CN207244472U - A kind of novel cantilever beam construction hanging basket advancing device - Google Patents

A kind of novel cantilever beam construction hanging basket advancing device Download PDF

Info

Publication number
CN207244472U
CN207244472U CN201721158351.0U CN201721158351U CN207244472U CN 207244472 U CN207244472 U CN 207244472U CN 201721158351 U CN201721158351 U CN 201721158351U CN 207244472 U CN207244472 U CN 207244472U
Authority
CN
China
Prior art keywords
hanging basket
main longitudinal
cantilever beam
advancing device
centre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721158351.0U
Other languages
Chinese (zh)
Inventor
何义
袁晓晨
顾留碗
嵇旭东
侍光耀
郭敏
全有维
黄峰
沈兴东
高栋
拓金城
马添
刘金伟
金童
仲启超
仲敏年
周翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201721158351.0U priority Critical patent/CN207244472U/en
Application granted granted Critical
Publication of CN207244472U publication Critical patent/CN207244472U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开一种新型悬臂梁施工挂篮前移装置,包括:挂篮行走支撑系统,牵引设备和张拉设备;所述挂篮行走支撑系统包括:支腿和反压梁,所述支腿沿施工方向间隔布设于箱梁顶面,并支撑挂篮的主纵梁,所述反压梁横向加压于所述主纵梁上;所述牵引设备包括:牵引锚固装置和穿心式千斤顶,所述牵引锚固装置固设于箱梁上方,并位于主纵梁前端,所述穿心式千斤顶位于主纵梁后端,所述牵引锚固装置和穿心式千斤顶之间连接有钢绞线;所述张拉设备包括:高压油泵和一拖二分配阀,所述高压油泵通过一拖二分配阀与穿心式千斤顶连接,为穿心式千斤顶提供张拉力,所述穿心式千斤顶反向张拉作用于限位挡板后推动挂篮前移。

The utility model discloses a novel forward-moving device for a hanging basket in cantilever beam construction, comprising: a walking support system for the hanging basket, traction equipment and tensioning equipment; The legs are arranged at intervals on the top surface of the box girder along the construction direction, and support the main longitudinal beam of the hanging basket, and the counter pressure beam is laterally pressed on the main longitudinal beam; Jack, the traction anchor device is fixed above the box girder and is located at the front end of the main longitudinal beam, the through-type jack is located at the rear end of the main longitudinal beam, and a steel strand is connected between the traction anchor device and the through-type jack; The tensioning equipment includes: a high-pressure oil pump and a one-to-two distribution valve. The high-pressure oil pump is connected to the through-type jack through the one-to-two distribution valve to provide tension for the through-type jack, and the through-type jack reverses After the tension acts on the limit baffle, the hanging basket is pushed forward.

Description

一种新型悬臂梁施工挂篮前移装置A new type of cantilever beam construction hanging basket forward moving device

技术领域technical field

本发明属于建筑施工技术领域,具体涉及一种新型悬臂梁施工挂篮前移装置,主要应用于悬臂梁施工中的挂篮前移。The invention belongs to the technical field of building construction, and in particular relates to a novel device for moving forward of a hanging basket in cantilever beam construction, which is mainly used for moving forward of the hanging basket in cantilever beam construction.

背景技术Background technique

桥梁挂篮施工技术,由于不需大型吊机和架设支架,且具有拼制简单、装拆方便、重复利用性高、受力后变形小等特点,在桥梁建设工程中得到了广泛地应用。Bridge hanging basket construction technology has been widely used in bridge construction projects because it does not require large cranes and erection brackets, and has the characteristics of simple assembly, convenient assembly and disassembly, high reusability, and small deformation after stress.

但是,其制作和施工缺少法定的规范和技术标准,挂篮施工过程前移时,一般都是采用10t 的手拉葫芦,由人工手动操作前移,极为依赖工人操作技巧。若控制出现稍许偏差,经常会导致二榀挂篮移动不同步而发生扭曲错位,从而不同程度的造成安全隐患。However, its production and construction lack legal norms and technical standards. When the construction process of the hanging basket is moved forward, a 10t chain block is generally used, which is moved forward by manual operation, which is extremely dependent on the worker's operating skills. If there is a slight deviation in the control, it will often cause the two hanging baskets to move asynchronously and distort and dislocate, thus causing safety hazards to varying degrees.

发明内容Contents of the invention

发明目的:本发明的目的在于针对现有技术的不足,提供一种新型悬臂梁施工挂篮前移装置,以解决挂篮前移时不同步而发生扭曲错位的问题,消除了施工过程中出现的安全隐患,节省了人力,同时提高了施工效率。Purpose of the invention: The purpose of the present invention is to address the deficiencies of the prior art and provide a new type of cantilever beam construction hanging basket forward device to solve the problem of twisting and dislocation caused by asynchronous movement of the hanging basket and eliminate the occurrence of Potential safety hazards, saving manpower, and improving construction efficiency.

技术方案:本发明所述一种新型悬臂梁施工挂篮前移装置,包括:挂篮行走支撑系统,牵引设备和张拉设备;Technical solution: A new type of cantilever beam construction hanging basket forward device according to the present invention, including: hanging basket walking support system, traction equipment and tensioning equipment;

所述挂篮行走支撑系统包括:支腿和反压梁,所述支腿沿施工方向间隔布设于箱梁顶面,并支撑挂篮的主纵梁,所述反压梁横向加压于所述主纵梁上;The walking support system of the hanging basket includes: outriggers and counter-pressure beams. The outriggers are arranged at intervals along the construction direction on the top surface of the box girder and support the main longitudinal beam of the hanging basket. on the main longitudinal beam;

所述牵引设备包括:牵引锚固装置和穿心式千斤顶,所述牵引锚固装置固设于箱梁上方,并位于主纵梁前端,所述穿心式千斤顶位于主纵梁后端,所述牵引锚固装置和穿心式千斤顶之间连接有钢绞线,所述钢绞线的前端由牵引锚固装置紧固,末端穿过固设于主纵梁后端的限位挡板后,由穿心式千斤顶紧固;The traction equipment includes: a traction anchor device and a through-hole jack, the traction anchor device is fixed above the box girder and is located at the front end of the main longitudinal beam, the through-type jack is located at the rear end of the main longitudinal beam, and the traction anchor device A steel strand is connected between the steel strand and the through-hole jack, the front end of the steel strand is fastened by a traction anchorage device, and the end passes through the limit baffle fixed at the rear end of the main longitudinal beam, and is tightened by the through-hole jack. solid;

所述张拉设备包括:高压油泵和一拖二分配阀,所述高压油泵通过一拖二分配阀与穿心式千斤顶连接,为穿心式千斤顶提供张拉力,所述穿心式千斤顶反向张拉作用于限位挡板后推动挂篮前移。The tensioning equipment includes: a high-pressure oil pump and a one-to-two distribution valve. The high-pressure oil pump is connected to the through-type jack through the one-to-two distribution valve to provide tension for the through-type jack, and the through-type jack reverses After the tension acts on the limit baffle, the hanging basket is pushed forward.

进一步地,所述反压梁横跨挂篮的两主纵梁,并加压于主纵梁的两端。Further, the anti-pressure beam straddles the two main longitudinal beams of the hanging basket, and presses the two ends of the main longitudinal beams.

进一步地,所述反压梁沿其长度方向通过若干根第一精轧螺纹钢反锁在箱梁上。Further, the anti-pressure beam is locked on the box girder along its length direction through several first finish-rolled rebars.

进一步地,所述支腿和反压梁与主纵梁的接触面上均设有滚动轮。Further, rolling wheels are provided on the contact surfaces of the supporting legs and the anti-pressure beam and the main longitudinal beam.

进一步地,所述牵引锚固装置包括:扁锚和槽钢,所述槽钢通过第二精轧螺纹钢水平固设于箱梁上方,所述扁锚固设于槽钢凹槽内,并紧固钢绞线。Further, the traction anchoring device includes: a flat anchor and a channel steel, the channel steel is fixed horizontally above the box girder through the second finish-rolled rebar, the flat anchor is arranged in the groove of the channel steel, and fastened Strand.

进一步地,所述槽钢的槽面开设有与第二精轧螺纹钢相匹配的通孔,所述第二精轧螺纹钢贯穿固定于通孔内。Further, the groove surface of the channel steel is provided with a through hole matching the second finish-rolled rebar, and the second finish-rolled rebar is penetrated and fixed in the through hole.

进一步地,所述限位挡板为L形结构,并焊接连接于主纵梁侧壁。Further, the limit baffle is an L-shaped structure, and is welded to the side wall of the main longitudinal beam.

有益效果:Beneficial effect:

(1)借助一拖二分配阀对两个千斤顶进行控制,以保证两侧同步,使二榀挂篮保持对称同步前移,可消除施工过程中出现的安全隐患,在节省了人力的同时,提高了施工效率;(1) Control the two jacks with the help of the one-to-two distribution valve to ensure that both sides are synchronized, so that the two hanging baskets can be moved forward symmetrically and synchronously, which can eliminate potential safety hazards in the construction process and save manpower at the same time. Improve construction efficiency;

(2)改人工手动操作为机械设备操作,大大提高了挂篮行走的精度;(2) Change manual operation to mechanical equipment operation, which greatly improves the walking accuracy of the hanging basket;

(3)反压梁同时横跨挂篮的两主纵梁的方式,简化了主纵梁紧固的方式;(3) The way that the anti-pressure beam spans the two main longitudinal beams of the hanging basket at the same time simplifies the fastening method of the main longitudinal beams;

(4)支腿和反压梁上设置的滚动轮,使得挂篮前移的运动过程更加的灵活、便捷。(4) The rolling wheels set on the outriggers and the counter pressure beam make the movement process of the hanging basket more flexible and convenient.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明牵引锚固装置细部放大示意图;Fig. 2 is a detailed enlarged schematic view of the traction anchoring device of the present invention;

图中:1-牵引锚固装置,2-支腿,3-限位挡板,4-穿心式千斤顶,5-一拖二分配阀,6-箱梁,7-高压油泵,8-第一精轧螺纹钢,9-反压梁,10-主纵梁,11-钢绞线,12-第二精轧螺纹钢,13-槽钢,14-扁锚。In the figure: 1-Traction anchor device, 2-Outrigger, 3-Limiting baffle, 4-Through jack, 5-One-to-two distribution valve, 6-Box beam, 7-High pressure oil pump, 8-First Finish-rolled rebar, 9-back pressure beam, 10-main longitudinal beam, 11-steel strand, 12-second finish-rolled rebar, 13-channel steel, 14-flat anchor.

具体实施方式Detailed ways

下面通过附图对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。The technical solutions of the present invention will be described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.

实施例1:一种新型悬臂梁施工挂篮前移装置,包括:挂篮行走支撑系统,牵引设备和张拉设备;Embodiment 1: A new type of cantilever beam construction hanging basket forward device, including: hanging basket walking support system, traction equipment and tensioning equipment;

所述挂篮行走支撑系统包括:支腿2和反压梁9,所述支腿2沿施工方向间隔布设于箱梁6顶面,并支撑挂篮的主纵梁10,所述反压梁9横向加压于所述主纵梁10上;The walking support system of the hanging basket includes: outriggers 2 and counter-pressure beams 9, the outriggers 2 are arranged on the top surface of the box girder 6 at intervals along the construction direction, and support the main longitudinal beam 10 of the hanging basket, and the back-pressure beams 9 laterally pressing on the main longitudinal beam 10;

所述牵引设备包括:牵引锚固装置1和穿心式千斤顶4,所述牵引锚固装置1固设于箱梁10上方,并位于主纵梁10前端,所述穿心式千斤顶4位于主纵梁10后端,所述牵引锚固装置1和穿心式千斤顶4之间连接有钢绞线11,所述钢绞线11的长度比主纵梁10略长,所述钢绞线11的前端由牵引锚固装置1紧固,末端穿过固设于主纵梁10后端的限位挡板3后,由穿心式千斤顶4紧固;The traction equipment includes: a traction anchor device 1 and a through-hole jack 4, the traction anchor device 1 is fixed above the box girder 10, and is located at the front end of the main longitudinal beam 10, and the through-type jack 4 is located on the main longitudinal beam 10 rear end, a steel strand 11 is connected between the traction anchorage device 1 and the through-hole jack 4, the length of the steel strand 11 is slightly longer than the main longitudinal beam 10, and the front end of the steel strand 11 is formed by The traction anchor device 1 is fastened, and the end passes through the limit baffle 3 fixed at the rear end of the main longitudinal beam 10, and is fastened by a through-hole jack 4;

所述张拉设备包括:高压油泵7和一拖二分配阀5,所述高压油泵7通过第一管线与一拖二分配阀5连接后,一拖二分配阀5再通过第二管线分别与2台穿心式千斤顶4连接,高压油泵7同时为2台穿心式千斤顶4供油,所述穿心式千斤顶4获得等大的张拉力后,所述穿心式千斤顶4反向张拉作用于限位挡板3后推动挂篮前移。The tensioning equipment includes: a high-pressure oil pump 7 and a one-to-two distribution valve 5. After the high-pressure oil pump 7 is connected to the one-to-two distribution valve 5 through the first pipeline, the one-to-two distribution valve 5 is connected to the two-to-one distribution valve through the second pipeline respectively. Two through-hole jacks 4 are connected, and the high-pressure oil pump 7 supplies oil to the two through-hole jacks 4 at the same time. Act on the limit baffle 3 to promote the hanging basket to move forward.

为了便于对挂篮两侧的主纵梁10加压固定,所述反压梁9直接横跨于挂篮的两主纵梁10上,并加压于主纵梁10的两端后,所述反压梁9沿其长度方向再通过若干根第一精轧螺纹钢8反锁在箱梁6上。In order to pressurize and fix the main longitudinal beams 10 on both sides of the hanging basket, the counter-pressure beams 9 directly straddle the two main longitudinal beams 10 of the hanging basket, and after being pressed on the two ends of the main longitudinal beams 10, the The anti-pressure beam 9 is locked on the box girder 6 through several first finish-rolled rebars 8 along its length direction.

所述牵引锚固装置包括:扁锚14和槽钢13,所述槽钢13通过第二精轧螺纹钢12固设于箱梁6上方,较佳的,所述槽钢13的槽面开设有与第二精轧螺纹钢12相匹配的通孔,所述第二精轧螺纹钢12贯穿固定于通孔内,所述扁锚14固设于槽钢13凹槽内后紧固钢绞线11。The traction and anchoring device comprises: a flat anchor 14 and a channel steel 13, and the channel steel 13 is fixed above the box girder 6 through the second finish-rolled rebar 12. Preferably, the channel surface of the channel steel 13 is provided with A through hole matched with the second finish-rolled rebar 12, the second finish-rolled rebar 12 penetrates and is fixed in the through hole, and the flat anchor 14 is fixed in the groove of the channel steel 13 to fasten the steel strand 11.

在常规的施工中,所述扁锚14可选用BM15-5横向预应力扁锚,相对应的,所述槽钢13可选用20#槽钢,所述扁锚14嵌入槽钢13的凹槽并进行有效的焊接牢固后,与钢绞线11有效连接,同时在槽钢上开40mm孔保证与桥面竖向Φ32竖向精轧螺纹钢固定。依据实际的施工需要,可相应的选择其他型号。In conventional construction, the flat anchor 14 can be selected from BM15-5 transverse prestressed flat anchor, and correspondingly, the channel steel 13 can be selected from 20# channel steel, and the flat anchor 14 can be embedded in the groove of the channel steel 13 And after carrying out effective welding firmly, be effectively connected with steel strand 11, open 40mm hole on channel steel simultaneously and guarantee to be fixed with bridge deck vertical Φ 32 vertical finish-rolled rebars. According to actual construction needs, other models can be selected accordingly.

此外,所述限位挡板3采用L形结构,并焊接连接于主纵梁10侧壁,所述限位挡板3的厚度为12mm最佳。依据现场施工状况,可选择其他厚度的限位挡板3。In addition, the limiting baffle 3 adopts an L-shaped structure and is welded to the side wall of the main longitudinal beam 10, and the thickness of the limiting baffle 3 is preferably 12 mm. Depending on the site construction conditions, other thickness limit baffles 3 can be selected.

具体实施过程如下:The specific implementation process is as follows:

1、首先将挂篮的主纵梁10支撑于滚动式支腿2上,再将滚动式反压梁9横跨于挂篮的两主纵梁10上,通过若干根第一精轧螺纹钢8将主纵梁10加压并反锁在箱梁6上方,加强挂篮的稳定性后,开始阶段性施工;1. First, support the main longitudinal beam 10 of the hanging basket on the rolling outrigger 2, then cross the rolling back pressure beam 9 across the two main longitudinal beams 10 of the hanging basket, and pass through several first finished rolled rebars 8 Pressurize and lock the main longitudinal beam 10 above the box girder 6, and after strengthening the stability of the hanging basket, start phased construction;

2、阶段性施工完成后,高压油泵7通过一拖二分配阀5连接2台穿心式千斤顶4,同时为2台穿心式千斤顶5供油并提供张压力,由于钢绞线11的前端由牵引锚固装置1紧固,因而,所述穿心式千斤顶4反向张拉作用于限位挡板3后,可推动挂篮前移。2. After the staged construction is completed, the high-pressure oil pump 7 is connected to two through-hole jacks 4 through the one-to-two distribution valve 5, and supplies oil and tension pressure to the two through-hole jacks 5 at the same time. Due to the front end of the steel strand 11 It is fastened by the traction anchoring device 1, therefore, after the reverse tension of the through-hole jack 4 acts on the limit baffle 3, the hanging basket can be pushed forward.

如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。As stated above, while the invention has been shown and described with reference to certain preferred embodiments, this should not be construed as limiting the invention itself. Various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (7)

  1. A kind of 1. novel cantilever beam construction hanging basket advancing device, it is characterised in that:Including:Hanging Basket walking support system, traction are set Standby and tensioning equipment;
    The Hanging Basket walking support system includes:Supporting leg(2)With back-pressure beam(9), the supporting leg(2)Laid along construction direction interval In box beam(6)Top surface, and support the main longitudinal grider of Hanging Basket(10), the back-pressure beam(9)Laterally stress on the main longitudinal grider(10)On;
    The pulling equipment includes:Draw anchor(1)And centre-hole jack(4), the traction anchor(1)It is fixed In box beam(6)Top, and it is located at main longitudinal grider(10)Front end, the centre-hole jack(4)Positioned at main longitudinal grider(10)Rear end, it is described Draw anchor(1)And centre-hole jack(4)Between be connected with steel strand wires(11), the steel strand wires(11)Front end by leading Draw anchor(1)Fastening, end pass through and are fixedly arranged on main longitudinal grider(10)The postive stop baffle of rear end(3)Afterwards, by centre-hole jack (4)Fastening;
    The tensioning equipment includes:High-pressure oil pump(7)With one drag two distributing valve(5), the high-pressure oil pump(7)Pass through one drag two point With valve(5)With centre-hole jack(4)Connection, is centre-hole jack(4)Stretching force, the centre-hole jack are provided(4) Reverse tensioning acts on postive stop baffle(3)After promote hanging basket advancing.
  2. 2. novel cantilever beam construction hanging basket advancing device according to claim 1, it is characterised in that:The back-pressure beam(9) Across two main longitudinal griders of Hanging Basket(10), and stress on main longitudinal grider(10)Both ends.
  3. 3. novel cantilever beam construction hanging basket advancing device according to claim 2, it is characterised in that:The back-pressure beam(9) Pass through some first fining twisted steels along its length(8)Lock in box beam(6)On.
  4. 4. novel cantilever beam construction hanging basket advancing device according to claim 3, it is characterised in that:The supporting leg(2)With Back-pressure beam(9)With main longitudinal grider(10)Contact surface on be equipped with scroll wheel.
  5. 5. novel cantilever beam construction hanging basket advancing device according to claim 1, it is characterised in that:The traction anchoring dress Put including:Flat anchor(14)And channel steel(13), the channel steel(13)Pass through the second fining twisted steel(12)It is horizontally located in box beam(6) Top, the flat anchor(14)It is fixedly arranged on channel steel(13)In groove, and fasten steel strand wires(11).
  6. 6. novel cantilever beam construction hanging basket advancing device according to claim 5, it is characterised in that:The channel steel(13)'s Groove face offers and the second fining twisted steel(12)The through hole to match, second fining twisted steel(12)It is logical through being fixed on In hole.
  7. 7. novel cantilever beam construction hanging basket advancing device according to claim 1, it is characterised in that:The postive stop baffle (3)For L-shaped structure, and it is welded to connect in main longitudinal grider(10)Side wall.
CN201721158351.0U 2017-09-11 2017-09-11 A kind of novel cantilever beam construction hanging basket advancing device Expired - Fee Related CN207244472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721158351.0U CN207244472U (en) 2017-09-11 2017-09-11 A kind of novel cantilever beam construction hanging basket advancing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721158351.0U CN207244472U (en) 2017-09-11 2017-09-11 A kind of novel cantilever beam construction hanging basket advancing device

Publications (1)

Publication Number Publication Date
CN207244472U true CN207244472U (en) 2018-04-17

Family

ID=61888012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721158351.0U Expired - Fee Related CN207244472U (en) 2017-09-11 2017-09-11 A kind of novel cantilever beam construction hanging basket advancing device

Country Status (1)

Country Link
CN (1) CN207244472U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723686A (en) * 2019-01-14 2019-05-07 江西集银科技有限公司 A kind of bridge hanging basket automatic station-keeping system and control method
CN110948676A (en) * 2019-12-30 2020-04-03 中交一公局集团有限公司 Steel tensioning device for prefabricated parts
CN114908883A (en) * 2022-07-04 2022-08-16 中国建筑第四工程局有限公司 Lifting device for vertical rotation installation of steel awning of stadium and operation method thereof
CN115613477A (en) * 2022-10-21 2023-01-17 四川公路桥梁建设集团有限公司 Main beam cantilever trackless triangular hanging basket and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723686A (en) * 2019-01-14 2019-05-07 江西集银科技有限公司 A kind of bridge hanging basket automatic station-keeping system and control method
CN110948676A (en) * 2019-12-30 2020-04-03 中交一公局集团有限公司 Steel tensioning device for prefabricated parts
CN114908883A (en) * 2022-07-04 2022-08-16 中国建筑第四工程局有限公司 Lifting device for vertical rotation installation of steel awning of stadium and operation method thereof
CN114908883B (en) * 2022-07-04 2024-04-26 中国建筑第四工程局有限公司 Lifting device for vertical rotation installation of steel awning of stadium and operation method thereof
CN115613477A (en) * 2022-10-21 2023-01-17 四川公路桥梁建设集团有限公司 Main beam cantilever trackless triangular hanging basket and construction method
CN115613477B (en) * 2022-10-21 2023-10-24 四川公路桥梁建设集团有限公司 Main girder cantilever trackless triangular hanging basket and construction method

Similar Documents

Publication Publication Date Title
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN105839549A (en) Truss type cantilever construction hanging basket
CN205630974U (en) Pre -tensioning system precast beam pedestal
CN102561591A (en) Retarded adhesive prestressed steel reinforced concrete beam
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN107012795A (en) A kind of continuous bridge pre-pressing bracket device and its construction method
CN205636521U (en) Basket is hung in construction of truss -like cantilever
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN201738246U (en) Continuous beam hanging basket ground preloading device
CN102071648B (en) Method and device for correcting box steel girder in construction
CN203174507U (en) Steel pipe arch suspender installation device
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN102004055A (en) A hanging basket static load test device
CN204370696U (en) Build T-shaped wall limb welding hooping structure
CN202644401U (en) Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN206448440U (en) A kind of thin wall type girder steel and composite floor
CN201292674Y (en) Pull cable head stretching oblique-splicing reaction frame
CN205558032U (en) Modular honeycomb roof beam
CN201809860U (en) Shear connector
CN205857729U (en) A kind of deflection is encorbelmented interior pull-type sliding and lifting device
CN204370695U (en) Building L-type wall limb welding hooping structure
CN211473342U (en) Overhanging scaffolding pole with anti-skid device
CN203546623U (en) Cast-in-cantilever construction 0# block concrete supporting system
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417