CN207197463U - Cover protectometer - Google Patents

Cover protectometer Download PDF

Info

Publication number
CN207197463U
CN207197463U CN201721153553.6U CN201721153553U CN207197463U CN 207197463 U CN207197463 U CN 207197463U CN 201721153553 U CN201721153553 U CN 201721153553U CN 207197463 U CN207197463 U CN 207197463U
Authority
CN
China
Prior art keywords
mounting seat
projection
housing
groove
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721153553.6U
Other languages
Chinese (zh)
Inventor
肖文静
陈道远
唐超
胡鹏
周萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juncheng Jianyu Engineering Group Co ltd
Original Assignee
Sichuan Juncheng Project Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Juncheng Project Management Consulting Co Ltd filed Critical Sichuan Juncheng Project Management Consulting Co Ltd
Priority to CN201721153553.6U priority Critical patent/CN207197463U/en
Application granted granted Critical
Publication of CN207197463U publication Critical patent/CN207197463U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a kind of cover protectometer; its drip irrigation device is to include housing; it is installed on the roller of housing both sides; detection module is provided with the housing, any roller of contact switch, contact switch face is connected on detection module and sets; mounting seat, the mounting seat for mounting seat is provided with the housing, being equipped with for installing roller in mounting seat are set through housing face contact switch, the mounting seat compresses mounting seat to the direction away from mounting seat with being arranged with elastic component, elastic component on the end in mounting seat.When contact switch can realize that mounting seat contacts with contact switch with the fit structure of mounting seat, analyzer is started working, and realizes that the energy compares saving.

Description

Cover protectometer
Technical field
It the utility model is related to architectural engineering detection device technical field, more particularly to a kind of cover protectometer.
Background technology
In building engineering structure acceptance test project, thickness of protection tier is one of dominant item.For steel Tendon concrete structure, when thickness of protection tier is too small, it is impossible to effectively resist the intrusion of extraneous aggressivity example, and due to Protective layer is gradually carbonized by the carbon dioxide in air, can not ensure that building service phase outermost layer reinforcing bar is in concrete alkalescence In the protection of environment, it is easily caused steel bar corrosion and then component deteriorates;When thickness of protection tier is excessive, as caused by reinforcing bar about Beam force is not enough to offset the convergent force of concrete, and concrete structure surface crack easily occurs, therefore, controls the reinforcing bar of concrete structure Protective layer thickness is beneficial to improve structure durability.
Thickness of protection tier analyzer tests the thickness of protection tier of concrete structure according to the principle of electromagnetic induction. Traditional thickness of protection tier analyzer is made up of probe and main frame, and both are connected by cable.Operating personnel wear main frame, hand Probe is held to be detected.
Armored concrete survey meter on existing market is to use battery to be needed more after using a period of time as the energy Battery has been maintained at ability normal work in the state of electricity when changing battery or charging, but during the use of reality, detection Instrument is constantly in the state of connection in use, when needing survey meter turning off ability during detection site is changed Electric energy is saved, operation is cumbersome.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of cover protectometer, The armored concrete survey meter saves the energy in use, easy to operate.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of cover protectometer, including housing, the roller of housing both sides is installed on, inspection is provided with the housing Any roller of contact switch, contact switch face is connected in survey module, detection module to set, and installation is provided with the housing Be equipped with base, mounting seat for roller is installed mounting seat, be provided through mounting seat and face contact in mounting seat The projection set, the projection are switched in being arranged with elastic component on the end in mounting seat, elastic component is by projection to away from installation The direction of base compresses.
Pass through above-mentioned technical proposal, roller is close to wall rolling to analyzer when in use, and now elastic component is compressed, convex Post can compress to contact switch direction, trigger contact switch so that the power supply connection of detection module can be used for detecting, the wall at one Wall will move analyzer to another place's wall after detecting, now roller separates with cavity wall, then projection and contact switch meeting Separate, now circuit access failure, it becomes possible to save the energy, then the usage time of the battery of analyzer also can be longer, whole mistake Journey is easy to operate.
The utility model is further arranged to:Projection and mounting seat are arranged to the cylinder being engaged, in projection side wall Casting lug thereon, be provided with the opening passed through for casting lug thereon in mounting seat.
Pass through above-mentioned technical proposal, when projection is installed in mounting seat, casting lug thereon passes through opening, is then rotatablely installed Seat so that casting lug thereon staggers with opening, and the now installation of mounting seat will be more stable.
The utility model is further arranged to:The mounting seat is detachably connected with housing screw thread.
Pass through above-mentioned technical proposal, mounting seat are threadedly coupled the replacing that can realize elastic component with housing, for a long time Use after, the elasticity of elastic component can reduce, then can now disassemble mounting seat and elastic component is changed.
The utility model is further arranged to:Be provided with the mounting hole passed through for projection on housing, projection in mounting hole Annular groove is provided with the side wall of contact, is embedded with sealing ring in annular groove.
Pass through above-mentioned technical proposal, the setting of sealing ring can be installed closely when mounting seat is mounted across housing, reduced The entrance of dust or steam, to reduce the influence of dust and steam to detection module.
The utility model is further arranged to:The housing includes upper encloser and lower encioser, the upper encloser and lower cover Shell socket connection.
Pass through above-mentioned technical proposal, the mode of grafting can realize the easy for installation of upper encloser and lower encioser.
The utility model is further arranged to:Set on the lower encioser it is fluted, be provided with upper encloser be inserted in it is recessed Projection in groove, the scalable fixture block that sector is provided with the side wall of projection.
Pass through above-mentioned technical proposal, projection is during groove is inserted in, and sector touches the side wall of groove first, Pressing projection is installed into groove, then scalable fixture block can gradually taper up, and now projection may pass through groove, when scalable on projection During fixture block face groove, scalable fixture block can stretch out and be clamped in groove, and now projection can just be installed stable.
The utility model is further arranged to:Mounting groove is provided with the side wall of the projection, scalable fixture block is installed on It is provided with to extrude scalable fixture block in the holddown spring and mounting groove of mounting groove in mounting groove, and in mounting groove and is provided with restriction The limited block of scalable fixture block position.
Pass through above-mentioned technical proposal, holddown spring can extrude scalable fixture block mounting groove, recessed projection is installed on When in groove, the arcwall face of fan-shaped fixture block touches the side wall of groove first, and now the side wall of groove gives scalable fixture block one The effect of thrust, then scalable fixture block take in mounting groove, facilitate the installation of projection;When projection is extracted into groove, pressing Scalable fixture block is shunk in mounting groove, now projection can be extracted into groove.
The utility model is further arranged to:The scalable fixture block is provided through close in the side wall of installation groove bottom wall Projection deviates from the shifting block of end of lower encioser, the end set of projection has the chute slid for shifting block.
Pass through above-mentioned technical proposal, the setting of shifting block can facilitate extracts groove by projection, and the process of groove is extracted in projection In, shifting block drives scalable fixture block to shrink in mounting groove or skids off mounting groove along chute sliding, realization it is easy to operate.
In summary, the utility model having the beneficial effect that in contrast to prior art:
1st, when contact switch can realize that mounting seat contacts with contact switch with the fit structure of mounting seat, analyzer is opened Beginning work, realize that the energy compares saving;
2nd, the connected mode of the grafting between upper shell and lower house is fairly simple.
Brief description of the drawings
Fig. 1 is the overall structure figure of embodiment;
Fig. 2 is the broken section structure chart of embodiment;
Fig. 3 is Fig. 2 A portions enlarged drawing, it is intended to represents the mounting structure of projection;
Fig. 4 is Fig. 2 B portions enlarged drawing, it is intended to represents the mounting structure of upper encloser and lower encioser;
Fig. 5 is the detection module of embodiment and the attachment structure of contact switch.
Reference:1st, housing;11st, mounting hole;2nd, roller;41st, mounting seat;42nd, mounting seat;421st, projection;43rd, bullet Property part;44th, casting lug thereon;45th, annular groove;451st, sealing ring;51st, upper encloser;511st, projection;52nd, lower encioser;521st, groove;5211、 Scalable fixture block;5212nd, limited block;5213rd, mounting groove;5214th, holddown spring;5215th, shifting block;5216th, chute;K, contact is opened Close.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of cover protectometer, as illustrated in fig. 1 and 2, including housing 1, the roller 2 of the both sides of housing 1 is installed on, is joined See Fig. 5, detection module is provided with housing 1, connects contact switch K, any roller 2 of contact switch K faces on detection module Set.
As shown in Figures 2 and 3, mounting seat 41 is provided with housing 1, is equipped with for installing roller 2 in mounting seat 41 Mounting seat 42, be provided through mounting seat 41 in mounting seat 42 and projection 421 that face contact switch K is set, projection 421 in Elastic component 43 is arranged with end in mounting seat 42, elastic component 43 compresses projection 421 to the direction away from mounting seat 41, Wherein elastic component 43 is arranged to the spring being set in mounting seat 42.
Roller 2 is close to wall rolling to analyzer when in use, and now elastic component 43 is compressed, and mounting seat 42 can be to contact Switch K directions are mobile and trigger contact switch K, and now detection module connection can be used for being used to detect operation, and wall is examined at one When analyzer to another place's wall is moved after survey, now roller 2 separates with cavity wall, then mounting seat 42 and contact switch K can be separated, now circuit access failure, it becomes possible to save the energy, then the usage time of the battery of analyzer also can be longer.
Wherein when setting roller 2, set a face contact switch K of roller 2 to be distributed, set remaining roller 2 to install Form is consistent with the installation form of roller 2 of the prior art or consistent with the installation form of face contact switch K roller 2 And remaining roller 2 not with contact switch K faces.
Secondly, projection 421 and mounting seat 41 are arranged to the cylinder being engaged, the casting lug thereon 44 in the side wall of projection 421, The opening (not shown) passed through for casting lug thereon 44 is provided with mounting seat 41.
When projection 421 is installed in mounting seat 41, casting lug thereon 44 passes through opening, is then rotatablely installed seat 42 so that convex Go out block 44 with opening to stagger, the now installation of mounting seat 42 will be more stable.
Mounting seat 41 is threadedly coupled the replacing that can realize elastic component 43 with housing 1, after a protracted use, elasticity The elasticity of part 43 can reduce, then can now disassemble mounting seat 41 and elastic component 43 is changed.
As shown in figure 3, being provided with the mounting hole 11 passed through for projection 421 on housing 1, projection 421 connects in mounting hole 11 Annular groove 45 is provided with tactile side wall, is embedded with sealing ring 451 in annular groove 45.
Dust may also be contained on concrete layer in the use of reality, or survey meter is stored in dark tide preserving When in wet environment, in fact it could happen that dust or steam are entered in housing 1, have influence on the using effect of survey meter, so setting The sealing ring 451 put can obstruct dust to a certain extent.
As shown in Figures 2 and 4, housing 1 includes upper encloser 51 and lower encioser 52, and upper encloser 51 and the grafting of lower encioser 52 connect Connect;Fluted 521 are set on lower encioser 52, the projection 511 that is inserted in groove 521, projection 511 are provided with upper encloser 51 Scalable fixture block 5211 is provided with side wall, scalable fixture block 5211 is arranged to fan-shaped.
When scalable fixture block 5211 is installed, by being provided with mounting groove 5213, scalable fixture block in the side wall of projection 511 5211 are installed in mounting groove 5213, and the compression that scalable fixture block 5211 is extruded to mounting groove 5213 is provided with mounting groove 5213 The limited block 5212 for limiting the scalable position of fixture block 5211 is provided with spring 5214 and mounting groove 5213.
Scalable fixture block 5211 is provided through projection 511 close in the side wall of the bottom wall of mounting groove 5213 and deviates from lower encioser 52 The shifting block 5215 of end, the end set of projection 511 have the chute 5216 slid for shifting block 5215.
The mounting means of upper encloser 51 and lower encioser 52:The face groove 521 of projection 511 is placed, sector contacts first To the one end of groove 521, projection 511 during groove 521 is inserted in, into groove 521 install by pressing projection 511, Then scalable fixture block 5211 can gradually taper up, and now projection 511 may pass through groove 521, when scalable fixture block 5211 on projection 511 During with 521 face of groove, scalable fixture block 5211 can stretch out mounting groove 5213, scalable card in the presence of holddown spring 5214 The side wall of the edge meeting groove 521 of block 5211 contradicts, and completes the installation of upper shell 1 and lower house 1.
The setting of shifting block 5215 can facilitate extracts groove 521 by projection 511, and the process of groove 521 is extracted in projection 511 In, shifting block 5215 drives scalable fixture block 5211 to shrink in mounting groove 5213 or skids off mounting groove along the sliding of chute 5216 5213, realization it is easy to operate.
Described above is only exemplary embodiment of the present utility model, not for limitation protection model of the present utility model Enclose, the scope of protection of the utility model is determined by appended claim.

Claims (8)

1. a kind of cover protectometer, including housing (1), the roller (2) of housing (1) both sides is installed on, it is characterized in that:Institute State and detection module is provided with housing (1), connect contact switch (K), any roller of contact switch (K) face on detection module (2) set, be provided with mounting seat (41), mounting seat (41) and be equipped with for installing roller (2) on the housing (1) Be provided through in mounting seat (42), mounting seat (42) projection (421) that mounting seat (41) and face contact switch (K) set, The projection (421) is in being arranged with elastic component (43) on the end in mounting seat (42), elastic component (43) is by projection (421) to remote Direction from mounting seat (41) compresses.
2. cover protectometer according to claim 1, it is characterized in that:Projection (421) and mounting seat (41) are set It is set to the cylinder being engaged, the casting lug thereon (44) in projection (421) side wall, mounting seat is provided with for casting lug thereon on (41) (44) opening passed through.
3. cover protectometer according to claim 1, it is characterized in that:The mounting seat (41) and housing (1) Screw thread is detachably connected.
4. cover protectometer according to claim 1, it is characterized in that:It is provided with housing (1) for projection (421) The mounting hole (11) passed through, projection (421) are interior in being provided with annular groove (45), annular groove (45) in the side wall contacted with mounting hole (11) It is embedded with sealing ring (451).
5. cover protectometer according to claim 1, it is characterized in that:The housing (1) includes upper encloser And lower encioser (52), the upper encloser (51) and lower encioser (52) socket connection (51).
6. cover protectometer according to claim 1, it is characterized in that:Set on the lower encioser (52) fluted (521), it is provided with the side wall of the projection (511) being inserted in groove (521), projection (511) and is provided with upper encloser (51) Fan-shaped scalable fixture block (5211).
7. cover protectometer according to claim 1, it is characterized in that:Set in the side wall of the projection (511) There is mounting groove (5213), scalable fixture block (5211) is installed in mounting groove (5213), and interior be provided with of mounting groove (5213) can Being provided with restriction in the holddown spring (5214) and mounting groove (5213) of flexible fixture block (5211) extrusion mounting groove (5213) can stretch The limited block (5212) of contracting fixture block (5211) position.
8. cover protectometer according to claim 7, it is characterized in that:The close peace of the scalable fixture block (5211) Shifting block (5215), convex of the projection (511) away from the end of lower encioser (52) is provided through in the side wall of tankage (5213) bottom wall The end set of block (511) has the chute (5216) for shifting block (5215) sliding.
CN201721153553.6U 2017-09-08 2017-09-08 Cover protectometer Expired - Fee Related CN207197463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721153553.6U CN207197463U (en) 2017-09-08 2017-09-08 Cover protectometer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721153553.6U CN207197463U (en) 2017-09-08 2017-09-08 Cover protectometer

Publications (1)

Publication Number Publication Date
CN207197463U true CN207197463U (en) 2018-04-06

Family

ID=61791794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721153553.6U Expired - Fee Related CN207197463U (en) 2017-09-08 2017-09-08 Cover protectometer

Country Status (1)

Country Link
CN (1) CN207197463U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109780981A (en) * 2018-12-18 2019-05-21 江苏华科建设工程质量检测有限公司 A kind of detection method of plate class member Reinforcement protective layer thickness

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109780981A (en) * 2018-12-18 2019-05-21 江苏华科建设工程质量检测有限公司 A kind of detection method of plate class member Reinforcement protective layer thickness

Similar Documents

Publication Publication Date Title
KR101165618B1 (en) Monitoring system for inside of the manhole
CN207197463U (en) Cover protectometer
CN207114079U (en) A kind of pantograph carbon slide loss real-time monitoring device
CN214223062U (en) Detection apparatus for boiler pressure-bearing
CN206246979U (en) Elevator pick-up head mounting structure, camera and elevator
CN205027719U (en) Visual gaseous monitoring facilities that electric substation used
CN209979154U (en) Sealing strip leakproofness check out test set
CN216816900U (en) Automatic detection device is used in portable power source production
CN217181584U (en) Stacker-reclaimer entrance guard calling device for coal wharf
CN104052844A (en) Smart phone with skin moisture detection function
CN207832834U (en) A kind of cable insulation detection support device
CN211146117U (en) Gas pipeline parameter monitoring device based on Internet of things
CN205363784U (en) Detection apparatus for nailing gun
CN110609122B (en) Cable pit gas monitoring equipment
CN108248720B (en) Tunnel detection vehicle and carriage
CN218546119U (en) Fire hydrant fast overhaul maintains device
CN206872246U (en) Single rope steel wire rope of hoist released rope detecting device
CN108225423B (en) Sensor for underground pipe gallery warehouse environment
CN101694300A (en) Movable automatic burning device of landfill gas
CN207113137U (en) One kind carries monitoring purification of air bellows
CN213544730U (en) Partial discharge detection mechanism
CN207879315U (en) A kind of coal bed gas well monitoring system
CN108120921A (en) The switch life detecting tool and its detection method of capacitive touch switch indoor lamp
CN205192702U (en) Machine oil trap test equipment
CN217928315U (en) Gas prying room centralized gas supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 610000 Sichuan city of Chengdu province Chenghua District two East 3rd Ring Rd section of Longtan Industrial Park Road No. 68 Building 2 to 1 unit 7 No. AB

Patentee after: Juncheng Jianyu Engineering Group Co.,Ltd.

Address before: 610000 Sichuan city of Chengdu province Chenghua District two East 3rd Ring Rd section of Longtan Industrial Park Road No. 68 Building 2 to 1 unit 7 No. AB

Patentee before: SICHUAN JUNCHENG PROJECT MANAGEMENT CONSULTING Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Steel cover tester

Effective date of registration: 20210322

Granted publication date: 20180406

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: Juncheng Jianyu Engineering Group Co.,Ltd.

Registration number: Y2021980001823

PE01 Entry into force of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406

Termination date: 20210908

CF01 Termination of patent right due to non-payment of annual fee
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230713

Granted publication date: 20180406

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: Juncheng Jianyu Engineering Group Co.,Ltd.

Registration number: Y2021980001823

PC01 Cancellation of the registration of the contract for pledge of patent right