CN207216009U - Instrument finished product test fixture - Google Patents

Instrument finished product test fixture Download PDF

Info

Publication number
CN207216009U
CN207216009U CN201721077225.2U CN201721077225U CN207216009U CN 207216009 U CN207216009 U CN 207216009U CN 201721077225 U CN201721077225 U CN 201721077225U CN 207216009 U CN207216009 U CN 207216009U
Authority
CN
China
Prior art keywords
instrument
sliding block
binding post
push rod
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721077225.2U
Other languages
Chinese (zh)
Inventor
俞文荣
黄志成
俞跃
蒋浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ACXION ELECTRIC CO Ltd
Original Assignee
JIANGSU ACXION ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ACXION ELECTRIC CO Ltd filed Critical JIANGSU ACXION ELECTRIC CO Ltd
Priority to CN201721077225.2U priority Critical patent/CN207216009U/en
Application granted granted Critical
Publication of CN207216009U publication Critical patent/CN207216009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of instrument finished product test fixture, it includes base, the centre of the base top is provided with guide rail, sliding block is provided with the guide rail, instrument locating rack is fixed with the top of sliding block, the rear end of the base top is provided with fixed plate, binding post is additionally provided with the fixed plate, binding post is connected after passing through fixed plate with commissioning device, the other end of binding post is connected with thimble, the thimble is engaged with the binding post of meters under test rear end, and the front end of the base top is provided with push rod, and front end and the handle of push rod are hinged.Instrument is put into by this instrument finished product test fixture above instrument locating rack along stopper slot, push rod is promoted to shift instrument in fixed plate onto, the binding post at the instrument back side is propped up with thimble, so signal just can be linked into instrument by commissioning device by wire, and be subsequently passed Current Voltage value and accessory power supply etc. just can debug to instrument.It just can so simplify worker's process, improve operating efficiency, reduce worker's electric shock risk.

Description

Instrument finished product test fixture
Technical field
A kind of instrument finished product test fixture is the utility model is related to, for being debugged to electrical measuring instrument.
Background technology
Electrical measuring instrument is the meter and instrument for measuring, recording and measuring various electrical quantities.Electrical measuring instrument It is divided into ammeter, voltmeter, ohmmeter, power meter, power-factor meter, frequency meter, phase meter, synchronizing indication by measurement function Universal meter of device, electric energy meter and multiple use etc..
These electrical measuring instruments need to carry out performance detection after the completion of production, ensure that it can be with normal work, generally Detection method be by being manually connected to the binding post of commissioning device on instrument one by one, turned on the power again after connection and voltage Electric current, so as to be tested with commissioning device instrument.But such test mode every time will be by manually by many wiring Connected with instrument, complex procedures, operating efficiency is not high, while worker also has the risk got an electric shock.
Utility model content
The purpose of this utility model is to be to overcome above-mentioned deficiency, there is provided a kind of simplified process, improves operating efficiency, reduces The instrument finished product test fixture of worker's electric shock risk.
What the purpose of this utility model was realized in:
A kind of instrument finished product test fixture, it includes base, and the centre of the base top is provided with guide rail, on the guide rail Sliding block is provided with, the sliding block can be slid back and forth on guide rail, and instrument locating rack is fixed with the top of sliding block, the instrument locating rack For the vertical rack of the left and right sides, a stopper slot opened up vertically, instrument to be tested are offered respectively on the vertical rack Loaded in stopper slot, so as to which it be engaged with instrument locating rack, the rear end of the base top is provided with fixed plate, the fixed plate position In the rear side of sliding block, the fixed plate is provided with fixture block close to the side of sliding block protrusion, and after sliding block rearward promotes, fixture block can be with Coordinate with stopper slot and fix meters under test, binding post is additionally provided with the fixed plate, after binding post passes through fixed plate It is connected with commissioning device, the other end of binding post is connected with thimble, the thimble and the binding post phase of meters under test rear end Coordinating, after sliding block rearward promotes, thimble just can be inserted in the binding post of instrument so that instrument is connected with commissioning device, The front end of the base top is provided with push rod, and push rod is located at the front side of sliding block, and push rod can be with elastic, and the rear end of push rod is with pushing away Plate is fixed, and push pedal is used to promote sliding block to slide back and forth on guide rail, and front end and the handle of push rod are hinged, can be with by rotational handle Push rod is promoted to move forward and backward.
The utility model has an advantageous effect in that:
Instrument is put into by this instrument finished product test fixture above instrument locating rack along stopper slot, promotes push rod by instrument Shift onto in fixed plate, and the corresponding binding post in the instrument back side is propped up with thimble, such commissioning device just be able to will be believed by wire Number it is linked into instrument, be subsequently passed corresponding Current Voltage value and accessory power supply etc. just can debug to instrument.So just can Simplify worker's process, improve operating efficiency, reduce worker's electric shock risk.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model instrument finished product test fixture.
Wherein:Base 1, guide rail 2, sliding block 3, instrument locating rack 4, stopper slot 5, fixed plate 6, fixture block 7, binding post 8, top Pin 9, push rod 10, push pedal 11, handle 12.
Embodiment
Such as Fig. 1, a kind of instrument finished product test fixture is the utility model is related to, it includes base 1, the top of base 1 Centre is provided with guide rail 2, is provided with sliding block 3 on the guide rail 2, the sliding block 3 can slide back and forth on guide rail 2, the top of sliding block 3 Instrument locating rack 4 is fixed with, the instrument locating rack 4 is the vertical rack of the left and right sides, and one is offered respectively on the vertical rack The stopper slot 5 that bar opens up vertically, instrument to be tested are loaded in stopper slot 5, described so as to which it be engaged with instrument locating rack 4 The rear end at the top of base 1 is provided with fixed plate 6, and the fixed plate 6 is located at the rear side of sliding block 3, and the fixed plate 6 is close to the one of sliding block 3 Side protrusion is provided with fixture block 7, and after sliding block 3 rearward promotes, fixture block 7 can coordinate with stopper slot 5 fixes meters under test, institute State and binding post 8 be additionally provided with fixed plate 6, binding post 8 pass through fixed plate 6 after be connected with commissioning device, binding post 8 it is another One end is connected with thimble 9, and the thimble 9 is engaged with the binding post of meters under test rear end, after sliding block 3 rearward promotes, Thimble 9 just can be inserted in the binding post of instrument so that instrument is connected with commissioning device, and the front end at the top of base 1 is provided with Push rod 10, push rod 10 are located at the front side of sliding block 3, and push rod 10 can be with elastic, and rear end and the push pedal 11 of push rod 10 are fixed, push pedal 11 are used to promote sliding block 3 to slide back and forth on guide rail 2, and the front end of push rod 10 is be hinged with handle 12, can be with by rotational handle 12 Promote push rod 10 movable.
Instrument is put into above instrument locating rack along stopper slot, promote push rod instrument is shifted onto in fixed plate, and with push up Pin props up the corresponding binding post in the instrument back side, and signal just can be linked into instrument by such commissioning device by wire, then Be passed through corresponding Current Voltage value and accessory power supply etc. just can debug to instrument.It just can so simplify worker's process, improve work Make efficiency, reduce worker's electric shock risk.

Claims (1)

  1. A kind of 1. instrument finished product test fixture, it is characterised in that:It includes base(1), the base(1)The centre at top is provided with Guide rail(2), the guide rail(2)On be provided with sliding block(3), the sliding block(3)Can be in guide rail(2)On slide back and forth, sliding block(3)'s Top is fixed with instrument locating rack(4), the instrument locating rack(4)For the vertical rack of the left and right sides, on the vertical rack respectively Offer a stopper slot opened up vertically(5), instrument to be tested is loaded on stopper slot(5)In, so as to which itself and instrument be positioned Frame(4)Engaging, the base(1)The rear end at top is provided with fixed plate(6), the fixed plate(6)Positioned at sliding block(3)Rear side, institute State fixed plate(6)Close to sliding block(3)Side protrusion be provided with fixture block(7), work as sliding block(3)After rearward promoting, fixture block(7)Can be with With stopper slot(5)Meters under test is fixed in cooperation, the fixed plate(6)On be additionally provided with binding post(8), binding post(8) Through fixed plate(6)It is connected afterwards with commissioning device, binding post(8)The other end and thimble(9)It is connected, the thimble(9)With The binding post of meters under test rear end is engaged, and works as sliding block(3)After rearward promoting, thimble(9)Just the wiring of instrument can be inserted In terminal so that instrument is connected with commissioning device, the base(1)The front end at top is provided with push rod(10), push rod(10)It is located at Sliding block(3)Front side, push rod(10)Can be with elastic, push rod(10)Rear end and push pedal(11)It is fixed, push pedal(11)For Promote sliding block(3)In guide rail(2)On slide back and forth, push rod(10)Front end and handle(12)It is be hinged, pass through rotational handle(12) Push rod can be promoted(10)It is movable.
CN201721077225.2U 2017-08-26 2017-08-26 Instrument finished product test fixture Expired - Fee Related CN207216009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721077225.2U CN207216009U (en) 2017-08-26 2017-08-26 Instrument finished product test fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721077225.2U CN207216009U (en) 2017-08-26 2017-08-26 Instrument finished product test fixture

Publications (1)

Publication Number Publication Date
CN207216009U true CN207216009U (en) 2018-04-10

Family

ID=61816803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721077225.2U Expired - Fee Related CN207216009U (en) 2017-08-26 2017-08-26 Instrument finished product test fixture

Country Status (1)

Country Link
CN (1) CN207216009U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110293075A (en) * 2019-07-26 2019-10-01 辽宁机电职业技术学院 A kind of working method of novel meter semi-automatic test tooling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110293075A (en) * 2019-07-26 2019-10-01 辽宁机电职业技术学院 A kind of working method of novel meter semi-automatic test tooling
CN110293075B (en) * 2019-07-26 2021-06-18 辽宁机电职业技术学院 Working method of instrument semi-automatic testing tool

Similar Documents

Publication Publication Date Title
CN107744967A (en) The method of work of instrument semi-automatic test frock
CN202939303U (en) Wire connecting and disconnecting mechanism for automated verification of electric energy meter
CN109297839B (en) Data line swing test machine
CN207216009U (en) Instrument finished product test fixture
CN204694555U (en) Multi-functional photovoltaic material peel strength tester
CN207894963U (en) Tooling for circuit board detecting
CN108828359A (en) A kind of method of inspection for realizing direct-current charging post electric flux error checking function
CN209570687U (en) A kind of magnetic parameters device of magnetic material
CN201758185U (en) Electricity meter perpendicular compression joint test probe seat device
CN205193191U (en) Ultracapacitor system test fixture
CN107462857A (en) The semi-automatic test frock of instrument
CN207396537U (en) Instrument semi-finished product test fixture
CN215986457U (en) Multifunctional electric energy meter calibration stand
CN201181317Y (en) Resistor test device of charge roller
CN209356642U (en) Motor detecting instrument
CN210270066U (en) Maintenance platform for functional circuit board of online test equipment
CN208283524U (en) Low voltage motor Energy Efficiency Analysis device
CN203630348U (en) Electric energy meter detection tooling plate
CN208421000U (en) The electric energy meter mounting base of electric energy meter calibrating apparatus
CN209014707U (en) A kind of power battery module test equipment
CN207424098U (en) A kind of full automatic high accurancy and precision one circuit resistance tester
CN202210106U (en) Clamp for testing capacitance capacity and loss
CN207216010U (en) The semi-automatic test frock of instrument
CN201845045U (en) Composite test pencil
CN220751833U (en) Wire harness terminal tension testing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210826

CF01 Termination of patent right due to non-payment of annual fee