CN207212374U - The anti-down early-warning apparatus of hydraulic support - Google Patents

The anti-down early-warning apparatus of hydraulic support Download PDF

Info

Publication number
CN207212374U
CN207212374U CN201721255123.5U CN201721255123U CN207212374U CN 207212374 U CN207212374 U CN 207212374U CN 201721255123 U CN201721255123 U CN 201721255123U CN 207212374 U CN207212374 U CN 207212374U
Authority
CN
China
Prior art keywords
hydraulic support
frame
warning apparatus
protractor
down early
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721255123.5U
Other languages
Chinese (zh)
Inventor
李欣
杨烁
王殿波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201721255123.5U priority Critical patent/CN207212374U/en
Application granted granted Critical
Publication of CN207212374U publication Critical patent/CN207212374U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model discloses a kind of anti-down early-warning apparatus of hydraulic support, including frame, tape measure, protractor, vertical line and pendant top are installed in the frame, the frame is connected on the canned paragraph of hydraulic support front column, zero end of the tape measure is connected in the telescopic section of hydraulic support front column, the zero degree line of the protractor is horizontally disposed with, and the vertical line is located on the outside of the scale of the protractor, and the lower end of the vertical line connects the pendant top.The utility model has the advantage of:Can the anti-hydraulic pressure of dynamic reflect the frame shape and mining height of support;It is easy to adjust support frame shape in time, effectively prevents that high working face hydraulic support is crooked, generation of the accident of falling frame.

Description

The anti-down early-warning apparatus of hydraulic support
Technical field
It the utility model is related to a kind of hydraulic support monitoring device, more particularly to a kind of anti-down early-warning apparatus of hydraulic support.
Background technology
The bearing height of high working face hydraulic support is larger, exists axially between the connection bearing pin of each part of hydraulic support and hole And radial clearance, in addition coal seam have that inclination angle and bottom plate are uneven, hydraulic support is easily crooked or even frame.Incline because coal seam has Angle, the stability problem of hydraulic support are generally presented with following several situations:First, what the gravity of hydraulic support was inclined to along coal seam Component is more than the frictional force between bracket base and bottom plate, can produce lateral movement;Second, the position of the gravity of hydraulic support It will topple over during beyond bracket base widthwise edges;Third, the bias of making a concerted effort of top of support bottom institute stress, produces torque and makes hydraulic pressure Support tilt.By virtue of experience judge in conventional production process and whether naked eyes identification hydraulic support frames shape is crooked, without accurate Instrument monitored in real time, prevention hydraulic support it is crooked, fall frame be high working face hydraulic support daily management emphasis and difficult point, And technical barrier urgently to be resolved hurrily in production process.
Utility model content
Technical problem to be solved in the utility model be to provide one kind can effectively prevent high working face hydraulic support it is crooked, The anti-down early-warning apparatus of hydraulic support for the accident of falling frame.
The utility model is that solve above-mentioned technical problem by the following technical programs:The anti-down early-warning apparatus of hydraulic support, bag Including rack (1), tape measure (2), protractor (3), vertical line (4) and pendant top (5) are installed, the frame (1) is even on the frame (1) It is connected on the canned paragraph of hydraulic support front column, zero end of the tape measure (2) is connected in the telescopic section of hydraulic support front column, The zero degree line of the protractor (3) is horizontally disposed with, and the vertical line (4) is located on the outside of the scale of the protractor (3), the vertical line (4) the lower end connection pendant top (5).
As the technical scheme of optimization, bolt hole is provided with 90 degree of lines of the protractor (3), is bolted on institute State in frame (1), the vertical line (4) is connected on bolt.
As the technical scheme of optimization, the both sides of 90 degree of lines of the protractor (3) are provided with symmetrical three colors section, described Three color sections are followed successively by normal interval (31), early warning section (32) and crooked section (33) from close to away from 90 degree of lines.Can Dynamic intuitively reflects hydraulic support frames shape.
As the technical scheme of optimization, the three colors section uses reflecting mark plaster, is pasted onto the back side of protractor.Neither shadow Reading is rung, the state interval of hydraulic support can be observed again.
As the technical scheme of optimization, zoom table (6) is also equipped with the frame (1), is shown on the zoom table (6) Positive step step corresponding to each support mining height and inclination angle.It is easy to the quick positive step step number for searching corresponding hydraulic pressure standard frame shape According to using positive step step as standard, hydraulic support frames shape can be adjusted in time.
As the technical scheme of optimization, the outside of the zoom table (6) was provided with plastic package sleeve.Prevent zoom table from damaging.
As the technical scheme of optimization, the frame (1) includes riser (11), transverse slat (12) and connecting plate (13), described Transverse slat (12) is horizontally disposed, and the riser (11) is fixed on the top of the transverse slat (12) vertically, and the connecting plate (13) is fixed Two clamp connection holes are provided with the side edge of the transverse slat (12), the connecting plate (13), the frame (1) passes through Clip (7) through clamp connection hole is connected on the canned paragraph of hydraulic support front column.
As the technical scheme of optimization, the riser (11), transverse slat (12) and connecting plate (13) use steel plate, the card Hoop (7) uses reinforcing bar.
As the technical scheme of optimization, the tape measure (2) is located in flexible rule box (8), and the top surface of the flexible rule box (8) is provided with Tape stretches out seam (81), and the tape of the tape measure (2) is stretched out from seam (81) from the tape stretches out.Prevent from, into ash and water inlet, prolonging The service life of tape.
As the technical scheme of optimization, the top surface of the flexible rule box (8) is arranged in box body by hinge.The top of flexible rule box Face can open, convenient installation and replacing tape measure.
The utility model has the advantage of:Simple in construction, convenient to make, cost is relatively low;Installed in hydraulic support front column On, the working space of operating personnel is neither influenceed, enough dynamically anti-hydraulic pressure reflects the frame shape and mining height of support to and can;It make use of tape measure certainly The advantages of dynamic flexible, avoid cumbersome when operating personnel gathers mining height data;It is easy to adjust support frame shape in time, effectively prevention High working face hydraulic support is crooked, the accident of falling frame generation.
Brief description of the drawings
Fig. 1 is the structural representation of the anti-down early-warning apparatus of the utility model hydraulic support.
Fig. 2 is the structural representation of the utility model frame.
Fig. 3 is the structural representation of the utility model protractor.
Fig. 4 is the structural representation of the utility model flexible rule box.
Embodiment
As Figure 1-4, the anti-down early-warning apparatus of hydraulic support, including frame 1, tape measure 2, protractor 3, vertical line 4, pendant top 5, speed Table look-up 6, clip 7 and flexible rule box 8.
Frame 1 includes riser 11, transverse slat 12 and connecting plate 13.
Riser 11, transverse slat 12 and connecting plate 13 use rectangle steel plate, and transverse slat 12 is horizontally disposed, and riser 11 is fixed vertically In the top of transverse slat 12, connecting plate 13 is fixed on the side edge of transverse slat 12.
Two clamp connection holes are provided with connecting plate 13, frame 1 is connected to hydraulic pressure by the clip 7 through clamp connection hole On the canned paragraph of support front column, U-shaped is made using ¢ 8mm reinforcing bar in clip 7, and a 60mm is respectively torn at the both ends of clip 7 open.
Tape measure 2 is located in the flexible rule box 8 of cuboid, and the bottom surface of flexible rule box 8 is provided with bolt hole, is bolted on transverse slat 12 top, the top surface of flexible rule box 8 are arranged in box body by hinge.
The top surface of flexible rule box 8 is provided with tape and stretches out seam 81, and the tape of tape measure 2 is stretched out at seam 81 from tape stretches out, tape Zero end is connected at the liquid back pipe head of the two level live post of hydraulic support front column.
The zero degree line of semicircular protractor 3 is horizontally disposed with, and is provided with bolt hole close to circle centre position on its 90 degree of lines, is passed through spiral shell Bolt is fixed on riser 11, and vertical line 4 is connected on bolt, and vertical line 4 is located on the outside of the scale of protractor 3, the lower end connection of vertical line 4 Fall top 5.
The both sides of 90 degree of lines of protractor 3 are provided with symmetrical three colors section, and three color sections use reflecting mark plaster, use mobile phone sticker The method of film is pasted onto the back side of protractor, from close to away from 90 degree lines be followed successively by green normal interval 31, yellow it is pre- 32 and red crooked section 33 between police region.
Normal interval 31 is divided in 85 °~95 °, and vertical line 4 is indicated in green section, represents that now hydraulic support frames shape is just.
Early warning section 32 is divided in 80 °~85 ° and 95 °~100 °, and vertical line 4 indicates, in yellow section, to represent now hydraulic pressure Support frame shape has squeezes frame, crooked omen up or down.
Crooked section 33 is divided in 70 °~80 ° and 100 °~110 °, and vertical line 4 indicates, in red section, to represent now hydraulic pressure Has there is crooked, frame phenomenon in support frame shape.
The outside of zoom table 6 was provided with plastic package sleeve, crosses the plastic package sleeve back side and is pasted onto on riser 11, was shown on zoom table 6 each Positive step step corresponding to support mining height and inclination angle, as shown in table 1.
The hydraulic support frames shape zoom table of table 1
In process of production, the anti-down early-warning apparatus of the hydraulic support is installed in working face at interval of 5 framves or 10 frame hydraulic supports One, the data measured by tape measure 2 draw support mining height, and the position indicated by vertical line 4 draws working face inclination angle, Ran Hou The positive step step data of corresponding rack standard frame shape are searched in zoom table 6 (table 1), adjust support frame shape in time.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model All any modification, equivalent and improvement made within new spirit and principle etc., should be included in guarantor of the present utility model Within the scope of shield.

Claims (10)

  1. A kind of 1. anti-down early-warning apparatus of hydraulic support, it is characterised in that:Including frame (1), tape measure is installed on the frame (1) (2), protractor (3), vertical line (4) and pendant top (5), the frame (1) is connected on the canned paragraph of hydraulic support front column, described Zero end of tape measure (2) is connected in the telescopic section of hydraulic support front column, and the zero degree line of the protractor (3) is horizontally disposed with, institute State vertical line (4) to be located on the outside of the scale of the protractor (3), the lower end connection pendant top (5) of the vertical line (4).
  2. 2. the anti-down early-warning apparatus of hydraulic support as claimed in claim 1, it is characterised in that:On 90 degree of lines of the protractor (3) Bolt hole is provided with, is bolted in the frame (1), the vertical line (4) is connected on bolt.
  3. 3. the anti-down early-warning apparatus of hydraulic support as claimed in claim 1, it is characterised in that:90 degree of lines of the protractor (3) Both sides are provided with symmetrical three colors section, and the three colors section is followed successively by normal interval (31), early warning from close to away from 90 degree of lines Section (32) and crooked section (33).
  4. 4. the anti-down early-warning apparatus of hydraulic support as claimed in claim 3, it is characterised in that:The three colors section uses reflecting sign Patch, it is pasted onto the back side of protractor.
  5. 5. the anti-down early-warning apparatus of hydraulic support as claimed in claim 1, it is characterised in that:Speed is also equipped with the frame (1) Table look-up (6), each support mining height and the positive step step corresponding to inclination angle are shown on the zoom table (6).
  6. 6. the anti-down early-warning apparatus of hydraulic support as claimed in claim 5, it is characterised in that:The outside of the zoom table (6) is provided with Cross plastic package sleeve.
  7. 7. the anti-down early-warning apparatus of hydraulic support as claimed in claim 1, it is characterised in that:The frame (1) include riser (11), Transverse slat (12) and connecting plate (13), the transverse slat (12) is horizontally disposed, and the riser (11) is fixed on the transverse slat (12) vertically Top, the connecting plate (13) is fixed on the side edge of the transverse slat (12), two is provided with the connecting plate (13) Clamp connection hole, the frame (1) are connected to the canned paragraph of hydraulic support front column by the clip (7) through clamp connection hole On.
  8. 8. the anti-down early-warning apparatus of hydraulic support as claimed in claim 7, it is characterised in that:The riser (11), transverse slat (12) and Connecting plate (13) uses steel plate, and the clip (7) uses reinforcing bar.
  9. 9. the anti-down early-warning apparatus of hydraulic support as claimed in claim 1, it is characterised in that:The tape measure (2) is located at flexible rule box (8) Interior, the top surface of the flexible rule box (8) is provided with tape and stretches out seam (81), and the tape of the tape measure (2) is stretched out from the tape stitches (81) place is stretched out.
  10. 10. the anti-down early-warning apparatus of hydraulic support as claimed in claim 9, it is characterised in that:The top surface of the flexible rule box (8) passes through Hinge is arranged in box body.
CN201721255123.5U 2017-09-28 2017-09-28 The anti-down early-warning apparatus of hydraulic support Active CN207212374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721255123.5U CN207212374U (en) 2017-09-28 2017-09-28 The anti-down early-warning apparatus of hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721255123.5U CN207212374U (en) 2017-09-28 2017-09-28 The anti-down early-warning apparatus of hydraulic support

Publications (1)

Publication Number Publication Date
CN207212374U true CN207212374U (en) 2018-04-10

Family

ID=61819645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721255123.5U Active CN207212374U (en) 2017-09-28 2017-09-28 The anti-down early-warning apparatus of hydraulic support

Country Status (1)

Country Link
CN (1) CN207212374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461211A (en) * 2017-09-28 2017-12-12 淮南矿业(集团)有限责任公司 The anti-down early-warning apparatus of hydraulic support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461211A (en) * 2017-09-28 2017-12-12 淮南矿业(集团)有限责任公司 The anti-down early-warning apparatus of hydraulic support

Similar Documents

Publication Publication Date Title
CN207212374U (en) The anti-down early-warning apparatus of hydraulic support
CN112012227B (en) Strip foundation pit steel structure supporting structure capable of conducting leveling and stress detection
CN109488841A (en) A kind of outdoor electronic message board with anti-typhoon capacity
CN206430713U (en) A kind of electronics angel measuring instrument
CN107461211A (en) The anti-down early-warning apparatus of hydraulic support
CN206092065U (en) Colliery stope gas and colliery nature coupling calamity detecting system
CN206069094U (en) For the supporting tool of solar energy backboard thin film
CN210686063U (en) Tunnel construction safety early warning device
CN206268845U (en) A kind of LED daylight lamp lamp bracket
CN207876069U (en) Automatic lower cover buckle closure device
CN209863829U (en) Folding intelligent health management terminal of accomodating
CN207344265U (en) Saw blade lateral bending detection device
CN208107321U (en) One kind being convenient for drainpipe mounting device
CN208073518U (en) A kind of mine anti-collapse safety alarm device of borehole wall attaching type
CN217422676U (en) Video analysis device capable of responding in real time
CN221125342U (en) Flood detection early warning device
CN207450481U (en) A kind of automatic labeling label device
CN212477495U (en) Traffic safety facility state detection device
CN211787495U (en) Alarm device with image recognition for traffic system
CN215639317U (en) Flatness checking device for surveying and mapping engineering
CN218969827U (en) Warning device
CN216285169U (en) Gas detection equipment with protection mechanism
CN216117668U (en) Wind power testing device for environmental monitoring
CN211340530U (en) Landscape belt with pedestrian flow dredging emergency function
CN107545838A (en) A kind of construction safety warning frock and its installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant