CN207245191U - A kind of construction elevator operating platform structure - Google Patents

A kind of construction elevator operating platform structure Download PDF

Info

Publication number
CN207245191U
CN207245191U CN201720748358.1U CN201720748358U CN207245191U CN 207245191 U CN207245191 U CN 207245191U CN 201720748358 U CN201720748358 U CN 201720748358U CN 207245191 U CN207245191 U CN 207245191U
Authority
CN
China
Prior art keywords
lattice girder
elevator
construction elevator
construction
big
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720748358.1U
Other languages
Chinese (zh)
Inventor
王斌
张明
苏伟
余尚
叶国昌
罗盈洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201720748358.1U priority Critical patent/CN207245191U/en
Application granted granted Critical
Publication of CN207245191U publication Critical patent/CN207245191U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of construction elevator operating platform structure,Including at least two construction elevator,Elevator standard section is arranged in corresponding construction elevator,In the floor lap-joint of each elevator standard section, elevator operation platform is set,The elevator operation platform includes the big lattice girder of two right-angled intersections,And the big lattice girder termination connects with corresponding elevator standard section fix respectively,The big lattice girder termination of wherein one end is fastened on corresponding high building Core Walls Structure,Small lattice girder is arranged between adjacent big lattice girder and the small lattice girder surrounds square structure,The Auxiliary support layer of section steel manufacture square structure is used in small lattice girder outer layer,Between big lattice girder and small lattice girder,Connect to form entirety using channel steel between small lattice girder and shaped steel,In construction elevator operating platform upper surface, checkered steel plate is set,The utility model causes transport channel to concentrate,Raising personnel's transport of materials efficiency;Easy to manage;And it is small on permanent elevator and decoration construction influence, shift to an earlier date project entirety time of completion.

Description

A kind of construction elevator operating platform structure
Technical field
Technical field of building construction is the utility model is related to, especially a kind of construction elevator operating platform structure.
Background technology
Traditional construction elevator operating platform is primarily referred to as the access platform between construction elevator and agent structure, and one group is applied Work elevator is corresponding with one group of operating platform, it is necessary to multigroup construction elevator be arranged, in construction elevator pair for high-rise building At the passway answered, can be formed slices notch, influence at construction elevator attachment body structure portion curtain wall installation and Interior decoration, causes overall claim for eot;Secondly the transport efficiency of construction elevator dispersed placement, personnel and material substantially reduces, So it is that this structure is in the urgent need to address for construction elevator centralized management and the effective prouctiveness for improving construction elevator Problem.
Utility model content
Technical problem to be solved in the utility model is:A kind of construction elevator operating platform structure and its making side are provided Method, this method cause transport channel to concentrate, and are conducive to personnel, transport of materials planning, improve personnel's transport of materials efficiency;Can be effective Avoid the transhipment of Core Walls Structure interior construction elevator, plug into and drag and change, easy to manage;And to permanent elevator and decoration construction shadow Sound is small, in advance project entirety time of completion.With this overcome the deficiencies in the prior art.
The utility model is realized in this way:
A kind of construction elevator operating platform structure, including at least two construction elevator, elevator standard section are arranged on corresponding construction In elevator, elevator operation platform is set in the floor lap-joint of each elevator standard section, which includes two ten The big lattice girder that word intersects, and the big lattice girder termination connects fixation, the wherein big lattice of one end with corresponding elevator standard section respectively Structure beam-ends head is fastened on corresponding high building Core Walls Structure, and small lattice girder is arranged between adjacent big lattice girder and the small lattice girder Square structure is surrounded, the Auxiliary support layer of section steel manufacture square structure is used in small lattice girder outer layer, in big lattice girder and small lattice Connect to form entirety using channel steel between structure beam, between small lattice girder and shaped steel, set and spend in construction elevator operating platform upper surface Line steel plate.
In a kind of foregoing construction elevator operating platform structure, set between construction elevator operating platform and high building Core Walls Structure Put attached wall part.
By adopting the above-described technical solution, compared with prior art, solve well one at traditional construction elevator The problems such as platform one is open, the delay duration.The construction elevator operating platform structure causes transport channel to concentrate, favourable personnel, material Transportation Planning, improves personnel's transport of materials efficiency;The transhipment of Core Walls Structure interior construction elevator can be effectively avoided, plugs into and drags Change, easy to manage;And it is small on permanent elevator and decoration construction influence, shift to an earlier date project entirety time of completion.
Brief description of the drawings
Attached drawing 1 is the structural plan figure of the utility model;
Attached drawing 2 is the landing slab layout drawing of the utility model;
Attached drawing 3 is the connection drawing of the junction of the utility model 1.;
Attached drawing 4 is the connection drawing of the junction of the utility model 2.;
Attached drawing 5 is the connection drawing of the junction of the utility model 3.;
Attached drawing 6 is the connection drawing of the junction of the utility model 4.
Attached drawing 7 is the connection drawing of the junction of the utility model 5..
Description of reference numerals:1- 1. number construction elevators, 2- construction elevator standard knots, the big lattice girders of 3-250mm × 400mm, 4-10# steel I-beams, 5-8# steel channel beams, the small lattice girders of 6-200mm × 350mm, 7- standard wall attaching rods, 8- high building Core Walls Structures, 9- 2. number construction elevator, 10- 3. number construction elevators, 11-10mm thickness welding plates, 12- bolts, 13- bolts hole, 14-90mm × 90mm × 10mm thickness equal leg angles, 15-20mm steel plates, 16-4mm thickness checkered steel plates.
Embodiment
The embodiment of the utility model:A kind of production method of construction elevator operating platform structure, this method use will be applied Work elevator operation platform is arranged on the floor overlapping part of vertical construction elevator standard knot, and the construction elevator operating platform is big Lattice girder and small lattice girder are connected with the vertical construction elevator standard knot at vertical construction elevator standard knot respectively so that are vertically applied Vertical load carrier of the work elevator standard section as the stabilization of the construction elevator operating platform, while the construction elevator operating platform Big lattice girder be connected with main structure body, and the big horizontal force structure of lattice girder and small lattice girder as the elevator operation platform Part.
Attached wall part is set wherein between construction elevator operating platform and main structure body, which includes The big lattice girder of two right-angled intersections, small lattice girder is arranged between adjacent big lattice girder and the small lattice girder surrounds square knot Structure, uses the Auxiliary support layer of section steel manufacture square structure, between big lattice girder and small lattice girder, small lattice in small lattice girder outer layer Connect to form entirety using channel steel between structure beam and shaped steel, checkered steel plate is set in construction elevator operating platform upper surface.
A kind of construction elevator operating platform structure according to made by the above method, as shown in drawings, including at least two is applied Work elevator, elevator standard section 2 are arranged in corresponding construction elevator, and elevator is set in the floor lap-joint of each elevator standard section 2 Operating platform, the elevator operation platform include the big lattice girder 3 of two right-angled intersections, and big 3 termination of lattice girder respectively with it is right The connection of elevator standard section 2 is answered to fix, 3 termination of big lattice girder of wherein one end is fastened on corresponding high building Core Walls Structure 8, small lattice Structure beam 6 is arranged between adjacent big lattice girder 3 and the small lattice girder 6 surrounds square structure, and shaped steel is used in small 6 outer layer of lattice girder 4 make the Auxiliary support layer of square structure, and between big lattice girder 3 and small lattice girder 6, groove is used between small lattice girder 6 and shaped steel 4 The connection of steel 5 forms entirety, checkered steel plate 16 is set in construction elevator operating platform upper surface, in construction elevator operating platform and tower Attached wall part 7 is set between building Core Walls Structure 8.
During specific making
Load is directly transferred to high building by every layer of horizontal force component of the present embodiment by the standard knot of three construction elevators On raft foundation, the connection of big lattice girder 3 and construction elevator standard knot 2 mainly passes through the standard knot 2 in three construction elevators Welding steel 15 on correspondence position, angle steel (14) is fixed in big 3 end of lattice girder by bolt 12, then will by bolt (12) Big lattice girder (3) is connected with the standard knot 2 of construction elevator, and load is reached bottom base by construction elevator standard knot 2 with this Plinth.
A kind of construction elevator operating platform structure, checkered steel plate 16 is set on structure platform, and checkered steel plate 16 passes through bolt 12 lattice girders 3 big with horizontal force component, steel I-beam 4, steel channel beam 5, small lattice girder 6 are connected, and forming construction elevator with this puts down The platform Slab element of platform.
When specifically used
1st, component and fitting size design
Big lattice girder uses area of section as the big lattice girders of 250mm × 400mm, small lattice girder use area of section for The small lattice girders of 200mm × 350mm.The specific length of lattice girder is determined according to the platform size of construction elevator operating platform.
Steel I-beam uses 10# I-steel, and steel channel beam uses 8# channel steels.Specific length is according to construction elevator operating platform Platform size determines.
Welding plate uses 10mm thickness cast iron plates;
Steel plate uses 10mm thickness × 630mm long × 400mm wide alloy-steel plates;
Landing slab uses 4mm thickness checkered steel plates.
2nd, operating method
The length of big lattice girder and small lattice girder is determined according to the size of construction elevator operating platform.And according to big lattice girder Suffered load condition calculates the size of bolt in sectional dimension, platform with small lattice girder;
Determine the length of steel I-beam, steel channel beam according to the size of construction elevator operating platform, and according to steel I-beam and Suffered load condition calculates the size of bolt in the sectional dimension of steel channel beam, platform;
It is above-mentioned that bolt is inserted into bolt hole after spiro keyhole position is aligned, and fastened in bolt end with double nut, complete each The connection of bolt.
Landing slab is attached with podium level horizontal member using M12 type bolts, along landing slab outer edge every 0.5m Perforate once, is bolted once.
According to the load situation of construction elevator operating platform layer, the sectional dimension between big lattice girder and steel plate calculates bolt Size, is then being bolted angle steel in big lattice beam end, by bolt by the standard of big lattice girder and construction elevator Section is connected, and load is reached base foundation by construction elevator standard knot
The description of such scheme is the utility model for being understood that and using for ease of those skilled in the art, Person skilled in the art obviously easily can make embodiment various modifications, and therefore, the utility model is unlimited In above-mentioned real scheme, those skilled in the art's method according to the present utility model, does not depart from what the utility model category was made Improve and modification all should be within the scope of protection of the utility model.

Claims (2)

1. a kind of construction elevator operating platform structure, including at least two construction elevator, elevator standard section (2) is arranged on correspondence and applies In work elevator, it is characterised in that:In the floor lap-joint of each elevator standard section (2), elevator operation platform, elevator behaviour are set Making platform includes the big lattice girder (3) of two right-angled intersections, and big lattice girder (3) termination respectively with corresponding elevator standard section (2) connection is fixed, and big lattice girder (3) termination of wherein one end is fastened on corresponding high building Core Walls Structure (8), small lattice girder (6) it is arranged between adjacent big lattice girder (3) and the small lattice girder (6) surrounds square structure, is used in small lattice girder (6) outer layer Shaped steel (4) makes the Auxiliary support layer of square structure, between big lattice girder (3) and small lattice girder (6), small lattice girder (6) and type Entirety is formed using channel steel (5) connection between steel (4), checkered steel plate (16) is set in construction elevator operating platform upper surface.
A kind of 2. construction elevator operating platform structure according to claim 1, it is characterised in that:It is flat in construction elevator operation Attached wall part (7) is set between platform and high building Core Walls Structure (8).
CN201720748358.1U 2017-06-26 2017-06-26 A kind of construction elevator operating platform structure Expired - Fee Related CN207245191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720748358.1U CN207245191U (en) 2017-06-26 2017-06-26 A kind of construction elevator operating platform structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720748358.1U CN207245191U (en) 2017-06-26 2017-06-26 A kind of construction elevator operating platform structure

Publications (1)

Publication Number Publication Date
CN207245191U true CN207245191U (en) 2018-04-17

Family

ID=61878121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720748358.1U Expired - Fee Related CN207245191U (en) 2017-06-26 2017-06-26 A kind of construction elevator operating platform structure

Country Status (1)

Country Link
CN (1) CN207245191U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof
CN107119912B (en) * 2017-06-26 2023-10-17 中国建筑第四工程局有限公司 Construction elevator operation platform structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
US9506266B2 (en) Concrete deck with lateral force resisting system
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN108643428B (en) But height-adjusting's assembled precast concrete coincide floor
WO2019019459A1 (en) Device for transporting ship superstructure as a whole
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN108755442A (en) Guiding and positioning device for the installation of heavy steel member high-altitude
CN107288353A (en) Equipment hoisting transition support platform and its construction method on a kind of super-high buildings floor
CN107090974A (en) A kind of top plate Quick Release support system and its construction method
CN110924537A (en) Construction process of H-shaped steel concrete transfer beam-reinforced concrete column joint
CN206859480U (en) A kind of assembled large span combines steel truss concrete superimposed sheet
CN207245191U (en) A kind of construction elevator operating platform structure
CN104213728B (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN108412099A (en) Bar connecting formula concrete prefabricated board and connection method are buried after through thickness
CN211278938U (en) Bottom paving device, precast beam bottom die and precast beam construction device
CN211340840U (en) Tower crane foundation of internal climbing tower crane
CN209277600U (en) Novel fabricated structure construction temporarily uses steel ladder
CN106968380A (en) A kind of assembled large span combination steel truss concrete superimposed sheet and its construction method
CN201671063U (en) Movable steel base for construction precast beams and standard knot thereof
CN217439544U (en) Building top outer vertical surface overhanging structure template supporting system
CN106592821A (en) Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN216840692U (en) Construction device for super high-rise building
CN206376375U (en) A kind of shear wall constructed in advance does shear resistance system of the beam slab in junction with after
CN205990773U (en) A kind of construction discharging platform
CN107119912A (en) A kind of construction elevator operating platform structure and preparation method thereof
CN213418135U (en) Local cast-in-place type connected node of assembled concrete outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20210626