CN207245716U - A kind of assembled under-traverse tunnel of high reliability - Google Patents

A kind of assembled under-traverse tunnel of high reliability Download PDF

Info

Publication number
CN207245716U
CN207245716U CN201721272059.1U CN201721272059U CN207245716U CN 207245716 U CN207245716 U CN 207245716U CN 201721272059 U CN201721272059 U CN 201721272059U CN 207245716 U CN207245716 U CN 207245716U
Authority
CN
China
Prior art keywords
side wall
top plate
tunnel
prefabricated
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721272059.1U
Other languages
Chinese (zh)
Inventor
魏运鸿
毕小毛
赵通
孙春平
王涛
吴波
冉庆国
刘天银
钟健
王鸿
谭斌
李玉涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architetural Design Institute Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Architetural Design Institute Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architetural Design Institute Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Architetural Design Institute Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN201721272059.1U priority Critical patent/CN207245716U/en
Application granted granted Critical
Publication of CN207245716U publication Critical patent/CN207245716U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

It the utility model is related to tunnel structure technical field, more particularly to a kind of assembled under-traverse tunnel of high reliability, multiple prefabricated piecemeals including forming tunnel construction sections, the prefabricated piecemeal includes left side wall, middle wall, the bottom plate of right-side wall and monoblock type, the splicing of the top of the left side wall and middle wall has left roof, the splicing of the top of the middle wall and right-side wall has right top plate, the bottom plate is W-shaped structure, on bottom plate be equipped with respectively with left side wall, middle wall, the support connecting pin that right-side wall is adapted, the left roof and right top plate are combined into top plate, the top plate is correspondingly arranged splicing pier with left side wall and right-side wall respectively.The assembled under-traverse tunnel of the utility model can reduce the splicing seam between prefabricated piecemeal quantity and prefabricated piecemeal in same section, improve the intensity and reliability in whole tunnel.

Description

A kind of assembled under-traverse tunnel of high reliability
Technical field
It the utility model is related to tunnel structure technical field, and in particular to a kind of assembled under-traverse tunnel of high reliability.
Background technology
In the construction of city tunnel, two kinds of forms of construction work are primarily present:One is use at the construction field (site) Set up falsework, the form of cast-in-place concrete carries out construction and builds, the second is prefabricated tunnel construction sections and by transport and lift into Luggage is matched somebody with somebody.
At present, domestic underground structure field has begun to promote the use prefabrication and assembly construction engineering method.It is whole in pedestrian tunnel is crossed the street The prefabricated tunnel block of body can there are weight and volume it is larger the problem of, bring greater inconvenience to transport and the assembled process of lifting. Therefore, the method for having used some to carry out precast block to tunnel now, the cyclic structure of tunnel construction sections is mainly split as by it Multiple independent piecemeals progress are prefabricated, these prefabricated piecemeals then are assembled into complete tunnel by way of lifting assembly and are broken Face.But in order to control the quality of prefabricated piecemeal and volume, often by a tunnel construction sections prefabricated piecemeal quantity divide compared with More, the bottom plate especially in a tunnel construction sections is often split as multiple piecemeals, is so easy for causing tunnel structure Split too scattered, cause seam during splicing excessive, and then cause tunnel reliability after the completion of splicing poor.
Utility model content
The goal of the invention of the utility model is:For the prior art, there are the prefabricated piecemeal quantity division ground in tunnel construction sections More and bottom plate is split as polylith, causes tunnel structure to split too scattered, seam when assembled is excessive, and then causes tunnel to exist The problem of reliability is poor after the completion of splicing, there is provided a kind of assembled under-traverse tunnel of high reliability, it can reduce same The splicing seam between prefabricated piecemeal quantity and prefabricated piecemeal in section, improves the intensity and reliability in whole tunnel.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of assembled under-traverse tunnel of high reliability, include composition tunnel construction sections multiple prefabricated piecemeals, described prefabricated point Block includes the bottom plate of left side wall, middle wall, right-side wall and monoblock type, and the top splicing of the left side wall and middle wall has left roof, institute The top splicing for stating middle wall and right-side wall has right top plate, and the bottom plate be W-shaped structure, on bottom plate equipped with respectively with left side wall, The support connecting pin that middle wall, right-side wall are adapted, the left roof and right top plate are combined into top plate, the top plate respectively with left side Wall and right-side wall are correspondingly arranged splicing pier.
Wherein, bottom plate is the prefabricated piecemeal of tunnel bottommost in the cross section, and left side wall and right-side wall are the left sides in tunnel Tunnel is divided into two warehouses by the side wall of right both sides, middle wall, by that can be fully formed after splicing left and right top plate and bottom plate Tunnel.Wherein, left and right wall can be arranged to " l " shape, and left and right top plate can be arranged to " L " shape, and middle wall can be arranged to " T " Shape, bottom plate can be arranged to " W " shape, after so setting, as long as first that bottom plate assembly is good, it becomes possible in follow-up assembled process The middle interim stabilization for ensureing component, does not cause component to topple over to both sides, can exempt interim bearing diagonal during wallboard assembly Set up, shaped easy to under-traverse tunnel quick-assembling.Easy to the interim stabilization of component during assembly, component is not caused to be rolled to two , setting up for interim bearing diagonal during wallboard assembly can be exempted, shaped easy to under-traverse tunnel quick-assembling.In some tunnels In structure, the wall of bottom plate and middle part can be divided into multiple and different piecemeals and carry out prefabricated and splicing, can so be made pre- The quantity of piecemeal processed is excessive, cause tunnel structure split it is too scattered and splicing when seam it is excessive, influence the integral strength in tunnel. And prefabricated tunnel is divided into 6 independent prefabricated piecemeals and bottom plate in whole tunnel construction sections is as an entirety Carry out it is prefabricated after, it is ensured that or else influence to efficiently reduce the pre- of tunnel in the case of transport and assembled difficulty and efficiency Piecemeal quantity and seam quantity processed, ensure that the integral strength and its security in the tunnel after the completion of assembly.
As the preferred solution of the utility model, the centre is T-shaped structure, and the corbel of roof supporting is formed on its top, The left roof and right top plate stitching position are located on corbel.Corbel also known as " bracket ", its be in middle wall top portion to left roof and The supporting structure that right top plate extends, sets corbel and left roof in middle wall top portion and right top plate is arranged to be overlapped on corbel it Afterwards, effective twelve Earthly Branches support can be formed to left roof and right top plate, avoids it from the excessive situation of local stress occur, eliminates at the same time Falsework is set up during top plate assembly, is shaped easy to domain under-traverse tunnel quick-assembling.
As the preferred solution of the utility model, the left roof is horizontal splicing construction, right top plate and the right side with left side wall Side wall is also horizontal splicing construction, and the left side wall, middle wall and right-side wall and column are horizontal splicing construction.Level splicing knot Structure refers to the connecting method that the splicing seams between two prefabricated piecemeals are arranged to horizontal seam, and horizontal seam can Ensure that two prefabricated piecemeals can be perfectly aligned in stitching portion up and down, be not in the risk of offset or slip.By left roof with It is arranged between left side wall, right top plate and right-side wall as left side wall after horizontal splicing construction, can be easy to left roof, right-side wall Horizontal lifting type load-bearing is carried out to right top plate, can avoid left roof and the feelings such as deforming occurs after permanent use in right top plate Condition.
As the preferred solution of the utility model, shearing bond is equipped between the seam of all horizontal splicing constructions Structure, the shear connector structure include raised shear connector and the groove being adapted to shear connector, and the shear connector and groove are set respectively Put on the wall of seam both sides.Wherein, shear connector and groove should be arranged on different prefabricated piecemeals, in the horizontal spelling of composition After shear connector structure is set on two different prefabricated piecemeals of binding structure, suffered transverse shear stresses on different prefabricated piecemeals The prefabricated piecemeal shared that can be spliced by multiple phases, it is achieved thereby that avoiding the excessive situation of single prefabricated piecemeal stress Occur, enhance the integral strength of tunnel structure.
As the preferred solution of the utility model, connection top plate and side wall, bottom plate and side wall, bottom plate and middle wall are additionally provided with Deformed bar, is correspondingly provided with the prestress hole through wall on top plate, bottom plate and side wall, and the deformed bar passes through respectively Wear connection left roof and left side wall, right top plate and right-side wall, bottom plate and left side wall, bottom plate and middle wall, bottom plate and right-side wall.In advance should Power reinforcing bar can offset external stress suffered after prefabricated piecemeal splicing is completed.Therefore, in the splicing seams of horizontal splicing construction After place sets deformed bar, the intensity for the different prefabricated piecemeals to form horizontal splicing construction can be strengthened, and then improve Integral strength on left tunnel side wall, middle wall and right-side wall cross section.
As the preferred solution of the utility model, the deformed bar for connecting top plate and side wall is additionally provided with, in top plate and side The prestress hole through wall is correspondingly provided with wall;The seam crossing of all prefabricated piecemeals of difference is equipped with longitudinal direction and runs through prefabricated piecemeal Deformed bar.Longitudinal direction sets longitudinal direction perforative pre- through referring to be extended on the length direction in tunnel, in seam crossing After stress reinforcing bar, the tunnel of different segmentations external stress suffered after splicing can be offset, strengthens the overall structure in tunnel.
As the preferred solution of the utility model, it is equipped with left and right sides of the seam crossing of the horizontal splicing construction pre-buried Steel plate, the pre-embedded steel slab of the left and right sides, which is equipped with, tenses connector.After pre-embedded steel slab and bolt fastening are set, Neng Goujin Reliability at one step enhancing horizontal joint, avoids it from phenomena such as displacement or slip occur.
As the preferred solution of the utility model, on the circumferential seam of the prefabricated piecemeal and the seam of horizontal splicing construction Equipped with expansion sealing strip, waterproof coating is equipped with outside the circumferential seam and horizontal joint.Circumferential direction seam refers to tunnel in the longitudinal direction Seam between difference segmentation.Expansion sealing strip can expand after water is met, and then dock gap and form sealing, and waterproof coating can Outside moisture gos deep into tunnel structure from seam crossing in a manner of, can be avoided the occurrence of after expansion sealing strip and waterproof coating are set to The phenomenon of infiltration, damages tunnel inside seam.
As the preferred solution of the utility model, the waterproof coating includes polyurethane water-proof coating, modified-high polymer drips Blue or green waterproof layer and water-proof concrete protective layer.Three kinds of waterproof layers are respectively provided with outstanding waterproof performance, can effectively avoid outer Portion is water stain to think infiltration inside tunnel structure through seam, protects the structure safety in tunnel.
In conclusion by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, by prefabricated tunnel be divided into 6 independent prefabricated piecemeals and using the bottom plate in whole cross section as After one entirety progress is prefabricated, it is ensured that or else influence to efficiently reduce in the case of transport and assembled difficulty and efficiency Prefabricated the piecemeal quantity and seam quantity in tunnel, ensure that the integral strength and its security in the tunnel after the completion of assembly;
2nd, can be by this cross section after all stitching portions in tunnel cross section being disposed as horizontal splicing construction Splicing construction between all different prefabricated piecemeals carry out unification so that improve the tunnel in same cross section intensity and Globality between different prefabricated piecemeals.
Brief description of the drawings
Fig. 1 is the assembled under-traverse tunnel structure diagram of the utility model high reliability.
Fig. 2 is the structure diagram at horizontal joint in Fig. 1.
Fig. 3 is the schematic diagram of the shear connector structure in Fig. 2.
Fig. 4 is the cross section reinforcing bar and waterproof construction schematic diagram of the utility model.
Marked in figure:1- bottom plates, 101- columns, wall on the left of 2-, wall in 3-, 301- corbels, 4- right-side walls, 5- left roofs, The right top plates of 6-.7- shear connectors, 8- grooves, 9- deformed bars, 10- pre-embedded steel slabs, 11- tense connector, 12- expansion water-stops Bar, 13- waterproof coatings.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only explaining this Utility model, is not used to limit the utility model.
Embodiment 1
As shown in Figures 1 to 4, the assembled under-traverse tunnel of the present embodiment, including several mutually independent prefabricated piecemeals, The single prefabricated piecemeal includes bottom plate 1, left side wall 2, middle wall 3 and right-side wall 4, and the left side wall 2, middle wall 3 and right-side wall 4 are equal On bottom plate 1, the top splicing of the left side wall 2 and middle wall 3 has the top of left roof 5, the middle wall 3 and right-side wall 4 for splicing Splicing has right top plate 6.Wherein, bottom plate 1 is the prefabricated piecemeal of tunnel bottommost in the cross section, and left side wall 2 and right-side wall 4 are Tunnel is divided into two warehouses by the side wall of the left and right sides in tunnel, middle wall 2, after splicing left and right top plate and bottom plate 1 Fully form tunnel.Wherein, left and right wall can be arranged to " l " shape, and left and right top plate can be arranged to " L " shape, and middle wall 2 can "T"-shaped to set, bottom plate can be arranged to " W " shape, after so setting, as long as first that bottom plate 1 is assembled good, it becomes possible to rear Ensure the interim stabilization of component during continuous assembly, do not cause component to topple over to both sides, during can exempting wallboard assembly Interim bearing diagonal is set up, and is shaped easy to under-traverse tunnel quick-assembling., can be by bottom plate 1 and middle part in some tunnel structures Wall is divided into multiple and different piecemeals and carries out prefabricated and splicing, can so make the quantity of prefabricated piecemeal excessive, cause tunnel Road structure split it is too scattered and splicing when seam it is excessive, influence the integral strength in tunnel.And prefabricated tunnel is divided into described 6 independent prefabricated piecemeals and using the bottom plate 1 in whole cross section as entirety carry out it is prefabricated after, it is ensured that Or else prefabricated the piecemeal quantity and seam quantity in tunnel are efficiently reduced in the case of the difficulty and efficiency that influence transport and assembly, Ensure that the integral strength and its security in the tunnel after the completion of assembly.
It is horizontal splicing construction, right top plate 6 between the left roof 5 and left side wall 2 on the basis of above-mentioned embodiment It is horizontal splicing construction between right-side wall 4.Horizontal splicing construction refers to the splicing seams between two prefabricated piecemeals being arranged to The connecting method of horizontal seam, horizontal seam can ensure that two prefabricated piecemeals can be completely right in stitching portion up and down Together, be not in the risk of offset or slip.It will be arranged between left roof 5 and left side wall 2, right top plate 6 and right-side wall 4 as water After flat splicing construction, horizontal lifting type load-bearing, energy can carry out right top plate 6 to left roof 5, right-side wall 4 easy to left side wall 2 Situations such as enough avoiding left roof 5 and right top plate 6 from being deformed after permanent use.
As the preferred solution of the utility model, the bottom plate 1 is in the stitching portion with left side wall 2, middle wall 3 and right-side wall 4 Equipped with upward column 101, the left side wall 2, middle wall 3 and right-side wall 4 are spliced on column 101, the left side wall 2, in It is horizontal splicing construction between wall 3 and right-side wall 4 and column 101.After so setting, it becomes possible to will own in this cross section Splicing construction between different prefabricated piecemeals is unified for horizontal splicing construction, so as to improve the tunnel in same cross section Globality between intensity and different prefabricated piecemeals.
Embodiment 2
As shown in Figures 1 to 4, the assembled under-traverse tunnel of the present embodiment, including several mutually independent prefabricated piecemeals, The single prefabricated piecemeal includes bottom plate 1, left side wall 2, middle wall 3 and right-side wall 4, and the left side wall 2, middle wall 3 and right-side wall 4 are equal On bottom plate 1, the top splicing of the left side wall 2 and middle wall 3 has the top of left roof 5, the middle wall 3 and right-side wall 4 for splicing Splicing has right top plate 6.Wherein, bottom plate 1 is the prefabricated piecemeal of tunnel bottommost in the cross section, and left side wall 2 and right-side wall 4 are Tunnel is divided into two warehouses by the side wall of the left and right sides in tunnel, middle wall 2, after splicing left and right top plate and bottom plate 1 Fully form tunnel.Wherein, left and right wall can be arranged to " l " shape, and left and right top plate can be arranged to " L " shape, and middle wall 2 can "T"-shaped to set, bottom plate can be arranged to " W " shape, after so setting, as long as first that bottom plate 1 is assembled good, it becomes possible to rear Ensure the interim stabilization of component during continuous assembly, do not cause component to topple over to both sides, during can exempting wallboard assembly Interim bearing diagonal is set up, and is shaped easy to under-traverse tunnel quick-assembling., can be by bottom plate 1 and middle part in some tunnel structures Wall is divided into multiple and different piecemeals and carries out prefabricated and splicing, can so make the quantity of prefabricated piecemeal excessive, cause tunnel Road structure split it is too scattered and splicing when seam it is excessive, influence the integral strength in tunnel.And prefabricated tunnel is divided into described 6 independent prefabricated piecemeals and using the bottom plate 1 in whole cross section as entirety carry out it is prefabricated after, it is ensured that Or else prefabricated the piecemeal quantity and seam quantity in tunnel are efficiently reduced in the case of the difficulty and efficiency that influence transport and assembly, Ensure that the integral strength and its security in the tunnel after the completion of assembly.
On the basis of the above embodiment, it is between the left roof 5 and left side wall 2, right top plate 6 and right-side wall 4 Horizontal splicing construction.Horizontal splicing construction refers to the splicing side that the splicing seams between two prefabricated piecemeals are arranged to horizontal joint Formula, will be arranged between left roof 5 and left side wall 2, right top plate 6 and right-side wall 4 as that after horizontal splicing construction, can be easy to left side Wall 2 carries out right top plate 6 horizontal lifting type load-bearing to left roof 5, right-side wall 4, and left roof 5 and right top plate 6 can be avoided to exist Situations such as being deformed after permanent use.
On the basis of the above embodiment, the bottom plate 1 is set in the stitching portion with left side wall 2, middle wall 3 and right-side wall 4 There is upward column 101, the left side wall 2, middle wall 3 and right-side wall 4 are spliced on column 101, the left side wall 2, middle wall 3 It is horizontal splicing construction between right-side wall 4 and column 101.So set after, it becomes possible to by this cross section it is all not Splicing construction between same prefabricated piecemeal is unified for horizontal splicing construction, so as to improve the strong of the tunnel in same cross section Globality between degree and different prefabricated piecemeals.
On the basis of the above embodiment, the middle top of wall 3 is equipped with corbel 301, the left roof 5 and middle wall 3 Stitching portion is corbel bridging arrangement, and the stitching portion of the right top plate 6 and middle wall 3 is corbel bridging arrangement.Corbel 301 also known as " ox Leg ", it is the supporting structure extended on the middle top of wall 3 to left roof 5 and right top plate 6, and corbel 301 is set at the middle top of wall 3 And left roof 5 and right top plate 6 are arranged to after being overlapped on corbel 301, left roof 5 and right top plate 6 can be formed effectively Support, avoids it from the excessive situation of local stress occur, while eliminates setting up for falsework during top plate assembly, is easy to Domain under-traverse tunnel quick-assembling shapes.
On the basis of the above embodiment, it is all provided between the seam of the horizontal splicing construction of all prefabricated piecemeals of difference There is shear connector structure, the shear connector structure includes raised shear connector 7 and the groove 8 being adapted to shear connector 7.Wherein, shear Key 7 and groove 8 should be arranged on different prefabricated piecemeals.On two different prefabricated piecemeals of horizontal splicing construction are formed After shear connector structure is set, suffered transverse shear stresses can be spliced by multiple phases on different prefabricated piecemeals prefabricated piecemeal Shared, it is achieved thereby that avoiding the excessive situation of single prefabricated piecemeal stress from occurring, enhances the overall strong of tunnel structure Degree.
On the basis of the above embodiment, connection top plate and side wall, bottom plate 1 and side wall, bottom plate 1 and middle wall 3 are additionally provided with Deformed bar 9, the prestress hole through wall, the deformed bar 9 are correspondingly provided with top plate, bottom plate 1 and side wall Extend through connection left roof 5 and left side wall 2, right top plate 6 and right-side wall 4, bottom plate 1 and left side wall 2, bottom plate 1 and middle wall 3, bottom Plate 1 and right-side wall 4.Deformed bar 9 can offset external stress suffered after prefabricated piecemeal splicing is completed.Therefore, in water After deformed bar 9 is set at the splicing seams of flat splicing construction, different prefabricated points to form horizontal splicing construction can be strengthened The intensity of block, and then improve the integral strength on 4 cross section of left tunnel side wall 2, middle wall 3 and right-side wall.
On the basis of the above embodiment, pre-buried steel is equipped with left and right sides of the seam crossing of the horizontal splicing construction Plate 10, the pre-embedded steel slab 10 of the left and right sides, which is equipped with, tenses connector 11.Pre-embedded steel slab 10 is being set and is tensing connector Phenomena such as after 11, the reliability at horizontal joint can be further enhanced, avoid it from displacement occur or slide.
On the basis of the above embodiment, the seam crossing of all prefabricated piecemeals of difference is equipped with longitudinal direction and runs through prefabricated piecemeal Deformed bar 9.Longitudinal direction sets longitudinal direction perforative pre- through referring to be extended on the length direction in tunnel, in seam crossing After stress reinforcing bar 9, the tunnel of different segmentations external stress suffered after splicing can be offset, strengthens the overall structure in tunnel.
On the basis of the above embodiment, it is all provided with the circumferential seam of the prefabricated piecemeal and the seam of horizontal splicing construction There is expansion sealing strip 12, waterproof coating 13 is equipped with outside the circumferential seam and horizontal joint.Circumferential direction seam refers to tunnel in length direction Seam between upper different segmentations.Expansion sealing strip 12 can expand after water is met, and then dock gap and form sealing, and waterproof applies Layer 13 can go deep into tunnel structure by outside moisture in a manner of from seam crossing, after expansion sealing strip 12 and waterproof coating 13 is set The phenomenon to seep water to seam inside is avoided the occurrence of, is damaged to tunnel.
On the basis of the above embodiment, the waterproof coating 13 includes polyurethane water-proof coating, modified-high polymer drips Blue or green waterproof layer and water-proof concrete protective layer.Three kinds of waterproof layers are respectively provided with outstanding waterproof performance, can effectively avoid outer Portion is water stain to think infiltration inside tunnel structure through seam, protects the structure safety in tunnel.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (9)

1. the assembled under-traverse tunnel of a kind of high reliability, it is characterised in that multiple prefabricated piecemeals including forming tunnel construction sections, institute Stating prefabricated piecemeal includes the bottom plate of left side wall, middle wall, right-side wall and monoblock type, and the top splicing of the left side wall and middle wall has a left side Top plate, the middle wall and right-side wall top splicing have right top plate, the bottom plate be W-shaped structure, on bottom plate equipped with respectively with The support connecting pin that left side wall, middle wall, right-side wall are adapted, the left roof and right top plate are combined into top plate, the top plate point Splicing pier is not correspondingly arranged with left side wall and right-side wall.
2. assembled under-traverse tunnel according to claim 1, it is characterised in that the middle wall is T-shaped structure, its top shape Into the corbel of roof supporting, the left roof and right top plate stitching position are located on corbel.
3. assembled under-traverse tunnel according to claim 1, it is characterised in that the left roof is spelled with left side wall to be horizontal Binding structure, right top plate and right-side wall are also horizontal splicing construction, and the left side wall, middle wall and right-side wall and column are horizontal spelling Binding structure.
4. assembled under-traverse tunnel according to claim 3, it is characterised in that all horizontal splicing constructions seam it Between be equipped with shear connector structure, the shear connector structure includes raised shear connector and the groove being adapted to shear connector, described to cut Power key and groove are separately positioned on the wall of seam both sides.
5. the assembled under-traverse tunnel according to one of claim 1-4, it is characterised in that be additionally provided with connection top plate and side wall Deformed bar, the prestress hole through wall is correspondingly provided with top plate and side wall.
6. assembled under-traverse tunnel according to claim 5, it is characterised in that on the top plate and side wall of seam both sides also It is respectively equipped with pre-embedded steel slab.
7. assembled under-traverse tunnel according to claim 1, it is characterised in that the seam crossing of all prefabricated piecemeals is equipped with The deformed bar of prefabricated piecemeal is run through in longitudinal direction.
8. the assembled under-traverse tunnel of high reliability according to claim 1, it is characterised in that all prefabricated piecemeals connect Expansion sealing strip is additionally provided with seam, waterproof coating is equipped with outside seam.
9. the assembled under-traverse tunnel of high reliability according to claim 8, it is characterised in that the waterproof coating includes Polyurethane water-proof coating, high-polymer modified pitch waterproof layer and water-proof concrete protective layer.
CN201721272059.1U 2017-09-29 2017-09-29 A kind of assembled under-traverse tunnel of high reliability Active CN207245716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721272059.1U CN207245716U (en) 2017-09-29 2017-09-29 A kind of assembled under-traverse tunnel of high reliability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721272059.1U CN207245716U (en) 2017-09-29 2017-09-29 A kind of assembled under-traverse tunnel of high reliability

Publications (1)

Publication Number Publication Date
CN207245716U true CN207245716U (en) 2018-04-17

Family

ID=61890536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721272059.1U Active CN207245716U (en) 2017-09-29 2017-09-29 A kind of assembled under-traverse tunnel of high reliability

Country Status (1)

Country Link
CN (1) CN207245716U (en)

Similar Documents

Publication Publication Date Title
CN103334422B (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN205604473U (en) Assembled shear force wall tooth's socket formula connection structure who combines coincide floor
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN206428551U (en) A kind of repeatable assembled engagement temporary pavement plate utilized of monoblock type
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN108999044B (en) Steel trestle platform structure applying modularized roadbed box and construction method of steel trestle platform structure
CN108729564A (en) Assembled architecture system
CN108708396A (en) A kind of the U-shaped channel structure and its installation method of precast assembly
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN103590404A (en) Method for supporting foundation pit next to established underground structure
CN207420584U (en) A kind of assembled under-traverse tunnel of quick-assembling
CN110185061B (en) Assembled integral type underground space retaining wall and construction method
CN208632986U (en) A kind of rectangular channel structure of precast assembly
CN107246014A (en) Detachable foundation pit trestle system and its construction method
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
CN207297009U (en) A kind of novel fabricated under-traverse tunnel
CN106677340A (en) Flange plate type precast assembly type concrete hidden bracket dry type connecting system
CN207245716U (en) A kind of assembled under-traverse tunnel of high reliability
CN106088437B (en) A kind of superimposed sheet enhancing two-way transmission force property
CN110735492A (en) Connecting structure of prestressed hollow composite slabs and construction method thereof
CN113981794B (en) Combined prefabricated assembled hollow slab beam and construction method thereof
CN110344442A (en) A kind of prefabricated assembled railway open cut tunnel and its construction method
CN208733672U (en) A kind of U-shaped channel structure of precast assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant