CN207211474U - Building ceiling access panel structure - Google Patents

Building ceiling access panel structure Download PDF

Info

Publication number
CN207211474U
CN207211474U CN201721120068.9U CN201721120068U CN207211474U CN 207211474 U CN207211474 U CN 207211474U CN 201721120068 U CN201721120068 U CN 201721120068U CN 207211474 U CN207211474 U CN 207211474U
Authority
CN
China
Prior art keywords
groove
ceiling
clamp
panel structure
shutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721120068.9U
Other languages
Chinese (zh)
Inventor
陈俊杰
李水平
姜洪毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongyi Construction Engineering Co Ltd
Original Assignee
Shenzhen Zhongyi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhongyi Construction Engineering Co Ltd filed Critical Shenzhen Zhongyi Construction Engineering Co Ltd
Priority to CN201721120068.9U priority Critical patent/CN207211474U/en
Application granted granted Critical
Publication of CN207211474U publication Critical patent/CN207211474U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses building ceiling access panel structure, it is lighter to solve cover plate itself, the problem of easily being blown afloat by strong wind, including ceiling and it is opened in the access hole of ceiling, ceiling upper end both sides open up fluted, and the groove is located at access hole both sides, magnetic sheet is fitted with the groove, the access hole activity is plugged with shutter, and the shutter both ends are connected with to be fixed in groove for the clamp in grafting groove, the clamp by magnetic sheet;By magnetic sheet fixing chuck plate, make the fixation of shutter more firm, and also allow for pushing shutter open, realize that maintenance worker passes through the equipment such as access hole service conduits and electric wire.

Description

Building ceiling access panel structure
Technical field
A kind of inspection port structure is the utility model is related to, in particular, it is related to building ceiling access panel structure.
Background technology
In recent years, ceiling gradually comes into fashion in decoration, finishing.The main function of furred ceiling when concrete application Have at 2 points:Ornamental and feature.It is more by ceiling by the one of top in frock for dicoration A little electric wires, various pipeline angle bar cover, and are combined using the moulding and monolithic architecture style of smallpox, good Design collocation can play a part of crucial touch in whole built-in effect.In house ornamentation, often by the blowdown at top Pipeline, exhaust fan and cement, frame post are covered, and mutually arranged in pairs or groups with surrounding decorated style, tone by plate face specification color, shape Into different owner's styles.Secondly it is more by key lights, auxiliary light, concealed lamp in frock for feature Light, air-conditioning air inlet, air outlet, applicator, smoke detector etc., using the characteristics of smallpox is easy to moulding, intensity is high, organically melt It is combined, whole top is not only had decorative effect, and more has the function of modern trend.
Commonly using sheet material closing smallpox in modern architecture indoor ceiling ornamental.In order to facilitate the equipment on maintenance ceiling And pipeline, electric wire etc., access hole typically can be all set on the ceiling.But the ceiling checking port just occurred on the market now For, due to higher floor, wind is typically all very big, and the cover plate for covering access hole is lighter, is buckled completely by cover plate own wt Close, cover plate easily blown afloat, and reduces cover plate for sealing effect, therefore, is badly in need of proposing that a kind of new technical scheme goes to solve this to ask Topic.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide building ceiling access panel structure, The firm closing access hole of shutter can be made, the phenomenon that strong wind blows afloat shutter is reduced and occur.
Above-mentioned technical purpose of the present utility model technical scheme is that:Building ceiling overhauls Mouth structure, including ceiling and the access hole for being opened in ceiling, the ceiling upper end both sides open up it is fluted, it is described recessed Groove is located at access hole both sides, and magnetic sheet is fitted with the groove, and the access hole activity is plugged with shutter, the shutter two End is connected with to be fixed in groove for the clamp in grafting groove, the clamp by magnetic sheet.
By using above-mentioned technical proposal, shutter is connected in groove by clamp, and the magnetic by being set in groove The magneticaction of piece is fixed, and shutter shelters from the pipeline on ceiling, electric wire etc., have the function that it is attractive in appearance, clean and tidy, in addition, By magnetic sheet fixing chuck plate, make the fixation of shutter more firm, and also allow for pushing shutter open, realize that maintenance worker passes through The equipment such as access hole service conduits and electric wire.
Further, sealing strip is provided with the groove, the storage tank for magnetic sheet grafting is offered in the sealing strip.
By using above-mentioned technical proposal, sealing strip, the grafting between sealing strip sealing clamp and groove are set in groove Gap, reduce the phenomenon that the dust on ceiling is fallen from gap and occur, in the storage tank in magnetic sheet insertion sealing strip, reduce The phenomenon that magnetic sheet slides in sealing strip occurs, and magnetic sheet can be made more to be stable in storage tank, clamp passes through in sealing strip Magnetic sheet adsorbs, and more can be firmly fixed in groove.
Further, the storage tank upper end offers dovetail groove, and the upper/lower terminal of dovetail groove connects with storage tank.
By using above-mentioned technical proposal, storage tank connects with dovetail groove so that magnetic sheet exposes sealing strip, reduces sealing strip To the barrier effect of magnetic sheet magnetic force, increase the magneticaction between magnetic sheet and clamp so that the stronger sealing maintenance of shutter Mouthful.
Further, the clamp bottom is connected with the fixed block of magnetic, and the fixed block is placed in dovetail groove, fixed block There is gap between the cell wall of dovetail groove.
By using above-mentioned technical proposal, fixed block insertion dovetail groove realizes the fixation of clamp, while fixed block also acts as The effect of counterweight, the steadiness that increase clamp is fixed in groove, leaves gap between fixed block and dovetail groove, reduce fixed block Insert frictional resistance when in dovetail groove.
Further, the spacing between the fixed block and magnetic sheet is 3-5cm.
By using above-mentioned technical proposal, fixed block is set to 3-5cm with magnetic sheet spacing, helps to increase magnetic sheet to fixed block Magneticaction, while also allow for fixed block depart from magnetic sheet absorption, can preferably push shutter open, be easy to worker to be examined Repair work.
Further, the groove is opened in the surrounding of access hole.
By using above-mentioned technical proposal, access hole surrounding is all provided with fluted, realizes that shutter is preferably fixed on inspection Mouth is repaiied, the phenomenon that shutter is dropped by access hole is reduced and occurs.
Further, the sealing strip uses rubber strip.
By using above-mentioned technical proposal, rubber strip tool has good wearability and very high elasticity, can play more preferable Sealing function.
Further, the clamp is made up of steel.
By using above-mentioned technical proposal, clamp is made up of steel, and the intensity and compressive property of steel are relatively good, Ke Yiqi To the effect of more preferable support shutter.
Further, the clamp thickness is consistent with the depth that groove opens up.
By using above-mentioned technical proposal, clamp thickness opens up that depth is consistent, and clamp is just placed in groove with groove, card Plate upper end is in same plane with ceiling upper end, and shutter lower end is in same plane with ceiling, played beautiful and clean Effect.
In summary, the utility model has the advantages that:
One:Opened up positioned at the ceiling of access hole fluted, clamp realizes the fixation of shutter by being connected in groove, Magnetic sheet is provided with groove, by magnetic sheet fixing chuck plate, makes the sealing access hole that shutter is more firm, and also allow for pushing screening open Baffle plate, realize that maintenance worker passes through the equipment such as access hole service conduits and electric wire;
Secondly:Rubber strip is set in groove, the storage tank for accommodating magnetic sheet is offered in rubber strip, is easy to magnetic sheet to be fixed on appearance Put in groove, reduce the phenomenon that magnetic sheet slides in groove and occur, realize the more firm sealing access hole of shutter.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present embodiment;
Fig. 2 is the cross-sectional view of ceiling in embodiment;
Fig. 3 is the mplifying structure schematic diagram at A in Fig. 2.
In figure:1st, ceiling;11st, access hole;12nd, groove;13rd, sealing strip;14th, storage tank;141st, magnetic sheet;142nd, it is trapezoidal Groove;2nd, shutter;21st, clamp;22nd, fixed block.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Building ceiling access panel structure, as shown in figure 1, including ceiling 1, the center of ceiling 1 offers square Access hole 11, access hole 11 are plugged with the shutter 2 of sealing access hole 11, and ceiling 1 is located at the surrounding difference of access hole 11 Fluted 12 are opened up, shutter 2 is welded with clamp 21 with the matching part of groove 12, and clamp 21 is made up of steel, and clamp 21 passes through It is connected in groove 12 and realizes that shutter 2 seals access hole 11, the thickness of clamp 21 is consistent with the depth of groove 12, passes through shutter 2 sealing access holes 11, can both make entirely to fit up beautiful and clean, can play again and reduce what the dust of the upper end of ceiling 1 dropped Phenomenon occurs.
As shown in Figures 2 and 3, hot melt has sealing strip 13 in groove 12, and sealing strip 13 uses rubber strip, opened in sealing strip 13 Provided with storage tank 14, magnetic sheet 141 is plugged with storage tank 14, the top that sealing strip 13 is located at storage tank 14 offers dovetail groove 142, dovetail groove 142 is mutually open-minded with storage tank 14, and the upper end of dovetail groove 142 is set to open.
The bottom of clamp 21 is welded with fixed block 22, and fixed block 22 is made up of steel, and fixed block 22 is by inserting dovetail groove 142 Realize that fixed block 22 is fixed on dovetail groove 142, gap is left between fixed block 22 and dovetail groove 142, reduce fixed block 22 and insert The frictional resistance of dovetail groove 142, the distance between the bottom of fixed block 22 and magnetic sheet 141 are 3-5cm, it is possible to achieve magnetic sheet 141 is logical Cross magneticaction and preferably adsorb fixed block 22, while also allow for fixed block 22 and depart from magnetic sheet 141, be easy to push shutter 2 open, it is real Existing worker carries out maintenance work by access hole 11.
The course of work and principle:The center of ceiling 1 opens up access hole 11, and the maintenances of equipment such as electric wire, pipeline are set and overhauled Near mouth 11, by setting shutter 2 to seal access hole 11, the surrounding of shutter 2 is welded with clamp 21, and clamp 21 passes through card Connect and be opened in the groove 12 of ceiling 1 and realize that shutter 2 seals access hole 11, be fitted with sealing strip 13, sealing strip in groove 12 The holding tank for accommodating magnetic sheet 132 is offered in 13, realizes that clamp 21 is more firmly connected in groove 12, makes shutter 2 more Add and be firmly fixed on ceiling 1, in addition, the dovetail groove 142 being opened in sealing strip 13, the fixed block 22 of the bottom of clamp 21 By inserting dovetail groove 142, the more firm sealing access hole 11 of shutter 2 is realized, access hole 11 is sealed by shutter 2, Both it can make entirely to fit up beautiful and clean, can play again and reduce the phenomenon that the dust of the upper end of ceiling 1 drops and occur.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (9)

1. building ceiling access panel structure, including ceiling (1) and the access hole (11) for being opened in ceiling (1), its It is characterized in:Ceiling (1) the upper end both sides open up fluted (12), and the groove (12) is located at access hole (11) both sides, institute State in groove (12) and be fitted with magnetic sheet (141), access hole (11) activity is plugged with shutter (2), the shutter (2) two End is connected with is fixed on groove (12) for the clamp (21) in grafting groove (12), the clamp (21) by magnetic sheet (141) It is interior.
2. building ceiling access panel structure according to claim 1, it is characterized in that:It is provided with the groove (12) close Strip of paper used for sealing (13), the interior storage tank (14) offered for magnetic sheet (141) grafting of the sealing strip (13).
3. building ceiling access panel structure according to claim 2, it is characterized in that:Open storage tank (14) upper end Provided with dovetail groove (142), the upper/lower terminal of dovetail groove (142) connects with storage tank (14).
4. building ceiling access panel structure according to claim 3, it is characterized in that:Clamp (21) the bottom connection There is the fixed block (22) of magnetic, the fixed block (22) is placed in dovetail groove (142), fixed block (22) and dovetail groove (142) Cell wall between there is gap.
5. building ceiling access panel structure according to claim 4, it is characterized in that:The fixed block (22) and magnetic sheet (141) spacing between is 3-5cm.
6. building ceiling access panel structure according to claim 5, it is characterized in that:The groove (12) is opened in inspection Repair the surrounding of mouth (11).
7. building ceiling access panel structure according to claim 6, it is characterized in that:The sealing strip (13) uses rubber Adhesive tape.
8. building ceiling access panel structure according to claim 7, it is characterized in that:The clamp (21) is by steel system Into.
9. building ceiling access panel structure according to claim 8, it is characterized in that:Clamp (21) thickness with it is recessed The depth that groove (12) opens up is consistent.
CN201721120068.9U 2017-09-02 2017-09-02 Building ceiling access panel structure Expired - Fee Related CN207211474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721120068.9U CN207211474U (en) 2017-09-02 2017-09-02 Building ceiling access panel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721120068.9U CN207211474U (en) 2017-09-02 2017-09-02 Building ceiling access panel structure

Publications (1)

Publication Number Publication Date
CN207211474U true CN207211474U (en) 2018-04-10

Family

ID=61826457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721120068.9U Expired - Fee Related CN207211474U (en) 2017-09-02 2017-09-02 Building ceiling access panel structure

Country Status (1)

Country Link
CN (1) CN207211474U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853814A (en) * 2019-01-29 2019-06-07 杜雨泽 A kind of ceiling structure
CN110764293A (en) * 2019-12-02 2020-02-07 苏州凯利昂光电科技有限公司 Shading jig with size capable of being adjusted randomly
CN111648546A (en) * 2020-05-29 2020-09-11 武汉市研华智造环保科技有限公司 Integrated ceiling pinch plate with atmosphere lamp strip
CN112443074A (en) * 2020-12-04 2021-03-05 浙江亚厦装饰股份有限公司 Building ceiling access hole with mortise structure
CN112443073A (en) * 2020-12-04 2021-03-05 浙江亚厦装饰股份有限公司 Formula building ceiling access hole structure is inhaled to magnetism

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853814A (en) * 2019-01-29 2019-06-07 杜雨泽 A kind of ceiling structure
CN110764293A (en) * 2019-12-02 2020-02-07 苏州凯利昂光电科技有限公司 Shading jig with size capable of being adjusted randomly
CN111648546A (en) * 2020-05-29 2020-09-11 武汉市研华智造环保科技有限公司 Integrated ceiling pinch plate with atmosphere lamp strip
CN112443074A (en) * 2020-12-04 2021-03-05 浙江亚厦装饰股份有限公司 Building ceiling access hole with mortise structure
CN112443073A (en) * 2020-12-04 2021-03-05 浙江亚厦装饰股份有限公司 Formula building ceiling access hole structure is inhaled to magnetism

Similar Documents

Publication Publication Date Title
CN207211474U (en) Building ceiling access panel structure
CN112443131B (en) Arc-shaped decoration panel capable of being quickly installed, suspended ceiling system and installation method
CN112443127A (en) Directly-card-inserting special-shaped veneer, ceiling system and installation method
CN113338526A (en) Ceiling closing-in structure and mounting method
CN205259398U (en) Architectural decoration wall body that gives sound insulation and prevent fires
CN214462189U (en) Arc-shaped veneer capable of being installed quickly and ceiling system
CN215670809U (en) But special-shaped decorative board of direct card formula and furred ceiling system
CN201512877U (en) Combined partition wall column device
CN209145236U (en) A kind of indoor ceiling apparatus for examination and repair
CN214461977U (en) Ceramic fiber ceiling and suspended ceiling system thereof
TWM551046U (en) Decoration cover plate assembly structure of folding screen
CN209524397U (en) Interlayer furred ceiling
CN211143578U (en) Indoor sound insulation decorative board
CN208105585U (en) Wall connecting component
CN208423632U (en) Electronic communication electric wire installation aiding device
CN107795064B (en) Assembled wood-like structure and molded body
CN220790277U (en) Integrated furred ceiling convenient to concatenation
CN206205245U (en) The T bone attachment structures of bright frame keel
CN217975100U (en) Eave structure
CN212271381U (en) Concatenation formula metal furred ceiling board
CN215254144U (en) Sound-absorbing assembly plate
CN206189763U (en) Light trough ceramic tile wall
CN208039590U (en) A kind of architectural decoration sound insulation furred ceiling
CN214739489U (en) Resin furred ceiling board
CN214090771U (en) Floor with sound insulation and heat preservation functions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20180902

CF01 Termination of patent right due to non-payment of annual fee