CN207194455U - A kind of stepped built-in fitting of aluminum dipping form material transfer mouth - Google Patents
A kind of stepped built-in fitting of aluminum dipping form material transfer mouth Download PDFInfo
- Publication number
- CN207194455U CN207194455U CN201721026896.6U CN201721026896U CN207194455U CN 207194455 U CN207194455 U CN 207194455U CN 201721026896 U CN201721026896 U CN 201721026896U CN 207194455 U CN207194455 U CN 207194455U
- Authority
- CN
- China
- Prior art keywords
- material transfer
- bucket
- transfer bucket
- connection ring
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of stepped built-in fitting of aluminum dipping form material transfer mouth,Including the first material transfer bucket,Connection ring and the second material transfer bucket,First material transfer bucket is tapered,And big footpath is upward,The connection ring squarely,And the inner ring size of connection ring is identical with the top dimension of the first material transfer bucket,The connection ring inner ring is fixed on the top of the first material transfer bucket,Second material transfer bucket is tapered,And big footpath is upward,And second material transfer bucket bottom it is identical with the outer ring size of connection ring,The bottom of second material transfer bucket is fixedly connected with the outer ring of connection ring,This stepped built-in fitting of aluminum dipping form material transfer mouth,After the completion of material transfer mouth use,It is filled by concrete,And when carrying out material transfer hole permanent closure,The water proof structure that stepped angle possesses itself can need not carry out dabbing,Direct formwork casting concrete,Other processes can be reduced,And material transfer mouth is into staged,Material transfer can conveniently be carried out,Increase and decrease material transfer speed and the efficiency built.
Description
Technical field
Aluminum dipping form material transfer technical field is the utility model is related to, specially a kind of stepped built-in fitting of aluminum dipping form material transfer mouth.
Background technology
Architectural engineering by it is newly-built, reconstruction or enlarging building construction and auxiliary construction facility carry out planning, prospecting,
The engineering entity and the circuit supporting with it, pipeline, the peace of equipment of the every technical work and completion such as design and construction, completion
Engineering is filled, wherein the construction engineering of " building construction " includes factory building, theater, hotel, shop, school, hospital and house etc., its
Newly-built, reconstruction or the dynamic material of the necessary emerging work of enlarging, could be realized by construction activities;" auxiliary construction facility " refers to and building construction
Supporting water tower, shed for bicycle, pond etc.." installation of circuit, pipeline, equipment " refers to and building construction and its affiliated facility matching
Circuit, pipeline, the installation activities of equipment such as the electric of set, plumbing, HVAC, communication, intellectuality, elevator.
Template when the material transfer mouth of existing architectural engineering needs to build zero when being built, it is time-consuming so as to cause
Arduously, production efficiency is relatively low, and existing material transfer mouth needs the waterproof structure that stepped angle possesses itself when being closed
Make, then carrying out cast concrete.
Utility model content
The purpose of this utility model is to provide a kind of stepped built-in fitting of aluminum dipping form material transfer mouth, to solve above-mentioned background technology
The problem of middle proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of stepped built-in fitting of aluminum dipping form material transfer mouth,
Including the first material transfer bucket, connection ring and the second material transfer bucket, first material transfer bucket is tapered, and big footpath is upward, the connection ring
Squarely, and the inner ring size of connection ring is identical with the top dimension of the first material transfer bucket, the connection ring inner ring is fixed on first
The top of material transfer bucket, second material transfer bucket is tapered, and big footpath is upward, and the bottom of the second material transfer bucket and the outer ring of connection ring
Size is identical, and the bottom of second material transfer bucket is fixedly connected with the outer ring of connection ring.
Preferably, it is logical that reinforcement side is symmetrically fixed with second material transfer bucket, the both ends that the side of reinforcementing leads into tilted conical,
And it is engaged with the hypotenuse of the second material transfer bucket.
Preferably, first material transfer bucket is identical with the gradient of the second material transfer bucket.
Preferably, first material transfer bucket, the second material transfer bucket are identical with the distance of connection ring horizontal direction, and are
50mm。
Preferably, concrete, and the top of concrete are filled with the inside of first material transfer bucket, the second material transfer bucket and connection ring
Portion is concordant with the top of the second material transfer bucket.
Compared with prior art, the beneficial effects of the utility model are:
1st, material transfer mouth is arranged to staged by the utility model first, then the first material transfer bucket, the second material transfer bucket and company
Ring is connect to be fixed in material transfer bucket, and by concrete being filled between a material transfer bucket, the second material transfer bucket and connection ring and building
Closely, so as to which the template in construction period provisional protection can be directly placed in step trough, without extra fixation.
2nd, after the completion of the utility model works as material transfer mouth use, it is filled by concrete, and carry out material transfer hole forever
Long during closing, water proof structure that stepped angle possesses itself can need not carry out dabbing, direct formwork casting concrete, can be with
Reduce other processes, and material transfer mouth can conveniently carry out material transfer, increase and decrease material transfer speed and the efficiency built into staged, and
And can increase fixed stability by the way that reinforcement side is logical, conveniently hole is supported.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model pre-processing structure schematic diagram;
Fig. 3 is the utility model cross section structure schematic diagram;
Fig. 4 is the utility model hole enclosed construction schematic diagram.
In figure:1st, the first material transfer bucket;2nd, connection ring;3rd, the second material transfer bucket;4th, reinforcement side is logical.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of stepped built-in fitting of aluminum dipping form material transfer mouth, bag
The first material transfer bucket 1, the material transfer bucket 3 of connection ring 2 and second are included, first material transfer bucket 1 is tapered, and big footpath is upward, the connection
The squarely of ring 2, and the inner ring size of connection ring 2 is identical with the top dimension of the first material transfer bucket 1, the inner ring of connection ring 2 is fixed
At the top of the first material transfer bucket 1, second material transfer bucket 3 is tapered, and big footpath is upward, and the bottom of the second material transfer bucket 3 and company
Connect that the outer ring size of ring 2 is identical, the bottom of second material transfer bucket 3 is fixedly connected with the outer ring of connection ring 2.
It is symmetrically fixed with reinforcement side logical 4 in second material transfer bucket 3, the side of reinforcementing leads to 4 both ends into tilted conical, and with
The hypotenuse of second material transfer bucket 3 is engaged, and can increase fixed stability by the way that reinforcement side is logical, and conveniently hole is propped up
Support, first material transfer bucket 1 is identical with the gradient of the second material transfer bucket 3, and material transfer mouth can conveniently carry out material transfer, increase into staged
Subtract material transfer speed and the efficiency built, the distance phase of first material transfer bucket 1, the second material transfer bucket 3 and the horizontal direction of connection ring 2
Together, and it is 50mm, first material transfer bucket 1, the second material transfer bucket 3 and the inner side of connection ring 2 are filled with concrete, and concrete
Top is concordant with the top of the second material transfer bucket 3, after the completion of material transfer mouth use, is filled by concrete, and passed
When expecting hole permanent closure, the water proof structure that stepped angle possesses itself can need not carry out dabbing, and direct formwork pours mixed
Solidifying soil, it is possible to reduce other processes.
Operation principle:When in use, material transfer mouth is arranged to staged first, then the first material transfer bucket 1, the second material transfer
Bucket 3 and connection ring 2 are fixed in material transfer bucket, and by concrete the first material transfer bucket 1, the second material transfer bucket 3 and connection ring 2 and
Filled between building closely, so as to which the template in construction period provisional protection can be directly placed in step trough, without volume
When outer fixation, after the completion of material transfer mouth use, being filled by concrete, and carrying out material transfer hole permanent closure,
The water proof structure that stepped angle possesses itself can need not carry out dabbing, direct formwork casting concrete, it is possible to reduce other
Process, and material transfer mouth can conveniently carry out material transfer, increase and decrease material transfer speed and the efficiency built into staged, and by adding
Strong side logical 4 can increase fixed stability, convenient that hole is supported.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of stepped built-in fitting of aluminum dipping form material transfer mouth, including the first material transfer bucket, connection ring and the second material transfer bucket, its feature exist
In:First material transfer bucket is tapered, and big footpath is upward, the connection ring squarely, and the inner ring size and first of connection ring
The top dimension of material transfer bucket is identical, and the connection ring inner ring is fixed on the top of the first material transfer bucket, and second material transfer bucket is into cone
Shape, and big footpath is upward, and the bottom of the second material transfer bucket is identical with the outer ring size of connection ring, the bottom of second material transfer bucket with
The outer ring of connection ring is fixedly connected.
A kind of 2. stepped built-in fitting of aluminum dipping form material transfer mouth according to claim 1, it is characterised in that:Second material transfer bucket
Inside it is symmetrically fixed with reinforcement side to lead to, the logical both ends in the reinforcement side are engaged into tilted conical, and with the hypotenuse of the second material transfer bucket.
A kind of 3. stepped built-in fitting of aluminum dipping form material transfer mouth according to claim 2, it is characterised in that:First material transfer bucket
It is identical with the gradient of the second material transfer bucket.
A kind of 4. stepped built-in fitting of aluminum dipping form material transfer mouth according to claim 3, it is characterised in that:First material transfer
Bucket, the second material transfer bucket are identical with the distance of connection ring horizontal direction, and are 50mm.
A kind of 5. stepped built-in fitting of aluminum dipping form material transfer mouth according to claim 4, it is characterised in that:First material transfer
Concrete is filled with the inside of bucket, the second material transfer bucket and connection ring, and the top of concrete is concordant with the top of the second material transfer bucket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721026896.6U CN207194455U (en) | 2017-08-16 | 2017-08-16 | A kind of stepped built-in fitting of aluminum dipping form material transfer mouth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721026896.6U CN207194455U (en) | 2017-08-16 | 2017-08-16 | A kind of stepped built-in fitting of aluminum dipping form material transfer mouth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207194455U true CN207194455U (en) | 2018-04-06 |
Family
ID=61797781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721026896.6U Expired - Fee Related CN207194455U (en) | 2017-08-16 | 2017-08-16 | A kind of stepped built-in fitting of aluminum dipping form material transfer mouth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207194455U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109516146A (en) * | 2018-11-20 | 2019-03-26 | 郑州金谷粮食机械工程设备有限公司 | Feeding inlet material guide device and antistatic belt conveyor |
-
2017
- 2017-08-16 CN CN201721026896.6U patent/CN207194455U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109516146A (en) * | 2018-11-20 | 2019-03-26 | 郑州金谷粮食机械工程设备有限公司 | Feeding inlet material guide device and antistatic belt conveyor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105839666A (en) | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof | |
CN106284412B (en) | A kind of prefabricated pipe gallery and construction method | |
CN105839667A (en) | Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery | |
CN205012359U (en) | Barrel -shaped basis in branch storehouse of direction is passed through to adjustable sinking | |
CN207194455U (en) | A kind of stepped built-in fitting of aluminum dipping form material transfer mouth | |
CN108726348B (en) | Horizontal prefabrication, overturning and hoisting method for pipe gallery segments | |
CN204000963U (en) | The water-stopping structure of push pipe work well reserving hole | |
CN206052778U (en) | A kind of steel and Combined concrete piping lane | |
CN208201856U (en) | A kind of concrete filling pile head laitance concrete collection device | |
CN207863305U (en) | A kind of building iron concrete structure column contracture device | |
CN217232445U (en) | Siphon rainwater hanging pipe fixing device | |
CN206878403U (en) | A kind of cable testing bridge connectivity structure | |
CN217175793U (en) | Movable assembly type box column grouting device | |
CN206233344U (en) | Well is checked in a kind of assembled draining | |
CN206987205U (en) | Cast iron sleeve device for longitudinal reinforcement connection | |
CN103362123A (en) | Reverse Y-shaped filling pile and construction method thereof | |
CN203878630U (en) | Inclination and straightness alternated pile group-bearing platform-upper structure similar model manufacturing template | |
CN203412083U (en) | Integral type sewage precipitating well | |
CN209412687U (en) | A kind of concrete cast template system for large-scale aqueduct | |
CN206570827U (en) | A kind of uninterrupted diversion cofferdam system | |
CN202657916U (en) | Hanging basket weight balancing structure for external wall decoration and weight balancing water tank thereof | |
CN206034503U (en) | Take pouring hole post -cast strip sealed cover plate | |
CN202012090U (en) | Glass fiber reinforced plastic well body | |
CN206157890U (en) | Prefabricated assembly building structure of building cavity formula | |
CN206157767U (en) | Utility tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180406 |