249387U (en)

Similar Documents

Publication Publication Date Title
Ozadowicz et al. Impact of building automation control systems on energy efficiency—University building case study
CN201381735Y (en) Door/window status monitoring device
CN205992803U (en) Intelligent power saving electric power system based on cloud computing technology
CN201615566U (en) Power-saving remote monitoring terminal for public air conditioners
CN105159110A (en) Building integrated and intelligent electricity utilization system
CN207249387U (en) Enterprise's energy efficiency management terminal
CN204992162U (en) Control air conditioning switch's smart jack
CN201562149U (en) Portable intelligent power consumption amount manager
CN206247564U (en) A kind of air handling system for the control device of VMC and containing it
CN211741949U (en) Full-automatic constant temperature and humidity intelligent controller
CN208124567U (en) A kind of architecture indoor manually intelligent air monitoring system
CN208835840U (en) A kind of intelligent UPS-EPS power source aging room
CN208704176U (en) The energy-saving control system of water heater and its energy-saving gas heater
CN209518252U (en) It is a kind of based on natural gas combustion engine be energy resource supply environmentally friendly tobacco flue-curing house
CN202835684U (en) Ventilating control system of solar inverting booster engine room
WO2017120949A1 (en) Power-saving air conditioning system
CN106020302A (en) Lab environment monitoring device
CN202032704U (en) Air-conditioner energy saving controller
CN105241042A (en) Central air conditioner tail end energy-saving control method
CN106524438B (en) One kind being based on the energy-efficient intelligent control method of central air-conditioning terminal
CN203704256U (en) Air conditioning with energy-saving controller
CN217519978U (en) Semi-centralized semi-household radiation air conditioning system
CN202818257U (en) Novel remote control receiving circuit free of power consumption
CN108695951A (en) A kind of curtain motor of intelligence low-power consumption battery powered
CN204648587U (en) A kind of central air-conditioning energy-saving system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20180930