CN207221495U - A kind of heating furnace water-supply structure - Google Patents
A kind of heating furnace water-supply structure Download PDFInfo
- Publication number
- CN207221495U CN207221495U CN201721234595.2U CN201721234595U CN207221495U CN 207221495 U CN207221495 U CN 207221495U CN 201721234595 U CN201721234595 U CN 201721234595U CN 207221495 U CN207221495 U CN 207221495U
- Authority
- CN
- China
- Prior art keywords
- water
- heating furnace
- settling tank
- communicating pipe
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to furnace cooling but systems technology field, discloses a kind of heating furnace water-supply structure, including initial filter portion, filter house and the diversion division set gradually from left to right;Initial filter portion includes settling tank and filter screen, and filter screen is slidably connected at the top of settling tank, and the top of settling tank is equipped with water inlet, and the middle part of the right side wall of settling tank is equipped with water outlet, and bottom is equipped with sewage draining exit;Filter house includes communicating pipe and water tank, and one end of communicating pipe is connected with water outlet, and the other end of communicating pipe is connected with water tank, is equipped with spongy layer, ultrafiltration film layer, active carbon layer and PP cottons layer in communicating pipe successively from left to right;Diversion division includes diversion pipe, and one end of diversion pipe is connected with water tank, and diversion pipe is equipped with check valve.The utility model solves the problems, such as that prior art cooling cost is high.
Description
Technical field
The utility model belongs to stove field of cooling, and in particular to a kind of heating furnace water-supply structure.
Background technology
Heating furnace, is a kind of equipment by material or workpiece heat to forging temperature, often apply oil, chemical industry, metallurgy,
The numerous areas such as machinery, heat treatment, surface treatment, building materials, electronics.Heating furnace when in use, it is necessary to be warming up to higher temperature,
After use, to avoid high temperature from impacting heating furnace, cause heat rate to be damaged, it is necessary to cool down to heating furnace, avoid
Heating furnace is damaged.
Now current heating furnace cooling, is by the way that heating furnace is connected with water pipe, switch is set on water pipe, passes through switch
Control water to enter in heating furnace, cool down to heating furnace.Since the materials such as calcium sulfate can be contained in common water, remain in and add
Hot stove inner wall, can form incrustation scale, to avoid incrustation scale from impacting, it is necessary to put into substantial amounts of financial resources, manpower pair heating furnace work
Incrustation scale is cleared up, and heating furnace is easily led in scale removal process and is damaged.
Therefore cooling of the inventor for heating furnace is studied, and is found, is passed through into heating furnace in the course of the research
Pure water, the inner wall of heating furnace do not have incrustation scale residual.But cooling heating furnace needs to use substantial amounts of pure water, can cause cold
But cost is too high.Now need to provide a kind of heating furnace water-supply structure at present, avoid heating furnace inner wall from forming incrustation scale, and reduce
The cost of cooling.
The content of the invention
The utility model is intended to provide a kind of heating furnace water-supply structure, to solve the problems, such as that prior art cooling cost is high.
To achieve the above object, the utility model provides following technical solution, a kind of heating furnace water-supply structure, including from a left side
Initial filter portion, filter house and the diversion division set gradually to the right side;Initial filter portion includes settling tank and filter screen, and filter screen is slidably connected at
The top of settling tank, the top of settling tank are equipped with water inlet, and the middle part of the right side wall of settling tank is equipped with water outlet, and bottom is equipped with row
Dirty mouth;Filter house includes communicating pipe and water tank, and one end of communicating pipe is connected with water outlet, the other end and water tank of communicating pipe
Connection, is equipped with spongy layer, ultrafiltration film layer, active carbon layer and PP cottons layer successively from left to right in communicating pipe;Diversion division includes water conservancy diversion
Pipe, one end of diversion pipe are connected with water tank, and diversion pipe is equipped with check valve.
The technique effect of this programme technical characteristic:
Initial filter portion is used to tentatively filter tap water, and the large granular impurity in tap water is removed;Filter house is used for
Depth-type filtration is carried out to tap water, the trickle material in tap water, dust etc. are filtered so that tap water forms pure water.From
Water is entered in settling tank by water inlet, is screened out the large particulate matter in tap water by filter screen, and in settling tank
Settled, the spot after sedimentation is flowed out by sewage draining exit, and supernatant is flowed into communicating pipe by water outlet.
It is used to communicating pipe connect settling tank with water tank, and for carrying out depth-type filtration to tap water;By sedimentation
Tap water afterwards, successively by spongy layer, ultrafiltration film layer, active carbon layer and PP cottons layer.It is loose structure that sponge, which has, can be caused
Tap water is quickly by that and can adsorb the impurity of bulky grain.Ultrafiltration film layer, it is micro- can be more than 0.01 by diameter
The impurity of rice removes so that the water after screening keeps pure;Ultrafiltration membrane has and under the effect of the pressure extrudes water to another at the same time
Side, and water will not flow back;Therefore the aqueous reflux after filtering can be avoided to be mixed with tap water.
Active carbon layer, has stronger adsorption capacity, can adsorb the impurity inside water, therefore energy water keeps pure.PP cottons
Layer, can realize the function of water filtration, and its absorption is small, will not occluded water so that water all passes through PP cottons layer.Tap water is successively
By spongy layer, ultrafiltration film layer, active carbon layer and PP cottons layer, the little particle impurity in tap water and dust can be caused to be removed,
So as to form pure water.Water tank is used to carry out pure water place's storage, and is imported by diversion pipe in heating furnace, to heating furnace
Cooled down.
The technical principle of this programme is:
Tap water is imported in settling tank, tap water screens out large granular impurity when passing through filter screen, and by settling
Stood in pond, can cause the larger impurity sedimentation of quality, supernatant is entered in communicating pipe by water outlet, and passes through sponge successively
Layer, ultrafiltration film layer, active carbon layer and PP cottons layer, carry out depth-type filtration to tap water, and form pure water, then by water tank into
Pure water is imported in heating furnace, cooled down, it is necessary to when being cooled down to heating furnace by row storage using diversion pipe.
What this programme can produce has the technical effect that:
1st, when this programme is by forming pure water to tap water filter, then heating furnace being cooled down, will not produce in heating furnace
Scale;And pure water can be prepared at any time, can be at any time compared with prior art purchase pure water carries out cooling to heating furnace
Pure water is prepared, so that cooling heating furnace uses;
2nd, by setting settling tank, tap water can be settled, while filter screen can be by the bulky grain in tap water
Impurity removes;
3rd, by setting spongy layer, ultrafiltration film layer, active carbon layer and PP cottons layer within communicating pipe, tap water can be carried out
Depth-type filtration, obtains pure water;
4th, by setting ultrafiltration film layer, it is avoided that the pure water reflux obtained after depth-type filtration.
It is the preferred solution based on such scheme below:
Preferred solution one:Based on base case, outlet tube is further included, one end of outlet tube is connected to the top of settling tank.
In use, outlet tube the other end connection heating furnace on, will to heating furnace pure water after cooling import settling tank in, by with
Tap water mixing in settling tank, carries out heat exchange and realizes cooling, then to form pure water by settling, filtering, can be to pure water
Reused, play the effect of environmental protection.
Preferred solution two:Based on preferred solution one, the communicating pipe is detachably connected with settling tank and water tank.Connection
Pipe can be removed, easy to clean.
Preferred solution three:Based on preferred solution two, the communicating pipe is equipped with booster pump close to the side of settling tank.Booster pump
The pressure in communicating pipe can be increased, pass through ultrafiltration film layer, realization filtering under hyperbaric environment easy to tap water.
Preferred solution four:Based on preferred solution three, the filter screen is detachably connected with settling tank.When miscellaneous on filter screen
When matter stops mesh, filter screen can be taken out and be cleared up.
Preferred solution five:Based on preferred solution four, the spongy layer is mesh sponge layer.Mesh sponge layer, easy to clean,
And durable, good water permeability, the effect of impurity screening are good.
Preferred solution six:Based on preferred solution five, the communicating pipe is equipped with inlet valve close to one end of water outlet.Close into
During water valve, the pure water obtained after filtering was rested in communicating pipe, and by lasting filtering, rested on the water in communicating pipe
Gradually increase so that pure water extrudes ultrafiltration film layer, so that the filter hole of ultrafiltration film layer is stretched, is carried out by booster pump
Supercharging, can clean ultrafiltration film layer.
Brief description of the drawings
Fig. 1 is a kind of structure diagram of heating furnace water-supply structure of the utility model.
Embodiment
The utility model is described in further detail below by embodiment:
Reference numeral in Figure of description includes:Settling tank 1, sieve 11, water inlet 12, water outlet 13, sewage draining exit 14,
Communicating pipe 2, pressure charging valve 21, spongy layer 22, ultrafiltration film layer 23, active carbon layer 24, PP cottons layer 25, inlet valve 26, water tank 3, lead
Flow tube 4, outlet tube 5.
As shown in Figure 1, a kind of heating furnace water-supply structure, including set gradually from left to right initial filter portion, filter house and lead
Stream portion, initial filter portion include settling tank 1 and filter screen, and the arranged on left and right sides on the top of settling tank 1 is respectively equipped with the sliding slot in longitudinal direction,
Filter screen is slidably connected in sliding slot, and pull rod is additionally provided with filter screen.
The top of settling tank is equipped with two water inlets 12, is connected with water inlet pipe on one of water inlet 12, on water inlet pipe
It is connected with water pump;Outlet tube 5 is connected with another water inlet 12.The right side wall of settling tank is equipped with sewage draining exit 14 and water outlet
13, sewage draining exit 14 is located at bottom, and blow-off pipe is connected with sewage draining exit 14, and blow-off pipe is equipped with outlet valve;Water outlet 13 was located at
Between strainer and sewage draining exit 14.
Filter house includes water tank 3 and communicating pipe 2, and the left end of communicating pipe 2 is threadedly coupled with the water inlet 12 of settling tank, even
The right end of siphunculus 2 is threadedly coupled with water tank 3, and water tank 3 is connected with settling tank by communicating pipe 2.The left end of communicating pipe 2 is set
There is booster pump, the right end of communicating pipe 2 is equipped with inlet valve 26.It is equipped with spongy layer 22, ultrafiltration film layer in communicating pipe 2 successively from left to right
23rd, active carbon layer 24 and PP cottons layer 25, spongy layer 22 is mesh sponge layer.Diversion pipe 4 is connected with the right side of water tank 3, is led
Flow tube 4 is equipped with check valve.
During using the present embodiment, diversion pipe 4 and outlet tube 5 are both connected on heating furnace, then added certainly into settling tank
Water, after tap water enters settling tank, filter screen screens out the impurity of bulky grain, then by being settled in settling tank.It is heavy
Sewage after drop provided sewage draining exit 14 and discharged, and supernatant is by entrance communicating pipe 2, then passes sequentially through spongy layer 22, ultrafiltration membrane
Layer 23, active carbon layer 24 and PP cottons layer 25 carry out depth-type filtration, and booster pump is increased into communicating pipe 2 during filtering
Pressure so that tap water is filtered under the action of pressure by ultrafiltration film layer 23, and by ultrafiltration film layer 23.Tap water passes through
After communicating pipe 2 pinches filtering, pure water is formed, and be stored in water tank 3.When heat rate needs heating, check valve is opened,
Pure water is entered in heating furnace by diversion pipe 4 to cool down, and after pure water cools down heating furnace, then is entered by liquid outlet and sunk
Drop and heat exchange, cooling are carried out in pond, and reused.
For those skilled in the art, on the premise of technical solutions of the utility model are not departed from, can also make
Go out several modifications and improvements, these should also be considered as the scope of protection of the utility model, these are all without influence the utility model
The effect and practical applicability of implementation.
Claims (7)
- A kind of 1. heating furnace water-supply structure, it is characterised in that:Including initial filter portion, filter house and the water conservancy diversion set gradually from left to right Portion;Initial filter portion includes settling tank and filter screen, and filter screen is slidably connected at the top of settling tank, and the top of settling tank is equipped with water inlet Mouthful, the middle part of the right side wall of settling tank is equipped with water outlet, and bottom is equipped with sewage draining exit;Filter house includes communicating pipe and water tank, even One end of siphunculus is connected with water outlet, and the other end of communicating pipe is connected with water tank, is equipped with sea in communicating pipe successively from left to right Continuous layer, ultrafiltration film layer, active carbon layer and PP cottons layer;Diversion division includes diversion pipe, and one end of diversion pipe is connected with water tank, water conservancy diversion Pipe is equipped with check valve.
- 2. heating furnace water-supply structure according to claim 1, it is characterised in that:Further include outlet tube, one end of outlet tube It is connected to the top of settling tank.
- 3. heating furnace water-supply structure according to claim 2, it is characterised in that:The communicating pipe and settling tank and water tank It is detachably connected.
- 4. heating furnace water-supply structure according to claim 3, it is characterised in that:The communicating pipe is close to the side of settling tank Equipped with booster pump.
- 5. heating furnace water-supply structure according to claim 4, it is characterised in that:The filter screen detachably connects with settling tank Connect.
- 6. heating furnace water-supply structure according to claim 5, it is characterised in that:The spongy layer is mesh sponge layer.
- 7. heating furnace water-supply structure according to claim 6, it is characterised in that:The communicating pipe is close to one end of water outlet Equipped with inlet valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721234595.2U CN207221495U (en) | 2017-09-25 | 2017-09-25 | A kind of heating furnace water-supply structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721234595.2U CN207221495U (en) | 2017-09-25 | 2017-09-25 | A kind of heating furnace water-supply structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207221495U true CN207221495U (en) | 2018-04-13 |
Family
ID=61863962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721234595.2U Active CN207221495U (en) | 2017-09-25 | 2017-09-25 | A kind of heating furnace water-supply structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207221495U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111020873A (en) * | 2019-12-26 | 2020-04-17 | 安徽绿源高分子材料科技有限公司 | Production process of spunlace non-woven fabric |
-
2017
- 2017-09-25 CN CN201721234595.2U patent/CN207221495U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111020873A (en) * | 2019-12-26 | 2020-04-17 | 安徽绿源高分子材料科技有限公司 | Production process of spunlace non-woven fabric |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103288177A (en) | Continuous membrane filtration system and water treatment method | |
CN107512787A (en) | Medium sort method is separated in ebullated bed separator | |
CN207221495U (en) | A kind of heating furnace water-supply structure | |
CN205821111U (en) | A kind of river water body prosthetic appliance | |
CN204803432U (en) | Take circulating filter apparatus's plating bath | |
CN207102346U (en) | A kind of reverse osmosis type sewage-treatment plant | |
CN206063897U (en) | A kind of novel water filtering device | |
CN206881242U (en) | High efficiency oil-water separate tank | |
CN200992514Y (en) | Waste water treating and concurrently classified collecting device for chemical laboratory | |
RU2005125388A (en) | WATER TREATMENT METHOD | |
CN206318795U (en) | A kind of public place water-saving and environmental protection device with multiple filtration | |
CN106282557B (en) | The method for concentration of lithium leachate | |
CN206645859U (en) | A kind of sewage-treatment plant for stirring Joint adsorption | |
CN105060536B (en) | A kind of water purifier | |
CN204714618U (en) | Self-cleaning filters purifier | |
CN107551661A (en) | Comprehensive industrial sewage purification processing equipment | |
CN206553295U (en) | A kind of heat supply network recycling water utilization processing unit | |
CN104478155B (en) | A kind of device utilizing nano-magnetic chitin and the arsenic removal of iron powder compound | |
CN106865648A (en) | A kind of Automatic Control sewage purification treatment equipment | |
CN206955798U (en) | Shallow-sand filter | |
CN207314425U (en) | A kind of full-automatic roof rain water collecting purifier | |
CN205965157U (en) | Husky jar with filtering capability | |
CN207270883U (en) | A kind of sewage filter system for sewage multidomain treat-ment | |
CN107285493A (en) | A kind of circulating filtration sewage water treatment method | |
CN206051629U (en) | A kind of unified water treating apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Water supply structure for heating furnace Effective date of registration: 20211220 Granted publication date: 20180413 Pledgee: Bank of Chongqing Co.,Ltd. Bishan sub branch Pledgor: CHONGQING BISHAN SYNTHESIS MACHINERY MANUFACTURING CO.,LTD. Registration number: Y2021980015441 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |