CN207221040U - A kind of pass-through box - Google Patents

A kind of pass-through box Download PDF

Info

Publication number
CN207221040U
CN207221040U CN201720223794.7U CN201720223794U CN207221040U CN 207221040 U CN207221040 U CN 207221040U CN 201720223794 U CN201720223794 U CN 201720223794U CN 207221040 U CN207221040 U CN 207221040U
Authority
CN
China
Prior art keywords
high efficiency
air filter
efficiency particulate
pass
particulate air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720223794.7U
Other languages
Chinese (zh)
Inventor
张华�
胡中平
还文高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhongwei Jiabao Purification Engineering Co Ltd
Original Assignee
Suzhou Zhongwei Jiabao Purification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhongwei Jiabao Purification Engineering Co Ltd filed Critical Suzhou Zhongwei Jiabao Purification Engineering Co Ltd
Priority to CN201720223794.7U priority Critical patent/CN207221040U/en
Application granted granted Critical
Publication of CN207221040U publication Critical patent/CN207221040U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model provides a kind of pass-through box, is related to purification instrument field.Pass-through box includes babinet and the mounting bracket for installing high efficiency particulate air filter.The working region to communicate with each other and device region are provided with babinet.Mounting bracket can pull be installed on device region.Pass-through box realizes that device region and realization are installed on to high efficiency particulate air filter removes high efficiency particulate air filter in device region by setting drawable mounting bracket.Also, mounting bracket is positioned over babinet again after mounting bracket replaces high efficiency particulate air filter, you can complete the replacement of high efficiency particulate air filter, the replacement of high efficiency particulate air filter can be realized without pass-through box is disassembled.This pass-through box has the characteristics that simple in structure and easy to operate.

Description

A kind of pass-through box
Technical field
Purification instrument field is the utility model is related to, in particular to a kind of pass-through box.
Background technology
Pass-through box is a kind of ancillary equipment of toilet, be mainly used between clean area and clean area, clean area with it is non-clean The pollution to toilet, to reduce the door opening times of toilet, is reduced to minimum level by the transmission of small article between net area.
And the high efficiency particulate air filter set in existing pass-through box is generally required after pass-through box is disassembled when replacing, then it is right It is replaced, troublesome in poeration, less efficient, is easily damaged.
Utility model content
The purpose of this utility model is to provide a kind of pass-through box, it can facilitate the replacement with high efficiency particulate air filter.
What the embodiment of the utility model was realized in:
A kind of pass-through box, including babinet and the mounting bracket for installing high efficiency particulate air filter.It is provided with and communicates with each other in babinet Working region and device region.Mounting bracket can pull be installed on device region.
In the utility model preferred embodiment, above-mentioned mounting bracket includes installing plate and multiple struts.Multiple struts are set It is placed in installing plate and the homonymy towards installing plate stretches out.High efficiency particulate air filter is arranged at multiple struts.
In the utility model preferred embodiment, above-mentioned multiple struts it is parallel be arranged to two rows.High efficiency particulate air filter is pacified Loaded between two rows of multiple struts.
In the utility model preferred embodiment, above-mentioned strut is provided with four.Four strut rectangular array distributions In installing plate.Each strut includes first body of rod and second body of rod, and first body of rod is connected with second body of rod with installing plate and edge The homonymy of installing plate stretches out, and first body of rod and second body of rod are arranged in a mutually vertical manner and form engaging space.The four of high efficiency particulate air filter A corner is sticked in the engaging space that four struts are formed respectively.
In the utility model preferred embodiment, PAO detection devices are provided with above device region.PAO detection dresses Put including detection mouth and gas-guide tube, detection mouth is arranged at the outer wall of babinet, and gas-guide tube one end is connected with detection mouth, and the other end stretches into In device region.
In the utility model preferred embodiment, above device is provided with wind turbine in region.Wind turbine is located at the interior of babinet Between wall and high efficiency particulate air filter.Wind turbine is provided with the air inlet being oppositely arranged and gas outlet, and gas outlet is close to high efficiency particulate air filter.Inspection Surveying mouth includes the first detection mouth and the second detection mouth, and gas-guide tube includes the first gas-guide tube and the second gas-guide tube.First gas-guide tube One end is connected with the first detection mouth, and the other end is stretched into device region and connected with air inlet.One end of second gas-guide tube and the Two detection mouths connect, and the other end is stretched into device region and between gas outlet and high efficiency particulate air filter.
In the utility model preferred embodiment, pressure-detecting device and connection are additionally provided with above device region The first pressure conduit and second pressure conduit of pressure-detecting device.The end of the remote pressure-detecting device of first pressure conduit Between wind turbine and high efficiency particulate air filter.The end of the remote pressure-detecting device of second pressure conduit be located at high efficiency particulate air filter with Between working region.
In the utility model preferred embodiment, above device is additionally provided with bactericidal lamp in region.Bactericidal lamp is positioned at height Imitate between filter and working region.
In the utility model preferred embodiment, it is provided with above-mentioned babinet for separating working region and device region Partition plate.Partition plate is provided with the through hole in connection working region and device region, and bactericidal lamp is arranged at partition plate.
In the utility model preferred embodiment, above-mentioned pass box further includes the control panel for being arranged at cabinet exterior. Wind turbine and bactericidal lamp are electrically connected with control panel.
The beneficial effect of the utility model embodiment is:Pass-through box is realized to efficient by setting drawable mounting bracket Filter, which is installed on device region and realizes, removes high efficiency particulate air filter in device region.Also, replace efficient mistake in mounting bracket Mounting bracket is positioned over babinet again after filter, you can the replacement of high efficiency particulate air filter is completed, can without pass-through box is disassembled Realize the replacement of high efficiency particulate air filter.This pass-through box has the characteristics that simple in structure and easy to operate.
Brief description of the drawings
, below will be to required use in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the utility model, therefore should not be by Regard the restriction to scope as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the structure diagram at the first visual angle of the pass-through box that the utility model embodiment provides;
Fig. 2 is the structure diagram at the second visual angle of the pass-through box that the utility model embodiment provides;
Fig. 3 is the structure diagram at the 3rd visual angle of the pass-through box that the utility model embodiment provides;
Fig. 4 is the cross-sectional view for the pass-through box that the utility model embodiment provides;
Fig. 5 is the structure diagram for the mounting bracket that the utility model embodiment provides;
Fig. 6 is enlarged diagram at VI in Fig. 4.
Icon:100- pass-through boxes;110- babinets;The first boxboards of 111-;The second boxboards of 112-;113- air flues;114- partition plates; 115- control panels;120- working regions;The first chamber doors of 121-;The second chamber doors of 122-;The first door locks of 123-;The 124- first Hand;130- devices region;140-PAO detection devices;The first detection mouths of 141-;The second detection mouths of 142-;The first gas-guide tubes of 143-; The second gas-guide tubes of 144-;150- pressure-detecting devices;151- first pressure conduits;152- second pressure conduits;160- wind turbines; 161- air inlets;162- gas outlets;170- high efficiency particulate air filters;180- bactericidal lamps;190- mounting brackets;191- installing plates;192- branch Bar;First bodies of rod of 193-;Second bodies of rod of 194-;195- frame bodies are shaken hands;196- fixing bolts;197- fixing nuts.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and The component of the utility model embodiment shown can be arranged and designed with a variety of configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiment of the utility model provided in the accompanying drawings below The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model Embodiment, those of ordinary skill in the art's all other embodiments obtained without creative efforts, all Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
, it is necessary to explanation, the orientation or position relationship of the instruction such as term " interior ", " outer " in the description of the utility model For based on orientation shown in the drawings or position relationship, or the utility model product using when the orientation or position usually put Relation, is for only for ease of description the utility model and simplifies description, rather than indicates or imply that signified device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.This Outside, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
In the description of the utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set Put ", " installation ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can mechanically connect or be electrically connected.For the ordinary skill in the art, can be with concrete condition Understand concrete meaning of the above-mentioned term in the utility model.
Fig. 1 is refer to, the present embodiment provides a kind of pass-through box 100, including babinet 110.Incorporated by reference to Fig. 1 and Fig. 4, babinet Working region 120 and device region 130 are provided with 110.
Referring to Fig.1 and 2, babinet 110 includes the first boxboard 111 being oppositely arranged and the second boxboard 112, is oppositely arranged The 3rd boxboard (not marked in figure) and the 4th boxboard (not marked in figure) and the 5th boxboard that is oppositely arranged (do not marked in figure Note) and the 6th boxboard (not marked in figure).Wherein, one end of the first boxboard 111 and one end of the second boxboard 112 are respectively with the 3rd Both ends of the other end of the both ends connection of boxboard, the other end of the first boxboard 111 and the second boxboard 112 respectively with the 4th boxboard connect Connect;Four ends of the 5th boxboard are connected with the first boxboard 111, the second boxboard 112, the 3rd boxboard and the 4th boxboard respectively;6th case Four ends of plate respectively with the end of first boxboard 111 away from the 5th boxboard, the end away from the 5th boxboard of the second boxboard 112 Portion, the end away from the 5th boxboard of the 3rd boxboard are connected with the end away from the 5th boxboard of the 4th boxboard.It is appreciated that case Body 110 is similar to rectangular parallelepiped structure.By setting six blocks of boxboards, you can be assembled into babinet 110, have the characteristics that simple in structure.
First boxboard 111, the second boxboard 112, the 3rd boxboard, the 4th boxboard, the 5th boxboard and the 6th boxboard all can be Steel plate, or composite plate, as long as can meet the requirement of cleaner.
In addition, incorporated by reference to Fig. 1 and Fig. 4, partition plate 114 is provided with babinet 110.Partition plate 114 is provided with connection working region 120 and the through hole (not illustrated in figure) in device region 130.The inside of babinet 110 is divided into working region 120 by partition plate 114 With device region 130, wherein, working region 120 is close to the 6th boxboard, and device region 130 is close to the 5th boxboard.It can manage Solution, working region 120 are used to transmit article.
In order to realize the transmission of article, the opposite sides of babinet 110 is respectively arranged with chamber door.Specifically, the first boxboard 111 The opening of connection working region 120 is provided with, the first chamber door 121 is arranged at the opening of the first boxboard 111, and the first boxboard 111 is set It is equipped with the first door lock 123 for locking the first chamber door 121.The end set coordinated with the first door lock 123 of first chamber door 121 There is the first in command 124, the end away from the first door lock 123 of the first chamber door 121 is articulated with the first boxboard 111.Set by above-mentioned Put, realize and open or close working region 120 by the first chamber door 121.Second boxboard 112 is provided with connection working region 120 Opening, the second chamber door 122 is arranged at the opening of the second boxboard 112, and the second boxboard 112 is provided with for locking the second chamber door 122 the second door lock (not illustrated in figure).The end set coordinated with the second door lock of second chamber door 122 has the second in command's (figure In do not illustrate), the second chamber door 122 is articulated with the second boxboard 112 away from the end of the second door lock.By above-mentioned setting, realize Working region 120 is opened or closes by the second chamber door 122.And for opening or closing working region 120.Pass through the first chamber door 121 and second chamber door 122 staggeredly open and close, you can realize the transmission of article.
The air flue 113 in connection working region 120 and device region 130 is provided with babinet 110.Specifically, the 3rd boxboard With hollow sandwich, the 3rd boxboard is set respectively positioned at the inner wall of working region 120 and the inner wall in device region 130 There are multiple eyelets.It is appreciated that the hollow folder of eyelet connection 120 and the 3rd boxboard of working region in working region 120 Layer, the hollow sandwich in eyelet communication apparatus region 130 and the 3rd boxboard in device region 130.It is also to be understood that air flue 113 include the hollow sandwich of multiple eyelets and the 3rd boxboard.By above-mentioned setting, realize that air flue 113 connects 120 He of working region Device region 130.
Fig. 3 and Fig. 4, PAO detection devices 140, pressure-detecting device 150, wind turbine 160, high are provided with device region 130 Imitate filter 170 and bactericidal lamp 180.
In device region 130 wind turbine 160,170 and of high efficiency particulate air filter are disposed with along the 5th boxboard to 114 direction of partition plate Bactericidal lamp 180.It is appreciated that wind turbine 160 is located at the inner wall of babinet 110 (i.e.:5th boxboard) between high efficiency particulate air filter 170; High efficiency particulate air filter 170 is between wind turbine 160 and bactericidal lamp 180;Bactericidal lamp 180 is installed on partition plate 114.
Wind turbine 160 has the air inlet 161 being oppositely arranged and gas outlet 162.The air inlet 161 of wind turbine 160 is close to Five boxboards, the gas outlet 162 of wind turbine 160 is close to high efficiency particulate air filter 170.By setting wind turbine 160, pass-through box can be realized The self-loopa of 100 internal gas flows, blows leaching so as to fulfill to transmission article.From the working region 120 of pass-through box 100 and device area Wind is taken inside domain 130.The working region 120 and device region absorbed i.e. under the centrifugal pressure of wind turbine 160 by air flue 113 130 inner airs, first pass around high efficiency particulate air filter 170 and obtain clean gas flow, clean gas flow is sent to working region 120 again.This When, clean gas flow forms uniform vertical ventilation air-flow.Due to forming stable unidirectional stream in working region 120, in this area The dust distributed in domain, can be absorbed under the carrying of one-way gas flow by high efficiency particulate air filter 170, so as to avoid secondary pollution.
PAO detection devices 140 include detection mouth and gas-guide tube.Detection mouth is arranged at the outer wall of babinet 110, gas-guide tube one end Connected with detection mouth, the other end is stretched into device region 130.Specifically, detection mouth includes the first detection mouth 141 and the second detection Mouth 142.Gas-guide tube includes the first gas-guide tube 143 and the second gas-guide tube 144.Wherein, one end of the first gas-guide tube 143 and the first inspection Survey mouth 141 to connect, the other end is stretched into device region 130 and connected with air inlet 161;One end of second gas-guide tube 144 and the Two detection mouths 142 connect, and the other end is stretched into device region 130 and between gas outlet 162 and high efficiency particulate air filter 170.It is logical Cross in this way, realized outside babinet 110 POA detect, it is easy to use and quick.
Fig. 4 and Fig. 5 are refer to, high efficiency particulate air filter 170 is arranged in device region 130 by mounting bracket 190.Mounting bracket 190 include installing plate 191 and four struts 192.Four struts 192 are vertically installed in installing plate 191 and towards installing plates 191 Homonymy stretch out.Four struts 192 are equally divided into two rows and are arranged in parallel, i.e., two struts 192 are a row.Four struts 192 It is rectangular to be distributed in installing plate 191.I.e. installing plate 191 is similar to rectangular configuration, and four struts 192 are respectively close to its four corners Position.
Incorporated by reference to Fig. 1 and Fig. 5, installing plate 191 includes the both ends of the surface being oppositely arranged, and one of end face is provided with frame body drawing Hand 195, other end set multiple struts 192.By setting frame body knob 195, conveniently by mounting bracket 190 in babinet 110 Device region 130 pulls out or closes.
Fig. 4 and Fig. 5 are continued referring to, each strut 192 includes first body of rod 193 and second body of rod 194.First body of rod 193 are connected with installing plate 191 with second body of rod 194 and are stretched out along the homonymy of installing plate 191.First body of rod 193 and the second bar Body 194 is arranged in a mutually vertical manner and forms engaging space (not marked in figure), and the end of the remote installing plate 191 of first body of rod 193 Portion is in the end flush of the remote installing plate 191 of second body of rod 194.By installing plate 191 and strut 192, formed and be used to pacify Fill the mounting bracket 190 of high efficiency particulate air filter 170.Four corners of high efficiency particulate air filter 170 are sticked in the engaging of four struts 192 respectively Space.
Mounting bracket 190 can pull be installed on device region 130.4th boxboard is provided with and opens in installing plate 191 is matched Mouthful.High efficiency particulate air filter 170 is arranged in device region 130 by mounting bracket 190 by strut 192.Installing plate 191 is embedded in the 4th During the opening of boxboard so that high efficiency particulate air filter 170 is between working region 120 and device region 130.
In other implementations of the present embodiment, strut 192 may be arranged as six, eight or ten etc., as long as Disclosure satisfy that the parallel setting of multiple struts 192 is two rows of, and by high efficiency particulate air filter 170 be arranged at two rows multiple struts 192 it Between.By the pull to mounting bracket 190, realize and device region 130 is installed on to high efficiency particulate air filter 170 and is realized to efficient Filter 170 removes device region 130.Also, again by mounting bracket 190 after mounting bracket 190 replaces high efficiency particulate air filter 170 It is positioned over babinet 110, you can complete the replacement of high efficiency particulate air filter 170.It can be realized efficiently without pass-through box 100 is disassembled The replacement of filter 170, it is simple in structure, it is easy to operate.
Fig. 4, Fig. 5 and Fig. 6 are continued referring to, in order to further increase the fixed effect of high efficiency particulate air filter 170, each strut 192 are additionally provided with fixing device.Specifically, fixing device is fixing bolt 196 and fixing nut 197.The of each strut 192 One body of rod 193 is provided with multiple screw holes.Fixing nut 197 and fixing bolt 196 are provided with multiple, and fixed spiral shell correspondingly Mother 197 and the quantity of fixing bolt 196 and the quantity of screw hole are consistent.Fixing bolt 196 and screw hole thread fitting, and fixed spiral shell One end high efficiency particulate air filter 170 of bolt 196 leans, the other end by fixing bolt 196 fix and it is spacing, realize to high efficiency filter Device 170 is further secured to four struts 192.The stability of the installation of high efficiency particulate air filter 170 is added by fixing device, is avoided Due to wind turbine 160 work when produce vibration high efficiency particulate air filter 170 is caused to damage.
Fig. 4 is continued referring to, pressure-detecting device 150, first pressure conduit 151 and second pressure conduit 152 are arranged at Device region 130.Pressure-detecting device 150 can select differential pressure indicator etc., and pressure-detecting device 150 is arranged at the first boxboard 111. One end of first pressure conduit 151 is connected with pressure-detecting device 150, the other end be located at wind turbine 160 and high efficiency particulate air filter 170 it Between.One end of second pressure conduit 152 is connected with pressure-detecting device 150, and the other end is located at high efficiency particulate air filter 170 and workspace Between domain 120.By setting pressure-detecting device 150, the convenient pressure condition observed inside pass-through box 100.
Bactericidal lamp 180 is additionally provided with device region 130.Bactericidal lamp 180 is arranged at partition plate 114, realizes bactericidal lamp 180 Between high efficiency particulate air filter 170 and working region 120.By setting bactericidal lamp 180, the article of transmission can be sterilized Afterwards, then move in toilet, to ensure sterile effect.
In order to facilitate the control realized to wind turbine 160 and bactericidal lamp 180, babinet 110 is additionally provided with control panel 115.Control Panel 115 processed is arranged at the first boxboard 111.Wind turbine 160 and bactericidal lamp 180 are electrically connected with control panel 115.In addition, when the When one chamber door 121 and the second chamber door 122 select electrically operated gate, the first chamber door 121 and the second chamber door 122 are electric with control panel 115 Connection.By setting control panel 115, the control to wind turbine 160, bactericidal lamp 180, the first chamber door 121 and the second chamber door 122 is realized System, is convenient to the transmission of article.
The operation principle of pass-through box 100 is:After pass-through box 100 is installed on toilet, the first chamber door 121 is located at toilet Outside, the second chamber door 122 is located at the inside of toilet.Placed by opening the article for transmitting needs after the first chamber door 121 After in working region 120, the first chamber door of tube wall 121.Wind turbine 160 and bactericidal lamp 180 are controlled to article by control panel 115 Sterilized.The second chamber door 122 is opened again, article after sterilization is taken out, that is, completes the transmission of article.
In conclusion the pass-through box 100 of the utility model is realized to efficient mistake by setting drawable mounting bracket 190 Filter 170 is installed on device region 130 and realizes removes device region 130 to high efficiency particulate air filter 170.Also, in mounting bracket Mounting bracket 190 is positioned over babinet 110 again after 190 replacement high efficiency particulate air filters 170, you can complete high efficiency particulate air filter 170 more Change, the replacement of high efficiency particulate air filter 170 can be realized without pass-through box 100 is disassembled.This pass-through box 100 have it is simple in structure and The features such as easy to operate.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the present invention, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on, should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of pass-through box, it is characterised in that including babinet and for installing the mounting bracket of high efficiency particulate air filter, set in the babinet Be equipped with the working region to communicate with each other and device region, the mounting bracket can pull be installed on described device region.
2. pass-through box according to claim 1, it is characterised in that the mounting bracket includes installing plate and multiple struts, more A strut is arranged at the installing plate and the homonymy towards the installing plate stretches out, and the high efficiency particulate air filter is arranged at multiple The strut.
3. pass-through box according to claim 2, it is characterised in that multiple struts it is parallel be arranged to two rows, it is described High efficiency particulate air filter is installed between multiple struts of two rows.
4. pass-through box according to claim 3, it is characterised in that the strut is provided with four, and four struts are in Rectangular array is distributed in the installing plate, and each strut includes first body of rod and second body of rod, first body of rod and institute Second body of rod is stated to be connected and stretch out along the homonymy of the installing plate, first body of rod and second bar with the installing plate Body is arranged in a mutually vertical manner and forms engaging space, and four corners of the high efficiency particulate air filter are sticked in four branch rods respectively Into the engaging space.
5. pass-through box according to claim 1, it is characterised in that PAO detection devices, institute are provided with described device region Stating PAO detection devices includes detection mouth and gas-guide tube, and the detection mouth is arranged at the outer wall of the babinet, described gas-guide tube one end Connected with the detection mouth, the other end is stretched into described device region.
6. pass-through box according to claim 5, it is characterised in that wind turbine, the wind turbine are provided with described device region Between the inner wall and the high efficiency particulate air filter of the babinet, the wind turbine is provided with the air inlet and outlet being oppositely arranged Mouthful, the gas outlet includes the first detection mouth and the second detection mouth, the air guide close to the high efficiency particulate air filter, the detection mouth Pipe includes the first gas-guide tube and the second gas-guide tube, and one end of first gas-guide tube is connected with first detection mouth, the other end Stretch into described device region and connected with the air inlet, one end of second gas-guide tube connects with second detection mouth Logical, the other end is stretched into described device region and between the gas outlet and the high efficiency particulate air filter.
7. pass-through box according to claim 6, it is characterised in that described device is additionally provided with pressure-detecting device in region And the first pressure conduit and second pressure conduit of the connection pressure-detecting device, the remote institute of the first pressure conduit The end of pressure-detecting device is stated between the wind turbine and the high efficiency particulate air filter, the remote institute of the second pressure conduit The end of pressure-detecting device is stated between the high efficiency particulate air filter and the working region.
8. pass-through box according to claim 6, it is characterised in that bactericidal lamp is additionally provided with described device region, it is described Bactericidal lamp is between the high efficiency particulate air filter and the working region.
9. pass-through box according to claim 8, it is characterised in that be provided with the babinet for separating the workspace Domain and the partition plate in described device region, the partition plate are provided with the through hole for connecting the working region and described device region, institute State bactericidal lamp and be arranged at the partition plate.
10. pass-through box according to claim 8, it is characterised in that further include the chain of command for being arranged at the cabinet exterior Plate, the wind turbine and the bactericidal lamp are electrically connected with the control panel.
CN201720223794.7U 2017-03-08 2017-03-08 A kind of pass-through box Expired - Fee Related CN207221040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720223794.7U CN207221040U (en) 2017-03-08 2017-03-08 A kind of pass-through box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720223794.7U CN207221040U (en) 2017-03-08 2017-03-08 A kind of pass-through box

Publications (1)

Publication Number Publication Date
CN207221040U true CN207221040U (en) 2018-04-13

Family

ID=61838573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720223794.7U Expired - Fee Related CN207221040U (en) 2017-03-08 2017-03-08 A kind of pass-through box

Country Status (1)

Country Link
CN (1) CN207221040U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113679861A (en) * 2020-05-18 2021-11-23 仁宝电脑工业股份有限公司 Sterilization equipment for portable electronic device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113679861A (en) * 2020-05-18 2021-11-23 仁宝电脑工业股份有限公司 Sterilization equipment for portable electronic device

Similar Documents

Publication Publication Date Title
CN207221040U (en) A kind of pass-through box
CN109025082A (en) A kind of solar energy green building with water saving fixtures
CN209165686U (en) A kind of air-conditioning equipment changes wind structure
CN204388243U (en) A kind of wall-hanging new blower fan
CN205324284U (en) Collection dirt type negative pressure dust catcher
CN208244332U (en) A kind of secondary dust processing equipment
CN208601826U (en) A kind of injection molding machine peculiar smell absorption plant
CN207294528U (en) A kind of integral domestic sewage treatment device
CN113390147A (en) Negative pressure keeps apart ward and uses exhaust device
CN207214305U (en) High-rise building intelligent fresh air purifier
CN106207823B (en) A kind of outer overall power distribution room of power system customer
CN109787126A (en) A kind of high power distribution cabinet of radiating efficiency for electrical engineering
CN205925355U (en) A device that is used for indoor formaldehyde that removes
CN111195444A (en) Filter equipment with adjustable domestic sewage treatment is used
CN212594517U (en) Air blowing device for experiments
CN113371858B (en) Building engineering water supply and drainage filter equipment
CN205860338U (en) A kind of bidirectional ventilated mouth structure
CN219347890U (en) Liquid level meter convenient to clearance
CN209286940U (en) A kind of combination vibration deduster
CN218854356U (en) Superclean bench with filtration purification performance
CN209576078U (en) A kind of air cleaning facility applied to modernization workshop
CN215989759U (en) Novel constant temperature and humidity cabinet
CN218924228U (en) Storage tank scarfing cinder waste gas treatment system
CN208139551U (en) A kind of analog machine visual system dust guard and analog machine
CN202578384U (en) Transfer window special for pharmaceutical plant clean room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215216 No.98, Donggu Road, tunnan village, Tongli Town, Wujiang Economic and Technological Development Zone, Suzhou City, Jiangsu Province

Patentee after: Suzhou Zhongwei Baojia Construction Engineering Co., Ltd

Address before: Wujiang District of Suzhou City, Jiangsu province 215000 Lili town Jinjiaba Xin Xi Lu

Patentee before: SUZHOU ZWBOK PURIFYING ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20210308