CN207209773U - A kind of construction site composite concrete wallboard hoisting structure - Google Patents

A kind of construction site composite concrete wallboard hoisting structure Download PDF

Info

Publication number
CN207209773U
CN207209773U CN201721216260.8U CN201721216260U CN207209773U CN 207209773 U CN207209773 U CN 207209773U CN 201721216260 U CN201721216260 U CN 201721216260U CN 207209773 U CN207209773 U CN 207209773U
Authority
CN
China
Prior art keywords
connecting rod
fixedly connected
block
fixed block
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721216260.8U
Other languages
Chinese (zh)
Inventor
何浩均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Lvke Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721216260.8U priority Critical patent/CN207209773U/en
Application granted granted Critical
Publication of CN207209773U publication Critical patent/CN207209773U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of construction site composite concrete wallboard hoisting structure, including lifting rope, the bottom of the lifting rope is socketed with connection ring, the bottom of the connection ring is fixedly connected with contiguous block, the bottom of the contiguous block is fixedly connected with connecting plate, the connecting plate is provided with hoisting mechanism close to the lower surface of its both sides, the hoisting mechanism includes support bar, the support bar is fixedly connected on the lower surface of connecting plate, the lower end of the support bar is hinged with connecting rod one and connecting rod two, the lower end of the connecting rod and connecting rod two is hinged with connecting rod three, the bottom of the connecting rod three is provided with clamping device, the clamping device includes fixed block, the fixed block is fixedly connected on the bottom of connecting rod three.The utility model, by the cooperation between the structure such as above-mentioned, the grip device in hanging device is improved, make its clamping effect more preferable, and clamp end size can be adjusted according to the thickness of different wallboards.

Description

A kind of construction site composite concrete wallboard hoisting structure
Technical field
It the utility model is related to composite concrete wallboard hoisting structure technical field, specially a kind of construction site is with compound Concrete panel hoisting structure.
Background technology
At present, as the mechanization degree in industrial production improves constantly, the application of various lifting apparatuses progressively increases. In actual production, using it is more be various lifting rope, lock ring and some special suspenders, but using fixture mode very It is few.What it is in commercial type is mostly iron plate fixture and the extraordinary fixture of various factories, and is used for various complex coagulation cob walls The fixture of plate level lifting is rarely found, and the good fixture of especially simple in construction but application effect does not almost have.Such as Chinese patent A kind of horizontal stone tongs of wallboard disclosed in CN103395689A, for the program when lifting, vertical loading board pulls up connecting rod, even Extension bar pulls jig arm inwardly movable.After jig arm firm grip lifting object, article moves up with moving up for vertical loading board, so as to reach The purpose sling.When putting down wallboard, after wallboard lands, suspension hook is continued traveling downwardly, and vertical loading board is pressed to below crossbeam and exposed Pin hole, jig arm are loosened so as to put down wallboard.After latch is inserted into pin hole, suspension hook moves up, and the latch on vertical loading board is crossbeam Lift, fixture removes from wallboard naturally.But its is simple in construction for the program, and clamping effect is bad, and can not be according to the thickness of wallboard The size of degree adjustment clamp end.
Utility model content
The purpose of this utility model is to provide a kind of construction site composite concrete wallboard hoisting structure, possessed to hanging Grip device during installing is standby is improved, and makes its clamping effect more preferable, and can adjust folder according to the thickness of different wallboards The advantages of mouthful end size, solve that traditional clamp structure is simple, and clamping effect is bad, and can not be adjusted according to the thickness of wallboard The problem of size of clamp end.
To achieve the above object, the utility model provides following technical scheme:A kind of construction site complex coagulation cob wall Plate hoisting structure, including lifting rope, the bottom of the lifting rope are socketed with connection ring, and the bottom of the connection ring is fixedly connected with Contiguous block, the bottom of the contiguous block are fixedly connected with connecting plate, and the lower surface of the connecting plate is provided with hoisting mechanism.
The hoisting mechanism includes support bar, and the support bar is fixedly connected on the lower surface of connecting plate, the support bar Lower end be hinged with connecting rod one and connecting rod two, the lower end of the connecting rod and connecting rod two is hinged with connecting rod three, institute The bottom for stating connecting rod three is provided with clamping device.
The clamping device includes fixed block, and the fixed block is fixedly connected on the bottom of connecting rod three, the fixed block Front at the top of it is fixedly connected with fixture block one, and the inside of fixed block offers cavity, and the fixed block is lived by cavity Dynamic to be connected with movable block, the lower surface of the movable block offers spring cavity, and the movable block is fixedly connected with by spring cavity Back-moving spring, the bottom of the back-moving spring are fixedly connected with the bottom of movable block intracavitary, and the front of the movable block is fixed to be connected Sliding bar is connected to, the front of fixed block offers chute, and fixed block is slidably connected by chute and sliding bar, the sliding bar Front is fixedly connected with fixture block two.
Preferably, the quantity of the hoisting mechanism is two, and two hoisting mechanisms are with the longitudinal central axis line pair of connecting plate Claim installed in the lower surface of connecting plate.
Preferably, the quantity of the clamping device is four, and four clamping devices are installed in the bottom of connecting rod three.
Preferably, the upper surface of the fixture block one is provided with rubber blanket with the lower surface of fixture block two.
Preferably, the quantity of the back-moving spring is eight, and eight back-moving springs are divided into four groups, four groups of back-moving springs point It is not symmetrically mounted in the spring cavity that movable block lower surface opens up.
Compared with prior art, the beneficial effects of the utility model are by fixed block, fixture block one, movable block, reset bullet Cooperation between spring, sliding bar and fixture block two, fixture block two is pulled downward on according to the thickness of wallboard, acted on by transmission, so as to press Contracting back-moving spring, then the side of wallboard is put between fixture block one and fixture block two, using the reset of back-moving spring, so that Fixture block one clamps wallboard with fixture block two, by the be hinged cooperation between connecting rod one, connecting rod two and connecting rod three, so as to root The distance between width adjustment fixed block according to wallboard, it is convenient by the opposite side of wallboard put into another pair fixture block one and fixture block two it Between, so as to complete the clamping work to wallboard, by the cooperation between contiguous block, connecting plate and support bar, when lifting rope is received During contracting, lift contiguous block, acted on by transmission, so that whole hoisting structure be raised, by using the gravity of wallboard itself, Make two fixed block firm grip wallboards.By the cooperation between said structure, the grip device in hanging device is carried out Improve, make its clamping effect more preferable, and clamp end size can be adjusted according to the thickness of different wallboards, solve traditional fixture Simple in construction, clamping effect is bad, and can not be according to the problem of the size of the thickness of wallboard adjustment clamp end.
Brief description of the drawings
Fig. 1 is the front schematic view of the utility model structure;
Fig. 2 is the side schematic view of the utility model hoisting structure structure;
Fig. 3 is the side sectional view of the utility model clamping device structure.
In figure:1- lifting ropes, 2- contiguous blocks, 3- connecting plates, 4- hoisting structures, 5- support bars, 6- connecting rods one, 7- connections Bar two, 8- connecting rods three, 9- clamping devices, 10- fixed blocks, 11- fixture blocks one, 12- movable blocks, 13- back-moving springs, 14- are slided Bar, 15- fixture blocks two.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:A kind of construction site is lifted with composite concrete wallboard Structure 4, including lifting rope 1, the bottom of lifting rope 1 are socketed with connection ring, and the bottom of connection ring is fixedly connected with contiguous block 2, even The bottom for connecing block 2 is fixedly connected with connecting plate 3, when lifting rope 1 shrinks, lifts contiguous block 2, is acted on by transmission, so that will Whole hoisting structure 4 is raised, and the lower surface of connecting plate 3 is provided with hoisting mechanism 4, and the quantity of hoisting mechanism 4 is two, and two Individual hoisting mechanism 4 is symmetrically mounted on the lower surface of connecting plate 3 with the longitudinal central axis line of connecting plate 3, same by two hoisting mechanisms 4 When wallboard is clamped, the process for being raised it is more steady.
Referring to Fig. 2, hoisting mechanism 4 includes support bar 5, support bar 5 is fixedly connected on the lower surface of connecting plate 3, support The lower end of bar 5 is hinged with connecting rod 1 and connecting rod 27, and the lower end of connecting rod 5 and connecting rod 27 is hinged with connecting rod three 8, the bottom of connecting rod 38 is provided with clamping device 9, and the quantity of clamping device 9 is four, and four clamping devices 9 are respectively mounted In the bottom of connecting rod 38, by the cooperation of four clamping devices 9, the convenient wallboard to different in width and thickness clamps.
Referring to Fig. 3, clamping device 9 includes fixed block 10, fixed block 10 is fixedly connected on the bottom of connecting rod 38, Gu Determine front of the block 10 at the top of it and be fixedly connected with fixture block 1, the upper surface and the lower surface of fixture block 2 15 of fixture block 1 are equal Rubber blanket is provided with, when fixture block 1 clamps wallboard with fixture block 2 15, rubber blanket plays a part of shock-absorbing protecting, reduces Fixture block 1 injures with fixture block 2 15 to caused by surfaces of wall, and the inside of fixed block 10 offers cavity, and fixed block 10 passes through Cavity is connected with movable block 12, and the lower surface of movable block 12 offers spring cavity, and spring cavity is the compression of back-moving spring 13 Direction provides the effect being oriented to, and movable block 12 is moveable to the bottom of the intracavitary of fixed block 10, and movable block 12 passes through spring Chamber is fixedly connected with back-moving spring 13, and the quantity of back-moving spring 13 is eight, and eight back-moving springs 13 divide for four groups, and four groups are answered Position spring 13 is respectively symmetrically arranged in the spring cavity that the lower surface of movable block 12 opens up, and the motion to movable block 12 provides one very Strong restoring force, make the chucking powers of 2 15 pairs of wallboards of fixture block more preferably, the bottom of back-moving spring 13 and the bottom of the intracavitary of movable block 12 It is fixedly connected, the front of movable block 12 is fixedly connected with sliding bar 14, and the front of fixed block 10 offers chute, and fixed block 10 is logical Cross chute to be slidably connected with sliding bar 14, the front of sliding bar 14 is fixedly connected with fixture block 2 15, downward according to the thickness of wallboard Fixture block 2 15 is pulled, is acted on by transmission, so as to compression reseting spring 13, then puts the side of wallboard into fixture block 1 and folder Between block 2 15, using the reset of back-moving spring 13, so that fixture block 1 clamps wallboard with fixture block 2 15, pass through connecting rod One 6, the be hinged cooperation between connecting rod 27 and connecting rod 38, so as between the width adjustment fixed block 10 according to wallboard Distance, it is convenient put the opposite side of wallboard between another pair fixture block 1 and fixture block 2 15 into, so as to complete the folder to wallboard Work is held, when lifting rope 1 shrinks, lifts contiguous block 2, is acted on by transmission, so as to which whole hoisting structure 4 be raised, is led to The gravity using wallboard itself is crossed, makes two firm grip wallboards of fixed block 10.By the cooperation between said structure, to lifting Grip device 9 in equipment is improved, and makes its clamping effect more preferable, and can adjust jaws according to the thickness of different wallboards Size is held, solves that traditional clamp structure is simple, and clamping effect is bad, and clamp end can not be adjusted according to the thickness of wallboard The problem of size.
Operation principle:The construction site with composite concrete wallboard hoisting structure 4 when in use, according to the thickness of wallboard to Lower pulling fixture block 2 15, is acted on by transmission, so as to compression reseting spring 13, then by the side of wallboard put into fixture block 1 with Between fixture block 2 15, using the reset of back-moving spring 13, so that fixture block 1 clamps wallboard with fixture block 2 15, pass through connection Be hinged cooperation between bar 1, connecting rod 27 and connecting rod 38, so as between the width adjustment fixed block 10 according to wallboard Distance, it is convenient put the opposite side of wallboard between another pair fixture block 1 and fixture block 2 15 into, so as to complete to wallboard Work is clamped, when lifting rope 1 shrinks, lifts contiguous block 2, is acted on by transmission, so as to which whole hoisting structure 4 be raised, By using the gravity of wallboard itself, make two firm grip wallboards of fixed block 10.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction site composite concrete wallboard hoisting structure, including lifting rope (1), it is characterised in that:The lifting The bottom of rope (1) is socketed with connection ring, and the bottom of the connection ring is fixedly connected with contiguous block (2), the bottom of the contiguous block (2) Portion is fixedly connected with connecting plate (3), and the lower surface of the connecting plate (3) is provided with hoisting mechanism (4);
The hoisting mechanism (4) includes support bar (5), and the support bar (5) is fixedly connected on the lower surface of connecting plate (3), institute The lower end for stating support bar (5) is hinged with connecting rod one (6) and connecting rod two (7), the connecting rod one (6) and connecting rod two (7) Lower end be hinged with connecting rod three (8), the bottom of the connecting rod three (8) is provided with clamping device (9);
The clamping device (9) includes fixed block (10), and the fixed block (10) is fixedly connected on the bottom of connecting rod three (8), Front of the fixed block (10) at the top of it is fixedly connected with fixture block one (11), and the inside of fixed block (10) offers logical Chamber, the fixed block (10) are connected with movable block (12) by cavity, and the lower surface of the movable block (12) offers bullet Spring chamber, the movable block (12) are fixedly connected with back-moving spring (13) by spring cavity, the bottom of the back-moving spring (13) with The bottom of movable block (12) intracavitary is fixedly connected, and the front of the movable block (12) is fixedly connected with sliding bar (14), fixed block (10) front offers chute, and fixed block (10) is slidably connected by chute and sliding bar (14), the sliding bar (14) Front is fixedly connected with fixture block two (15).
A kind of 2. construction site composite concrete wallboard hoisting structure according to claim 1, it is characterised in that:It is described The quantity of hoisting mechanism (4) is two, and two hoisting mechanisms (4) are symmetrically mounted on company with the longitudinal central axis line of connecting plate (3) The lower surface of fishplate bar (3).
A kind of 3. construction site composite concrete wallboard hoisting structure according to claim 1, it is characterised in that:It is described The quantity of clamping device (9) is four, and four clamping devices (9) are installed in the bottom of connecting rod three (8).
A kind of 4. construction site composite concrete wallboard hoisting structure according to claim 1, it is characterised in that:It is described The upper surface of fixture block one (11) is provided with rubber blanket with the lower surface of fixture block two (15).
A kind of 5. construction site composite concrete wallboard hoisting structure according to claim 1, it is characterised in that:It is described The quantity of back-moving spring (13) is eight, and eight back-moving springs (13) are divided into four groups, and four groups of back-moving springs (13) are respectively symmetrically In the spring cavity opened up installed in movable block (12) lower surface.
CN201721216260.8U 2017-09-21 2017-09-21 A kind of construction site composite concrete wallboard hoisting structure Expired - Fee Related CN207209773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721216260.8U CN207209773U (en) 2017-09-21 2017-09-21 A kind of construction site composite concrete wallboard hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721216260.8U CN207209773U (en) 2017-09-21 2017-09-21 A kind of construction site composite concrete wallboard hoisting structure

Publications (1)

Publication Number Publication Date
CN207209773U true CN207209773U (en) 2018-04-10

Family

ID=61822345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721216260.8U Expired - Fee Related CN207209773U (en) 2017-09-21 2017-09-21 A kind of construction site composite concrete wallboard hoisting structure

Country Status (1)

Country Link
CN (1) CN207209773U (en)

Similar Documents

Publication Publication Date Title
CN102730548A (en) Heavy manipulator
CN208814493U (en) A kind of steel forming plate for bridge suspender
CN103395689B (en) A kind of horizontal stone tongs of wallboard
CN207209773U (en) A kind of construction site composite concrete wallboard hoisting structure
CN210944509U (en) Plate hoisting clamping part for building construction
CN210594907U (en) Adjustable graphite electrode lifts by crane frock
CN204474138U (en) A kind of fast hoisting jig
CN207170926U (en) Engine cylinder-body suspended core fixture
CN207063460U (en) A kind of mosaic tiles batch sticker
CN212076147U (en) Non-excavation drilling rod screw thread surface nitrogenize hoist device
CN201525029U (en) Grasping device for an unloading and loading device of wall and floor tiles
CN209052284U (en) Multi-layered board hoisting machine
CN209601348U (en) One kind embracing brick clamping equipment
CN209665803U (en) A kind of special fixture for concrete component
CN207144523U (en) A kind of precast wall body lifts protection supporting frame
CN208775590U (en) A kind of scalable brick clamp
CN207877083U (en) One kind playing reuse suspender
CN206987137U (en) A kind of hanging set
CN206735149U (en) A kind of oscillation handling gripper
CN211619744U (en) Clamp for hoisting plate
CN207107844U (en) A kind of brick holding machine chuck and brick holding machine
CN211712449U (en) A hoist and mount couple for girder steel
CN210133572U (en) Novel brick lifting device
CN212503628U (en) Marble hoisting and carrying device
CN215854578U (en) Protective non-damage lifting clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Jinbin

Inventor before: He Haojun

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180426

Address after: 364200 fourth, North Ring Road, Linjiang Town, Shanghang, Longyan, Fujian, Fourth

Patentee after: FUJIAN LVKE CONSTRUCTION GROUP CO.,LTD.

Address before: 311804 Changshan village, Shan Xia Town, Zhuji, Shaoxing, Zhejiang, 366

Patentee before: He Haojun

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410