CN207244699U - Sludge treatment ship - Google Patents
Sludge treatment ship Download PDFInfo
- Publication number
- CN207244699U CN207244699U CN201721307587.6U CN201721307587U CN207244699U CN 207244699 U CN207244699 U CN 207244699U CN 201721307587 U CN201721307587 U CN 201721307587U CN 207244699 U CN207244699 U CN 207244699U
- Authority
- CN
- China
- Prior art keywords
- mud
- sludge treatment
- conveyor
- hull
- treatment ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of sludge treatment ship, including:Hull;Mud, which twists, inhales device, is arranged on hull, and mud, which twists suction device, includes dredge pump;Desiccation apparatus, is installed on hull by the way of skid;Chemicals dosing plant, is installed on the hull by the way of skid, and the outlet of the chemicals dosing plant is provided with dosing pump, and the medicine exit of the dosing pump is connected to the medicine entrance in the homogeneous pond;And conveyor, the dry mud which isolates are transmitted to barge through the conveyor.The utility model can solve that sludge treatment installation area in the prior art is big, is awkward and the problems such as position can not move.
Description
Technical field
It the utility model is related to desilting equipment, more particularly to a kind of sludge treatment ship of dredging desiccation integral.
Background technology
In the prior art, channel cleanout drying equipment, its structure mainly include the desilting equipment being arranged on river and are arranged on
Desiccation (or dehydration) equipment on bank, desilting equipment include hull, are fixed on the slush pump of hull fore, and by fixing it
Between the mud-sucking device that is connected with slush pump.The water inlet of slush pump is connected with the suction bucket of mud-sucking device, and water outlet passes through
Slurry transportation pipeline is connected to hull afterbody.Drying equipment includes homogeneous pond, and homogeneous pond is connected with centrifugation by mud feed pump
Machine, mud are divided into discarded clod and waste water discharge after drying equipment desiccation.But above device huge structure, hull and dry
Change equipment to depart from, be not easy to shift position, and the conveying cost of mud is also very high.
Utility model content
Therefore, one of the purpose of this utility model is to provide a kind of sludge treatment ship, to solve mud in the prior art
The problems such as processing unit takes up a large area, is awkward and position can not move.
In order to achieve the above object, the utility model provides a kind of sludge treatment ship, which includes:Hull, the ship
The stern of body is provided with propeller;Mud, which twists, inhales device, is arranged at one end of the hull, which, which twists, inhales device including inhaling mud
Pump;Desiccation apparatus, is installed on the hull, which includes by the way of skid:Shaking-sieving device, the dredge pump
Outlet be connected to the shaking-sieving device through mud conveying pipeline;Homogeneous pond, is arranged at below the shaking-sieving device;And centrifugation
Seperator, connects with the homogeneous pond, which carries out mud-water separation to the mud from the homogeneous pond;Chemicals dosing plant,
It is installed on by the way of skid on the hull, the outlet of the chemicals dosing plant is provided with dosing pump, the medicine exit of the dosing pump
It is connected to the medicine entrance in the homogeneous pond;And conveyor, the dry mud which isolates is transmitted to through the conveyor refutes
Ship.
As optional technical solution, which includes:First sub- conveyor, the dry mud for being connected to the desiccation apparatus go out
Mouthful;Second sub- conveyor, is docked with the first sub- conveyor, is received the dry mud from the first sub- conveyor and is delivered to dry mud
The barge.
As optional technical solution, further include material-gathering device, the material-gathering device be connected to the first sub- conveyor and
Between the second sub- conveyor.
As optional technical solution, which is integrated on same base with the desiccation apparatus, which fixes
In on the hull;Or the chemicals dosing plant is integrated in first base and second base respectively with the desiccation apparatus, the first base
And the second base is fixed on the hull.
As optional technical solution, the bottom which twists suction device is provided with reamer head, for twisting silt dredging mud.
As optional technical solution, which further includes filter press, which separates the centrifugal separator
The mud gone out discharges dry mud and waste water respectively after press filtration cures.
As optional technical solution, which further includes agitating device, and the agitating device is by mud and puts into this
Medicine in homogeneous pond stirs evenly.
As optional technical solution, further include power generator, the power generator be powered at the mud twist inhale device, this is dry
Makeup is put, the chemicals dosing plant and the sludge treatment ship household electricity.
As optional technical solution, which is device of solar generating or wind electricity generating system.
As optional technical solution, control device is further included, is twisted with the power generator, the mud and inhales device, the desiccation
Device and the chemicals dosing plant are connected, and inhale device, the desiccation apparatus and dosing dress to control the power generator, the mud to twist
The work put.
Compared with prior art, mud directly can be carried out desiccation on the spot by the utility model, clean water overflow is gone back to river, be become silted up
Mud directly loads transport onto ship, and without setting mud-dumping yard, equipment solves the problems, such as that construction land tenure is difficult and improve at the same time without operation on the bank
Channel cleanout efficiency.In addition, desiccation apparatus and chemicals dosing plant are installed on hull using skid mode, that is to say, that desiccation
The various components of device or part are integrated on a unsplit bedplate, can be with integral installation or movement;Likewise, chemicals dosing plant
Various components are also integrated on a unsplit bedplate, can be with integral installation or movement so that sludge treatment ship can move freely
Operation.
The advantages of on the utility model can be described in detail with spirit by following utility model and institute's accompanying drawings obtain into
The understanding of one step.
Brief description of the drawings
Fig. 1 show the floor map of sludge treatment ship according to the present utility model;
Fig. 2 show the front view of the part-structure of the sludge treatment ship in Fig. 1.
Embodiment
Fig. 1 and Fig. 2 are referred to, Fig. 1 show the floor map of sludge treatment ship according to the present utility model, Fig. 2 institutes
The front view of the part-structure for the sludge treatment ship being shown as in Fig. 1.The utility model provides a kind of sludge treatment ship, above-mentioned mud
Handling ship includes hull 1, mud strand suction device, desiccation apparatus 3, chemicals dosing plant 4 and conveyor.Wherein, the stern of hull 1 is set
Propeller is equipped with, to provide the power of the movement of hull 1.Mud, which twists, inhales one end that device (not shown) is arranged at hull 1,
Mud, which twists suction device, includes dredge pump, and the bottom of mud strand suction device is additionally provided with reamer head, for twisting silt dredging mud.
Desiccation apparatus 3 includes shaking-sieving device 31, homogeneous pond 32 and centrifugal separator 33.The outlet of dredge pump is through defeated
Mud pipeline is connected to shaking-sieving device 31;Homogeneous pond 32 is arranged at the lower section of shaking-sieving device 31;Centrifugal separator 33 with
Matter pond 32 connects, and centrifugal separator 33 carries out mud-water separation to the mud from homogeneous pond 32.The outlet of chemicals dosing plant 4 is provided with
Dosing pump 42, the medicine exit 41,43 (exporting) of dosing pump 42 are connected to the medicine entrance 321 in homogeneous pond 32.Moreover, desiccation
The dry mud that device 3 is isolated is transmitted to barge through conveyor.Above-mentioned medicine is, for example, medicament, but the utility model not as
Limit.And the specific component of medicament can be determined according to the Contents of Main Components in the mud of processing, such as a huge sum of money in some mud
Belong to content height, then can add the medicament of removable heavy metal;Or medicament is, for example, flocculant etc..And chemicals dosing plant 4
Dosing tank 44 is further included, dosing tank is holding medicine.
Fig. 1 is specifically can be found in, dredge pump sucks a large amount of mud and water, and enters from the mud entrance 35 of desiccation apparatus 3
Desiccation apparatus 3 and through 31 vibrosieve of shaking-sieving device, by the discarded object (such as the particulate matter such as sand, mud) of bulky grain in mud
Sift out, remaining mud is then flowed into homogeneous pond 32, wherein the bulky grain discarded object sifted out can be cleared up by dross extractor.Fall into
Mud in homogeneous pond 32 is mixed with the medicament that chemicals dosing plant 4 adds, and is then centrifuged machine 33 again by mud (or mud)
Desiccation separates, and the waste water separated can directly be back-silted by the discharge of pipes for the wastewater outlet 36 for being connected to desiccation apparatus 3
In river where mud processing ship, and dry mud is then delivered to barge by conveyor or temporarily deposits in the dress that gathers materials set on hull
Put in 6.
Wherein, in present embodiment, conveyor includes the first sub- 7 and second sub- conveyor 8 of conveyor, the first son transmission
With the 7 dry mud outlets for being connected to desiccation apparatus 3;Second sub- conveyor 8 is docked with the first sub- conveyor 7, and the second sub- conveyor 8 connects
Receive the dry mud from the first sub- conveyor 7 and dry mud is delivered to barge.In addition, material-gathering device 6 is connected to the first sub- conveyor 7
And second between sub- conveyor 8, when barge is not up to, material-gathering device 6 can be used to temporarily collect or the son conveying of storage first
With the 7 dry mud transmitted.
Moreover, in present embodiment, desiccation apparatus 3 and chemicals dosing plant 4 are installed on hull by the way of skid,
That is the various components of desiccation apparatus 3 or part are integrated on a unsplit bedplate, and base is fixed on hull, so that
Desiccation apparatus 3 can be with integral installation or movement;Likewise, the various components of chemicals dosing plant 4 are also integrated on a unsplit bedplate,
Base is fixed on hull, so that chemicals dosing plant 4 can be with integral installation or movement.Certainly, in another embodiment, desiccation dress
Put 3 and chemicals dosing plant 4 can be integrated on same base.
In addition, desiccation apparatus 3 further includes filter press, filter press cures the mud that centrifugal separator 33 is isolated through press filtration
Discharge dry mud and waste water respectively afterwards.
Homogeneous pond 32 further includes agitating device, which stirs mud and the medicine put into the homogeneous pond 32
Uniformly.
The sludge treatment ship of the utility model further includes power generator 9, which, which fills 9 and be powered at mud and twist, inhales device, does
3, chemicals dosing plant 4 and sludge treatment ship household electricity are put in makeup.And power generator 9 is, for example, device of solar generating or wind energy
Power generator.
In addition, sludge treatment ship further includes control device, twisted with power generator 9, mud inhale device, the desiccation apparatus 3 with
And the chemicals dosing plant 4 is connected, device, the desiccation apparatus 3 and the chemicals dosing plant 4 are inhaled to control the power generator 9, the mud to twist
Work.
In some embodiments, mud twists suction device and is additionally provided with elevation control system, elevation control system and mud
Twist and inhale device electric connection, for controlling mud to twist the excavating depth for the reamer head for inhaling device, so can accurately control reamer
Head depth, improves and excavates precision.
In other embodiments, monitoring system is additionally provided with, monitoring system includes the strand for being arranged on dredging desiccation ship
GPS locator on cutter head, and monitoring device on the ground is set, for observing the digging of reamer head for surface personnel
Dig track.Such surface personnel can grasp mud in real time and twist the mining track for inhaling device.
And in present embodiment, screw machine can be set in the side of centrifugal separator 33, dry mud is conveyed by screw machine.
In conclusion mud directly can be carried out desiccation on the spot by the utility model, clean water overflow is set to go back to river, mud is direct
Shipment transport, without setting mud-dumping yard, equipment is without operation on the bank, and solving the problems, such as construction land tenure, difficult to improve river at the same time clear
Silt efficiency.In addition, desiccation apparatus and chemicals dosing plant are installed on hull using skid mode, that is to say, that desiccation apparatus
Various components or part are integrated on a unsplit bedplate, can be with integral installation or movement;Likewise, each group of chemicals dosing plant
Part is also integrated on a unsplit bedplate, can be with integral installation or movement so that sludge treatment ship can move freely operation.
By the above detailed description of preferred embodiments, it is intended to more clearly describe the feature and essence of the utility model
God, and not the scope of protection of the utility model is any limitation as with above-mentioned disclosed preferred embodiment.On the contrary,
The purpose is to wish to cover various changes and have the guarantor for being arranged in the claim to be applied of the utility model of equality
In the range of shield.Therefore, the apllied scope of the claims of the utility model should be made most broad according to above-mentioned explanation
Explanation, with cause its cover it is all possible change and tool equality arrangement.
Claims (10)
1. a kind of sludge treatment ship, it is characterised in that the sludge treatment ship includes:
Hull, the stern of the hull are provided with propeller;
Mud, which twists, inhales device, is arranged at one end of the hull, which, which twists suction device, includes dredge pump;
Desiccation apparatus, is installed on the hull, which includes by the way of skid:
Shaking-sieving device, the outlet of the dredge pump are connected to the shaking-sieving device through mud conveying pipeline;
Homogeneous pond, is arranged at below the shaking-sieving device;And
Centrifugal separator, connects with the homogeneous pond, which carries out mud-water separation to the mud from the homogeneous pond;
Chemicals dosing plant, is installed on the hull by the way of skid, and the outlet of the chemicals dosing plant is provided with dosing pump, the dosing
The medicine exit of pump is connected to the medicine entrance in the homogeneous pond;And
Conveyor, the dry mud which isolates are transmitted to barge through the conveyor.
2. sludge treatment ship as claimed in claim 1, it is characterised in that the conveyor includes:
First sub- conveyor, is connected to the dry mud outlet of the desiccation apparatus;
Second sub- conveyor, is docked with the first sub- conveyor, is received the dry mud from the first sub- conveyor and is conveyed dry mud
To the barge.
3. sludge treatment ship as claimed in claim 2, it is characterised in that further include material-gathering device, which is connected to
Between the first sub- conveyor and the second sub- conveyor.
4. sludge treatment ship as claimed in claim 1, it is characterised in that the chemicals dosing plant is integrated in same with the desiccation apparatus
On base, which is fixed on the hull;Or the chemicals dosing plant and the desiccation apparatus are integrated in first base and the respectively
Two bases, the first base and the second base are fixed on the hull.
5. sludge treatment ship as claimed in claim 1, it is characterised in that the bottom that the mud twists suction device is provided with reamer
Head, for twisting silt dredging mud.
6. sludge treatment ship as claimed in claim 1, it is characterised in that the desiccation apparatus further includes filter press, the filter press
The mud that the centrifugal separator is isolated is discharged into dry mud and waste water respectively after press filtration cures.
7. sludge treatment ship as claimed in claim 1, it is characterised in that the homogeneous pond further includes agitating device, stirring dress
Put and stir evenly mud with putting into the medicine in the homogeneous pond.
8. sludge treatment ship as claimed in claim 1, it is characterised in that further include power generator, which is powered at
The mud, which twists, inhales device, the desiccation apparatus, the chemicals dosing plant and the sludge treatment ship household electricity.
9. sludge treatment ship as claimed in claim 8, it is characterised in that the power generator is device of solar generating or wind energy
Power generator.
10. sludge treatment ship as claimed in claim 8, it is characterised in that further include control device, with the power generator, should
Mud twists suction device, the desiccation apparatus and the chemicals dosing plant and is connected, and inhales device to control the power generator, the mud to twist, is somebody's turn to do
The work of desiccation apparatus and the chemicals dosing plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721307587.6U CN207244699U (en) | 2017-10-11 | 2017-10-11 | Sludge treatment ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721307587.6U CN207244699U (en) | 2017-10-11 | 2017-10-11 | Sludge treatment ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207244699U true CN207244699U (en) | 2018-04-17 |
Family
ID=61891152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721307587.6U Expired - Fee Related CN207244699U (en) | 2017-10-11 | 2017-10-11 | Sludge treatment ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207244699U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108911464A (en) * | 2018-07-16 | 2018-11-30 | 广州星际海洋工程设计有限公司 | A kind of mud minimizing processing unit |
-
2017
- 2017-10-11 CN CN201721307587.6U patent/CN207244699U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108911464A (en) * | 2018-07-16 | 2018-11-30 | 广州星际海洋工程设计有限公司 | A kind of mud minimizing processing unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5361998A (en) | Plant for treating drill cuttings | |
CN206567083U (en) | Highly effective coagulation soil paste retracting device | |
CN105064938B (en) | The integrating device of chemical flocculation and mechanical presses processing rejected well drilling liquid | |
CN205653326U (en) | Muddy water processing system | |
CN103205991A (en) | Channel cleanout device and method thereof | |
CN203174656U (en) | Channel cleanout device | |
CN106759602A (en) | River course green ecological desilting processing system and its processing method | |
CN103351090A (en) | Method and device for collecting and treating sludge in shallow lake | |
JP6247663B2 (en) | Firewood system | |
CN204098107U (en) | Strand suction channel cleanout device | |
CN207244699U (en) | Sludge treatment ship | |
FI90113C (en) | FOERFARANDE FOER ATT MUDDRA UPP SLAM FRAON HAMNAR, VATTENVAEGAR ELLER MOTSVARANDE OCH ETT MUDDERFARTYG | |
CN205061732U (en) | Concrete thick liquid recovery unit | |
JP5278885B1 (en) | Method and apparatus for removing contaminants contained in agricultural soil | |
CN104747107A (en) | Integrated treatment method on waste drilling mud | |
CN209242822U (en) | A kind of quotient's concrete mixing station resource recovering system | |
US3807558A (en) | Apparatus for separating lightweight debris from sand and gravel | |
CN103909009B (en) | papermaking waste recovery system | |
CN203382620U (en) | Device for collecting and treating sludge in shallow lake | |
CN204511343U (en) | Well drilling waste mud integrated processing system | |
CN206824002U (en) | A kind of sand-stone separator | |
CN206570122U (en) | A kind of quick equipment for separating liquid from solid of oilfield drilling waste | |
CN106194078B (en) | Drilling mud does not fall to ground processing apparatus | |
CN206089401U (en) | Processing system is handled to river lake silt | |
CN205473326U (en) | Sand dehydration platform is divided to an organic whole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180417 Termination date: 20201011 |
|
CF01 | Termination of patent right due to non-payment of annual fee |