CN207194955U - The permanent traverse point of underground mine use - Google Patents

The permanent traverse point of underground mine use Download PDF

Info

Publication number
CN207194955U
CN207194955U CN201721116756.8U CN201721116756U CN207194955U CN 207194955 U CN207194955 U CN 207194955U CN 201721116756 U CN201721116756 U CN 201721116756U CN 207194955 U CN207194955 U CN 207194955U
Authority
CN
China
Prior art keywords
anchor connection
connection device
region
light
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721116756.8U
Other languages
Chinese (zh)
Inventor
郎建伟
栗军昌
王珏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN201721116756.8U priority Critical patent/CN207194955U/en
Application granted granted Critical
Publication of CN207194955U publication Critical patent/CN207194955U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The permanent traverse point of underground mine use is by anchor connection device(1)With copper threader(2)Two parts form, anchor connection device(1)It is divided into threaded portion(1‑1)Justify region with light(1‑2), in Guang Yuan areas(1‑2), in anchor connection device(1)Light circle region(1‑2)End have less than light justify region(1‑2)The inserting section of diameter(1‑3), in copper threader(2)On have and inserting section(1‑3)The grafting blind hole of matching, anchor connection device(1)With copper threader(2)Hot charging connects, it is characterised in that in anchor connection device(1)Light circle region(1‑2)It is provided with six rib anchor connection devices(3), six rib anchor connection devices(3)Maximum away from the of length no more than note anchor device in threading one end uses depth.Compared with prior art, the utility model simplifies technique, shortens the time, improves the adhesion strength of traverse point and rock stratum, reduce copper material using, save expense.

Description

The permanent traverse point of underground mine use
Technical field
It the utility model is related to a kind of permanent traverse point of underground mine use and installation method.
Background technology
Because underground coal mine measures the requirement of permanent traverse point service life and precision, permanent traverse point and back Anchoring must be solid and reliable, and conventional mounting arrangements are after top plate punching, are anchored at using mortar in back, technique is multiple It is miscellaneous, manual operations, setting time length, and anchor force is not strong, costly, above method is difficult to ensure that anchoring effect, therefore sets The permanent traverse point of underground mine use that a kind of construction technology is simple, anchor force is strong is counted, is the current technical issues that need to address.
The content of the invention
Technical problem to be solved in the utility model is to provide the underground coal mine that a kind of construction technology is simple, anchor force is strong With permanent traverse point and installation method.
The technical scheme in the invention for solving the technical problem is:
The permanent traverse point of underground mine use is made up of anchor connection device and copper threader two parts, anchor connection dress Put and be divided into threaded portion and light circle region, in Guang Yuan areas, have in the end that the light of anchor connection device justifies region less than Guang Yuan areas The inserting section of domain diameter, there is the grafting blind hole matched with inserting section on copper threader, and anchor connection device is worn with copper Line apparatus hot charging is connected, and six rib anchor connection devices, six rib anchor connections dress are provided with the light circle region of anchor connection device Put the maximum away from the of length no more than note anchor device in threading one end and use depth.
As a kind of preferred scheme of the present utility model, the length of the threaded portion of anchor connection device is 300mm, light is justified The length in region is 250mm, and the length of copper threader is 50mm.
Installation method of the present utility model, its processing step are:1. beating mounting hole first, 2. and then mounting hole is cleared up, 3. Resin anchoring agent is filled in the mounting hole cleared up, is 4. filled afterwards using jumbolter by noting anchor device and six rib anchor connections Put the permanent traverse point of underground coal mine being sent into mounting hole and stir, jumbolter and note anchor device are withdrawn to after the completion of anchoring, finally Spray painting anti-corrosion is carried out to irony exposed parts.
Operation principle of the present utility model:
During traverse point is sent into mounting hole using jumbolter, because six rib anchor connection devices are fixed on bar On body, jumbolter drives the body of rod to rotate so that resin anchoring agent reaches in hole by driving six rib anchor connection devices to rotate To the effect of intense agitation, the adhesion strength of permanent traverse point and rock stratum is improved, so as to reach the effect for improving anchor force.
Compared with prior art, the utility model can timely use drilling tool by permanent traverse point anchor after top plate punching Note simplifies technique in top plate, shortens the time, improves the adhesion strength of traverse point and rock stratum, reducing copper material makes With, save expense.
Brief description of the drawings
Fig. 1 is structural representation front view of the present utility model;
Fig. 2 is structural representation of the present utility model)(The rib anchor connection device of sectional view-six junction enlarged drawing).
Embodiment
As illustrated, the permanent traverse point of underground mine use is by anchor connection device 1 and two parts group of copper threader 2 Divide into, anchor connection device 1 and justify region 1-2 for threaded portion 1-1 and light, in Guang Yuan areas 1-2, in the light of anchor connection device 1 There is the inserting section 1-3 less than light circle region 1-2 diameters circle region 1-2 end, has on copper threader 2 and inserting section 1- The grafting blind hole of 3 matchings, anchor connection device 1 is connected with the copper hot charging of threader 2, in the Guang Yuan areas of anchor connection device 1 Domain 1-2 is provided with six rib anchor connection devices 3, and away from threading, one end is of length no more than to note anchor device most to six rib anchor connection devices 3 Use depth greatly.
The threaded portion 1-1 of anchor connection device 1 length is 300mm, light circle region 1-2 length is 250mm, copper The length of threader 2 is 50mm.

Claims (2)

1. the permanent traverse point of underground mine use, by anchor connection device(1)With copper threader(2)Two parts form, anchoring Attachment means(1)It is divided into threaded portion(1-1)Justify region with light(1-2), justify region in light(1-2), in anchor connection device(1) Light circle region(1-2)End have less than light justify region(1-2)The inserting section of diameter(1-3), in copper threader(2)On Have and inserting section(1-3)The grafting blind hole of matching, anchor connection device(1)With copper threader(2)Hot charging connects, its feature It is, in anchor connection device(1)Light circle region(1-2)It is provided with six rib anchor connection devices(3), six rib anchor connections dress Put(3)Maximum away from the of length no more than note anchor device in threading one end uses depth.
2. the permanent traverse point of underground mine use according to claim 1, it is characterised in that anchor connection device(1)Spiral shell Line region(1-1)Length for 300mm, light justify region(1-2)Length be 250mm, copper threader(2)Length be 50mm。
CN201721116756.8U 2017-09-01 2017-09-01 The permanent traverse point of underground mine use Expired - Fee Related CN207194955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721116756.8U CN207194955U (en) 2017-09-01 2017-09-01 The permanent traverse point of underground mine use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721116756.8U CN207194955U (en) 2017-09-01 2017-09-01 The permanent traverse point of underground mine use

Publications (1)

Publication Number Publication Date
CN207194955U true CN207194955U (en) 2018-04-06

Family

ID=61790507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721116756.8U Expired - Fee Related CN207194955U (en) 2017-09-01 2017-09-01 The permanent traverse point of underground mine use

Country Status (1)

Country Link
CN (1) CN207194955U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355257A (en) * 2017-09-01 2017-11-17 中煤第建设有限公司 The permanent traverse point of underground mine use and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355257A (en) * 2017-09-01 2017-11-17 中煤第建设有限公司 The permanent traverse point of underground mine use and installation method

Similar Documents

Publication Publication Date Title
CN105888540B (en) A kind of drilling method of drilling
CN103174444B (en) Support method and support structure for soft coal/ rock stratum alley
CN207194955U (en) The permanent traverse point of underground mine use
CN110805404A (en) Claw spring type double-tube sampling drilling tool
CN105863698B (en) A kind of high-elongation combination of steel rope and its installation method
CN113738423B (en) Coal mine tunnel ultrahigh-strength anti-bending shear anchor cable supporting device and supporting method
CN104879152A (en) Novel mining anchor cable
CN102748048A (en) Hole wall grouting anchor cable
CN103410542B (en) Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor
CN205778964U (en) A kind of high-elongation combination of steel rope
CN107355257A (en) The permanent traverse point of underground mine use and installation method
CN201539209U (en) Light-duty well-point dewatering and punching device
CN105443150A (en) Self-drilling anchor rod capable of rapidly mounting
CN216110633U (en) Colliery is high pressure hydraulic fracturing hole packer in pit
CN108843355A (en) A kind of mechanical anchoring device
CN204344048U (en) Foreign matter fisher in hole
CN205047167U (en) Big latus rectum spiral drill rod
CN204532194U (en) A kind of expansion tube can drag for end block apparatus
CN211058732U (en) Anchor rod taking drill rod
CN210530749U (en) Self-advancing pipe shed drilling tool for tunnel soft rock excavation
CN208138275U (en) A kind of glue injection type structure anchor bolt
CN105735312A (en) Expansion self-drilling type anchor rod applied to soft soil
CN219118126U (en) Portable grouting pipe
CN105626111A (en) Telescopic two-ended anchor cable for two-direction reinforcing of coal pillar
CN205382943U (en) Flexible connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406

Termination date: 20180901