CN207194906U - Precast lining structure for tunnel model test - Google Patents

Precast lining structure for tunnel model test Download PDF

Info

Publication number
CN207194906U
CN207194906U CN201720586028.7U CN201720586028U CN207194906U CN 207194906 U CN207194906 U CN 207194906U CN 201720586028 U CN201720586028 U CN 201720586028U CN 207194906 U CN207194906 U CN 207194906U
Authority
CN
China
Prior art keywords
tunnel
exterior sheathing
model
inner template
model test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720586028.7U
Other languages
Chinese (zh)
Inventor
关振长
徐遒
缪圆冰
陈仁春
洪永佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201720586028.7U priority Critical patent/CN207194906U/en
Application granted granted Critical
Publication of CN207194906U publication Critical patent/CN207194906U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to the precast lining structure for tunnel model test, precast lining structure wherein for tunnel model test includes base, is located at the mould that base upper section is in tunnel contour vertically, the mould includes inner template and exterior sheathing, the inner template and exterior sheathing form by some sections of circular arc steel plate splicings, the cavity formed between inner template and exterior sheathing is interval with barrier flaps, gypsum slurries are cast with several separate chambers formed between inner template, exterior sheathing and barrier flaps, soil pressure sensor is embedded with the separate chamber.For the utility model compared with the tunnel-liner model of traditional one-piece casting, pin-connected panel tunnel-liner model preferably simulation face partial excavation, lining cutting can be segmented the practice of construction process applied;The pre-buried miniature soil pressure sensor in lining cutting piecemeal simultaneously, it is convenient to measure the contact between liner structure and country rock, avoid traditional external labeling type sensor to the resulting adverse effect of model test.

Description

Precast lining structure for tunnel model test
Technical field:
It the utility model is related to a kind of precast lining structure for tunnel model test.
Background technology:
With the fast development of China Higher level highway, railway, the construction scale of mountain tunnel is also unprecedented with building difficulty Increase.On the other hand, the complexity due to ground and Tunnel Engineering in itself, in addition to theory analysis, field observation and numerical simulation, Model test method has increasingly becomed a kind of important means of Tunnel Engineering association area research.
Model test is by certain geometry, physical relation, replaces prototype to carry out testing research with model, and research is tied Fruit is used for the test method of prototype.From domestic and international disclosed documents and materials, in the related model test of Tunnel Engineering, its Liner structure model is typically in the mould of specific dimensions, is poured and is built up using gypsum slurries or cement bonded sand slurries disposable whole body Type.But in engineering practice, mountain tunnel generally use face partial excavation, liner structure are segmented the New Austrian Tunneling Method applied Construction, therefore the tunnel-liner model of one-piece casting formula, can not simulate practice of construction process.
On the other hand, during carrying out model test, foil gauge or miniature need to be posted in the outer surface of liner structure model Soil pressure sensor, to measure the physical quantitys such as the contact between the stress of liner structure, country rock lining cutting.But through likelihood ratio reduced scale Tunnel model afterwards, its physical dimension is smaller, and various external labeling type measurement sensors(And its lead-foot-line)Occupy suitable body Product, this will produce considerable influence to model test result.
The content of the invention:
The purpose of this utility model is to provide a kind of precast lining structure for tunnel model test, and this is used for tunnel The precast lining of road model test is reasonable in design, and compared with the tunnel-liner model of traditional one-piece casting, it can be preferable The practice of construction process that simulation face partial excavation, lining cutting segmentation apply.
The utility model is used for the precast lining structure of tunnel model test, it is characterised in that:Including base, vertically set It is in the mould of tunnel contour in base upper section, the mould includes inner template and exterior sheathing, and the inner template and exterior sheathing are equal Formed by some sections of circular arc steel plate splicings, the cavity formed between inner template and exterior sheathing is interval with barrier flaps, in internal model Gypsum slurries are cast with several separate chambers formed between plate, exterior sheathing and barrier flaps, are buried in the separate chamber There is soil pressure sensor.
Further, the outer surface of above-mentioned inner template, the inner surface of exterior sheathing are coated with releasing agent layer, the barrier flaps Two sides be also coated with releasing agent layer.
Further, above-mentioned barrier flaps are the flake aluminum in " Ω " shape.
Further, above-mentioned base is PVC cystosepiments.
Further, above-mentioned releasing agent is vaseline or butter, and the circular arc steel plate is circular arc galvanized steel plain sheet, described Gypsum slurries are that plaster of Paris presses 2 with water:1 ratio stirs the stream plastic state to be formed.
The preparation method that the utility model is used for the precast lining structure of tunnel model test, it is described to be used for tunnel model The precast lining structure of experiment includes base, is located at the mould that base upper section is in tunnel contour vertically, and the mould includes Inner template and exterior sheathing, the inner template and exterior sheathing form by some sections of circular arc steel plate splicings, inner template and exterior sheathing Between the cavity that is formed be interval with barrier flaps, several separate chambers formed between inner template, exterior sheathing and barrier flaps Gypsum slurries are inside cast with, soil pressure sensor is embedded with the separate chamber;During making, by tunnel prototype by design geometry The likelihood ratio carries out reduced scale, and then according to the inside and outside contour size of lining cutting structural model after reduced scale, customizes corresponding mould, mould Inner template and exterior sheathing form by some sections of circular arc steel plate splicings;The base of mould uses PVC cystosepiments;The barrier of mould Piece is using the flake aluminum for bending to Ω shapes;In inner template lateral surface and exterior sheathing medial surface smearing release agent in order to which the later stage takes off Mould, liner structure model inside and outside contour line position is depicted on base, by inner template and exterior sheathing insertion base, obstructed Piece both sides smearing release agent, and between it is inserted into inner and outer template at a certain distance, be allowed to form some separate chambers;Then exist In above-mentioned chamber independently of each other, the gypsum slurries allocated in specific proportions are injected, after it air-dries shaping, being formed, there is Ω shapes to connect The precast lining structure piecemeal of head;In casting process, can in liner structure piecemeal pre-buried miniature soil pressure sensor, so as to During later stage carries out model test, the contact between specific location liner structure and country rock is measured;Then bottom is removed Seat, deviates from mould successively by the liner structure piecemeal of air-dried shaping;When carrying out model test, with the partial excavation of face, Each liner structure piecemeal is assembled successively,, should be in the assembled seam crossing of each piecemeal during assembled to simulate practice of construction process Seccotine is smeared, to ensure to be reliably connected between each piecemeal.
The utility model advantage is:Compared with the tunnel-liner model of traditional one-piece casting, pin-connected panel tunnel-liner mould Type preferably simulation face partial excavation, lining cutting can be segmented the practice of construction process applied;It is simultaneously pre-buried in lining cutting piecemeal Miniature soil pressure sensor, it is convenient to measure the contact between liner structure and country rock, avoid traditional external labeling type sensor To the resulting adverse effect of model test.
Brief description of the drawings:
Fig. 1 is the top view for pouring device of precast lining structural model;
Fig. 2 is the side view of the single liner structure piecemeal of pre-buried miniature soil pressure sensor;
Fig. 3 is the top view of the assembled tunnel lining structure model completed in part;
In figure:1- inner templates, 2- exterior sheathings, 3- bases, 4- barrier flaps, the chamber of 5- independences, 6- liner structure piecemeals, 7- Miniature soil pressure sensor, 8- assembly seams.
Embodiment:
The utility model is described in more detail with reference to the accompanying drawings and detailed description.
The precast lining structure that the utility model is used for tunnel model test includes base 3, vertical be located on base is cut Face is in the mould of tunnel contour, and the mould includes inner template 1 and exterior sheathing 2, and the inner template 1 and exterior sheathing 2 are by some Section circular arc steel plate splicing forms, and the cavity formed between inner template and exterior sheathing is interval with barrier flaps 4, in inner template, outside Gypsum slurries are cast with several separate chambers 5 formed between template and barrier flaps, are embedded with the separate chamber micro- Type soil pressure sensor 7.
Further, it is coated with releasing agent for the ease of the demoulding, the outer surface of above-mentioned inner template, the inner surface of exterior sheathing Layer, the two sides of the barrier flaps are also coated with releasing agent layer.
Further, in order to reasonable in design, above-mentioned barrier flaps 4 are the flake aluminum in " Ω " shape.
Further, in order to easy to make, above-mentioned base is PVC cystosepiments.
Further, above-mentioned releasing agent is vaseline or butter, and the circular arc steel plate is circular arc galvanized steel plain sheet, described Gypsum slurries are that plaster of Paris presses 2 with water:1 ratio stirs the stream plastic state to be formed.
The preparation method that the utility model is used for the precast lining structure of tunnel model test, it is described to be used for tunnel model The precast lining structure of experiment includes base, is located at the mould that base upper section is in tunnel contour vertically, and the mould includes Inner template and exterior sheathing, the inner template and exterior sheathing form by some sections of circular arc steel plate splicings, inner template and exterior sheathing Between the cavity that is formed be interval with barrier flaps, several separate chambers formed between inner template, exterior sheathing and barrier flaps Gypsum slurries are inside cast with, soil pressure sensor is embedded with the separate chamber;During making, by tunnel prototype by design geometry The likelihood ratio carries out reduced scale, and then according to the inside and outside contour size of lining cutting structural model after reduced scale, customizes corresponding mould, mould Inner template and exterior sheathing form by some sections of circular arc steel plate splicings;The base of mould uses PVC cystosepiments;The barrier of mould Piece is using the flake aluminum for bending to Ω shapes;In inner template lateral surface and exterior sheathing medial surface smearing release agent in order to which the later stage takes off Mould, liner structure model inside and outside contour line position is depicted on base, by inner template and exterior sheathing insertion base, obstructed Piece both sides smearing release agent, and between it is inserted into inner and outer template at a certain distance, be allowed to form some separate chambers;Then exist In above-mentioned chamber independently of each other, the gypsum slurries allocated in specific proportions are injected, after it air-dries shaping, being formed, there is Ω shapes to connect The precast lining structure piecemeal of head;In casting process, can in liner structure piecemeal pre-buried miniature soil pressure sensor, so as to During later stage carries out model test, the contact between specific location liner structure and country rock is measured;Then bottom is removed Seat, deviates from mould successively by the liner structure piecemeal of air-dried shaping;When carrying out model test, with the partial excavation of face, Each liner structure piecemeal is assembled successively,, should be in the assembled seam crossing of each piecemeal during assembled to simulate practice of construction process Seccotine is smeared, to ensure to be reliably connected between each piecemeal.
It is specific to make embodiment(Such as Fig. 1-3):
1)Using four lane road tunnel as prototype, according to its excavation contour line and lining thickness at initial stage, by 1:20 geometry The likelihood ratio carries out reduced scale.The planar dimension of lining model is after reduced scale:Width 186cm, height 112cm, thickness 2cm.
2)According to the physical dimension of lining model after reduced scale, corresponding mould is customized.The left-half of inner template 1 and right side Point, it is respectively 92cm, 51cm, 15cm, 220cm circular arc galvanized steel plain sheet by 4 sections of radiuses(Thickness 3mm)Composition, above-mentioned 8 sections Circular arc galvanized steel plain sheet forms inner template 1 by welding.
3)The left-half of exterior sheathing 2 and right half part, it is respectively 94cm, 53cm, 17cm, 222cm circle by 4 sections of radiuses Arc galvanized steel plain sheet(Thickness 3mm)Composition, above-mentioned 8 sections of circular arc galvanized steel plain sheets form inner template 2 by welding.
4)By length 6cm aluminium flake(Thickness 2mm)Ω shapes are bent to as barrier flaps.
5)In the lateral surface of inner template 1, the uniform smearing release agent of the medial surface of exterior sheathing 2 and the both sides of barrier flaps 4(Vaseline or Huang Oil), in order to which the later stage is stripped.
6)Using the PVC cystosepiments of 5cm thickness as mold base, depict on the base 3 for laying inner and outer template Embedded slot, inner template 1 and exterior sheathing 2 are embedded in base 3.16 pieces of barrier flaps 4 are inserted at a certain distance inner and outer template it Between, it is allowed to form 16 separate chambers 5.
6)Plaster of Paris and water are pressed 2:1 ratio stirs to form the gypsum slurries of stream plastic state, and is implanted sequentially above-mentioned In each separate chamber 5.Simultaneously can in the chamber of vault and abutment wall pre-buried miniature soil pressure sensor 7, be easy to the later stage to measure Vault and the contact at abutment wall.
7)After gypsum slurries air-dry shaping completely, base 3 is first removed, then pushes away by people's force vibration the mode such as drag, by wind The liner structure piecemeal 6 of dry forming deviates from mould successively.
8)It is according to the partial excavation situation of face, each liner structure piecemeal 6 is assembled successively when carrying out model test, And smear seccotine in assembled seam crossing 8.Using the precast lining structural model described in this patent, face branch can be simulated Excavate, the practice of construction process that lining cutting segmentation applies;And ad-hoc location can easily be measured by miniature soil pressure sensor 7 Locate the contact between liner structure and country rock.
The utility model advantage is:Compared with the tunnel-liner model of traditional one-piece casting, pin-connected panel tunnel-liner mould Type preferably simulation face partial excavation, lining cutting can be segmented the practice of construction process applied;It is simultaneously pre-buried in lining cutting piecemeal Miniature soil pressure sensor, it is convenient to measure the contact between liner structure and country rock, avoid traditional external labeling type sensor To the resulting adverse effect of model test.
The foregoing is only preferred embodiment of the present utility model, it is all done according to present utility model application the scope of the claims it is equal Deng change and modification, it should all belong to covering scope of the present utility model.

Claims (4)

  1. A kind of 1. precast lining structure for tunnel model test, it is characterised in that:Including base, vertically it is located on base Section is in the mould of tunnel contour, and the mould includes inner template and exterior sheathing, and the inner template and exterior sheathing are by some sections Circular arc steel plate splicing forms, and the cavity formed between inner template and exterior sheathing is interval with barrier flaps, in inner template, exterior sheathing Gypsum slurries are cast with several separate chambers formed between barrier flaps, soil pressure biography is embedded with the separate chamber Sensor.
  2. 2. the precast lining structure according to claim 1 for tunnel model test, it is characterised in that:The internal model The outer surface of plate, the inner surface of exterior sheathing are coated with releasing agent layer, and the two sides of the barrier flaps are also coated with releasing agent layer.
  3. 3. the precast lining structure according to claim 1 for tunnel model test, it is characterised in that:The barrier Piece is the aluminium flake in " Ω " shape.
  4. 4. the precast lining structure according to claim 1 for tunnel model test, it is characterised in that:The base For PVC cystosepiments.
CN201720586028.7U 2017-05-24 2017-05-24 Precast lining structure for tunnel model test Expired - Fee Related CN207194906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720586028.7U CN207194906U (en) 2017-05-24 2017-05-24 Precast lining structure for tunnel model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720586028.7U CN207194906U (en) 2017-05-24 2017-05-24 Precast lining structure for tunnel model test

Publications (1)

Publication Number Publication Date
CN207194906U true CN207194906U (en) 2018-04-06

Family

ID=61793944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720586028.7U Expired - Fee Related CN207194906U (en) 2017-05-24 2017-05-24 Precast lining structure for tunnel model test

Country Status (1)

Country Link
CN (1) CN207194906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577318A (en) * 2020-04-17 2020-08-25 中国海洋大学 Tunnel long-distance excavation supporting construction device suitable for model test

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577318A (en) * 2020-04-17 2020-08-25 中国海洋大学 Tunnel long-distance excavation supporting construction device suitable for model test
CN111577318B (en) * 2020-04-17 2021-02-26 中国海洋大学 Tunnel long-distance excavation supporting construction device suitable for model test

Similar Documents

Publication Publication Date Title
CN107060829A (en) Precast lining structure for tunnel model test and preparation method thereof
CN106442154A (en) Testing device and testing method for simulating hydraulic fracture characteristic of concrete bedrock contact surface
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN106442153B (en) The experimental rig and test method of simulation concrete Dam Heel of Gravity Dam hydraulic fracture
CN106956359A (en) A kind of tunnel model test shield duct piece prepares mould
CN110470522B (en) Method for prefabricating fracture network rock mass samples with different water saturation degrees
CN108643247A (en) Soft clay area rectangle foundation pit bottom soil body reinforced model testing device and test method
CN107976352A (en) A kind of production method for simulating the transparent tunnel model containing complicated Fracture Networks
CN112757473A (en) Gypsum shield segment model casting mold and casting method
CN105459253A (en) Large-volume lining model pouring device for tunnel model test and method of large-volume lining model pouring device
CN107621538A (en) The test method of elastic resistance of ground suffered by a kind of testing tunnel expansive concrete lining cutting
CN106553263B (en) It is a kind of for the prefabricated construction method with side slope model cavitation of laboratory test cut-and-cover tunnel model
CN101644082A (en) Assembling method of gypsum evacuated mould
CN207194906U (en) Precast lining structure for tunnel model test
CN107945646A (en) A kind of assembled tunnel model structure and preparation method thereof
CN107338803A (en) A kind of assembly type building U-type groove basis and its construction method
CN107907393A (en) A kind of mould for being used to make rock-like materials
CN206748721U (en) A kind of tunnel model test shield duct piece prepares mould
CN105604606A (en) Integral construction method for air bag of tunnel sewer ditch
CN103410072B (en) Construction method of annular proving road three-dimensional cambered surface using foam light-weight soil
CN208476552U (en) A kind of pipe-plate lining model for shield tunnel longitudinal direction model test
CN107167385A (en) The indoor test device and method of anchor stress loss
CN205422740U (en) Horizontal tunnel model test device in cavity behind simulation lining wall
JP7365180B2 (en) Methods for measuring relative humidity, drying shrinkage strain, and relative moisture content inside concrete
CN209703582U (en) A kind of high slope and anchorage excavation of foundation pit influence each other the model assay systems of mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406

Termination date: 20200524

CF01 Termination of patent right due to non-payment of annual fee