CN207245020U - One kind goes out roof pipeline waterproof construction - Google Patents

One kind goes out roof pipeline waterproof construction Download PDF

Info

Publication number
CN207245020U
CN207245020U CN201721115190.7U CN201721115190U CN207245020U CN 207245020 U CN207245020 U CN 207245020U CN 201721115190 U CN201721115190 U CN 201721115190U CN 207245020 U CN207245020 U CN 207245020U
Authority
CN
China
Prior art keywords
pipeline
waterproof
block piece
goes out
out roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721115190.7U
Other languages
Chinese (zh)
Inventor
花锦晟
翟焕
王源辉
孙芹
孙迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Far Han Architectural Design Co Ltd
Original Assignee
Jiangsu Far Han Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Far Han Architectural Design Co Ltd filed Critical Jiangsu Far Han Architectural Design Co Ltd
Priority to CN201721115190.7U priority Critical patent/CN207245020U/en
Application granted granted Critical
Publication of CN207245020U publication Critical patent/CN207245020U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses one kind to go out roof pipeline waterproof construction, including the waterproof layer for being sheathed on casing on the outside of pipeline, being layed on roofing and roofing and the additional waterproof course of outside of sleeve are layed in, the junction of described sleeve pipe and pipeline is provided with first seal;The upper surface of the additional waterproof course is abutted with the lower face of first seal, and some fixing pieces are provided with the outside of its upper part;The first block piece is provided with the outside of the first seal and fixing piece;The upper surface of first block piece is abutted with the outer wall of pipeline, its joint is provided with the second block piece;The utility model plays a protective role pipeline and each joint, strengthens the barrier effect to rainwater so that the waterproof effect for going out roof pipeline greatly improves.

Description

One kind goes out roof pipeline waterproof construction
Technical field
A kind of buildings waterproof structure is the utility model is related to, more particularly to one kind goes out roof pipeline waterproof construction.
Background technology
In the work progress of roofing, due to the needs of building functions, people often set various forms in roofing Go out roof pipeline.
Authorization Notice No. is that the Chinese patent of CN202492975U discloses a kind of pipeline waterproof structure for stretching out roofing, bag Include the waterproof layer being layed on roofing, the additional waterproof course being layed on the outside of roofing and pipeline and be fixed on waterproof through ferrule Sealing material at the top of extra play.
When roofing wind pressure is big, the pipeline of stretching roofing is longer, above-mentioned pipeline often occurs light under the blowing of wind Micro- vibrations, in addition over time and temperature change, the slight deformation of pipeline can be caused, both the above situation is equal The joint of additional waterproof course and pipeline can be caused trickle crack occur, rainwater can be along the gap leakage of joint to roof In.
Utility model content
The purpose of this utility model is to provide one kind and goes out roof pipeline waterproof construction, which solve it is existing go out roof pipeline The problem of waterproof effect of waterproof construction is bad.
The above-mentioned technical purpose of the utility model technical scheme is that:
One kind goes out roof pipeline waterproof construction, including the waterproof layer for being sheathed on casing on the outside of pipeline, being layed on roofing And roofing and the additional waterproof course of outside of sleeve are layed in, the junction of described sleeve pipe and pipeline is provided with first seal; The upper surface of the additional waterproof course is abutted with the lower face of first seal, and some fixing pieces are provided with the outside of its upper part; It is arranged on the outside of the first seal and fixing piece and is fixed with the first block piece;The top of first block piece and pipeline Outer wall abuts, both joints are provided with the second block piece.
Using the above scheme, the wind and rain above roofing blows to pipeline, and the first block piece is wrapped in first seal and fixation The outside of part, stops wind to pipeline and the two joints of casing, casing and additional waterproof course.It is attached that fixing piece is arranged on waterproof Add the outside on layer top, strengthen the fixation of additional waterproof course, and the inner wall of the first block piece is connected on the outer wall of fixing piece, So that fixing piece also acts on the fixation of reinforcing sleeve and pipeline, the amplitude of pipe vibration is reduced, adds the stabilization of pipeline Property.At the same time, aggegation is after the raindrop of pipeline outer wall glide along pipeline, first arrives at the first block piece, on the first block piece Rainwater is blocked in the outside of the first block piece by second block piece at end, prevents gap of the rainwater along the first block piece and pipeline The lower end of pipeline is down leaked out to, improves the water resistance of roof pipeline entirety, and then adds the service life on roof.
More preferably:The fixing piece is the rounded stirrup ring in section.
Using the above scheme, stirrup ring has certain structural strength, can strengthen consolidating for additional waterproof course top and casing It is fixed.The abutting of stirrup ring and the first block piece inner wall abuts for line face, and when wind is to the first block piece, stirrup ring can occur gently Micro- elastic deformation, and then slow down impact of the wind-force to additional waterproof course.
More preferably:Second seal is provided between second block piece and the first block piece.
Using the above scheme, the rainwater slid on the second block piece can be along between the second block piece and the first block piece Gap is slowly penetrated into first seal, and second seal is blocked up the gap between the first block piece and the second block piece Plug, reduces infiltration to the amount of rainfall at first seal.
More preferably:First block piece include be fixedly connected sequentially the first fixed part being bonded with pipeline, The first guide part being arranged on above first seal is tilted down towards remote duct orientation, is sheathed on additional waterproof course top Second fixed part and the second guide part that setting is tilted down towards remote duct orientation.
Using the above scheme, the first block piece by additional waterproof course and the two joints of casing, casing and pipeline and The top of additional waterproof course is wrapped up, formed a protective barrier, at engagement and additional waterproofing layer top play it is anti- Shield acts on, and adds the effect for waterproof of keeping out the wind.
More preferably:It is all provided with being arranged with hose clamp on the outside of first fixed part and the second fixed part.
Using the above scheme, hose clamp is respectively sleeved at the outside of the first fixed part and the second fixed part, stops to first Part is fixed, and adds the stability of the first block piece.The structure of hose clamp is simple, easy to operate, reduces the cost of construction, Easy to be widely used.
More preferably:The waterproof layer is tilting down towards away from duct orientation with the joint of casing and is provided with one Cricoid inclined-plane.
Using the above scheme, when outer wall flow direction and the joint of waterproof layer of the rainwater along additional waterproof course, rainwater meeting Leaked from the joint toward close to casing direction, be obliquely installed and prevent rain leakage to the junction of casing and waterproof layer, and then Barrier effect is played to the rainwater of leakage, adds the water resistance of roofing.
More preferably:The waterproof layer is provided with a bulge loop in the side away from casing, the additional waterproof course with The joint of waterproof layer is located at side of the bulge loop away from casing.
Using the above scheme, the rainwater that bulge loop to leak from the gap of waterproof layer and additional waterproof course is blocked in convex The outer circumferential surface of ring, has good barrier effect to the leakage of rainwater, and then adds one of waterproof barrier for casing.
More preferably:Reinforcing layer is additionally provided between the roofing and waterproof layer, the reinforcing layer is fixedly connected In the lower part of casing.
Using the above scheme, the reinforcing layer being fixedly connected with casing acts on for sleeve providing support, when wind-force is stronger, adds Slightly shaken under the action of the forces of the wind Gu the fixation of layer reduces casing, so that support of the casing to pipeline is more firm, Add the structural strength of pipeline and casing.
More preferably:Adhesive layer is provided between the reinforcing layer and waterproof layer.
Using the above scheme, adhesive layer is arranged between reinforcing layer and waterproof layer, and when extraneous wind-force is larger, adhesive layer is used In the disengaging for preventing reinforcing layer and additional waterproof course so that the connection of reinforcing layer and additional waterproof course is more firm, and then increases The stability of waterproof construction entirety.
In conclusion the utility model has the advantages that:
By the setting of the first block piece and fixing piece, protection and cushioning effect are played to pipeline and each joint, The barrier effect to wind and rain is strengthened, the amplitude of pipeline concussion and the degree of deformation is reduced, adds the stability of pipeline, protect The sealing effect of each joint on pipeline is hindered, so that the waterproof effect for going out roof pipeline greatly improves.
Brief description of the drawings
Fig. 1 is the internal structure schematic diagram for roof pipeline waterproof construction;
Fig. 2 is enlarged drawings of the Fig. 1 at A.
In figure, 1, pipeline;2nd, roof;3rd, casing;4th, the first block piece;5th, additional waterproof course;6th, waterproof layer;7th, bond Layer;8th, reinforcing layer;9th, first seal;10th, fixing piece;21st, roofing;41st, the first fixed part;42nd, the first guide part;43rd, Two fixed parts;44th, the second guide part;45th, hose clamp;46th, the second block piece;47th, second seal;61st, inclined-plane;62nd, bulge loop.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
One kind goes out roof pipeline waterproof construction, as shown in Figure 1, the casing 3, first including being sheathed on 1 lower outside of pipeline Block piece 4 and the additional waterproof course 5 being from top to bottom set in turn on roofing 21, waterproof layer 6, adhesive layer 7 and reinforcing layer 8.
Wherein, waterproof layer 6 is provided with a cricoid inclined-plane 61 in the joint with casing 3, and inclined-plane 61 is towards away from casing 3 Direction tilt down setting.Side of the waterproof layer 6 away from casing 3 is additionally provided with a bulge loop 62, additional waterproof course 5 and waterproof layer 6 joint is located at side of the bulge loop 62 away from casing 3, to prevent the leakage of rainwater.
As depicted in figs. 1 and 2, the upper end of casing 3 is provided with cricoid first seal 9, and its underpart plugged and fixed is in room Pass through casting integrated shaping in top 2 and with reinforcing layer 8.The section of additional waterproof course 5 is L-shaped, is layed in waterproof layer 6 and casing 3 Outer wall.The upper surface of additional waterproof course 5 is abutted with the lower face of first seal 9, the outside winding on 5 top of additional waterproof course It is circular fixing piece 10 to have some sections, and its underpart is smooth excessively in the bending of the joint of casing 3 and waterproof layer 6.Wherein, Gu It is stirrup ring to determine part 10.
First block piece 4 is annular tubular, and a protective barrier is formed in the outside of first seal 9.First block piece 4 Including sequentially connected first fixed part 41, the first guide part 42, the second fixed part 43 and the second guide part 44.Wherein, One fixed part 41 is sheathed on the outside of pipeline 1 of the top of casing 3, its inner wall is bonded with the outer wall of pipeline 1;Outside first fixed part 41 Side is also arranged with a hose clamp 45, to fix the top of the first block piece 4.First guide part 42 is arranged at first seal 9 Top, and relative to horizontal direction setting is tilted down towards away from 3 direction of pipeline.Second fixed part 43 is sheathed on additional waterproof course The outside on 5 tops, its inner wall are abutted with to fixing piece 10, and outside is equally arranged with a hose clamp 45.Second guide part 44 is opposite In water direction setting is tilted down towards away from 3 direction of pipeline.First block piece 4 is additionally provided with ring in the upper end of the first fixed part 41 Second block piece 46 of shape, and the joint of the second block piece 46 and the first fixed part 41 is provided with second seal 47.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but As long as within the protection scope of the present utility model all protected be subject to Patent Law.

Claims (9)

1. one kind goes out roof pipeline waterproof construction, including it is sheathed on casing (3) on the outside of pipeline (1), is layed on roofing (21) Waterproof layer (6) and the additional waterproof course (5) that is layed on the outside of roofing (21) and casing (3), it is characterized in that:Described sleeve pipe (3) junction with pipeline (1) is provided with first seal (9);The upper surface of the additional waterproof course (5) and first seal (9) lower face abuts, and some fixing pieces (10) are provided with the outside of its upper part;The first seal (9) and fixing piece (10) it is arranged on the outside of and is fixed with the first block piece (4);The top of first block piece (4) is abutted with the outer wall of pipeline (1), Both joints are provided with the second block piece (46).
2. one kind according to claim 1 goes out roof pipeline waterproof construction, it is characterized in that:The fixing piece (10) is section Rounded stirrup ring.
3. one kind according to claim 2 goes out roof pipeline waterproof construction, it is characterized in that:Second block piece (46) with Second seal (47) is provided between first block piece (4).
4. one kind as claimed in any of claims 1 to 3 goes out roof pipeline waterproof construction, it is characterized in that:Described The first fixed part (41) be bonded with pipeline (1) that one block piece (4) includes being fixedly connected sequentially, towards remote pipeline (1) direction Tilt down the first guide part (42) being arranged on above first seal (9), be sheathed on the second of additional waterproof course (5) top Fixed part (43) and the second guide part (44) that setting is tilted down towards remote pipeline (1) direction.
5. one kind according to claim 4 goes out roof pipeline waterproof construction, it is characterized in that:First fixed part (41) and It is all provided with being arranged with hose clamp (45) on the outside of second fixed part (43).
6. one kind according to claim 5 goes out roof pipeline waterproof construction, it is characterized in that:The waterproof layer (6) with set The joint of pipe (3) tilts down towards remote pipeline (1) direction and is provided with a cricoid inclined-plane (61).
7. one kind according to claim 1 goes out roof pipeline waterproof construction, it is characterized in that:The waterproof layer (6) is remote The side of casing (3) is provided with a bulge loop (62), and the additional waterproof course (5) and the joint of waterproof layer (6) are located at bulge loop (62) side away from casing (3).
8. one kind according to claim 7 goes out roof pipeline waterproof construction, it is characterized in that:The roofing (21) and waterproof layer (6) reinforcing layer (8) is additionally provided between, the reinforcing layer (8) is fixedly connected on the lower part of casing (3).
9. one kind according to claim 8 goes out roof pipeline waterproof construction, it is characterized in that:The reinforcing layer (8) and waterproof Adhesive layer (7) is provided between layer (6).
CN201721115190.7U 2017-08-31 2017-08-31 One kind goes out roof pipeline waterproof construction Active CN207245020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721115190.7U CN207245020U (en) 2017-08-31 2017-08-31 One kind goes out roof pipeline waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721115190.7U CN207245020U (en) 2017-08-31 2017-08-31 One kind goes out roof pipeline waterproof construction

Publications (1)

Publication Number Publication Date
CN207245020U true CN207245020U (en) 2018-04-17

Family

ID=61884911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721115190.7U Active CN207245020U (en) 2017-08-31 2017-08-31 One kind goes out roof pipeline waterproof construction

Country Status (1)

Country Link
CN (1) CN207245020U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938959A (en) * 2017-11-30 2018-04-20 上海宝冶集团有限公司 Metal roofing board goes out the waterproof method of roof pipeline
CN113323294A (en) * 2021-06-11 2021-08-31 中国民用航空总局第二研究所 Take waterproof construction's airport terminal building roof boarding installing support
CN115262873A (en) * 2022-07-22 2022-11-01 中建一局集团第五建筑有限公司 Go out roofing downspout pre-buried structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938959A (en) * 2017-11-30 2018-04-20 上海宝冶集团有限公司 Metal roofing board goes out the waterproof method of roof pipeline
CN113323294A (en) * 2021-06-11 2021-08-31 中国民用航空总局第二研究所 Take waterproof construction's airport terminal building roof boarding installing support
CN113323294B (en) * 2021-06-11 2023-01-24 中国民用航空总局第二研究所 Take waterproof construction's airport terminal building roof boarding installing support
CN115262873A (en) * 2022-07-22 2022-11-01 中建一局集团第五建筑有限公司 Go out roofing downspout pre-buried structure
CN115262873B (en) * 2022-07-22 2024-03-26 中建一局集团第五建筑有限公司 Go out pre-buried structure of roofing downspout

Similar Documents

Publication Publication Date Title
CN207245020U (en) One kind goes out roof pipeline waterproof construction
CN207314560U (en) A kind of prefabricated outer wall panel vertical abutment joint waterproofing node
CN102352670B (en) Roof ridge waterproof construction
CN201672159U (en) Waterproof-ground penetrating structure for pipes
CN205475948U (en) A roofing strutting arrangement and abat -vent for installing oblique roofing of abat -vent
CN206636065U (en) A kind of drain structure of building roof
CN205116573U (en) Waterproof polyurethane roof boarding keeps warm
CN205369917U (en) Bathroom antiseep built -in fitting
CN212510947U (en) Electroless lighting system for waterproof building roof
CN209616541U (en) A kind of polyethylene polypropylene fiber waterproof coiled material with heat insulation function
CN210800266U (en) Go out roofing pipeline waterproof construction
CN204728498U (en) A kind of building deformation joint leak-proof device
CN207537973U (en) A kind of landscape pond expanded joint structure
CN208293661U (en) A kind of buried shockproof stretch-proof running water pipe of buffering
CN212718618U (en) A prevention of seepage water swivel, prevention of seepage water installation for roofing
CN206903084U (en) A kind of accessible roof secretly buries exhaust pipe structure
CN220469264U (en) Roof waterproof structure
CN218670938U (en) Pipeline floor penetrating structure
CN205475750U (en) Waterproof construction of prefabricated exterior wall of transformer substation board
CN217711433U (en) Waterproof construction structure for pipeline outlet roof
CN215763647U (en) Take waterproof construction's piping lane
CN211172928U (en) Building installation pipe structure with inner circle and outer square pipelines
CN215928653U (en) Seepage-proofing structure for sleeve penetrating through civil air defense roof
CN217128760U (en) Roof waterproof structure
CN204640944U (en) A kind of corrugated type TPU composite membrane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant