CN207181067U - A kind of multipurpose experiment loading unit - Google Patents

A kind of multipurpose experiment loading unit Download PDF

Info

Publication number
CN207181067U
CN207181067U CN201720949549.4U CN201720949549U CN207181067U CN 207181067 U CN207181067 U CN 207181067U CN 201720949549 U CN201720949549 U CN 201720949549U CN 207181067 U CN207181067 U CN 207181067U
Authority
CN
China
Prior art keywords
pin
otic placode
shaped
diplopore
wing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720949549.4U
Other languages
Chinese (zh)
Inventor
张彦秋
陆辉
张建
温启亮
李云峰
黄山
付军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Lanzhou LS Group Co Ltd
Original Assignee
Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Lanzhou LS Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd, Lanzhou LS Group Co Ltd filed Critical Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Priority to CN201720949549.4U priority Critical patent/CN207181067U/en
Application granted granted Critical
Publication of CN207181067U publication Critical patent/CN207181067U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a kind of multipurpose experiment loading unit, it includes six groups of hydraulic cylinders, the piston end of hydraulic cylinder is connected with the bi-lug plate seat pin on attachment means lateral wall, attachment means include two block-shaped specification identical diplopore otic placodes, the inwall bottom of two pieces of diplopore otic placodes is connected by I-shaped wing plate respectively with top, the position that the outer wall top and bottom of every piece of diplopore otic placode are opposite with I-shaped wing plate is provided with convex wing plate, I-shaped wing plate, the convex wing and the web of connection constitute welding i shaped steel, in six shaped steel terminations of formation on the both ends of diplopore otic placode and lateral wall, each shaped steel termination is mounted on ears panel seat;Bottom pin connection of the top both sides of every piece of diplopore otic placode with one piece of connecting plate.Hydraulic cylinder is connected in equipment to be tested by the utility model by connecting plate, attachment means, by test of the flexible realization of hydraulic jack to derrick or drilling equipment max. hook load, simple in construction, simple operation, securely and reliably.

Description

A kind of multipurpose experiment loading unit
Technical field
Oil-well rig technical field of test equipment is the utility model is related to, specifically a kind of multipurpose experiment loading dress Put, be applicable to a variety of examinations such as marine rig, the derrick pull test of land rig, rig floor load test, winch pull test Test.
Background technology
The research and development manufacture of rig, the max. hook load for being intended to can bear rig carry out pull test, and test rig is various Whether performance reaches design requirement.In the prior art, it is complicated for the experimental rig of land rig, manufacturing cost phase To higher, or form is single, can be only done the single test of derrick or base, apparatus function is imperfect.For marine rig more It is few effective experiment loading units, it is more by the way of weight is hung in traveling system, carry out the pulling force of whole platform Experiment, wastes time and energy, and potential safety hazard be present.In addition, prior art does not have and a set of can meet land rig and sea simultaneously The experiment loading unit of foreign rig.
Utility model content
The purpose of this utility model is to provide a kind of multipurpose experiment loading unit, and pull test dress is carried to solve rig hook Put complicated, performance is single, the problem of wasting time and energy.
To reach above-mentioned purpose, technical solution adopted in the utility model is:
A kind of multipurpose experiment loading unit, it includes six groups of hydraulic cylinders being connected with rig pull test platform otic placode, The piston end of hydraulic cylinder is connected with the bi-lug plate seat pin on attachment means both ends and lateral wall, and attachment means include two block-shaped rule Lattice identical diplopore otic placode, the inwall bottom of two pieces of diplopore otic placodes are connected by I-shaped wing plate respectively with top, two pieces of works It is provided with web between font wing plate, the position that the outer wall top and bottom of every piece of diplopore otic placode are opposite with I-shaped wing plate is provided with Convex wing plate, be connected by web between neighbouring two blocks of convex wing plates, I-shaped wing plate, convex wing plate and The web of connection constitutes welding i shaped steel, in forming six shaped steel terminations on the both ends of diplopore otic placode and lateral wall, each Shaped steel termination is mounted on ears panel seat;Bottom pin connection of the top both sides of every piece of diplopore otic placode with one piece of connecting plate.
Preferably, the top of the diplopore otic placode is provided with two pin-and-holes, and the both sides of pin-and-hole are provided with annular slab, and hole is with being arranged on The pin-and-hole of two pieces of connecting plate bottoms of diplopore otic placode both sides aligns.
Preferably, the ears panel seat includes base, and two pieces of opposite connection otic placodes, connection otic placode are provided with base Front end be provided with pin-and-hole, the piston end pin connection of annular slab, connection otic placode and hydraulic cylinder is equipped with the outside of pin-and-hole.
Preferably, the connecting plate is strip, and the both ends of connecting plate are respectively equipped with two pin-and-holes, the four of connecting plate side Annular slab is equipped with outside individual pin-and-hole, the side that two pieces of connecting plate pin-and-holes are not provided with annular slab outside is opposite, and its bottom is placed Pin connection is carried out in the top both sides of one piece of diplopore otic placode, elongated slot is provided between two pin-and-holes of connecting plate upper end.
Before the utility model carries out equipment load load test, the heel pin of six hydraulic cylinders is connected to rig first and drawn On power testing stand otic placode, hydraulic cylinder is fixed temporarily, lifts by crane the connecting plate connected and attachment means, by the work of hydraulic cylinder Six ears panel seats of plug end and attachment means coordinate and wear pin connection, connect hydraulic line, debug hydraulic system.This practicality is new After type is completed, after checking that the connecting pin, shear-pin and safety pin of each connecting portion are installed in place, you can carry out pull test and add Carry.
When carrying out load test, two pin-and-holes and the derrick to be tested or rig floor on connecting plate top are set the utility model After standby connection is firm, the temporary fastening device of hydraulic cylinder bottom, hydraulic power system fuel feeding are removed, hydraulic cylinder piston end is stretched out, After reaching loading original position, slowly control makes hydraulic cylinder piston end gradually bounce back to hydraulic control system, and loading is provided to equipment Load, reach locking and record data after target load.Pressure release, off-test are carried out to hydraulic cylinder after the completion of loading.
The beneficial effects of the utility model are:
(1)Array hydraulic cylinder is connected to ocean or land to be tested by the utility model by connecting plate, attachment means On rig, by controlling the stroke of hydraulic jack that the test to equipment max. hook load, the letter of the utility model structure can be achieved It is single, simple operation, securely and reliably;
(2)The utility model on the both ends of diplopore otic placode and outer wall by I-shaped wing plate, convex wing plate and its it Intersternite constitutes welding i shaped steel, and each shaped steel termination is mounted on ears panel seat, can connect six groups of hydraulic cylinders simultaneously, The quantity of hydraulic cylinder can be adjusted according to actual condition, to be adapted to the pull test of distinct device.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of connecting seat in Fig. 1;
Fig. 3 is the structural representation of diplopore otic placode in Fig. 2;
Fig. 4 is the structural representation of I-shaped wing plate in Fig. 2;
Fig. 5 is the structural representation of convex wing plate in Fig. 2;
Fig. 6 is the structural representation of ears panel seat in Fig. 2;
Fig. 7 is the structural representation of connecting plate in Fig. 1;
In figure:1st, pull test platform otic placode, 2, hydraulic cylinder, 3, attachment means, 4, connecting plate, 5, diplopore otic placode, 6, I-shaped Type wing plate, 7, convex wing plate, 8, hole, 9, annular slab, 10, ears panel seat, 11, bottom plate, 12, otic placode, 13, elongated slot.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
A kind of multipurpose experiment loading unit as shown in Figures 1 to 7, it includes and the phase of rig pull test platform otic placode 1 Six groups of hydraulic cylinders 2 of connection, piston end and the pin connection of ears panel seat 10 on the both ends of attachment means 3 and lateral wall of hydraulic cylinder 2, Attachment means 3 include two block-shaped specification identical diplopore otic placodes 5, and the inwall bottom and top of two pieces of diplopore otic placodes 5 lead to respectively Cross I-shaped wing plate 6 to be connected, web, the outer wall top and bottom of every piece of diplopore otic placode 5 are provided between two blocks of I-shaped wing plates 6 Convex wing plate 7 is provided with the opposite position of I-shaped wing plate 6, passes through abdomen between neighbouring two blocks of convex wing plates 7 Plate is connected, and the web of I-shaped wing plate 6, convex wing plate 7 and connection constitutes welding i shaped steel, in diplopore otic placode 5 Six shaped steel terminations are formed on both ends and lateral wall, each shaped steel termination is with being provided with ears panel seat 10;Every piece of diplopore ear Bottom pin connection of the top both sides of plate 5 with one piece of connecting plate 4.
The top of diplopore otic placode 5 is provided with two pin-and-holes 8, and the both sides of pin-and-hole 8 are provided with annular slab 9, and pin-and-hole 8 is with being arranged on diplopore The pin-and-hole 8 of two pieces of bottoms of connecting plate 4 of the both sides of otic placode 5 aligns.
Ears panel seat 10 includes base 11, and two pieces of opposite connection otic placodes 12, connection otic placode 12 are provided with base 11 Front end be provided with pin-and-hole 8, the outside of pin-and-hole 8 is equipped with annular slab 9, connection otic placode 12 and the piston end pin connection of hydraulic cylinder 2.
Connecting plate 4 is strip, and the both ends of connecting plate 4 are respectively equipped with two pin-and-holes, four pin-and-holes 8 of the side of connecting plate 4 Outside is equipped with annular slab 9, and the side that two pieces of pin-and-holes 8 of connecting plate 4 are not provided with annular slab 9 outside is opposite, and its bottom is placed Pin connection is carried out in the top both sides of one piece of diplopore otic placode 5, elongated slot 13 is provided between two pin-and-holes 8 of the upper end of connecting plate 4.
Before the utility model carries out equipment load load test, the heel pin of six hydraulic cylinders 2 is connected to rig first On pull test platform otic placode 1, hydraulic cylinder 2 to be fixed temporarily, connecting plate 4 lifts by crane the attachment means 3 being connected thereto upwards, The piston end of hydraulic cylinder 2 is matched somebody with somebody to merge with six ears panel seats 10 of attachment means 3 and wears pin connection, connects hydraulic line, debugging Hydraulic system.After the utility model is completed, after checking that the connecting pin, shear-pin and safety pin of each connecting portion are installed in place, Pull test loading can be carried out.
The utility model is when carrying out load test, two pin-and-holes on the top of connecting plate 4 and derrick or rig floor to be tested After equipment connection is firm, the temporary fastening device of the bottom of hydraulic cylinder 2, hydraulic power system fuel feeding are removed, the piston end of hydraulic cylinder 2 is stretched Go out, after reaching loading original position, slowly control makes the piston end of hydraulic cylinder 2 gradually bounce back to hydraulic control system, and equipment is provided Loaded load, reach locking and record data after target load.Pressure release, off-test are carried out to hydraulic cylinder 2 after the completion of loading.
Array hydraulic cylinder is connected on derrick or rig to be tested by the utility model by connecting plate, attachment means, By controlling the stroke of hydraulic jack that the test to derrick or drilling equipment max. hook load, the utility model structure can be achieved Simply, simple operation, securely and reliably.

Claims (4)

  1. A kind of 1. multipurpose experiment loading unit, it is characterised in that:It includes and rig pull test platform otic placode(1)It is connected Six groups of hydraulic cylinders(2), hydraulic cylinder(2)Piston end and attachment means(3)Ears panel seat on both ends and lateral wall(10)Pin connects Connect, attachment means(3)Including two block-shaped specification identical diplopore otic placodes(5), two pieces of diplopore otic placodes(5)Inwall bottom and upper Portion passes through I-shaped wing plate respectively(6)It is connected, two blocks of I-shaped wing plates(6)Between be provided with web, every piece of diplopore otic placode(5)'s Outer wall top and bottom and I-shaped wing plate(6)Opposite position is provided with convex wing plate(7), neighbouring two pieces of types Type wing plate(7)Between be connected by web, I-shaped wing plate(6), convex wing plate(7)Welding is constituted with the web of connection I shaped steel, in diplopore otic placode(5)Both ends and lateral wall on formed six shaped steel terminations, each shaped steel termination with installation There is ears panel seat(10);Every piece of diplopore otic placode(5)Top both sides with one piece of connecting plate(4)Bottom pin connection.
  2. A kind of 2. multipurpose experiment loading unit according to claim 1, it is characterised in that:The diplopore otic placode(5)'s Top is provided with two pin-and-holes(8), pin-and-hole(8)Both sides be provided with annular slab(9), pin-and-hole(8)With being arranged on diplopore otic placode(5)Both sides Two pieces of connecting plates(4)The pin-and-hole of bottom(8)Align.
  3. A kind of 3. multipurpose experiment loading unit according to claim 1 or 2, it is characterised in that:The ears panel seat (10)Including base(11), base(11)On two pieces of opposite connection otic placodes are installed(12), connection otic placode(12)Front end Provided with pin-and-hole(8), pin-and-hole(8)Outside be equipped with annular slab, connection otic placode(12)With hydraulic cylinder(2)Piston end pin connection.
  4. A kind of 4. multipurpose experiment loading unit according to claim 3, it is characterised in that:The connecting plate(4)For length Strip, connecting plate(4)Both ends be respectively equipped with two pin-and-holes(8), connecting plate(4)Four pin-and-holes of side(8)Outside is equipped with Annular slab, two pieces of connecting plates(4)Pin-and-hole(8)It is not provided with annular slab outside(9)Side it is opposite, and its bottom is positioned over one piece Diplopore otic placode(5)Top both sides carry out pin connection, connecting plate(4)Two pin-and-holes of upper end(8)Between be provided with elongated slot(13).
CN201720949549.4U 2017-08-01 2017-08-01 A kind of multipurpose experiment loading unit Expired - Fee Related CN207181067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720949549.4U CN207181067U (en) 2017-08-01 2017-08-01 A kind of multipurpose experiment loading unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720949549.4U CN207181067U (en) 2017-08-01 2017-08-01 A kind of multipurpose experiment loading unit

Publications (1)

Publication Number Publication Date
CN207181067U true CN207181067U (en) 2018-04-03

Family

ID=61744962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720949549.4U Expired - Fee Related CN207181067U (en) 2017-08-01 2017-08-01 A kind of multipurpose experiment loading unit

Country Status (1)

Country Link
CN (1) CN207181067U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107389368A (en) * 2017-08-01 2017-11-24 兰州兰石集团有限公司 A kind of multipurpose experiment loading unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107389368A (en) * 2017-08-01 2017-11-24 兰州兰石集团有限公司 A kind of multipurpose experiment loading unit

Similar Documents

Publication Publication Date Title
CN201116453Y (en) Drilling tool sleeve transmission device
CN203519351U (en) Loading device for mooring test
CN203247009U (en) Automatic detacher of under water hanging object
CN205246367U (en) Stranded cable machine stranded cable test device
CN102530711B (en) Hydraulic pressure adjustable type balance frame for hoisting engine room of wind turbine
CN207181067U (en) A kind of multipurpose experiment loading unit
CN203365162U (en) Universal three-dimensional loading device for rocket cabin segment hoisting test, and loading devices thereof
CN207181008U (en) Winch pull force tester
CN207268675U (en) Derrick pull force tester
CN203653080U (en) Mooring rope hanging mechanism capable of meeting motion of portal crane
CN207181066U (en) Rig floor load testing machine
CN204625030U (en) The portable integrated side of a ship hangs
CN208744093U (en) Axis tooling is torn in a kind of ship lock ogee gate sunpender joint open
CN107389368A (en) A kind of multipurpose experiment loading unit
CN204924803U (en) Hoisting point is instrument for loading test
CN203269337U (en) Clamp for high-altitude construction of long sleeve
CN202793821U (en) Drilling machine load test apparatus
CN106207884B (en) Cable connecting arrangement is bridged between ocean platform
CN201983982U (en) Tensile testing machine for petroleum drilling machine
CN206161336U (en) Strong unhook test device who rams machine
CN110056711A (en) A kind of self-tipping type lowering equipment
CN207030731U (en) A kind of more cabin piping lane adjustable horizontal boom hoistings
CN209538035U (en) A kind of deck unit erection gantry device with automatic aligning pressure-bearing shearing resistance
CN206208547U (en) A kind of handrail load test device
CN205662285U (en) But on -site Assembly's portable electric A type hangs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20180801