CN207194173U - Non-destructive post-install - Google Patents

Non-destructive post-install Download PDF

Info

Publication number
CN207194173U
CN207194173U CN201720920025.2U CN201720920025U CN207194173U CN 207194173 U CN207194173 U CN 207194173U CN 201720920025 U CN201720920025 U CN 201720920025U CN 207194173 U CN207194173 U CN 207194173U
Authority
CN
China
Prior art keywords
plate
building body
hoop plate
install
round
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720920025.2U
Other languages
Chinese (zh)
Inventor
郭忠庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Shanghai Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd filed Critical SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Priority to CN201720920025.2U priority Critical patent/CN207194173U/en
Application granted granted Critical
Publication of CN207194173U publication Critical patent/CN207194173U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of non-destructive post-install, it includes the upper hoop plate positioned at building body top surface, and the lower hoop plate positioned at building body bottom surface;The floor of the building body top surface offers vertical through hole, and vertical screw rod is provided with the through hole, and the screw rod both ends are located on this respectively binds round in plate and lower hoop plate, and is fixed by fixing nut;The outer end that plate and lower hoop plate are bound round on this is stretched out on the outside of the building body, and is bound round on this and be fixed with keel shoe between plate and the lower outer end for binding round plate.The utility model non-destructive post-install, efficiently avoid the destruction to original structure presstressed reinforcing steel, and buried plate is replaced in the form of anchor ear, ensure that the reliability of agent structure stress;Keel shoe makes whole product, assembled installation, reduces the welding capacity at scene, reduces disaster hidden-trouble, and effectively increase in-site installation efficiency.

Description

Non-destructive post-install
Technical field
A kind of embedded part is the utility model is related to, particularly a kind of non-destructive post-install.
Background technology
In Building Curtain Wall Structures, existing rear Anchorage Plan typically uses beats post-install on the body construction.However, For the Structural Engineering of presstressed reinforcing steel be present, original structure can be destroyed by so doing, and cause major structure of construction intensity to decline, to building It is unfavorable to build.
Utility model content
The purpose of this utility model is to provide a kind of non-destructive post-install, in the case where not destroying original structure, Post-install is replaced using anchor ear form, to ensure the installation of curtain wall.
To achieve the above object, the utility model takes following technical scheme:
A kind of non-destructive post-install, it includes the upper hoop plate positioned at building body top surface, and positioned at building body The lower hoop plate of bottom surface;The floor of the building body top surface offers vertical through hole, and vertical screw rod, the spiral shell are provided with the through hole Bar both ends are located on this respectively binds round in plate and lower hoop plate, and is fixed by fixing nut;The outer end of plate and lower hoop plate is bound round on this Stretch out on the outside of the building body, and bound round on this and be fixed with keel shoe between plate and the lower outer end for binding round plate.
Further, it is described it is lower hoop plate top surface be provided with two locating parts, respectively positioned at the inner side of the building body with Outside;The locating part is welded on the lower hoop plate.
Further, locking nut is additionally provided with the screw rod, positioned at the through hole lower end.
Further, the outer end of the keel shoe and the upper hoop plate and lower hoop plate is welded.
Further, the upper hoop plate outer end top surface is welded with reinforcer, the reinforcer side and the keel shoe upper end Weld inner side.
The beneficial effects of the utility model are:The utility model non-destructive post-install, efficiently avoid to original The destruction of construction pre-stress muscle, buried plate is replaced in the form of anchor ear, ensure that the reliability of agent structure stress;Keel shoe is made whole Product, assembled installation, reduce the welding capacity at scene, reduce disaster hidden-trouble, and effectively increase in-site installation efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model non-destructive post-install.
Fig. 2 is the scheme of installation of the utility model non-destructive post-install.
Embodiment
The utility model is described further below by drawings and examples.
As shown in figure 1, the utility model provides a kind of non-destructive post-install, it includes being located at the top surface of building body 1 Upper hoop plate 2, and the lower hoop plate 3 positioned at the bottom surface of building body 1.The floor of the top surface of building body 1 offers vertical lead to Hole 4, the through hole 4 is interior to be provided with vertical screw rod 5, and the both ends of screw rod 5 are located on this respectively binds round in plate 2 and lower hoop plate 3, and passes through Fixing nut 6 is fixed.Locking nut 7 is additionally provided with the screw rod 5, positioned at the lower end of through hole 4.The outer of plate 2 and lower hoop plate 3 is bound round on this The outside of building body 1 is stretched out at end, and is bound round on this and be fixed with keel shoe 8 between plate 2 and the lower outer end for binding round plate 3.The keel Frame 8 welds with binding round the outer end of plate 2 and lower hoop plate 3 on this.In order to ensure bonding strength, on this, the hoop outer end top surface of plate 2, which is welded with, adds Strong part 9, the side of reinforcer 9 on the inside of the upper end of keel shoe 8 with welding.
In order to ensure that lower bind round is slided between plate 3 and building body 1 without relative, top surface of the lower hoop plate 3 is spacing provided with two Part 10, respectively positioned at the inner side and outer side of the building body 1, the locating part 10 is welded on the lower hoop plate 3.
As shown in Fig. 2 the utility model when mounted, is divided into following steps:
1:The upper and lower hoop plate of the concrete beam of building body 1 is installed;Advance opened hole 4 on floor, the side that scene is connected by screw bolts Formula, upper and lower hoop plate is linked to be entirety with beams of concrete;
2:Locating part 10 before and after installation, ensure that lower hoop plate 3 and the front and rear surfaces of the structure of building body 1 clamp, without relatively sliding It is dynamic, effectively curtain wall load is delivered in the structure of building body 1;
3:The keel shoe 8 that installation curtain wall support is taken root, keel shoe 8 make whole product shelf in advance, and live vertical keel frame 8 pushes up Back welding is connected on upper and lower hoop plate, and top and the structure of building body 1 of vertical keel frame 8 are adjacent to, and are effectively delivered to curtain wall load In the structure of building body 1.
The utility model has the following advantages:
1st, compared to other rear Anchorage Plans, the destruction to agent structure presstressed reinforcing steel is effectively prevent, ensure that body junction The reliability of structure stress.
2nd, compared to other rear Anchorage Plans, the quantity of scene drilling is effectively reduced, improves efficiency of construction.
3rd, compared to other rear Anchorage Plans, the whole product anchor ear steelframe of in-site installation, reduce the welding capacity at scene, reduce fire Calamity hidden danger, and effectively improve efficiency of construction.
The merely exemplary explanation of above-described embodiment principle of the present utility model and its effect are new not for this practicality is limited Type.The utility model also has many aspects to be improved on the premise of without prejudice to overall thought, any to be familiar with this technology Personage all modifications and changes can be carried out to above-described embodiment without prejudice under spirit and scope of the present utility model.Therefore, lift All those of ordinary skill in the art are complete without departing from the spirit disclosed in the utility model and institute under technological thought Into all equivalent modifications or change, should be covered by claim of the present utility model.

Claims (5)

1. a kind of non-destructive post-install, it is characterised in that it includes the upper hoop plate positioned at building body top surface, and is located at The lower hoop plate of building body bottom surface;The floor of the building body top surface offers vertical through hole, is provided with vertically in the through hole Screw rod, the screw rod both ends are located on this respectively binds round in plate and lower hoop plate, and is fixed by fixing nut;Plate and lower hoop are bound round on this The outer end of plate is stretched out on the outside of the building body, and is bound round on this and be fixed with keel shoe between plate and the lower outer end for binding round plate.
2. non-destructive post-install according to claim 1, it is characterised in that:The top surface of the lower hoop plate is provided with two Locating part, respectively positioned at the inner side and outer side of the building body;The locating part is welded on the lower hoop plate.
3. non-destructive post-install according to claim 1 or 2, it is characterised in that:Locking is additionally provided with the screw rod Nut, positioned at the through hole lower end.
4. non-destructive post-install according to claim 1, it is characterised in that:The keel shoe with it is described it is upper hoop plate and The outer end welding of lower hoop plate.
5. non-destructive post-install according to claim 4, it is characterised in that:The upper hoop plate outer end top surface is welded with Reinforcer, the reinforcer side on the inside of the keel shoe upper end with welding.
CN201720920025.2U 2017-07-27 2017-07-27 Non-destructive post-install Active CN207194173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720920025.2U CN207194173U (en) 2017-07-27 2017-07-27 Non-destructive post-install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720920025.2U CN207194173U (en) 2017-07-27 2017-07-27 Non-destructive post-install

Publications (1)

Publication Number Publication Date
CN207194173U true CN207194173U (en) 2018-04-06

Family

ID=61798960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720920025.2U Active CN207194173U (en) 2017-07-27 2017-07-27 Non-destructive post-install

Country Status (1)

Country Link
CN (1) CN207194173U (en)

Similar Documents

Publication Publication Date Title
CN106930593B (en) Bamboo(Wood)Frame structure beam column assembled energy dissipation node
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN105064503A (en) Steel tube and core tube mixed structure
CN105155684A (en) Steel frame integrated member for concrete core tube structures and assembly method thereof
CN101368407B (en) High tensility shock-resistant node of steel structure
CN105064512A (en) Connecting structure of circular steel tube concrete column and steel beam
CN206680888U (en) A kind of ruggedized construction of arch bridge spandrel arch circle
CN201809873U (en) Reinforcing aseismatic beam for house
CN205907855U (en) Steel pipe board combination steel sheet shear force wall
CN204676733U (en) A kind of steel sheet concrete shear force wall
CN107034793A (en) A kind of ruggedized construction of arch bridge spandrel arch circle
CN207194173U (en) Non-destructive post-install
CN109610654A (en) Prefabricated assembled double steel plate concrete shear force wall connection component and its application method
CN206800791U (en) A kind of multi-cavity steel tube concrete post with tie hoop and pull bar
CN203403402U (en) Upright pile
CN205934722U (en) Seam bolted connection precast concrete decking
CN209066594U (en) The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column
CN209163043U (en) A kind of side's Concrete-filled Double Skin Steel Tube Columns and steel beam connecting joint
CN207553644U (en) A kind of rc-frame-beam column reinforcing joint
CN107700517B (en) A kind of boots beam type foot joint component for tubular pillar
CN206957055U (en) A kind of replaceable steel truss high spin system superimposed sheet composite coupling beams
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN105971127B (en) A kind of support plug-in type beam column supporting bilateral plate node
CN107764133A (en) A kind of truss-like Missile Erecting Arm
CN101525918A (en) Method for making winged steel tube-concrete composite beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant