CN207211703U - A kind of construction site steel pipe scaffold builds fixing device - Google Patents

A kind of construction site steel pipe scaffold builds fixing device Download PDF

Info

Publication number
CN207211703U
CN207211703U CN201720680660.8U CN201720680660U CN207211703U CN 207211703 U CN207211703 U CN 207211703U CN 201720680660 U CN201720680660 U CN 201720680660U CN 207211703 U CN207211703 U CN 207211703U
Authority
CN
China
Prior art keywords
steel pipe
bolt
supporting plate
connection lead
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720680660.8U
Other languages
Chinese (zh)
Inventor
喻泽东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Yujie
Original Assignee
Hubei Dongwoo Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Dongwoo Construction Engineering Co Ltd filed Critical Hubei Dongwoo Construction Engineering Co Ltd
Priority to CN201720680660.8U priority Critical patent/CN207211703U/en
Application granted granted Critical
Publication of CN207211703U publication Critical patent/CN207211703U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction site steel pipe scaffold and builds fixing device, the left side of described left connection lead welding on the supporting plate, the right side of right connection lead welding on the supporting plate, bottom plate is welded on the bottom of supporting plate, described upper platen is arranged on the top of supporting plate by moveable hinge, described upper left fastening hold-down bolt is arranged on the left side on upper platen, upper right fastening hold-down bolt is arranged on the right side on upper platen, lower-left puller bolt is arranged on the left side on bottom plate, bottom right puller bolt is arranged on the right side on bottom plate.Its design science of the utility model is reasonable, simple in construction, easy to use.

Description

A kind of construction site steel pipe scaffold builds fixing device
Technical field:
It the utility model is related to a kind of construction site steel pipe scaffold and build fixing device, belong to scaffold and build technology neck Domain.
Background technology:
In steel construction is built, steel pipe is the most widely used material, during steel construction is built using pipe fitting, it is necessary to Pipe fitting is attached by connector.The pipe fitting connected mode of use is mainly welded and bolt connection, pipe fitting welding are non-collapsible Formula connects, after pipe fitting welding, it is impossible to dismantled, in-convenience in use;It is connected by screw bolts, because steel pipe is cylindric, connection Portion is firm and easily causes pipe deformation.
Utility model content:
The technical problems to be solved in the utility model is to provide a kind of construction site steel pipe scaffold and builds fixing device, adopts With the left side of left connection lead welding on the supporting plate, the right side of right connection lead welding on the supporting plate, upper left fastening Hold-down bolt is arranged on the left side on upper platen, and upper right fastening hold-down bolt is arranged on the right side on upper platen, lower-left top Tight bolt is arranged on the left side on bottom plate, and bottom right puller bolt is arranged on the design on the right side on bottom plate, utilizes a left side The right-hand member of steel pipe is inserted on left connection lead, and the left end of right steel pipe is inserted on right connection lead, the fastening of rotation upper left Bolt and upper right fastening bolt can compress the upper side wall of left steel pipe and right steel pipe, rotate lower-left puller bolt and bottom right is held out against Bolt can compress the lower wall of left steel pipe and right steel pipe, and then realize the fixation of left steel pipe and right steel pipe, its design science Rationally, it is simple in construction, it is easy to use.
A kind of construction site steel pipe scaffold builds fixing device, and its structure includes:Supporting plate, left connection lead, the right side Connect lead, bottom plate, upper platen, moveable hinge, upper left fastening hold-down bolt, upper right fastening hold-down bolt, lower-left top Tight bolt, bottom right puller bolt, left steel pipe, right steel pipe, the left side of described left connection lead welding on the supporting plate, right company The right side of lead welding on the supporting plate is connect, bottom plate is welded on the bottom of supporting plate, and described upper platen passes through work Dynamic hinge is arranged on the left side on upper platen, upper right fastening installed in the top of supporting plate, described upper left fastening hold-down bolt Hold-down bolt is arranged on the right side on upper platen, and lower-left puller bolt is arranged on the left side on bottom plate, and bottom right holds out against spiral shell Bolt is arranged on the right side on bottom plate.
Further, the right-hand member of described left steel pipe is inserted on left connection lead, and the left end of right steel pipe is inserted into right company Connect on lead, the upper side wall of left steel pipe and right steel pipe can be compressed by rotating upper left fastening bolt and upper right fastening bolt, be revolved Turn left lower puller bolt and bottom right puller bolt can compress the lower wall of left steel pipe and right steel pipe, so realize left steel pipe and The fixation of right steel pipe.
The beneficial effects of the utility model:Left side of the utility model using left connection lead welding on the supporting plate, The right side of right connection lead welding on the supporting plate, upper left fastening hold-down bolt are arranged on the left side on upper platen, upper right The right side that hold-down bolt is arranged on upper platen is fastened, lower-left puller bolt is arranged on the left side on bottom plate, bottom right top Tight bolt is arranged on the design on the right side on bottom plate, is inserted in using the right-hand member of left steel pipe on left connection lead, right steel The left end of pipe is inserted on right connection lead, rotates upper left fastening bolt and upper right fastening bolt can be by left steel pipe and right steel The upper side wall of pipe compresses, and rotates lower-left puller bolt and bottom right puller bolt can be by left steel pipe and the downside wall pressure of right steel pipe Tightly, and then the fixation of left steel pipe and right steel pipe is realized, its design science is reasonable, simple in construction, easy to use.
Brief description of the drawings:
For ease of explanation, the utility model is described in detail by following specific implementations and accompanying drawing.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is pipe fitting connection diagram of the present utility model.
In figure:1- supporting plates;The left connection leads of 2-;The right connection leads of 3-;4- bottom plates;5- upper platens;6- Moveable hinge;7- upper lefts fasten hold-down bolt;8- upper rights fasten hold-down bolt;9- lower-lefts puller bolt;10- bottom rights puller bolt; The left steel pipes of 11-;The right steel pipes of 12-.
Embodiment:
To make the purpose of this utility model, technical scheme and advantage of greater clarity, below by what is shown in accompanying drawing Specific embodiment describes the utility model.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit this reality With new scope.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily mixing Confuse concept of the present utility model.
As depicted in figs. 1 and 2, a kind of construction site steel pipe scaffold builds fixing device, and its structure includes:Supporting plate 1, Left connection lead 2, right connection lead 3, bottom plate 4, upper platen 5, moveable hinge 6, upper left fastening hold-down bolt 7, the right side Solid hold-down bolt 8, lower-left puller bolt 9, bottom right puller bolt 10, left steel pipe 11, right steel pipe 12 are tightened, described left connection is led The left side in supporting plate 1 is welded on to post 2, right connection lead 3 is welded on the right side in supporting plate 1, and bottom plate 4 is welded on The bottom of supporting plate 1, described upper platen 5 are arranged on the top of supporting plate 1, described upper left fastening pressure by moveable hinge 6 Tight bolt 7 is arranged on the left side on upper platen 5, and upper right fastening hold-down bolt 8 is arranged on the right side on upper platen 5, lower-left Puller bolt 9 is arranged on the left side on bottom plate 4, and bottom right puller bolt 10 is arranged on the right side on bottom plate 4.
Specifically, the right-hand member of described left steel pipe 11 is inserted on left connection lead 2, and the left end of right steel pipe 12 is inserted into On right connection lead 3, rotating upper left fastening bolt 7 and upper right fastening bolt 8 can be by the upper of left steel pipe 11 and right steel pipe 12 Side wall compresses, and rotates lower-left puller bolt 9 and bottom right puller bolt 10 can be by left steel pipe 11 and the downside wall pressure of right steel pipe 12 Tightly, and then the fixation of left steel pipe 11 and right steel pipe 12 is realized.
In the technical solution of the utility model, using the left side of left connection lead welding on the supporting plate, right connection is led To the right side of post welding on the supporting plate, upper left fastening hold-down bolt is arranged on the left side on upper platen, and upper right fastening compresses Bolt is arranged on the right side on upper platen, and lower-left puller bolt is arranged on the left side on bottom plate, bottom right puller bolt peace The design on the right side on bottom plate, it is inserted in using the right-hand member of left steel pipe on left connection lead, the left end of right steel pipe It is inserted on right connection lead, rotates upper left fastening bolt and upper right fastening bolt can be by the upside of left steel pipe and right steel pipe Wall pressure is tight, and the lower wall of left steel pipe and right steel pipe can be compressed by rotating lower-left puller bolt and bottom right puller bolt, Jin Ershi The fixation of existing left steel pipe and right steel pipe.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (2)

1. a kind of construction site steel pipe scaffold builds fixing device, it is characterised in that:Structure includes:Supporting plate, left connection are led Xiang Zhu, it is right connection lead, bottom plate, upper platen, moveable hinge, upper left fastening hold-down bolt, upper right fastening hold-down bolt, Lower-left puller bolt, bottom right puller bolt, left steel pipe, right steel pipe, the left side of described left connection lead welding on the supporting plate Side, the right side of right connection lead welding on the supporting plate, bottom plate are welded on the bottom of supporting plate, described upper platen The top of supporting plate is arranged on by moveable hinge, described upper left fastening hold-down bolt is arranged on the left side on upper platen, right Right side of the solid hold-down bolt on upper platen is tightened, lower-left puller bolt is arranged on the left side on bottom plate, bottom right Puller bolt is arranged on the right side on bottom plate.
2. a kind of construction site steel pipe scaffold according to claim 1 builds fixing device, it is characterised in that:Described The right-hand member of left steel pipe is inserted on left connection lead, and the left end of right steel pipe is inserted on right connection lead.
CN201720680660.8U 2017-06-13 2017-06-13 A kind of construction site steel pipe scaffold builds fixing device Expired - Fee Related CN207211703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720680660.8U CN207211703U (en) 2017-06-13 2017-06-13 A kind of construction site steel pipe scaffold builds fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720680660.8U CN207211703U (en) 2017-06-13 2017-06-13 A kind of construction site steel pipe scaffold builds fixing device

Publications (1)

Publication Number Publication Date
CN207211703U true CN207211703U (en) 2018-04-10

Family

ID=61811857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720680660.8U Expired - Fee Related CN207211703U (en) 2017-06-13 2017-06-13 A kind of construction site steel pipe scaffold builds fixing device

Country Status (1)

Country Link
CN (1) CN207211703U (en)

Similar Documents

Publication Publication Date Title
CN207211703U (en) A kind of construction site steel pipe scaffold builds fixing device
CN207455048U (en) A kind of Pipe leakage stopper
CN207605837U (en) Formula Traditional Chinese medicine tamping pot is spread outside one kind is anti-
CN205504251U (en) Pressurization connects
CN209662352U (en) A kind of non-solution injector stirred using piston
CN206229749U (en) A kind of wiper mechanism of water paint mixer
CN109432550A (en) A kind of non-solution injector stirred using piston
CN203586556U (en) Pipe connector connection device for enamel linear of water heater
CN206655879U (en) A kind of new steel structure pipe connecting component
CN206817010U (en) A kind of Fast Installation and the pipeline connecting device of dismounting and self-locking self sealss
CN207508753U (en) Insert side processing and loading clamp mechanism
CN206929430U (en) A kind of adjustable water outlet pipe fixing device
CN206571162U (en) Structure support frame adjustment device in a kind of transformer station
CN206381947U (en) A kind of agent mixer
CN206156731U (en) Filling equipment that can bottled yellow rice wine
CN206359768U (en) Overflow dyeing machine
CN204532236U (en) Stir note integrated pump
CN200991413Y (en) Small Chinese-medicine concentraction apparatus
CN202464540U (en) Vertical hanging cover inbuilt manhole for pressure container
CN211112909U (en) Feeding device of rotary spherical digester
CN206884250U (en) A kind of rotatable tablet press machine
CN203009205U (en) Pneumatic concrete hole sealing pump for mining
CN207364500U (en) A kind of liquid tube connector of anti-leak
CN207073652U (en) A kind of bidirectional fastening seaming type clip
CN206956857U (en) A kind of tap being easily installed on table top

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210421

Address after: 430000, No. 6, Shizi street, Qiaokou District, Wuhan City, Hubei Province

Patentee after: Jin Yujie

Address before: 430000 Hubei province Wuhan economic and Technological Development Zone 31MD block (Dongfeng Road No. 268)

Patentee before: HUBEI DONGYOU CONSTRUCTION ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410