CN207180950U - A kind of construction supervision construction wall water test device - Google Patents
A kind of construction supervision construction wall water test device Download PDFInfo
- Publication number
- CN207180950U CN207180950U CN201721124015.4U CN201721124015U CN207180950U CN 207180950 U CN207180950 U CN 207180950U CN 201721124015 U CN201721124015 U CN 201721124015U CN 207180950 U CN207180950 U CN 207180950U
- Authority
- CN
- China
- Prior art keywords
- water
- fixedly connected
- construction
- crane
- drainpipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of construction supervision construction wall water test device, including bottom plate, the top of bottom plate is sequentially provided with baffle plate from left to right, water tank and pedestal, the inner chamber roof side of water tank is fixedly connected with Rose Box, the top left hand through connection filler pipe of water tank, water pump is provided with the right side of the top of water tank, the top of pedestal is fixedly connected with motor and crane, the motor shaft of motor is fixedly connected with leading screw, the inner chamber left and right sidewall of crane is arranged with guide rail, the elevator chamber being engaged with guide rail is arranged with leading screw, the top of crane is fixedly connected with drip tray, the inner chamber of drip tray is fixedly connected with the second electrical retractor by support bar, second expansion link of the second electrical retractor is fixedly connected with the second water injector, the bottom of bottom plate is uniformly provided with some universal wheels;The water cover and drip tray that the utility model is set have backflow effect, can withdraw the current sprayed, the water of backflow secondary use after filtering, the consumption of reduction detection process reclaimed water.
Description
Technical field
Water test technical field is the utility model is related to, specially a kind of construction supervision is filled with construction wall water test
Put.
Background technology
Jerry-built project refers to that those cause unsubstantial dangerous to hold destructible engineering due to the reason such as use inferior materials and turn out substandard goods.It is narrow
" jerry-built project " of justice is to refer exclusively to the engineering of quality dissatisfaction, and " jerry-built project " of broad sense should refer to produce, manage
All nonconformances in journey.
The completion of high quality buildings engineering, it all can't do without the conscientious careful supervision of construction supervision.Construction supervision is responsible for
Great responsibility, therefore, to assure that engineering meets the standard of state's laws regulation.He is the important ring in engineering, plays inspection
The role of person, it is the guarder of high quality and safety, exactly because theirs makes nothing of hardships, just ensure that the quality and peace of engineering
Entirely.
With the increase of skyscraper, external wall of high-rise building or window side infiltration situation increase, and during engineering construction, generally occur
The phenomenon of leak is more, when exterior wall is examined and seeped water, often goes to check with water pipe water drenching or when rainy, finds out several
Leakage point repairs, without the careful hidden danger for checking potential leakage point, leak being caused to skin, in the future
During use, the situation of exterior wall or the infiltration of window side is will appear from when raining larger, has had a strong impact on the normal use of building.
Utility model content
The purpose of this utility model is to provide a kind of construction supervision construction wall water test device, above-mentioned to solve
The problem of being proposed in background technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of construction supervision construction wall water test device, including bottom plate, the top of bottom plate are set successively from left to right
There are baffle plate, water tank and pedestal, the left-hand end of baffle plate is fixedly connected with handrail, and handrail is that U-shape structure designs, the inner chamber roof one of water tank
Side is fixedly connected with Rose Box, the top left hand through connection filler pipe of water tank, and the top right side of water tank is provided with water pump, and water pump enters
Water end (W.E.) passes through water inlet pipe and water tank through connection, the connecting tube of water side through connection first and the second connecting tube of water pump, pedestal
Top be fixedly connected with motor and crane, motor is fixed on the top end face center of pedestal, and crane is set in the outer of motor
Side, the motor shaft of motor are fixedly connected with leading screw, and the top of leading screw is rotatablely connected on crane by bearing, and the inner chamber of crane is left
Right side wall is arranged with guide rail, and guide rail is T-shaped guide rail, and the elevator chamber being engaged with guide rail, elevator chamber and silk are arranged with leading screw
It is threaded connection between thick stick, is to be slidably connected between elevator chamber and guide rail, the front end face of elevator chamber is fixedly connected with first and electronic stretched
Compression apparatus, the expansion link of the first electrical retractor are fixedly connected with water cover, and the first water injector, the first spray are provided with water cover
Uniformly it is provided with some first water spouts in water installations, the other end of the first connecting tube is fixedly connected with the first water injector, and first
Connecting tube is provided with the second control valve, and the inner chamber downside wall of water cover is provided with osculum, and the other end insertion of the first drainpipe connects
Run in water hole, the top of crane is fixedly connected with drip tray, and the inner chamber of drip tray is fixedly connected with second by support bar and electronic stretched
Compression apparatus, the second expansion link of the second electrical retractor are fixedly connected with the second water injector, uniform on the second water injector
Provided with some second water spouts, the water injector of other end through connection second of the second connecting tube, the second connecting tube is provided with the
Three control valves, the other end through connection drip tray of the second drainpipe, the bottom of bottom plate is uniformly provided with some universal wheels, universal
Wheel is provided with service brake.
As the further technical scheme of the utility model, the drainpipe of top through connection second of Rose Box, filtering
The drainpipe of through connection first at the top of one side of case, the inner chamber of Rose Box are sequentially provided with screen pack, the first filtering from top to bottom
Layer and the second filter layer, the bottom through connection communicating pipe of Rose Box, the first filter layer are micro- ceramic filter layers, the second filter layer
It is activated carbon filter layer.
As the further technical scheme of the utility model, the drainpipe of bottom through connection the 3rd of water tank, the 3rd row
Water pipe penetrates the upper and lower end face of bottom plate, and the 3rd drainpipe is provided with the first control valve.
As the further technical scheme of the utility model, crane is the U-shaped structure design of back-off.
As the further technical scheme of the utility model, the length of the first connecting tube and the first drainpipe is all higher than rising
The height of frame drops.
As the further technical scheme of the utility model, the length of the second connecting tube is more than the second water injector most
Height.
As the further technical scheme of the utility model, the length of the second drainpipe is more than the height of drip tray.
As the further technical scheme of the utility model, the bottom of bottom plate is uniformly provided with four universal wheels.
Compared with prior art, the water cover and drip tray that the utility model is set have backflow effect, can withdraw injection
Current, prevent water logging dye building, and the water secondary use after filtering to flow back, reduce the consumption of detection process reclaimed water;First
The setting of water injector and the second water injector, the test of different walls is adapted to, meets a variety of demands.
Brief description of the drawings
Fig. 1 is a kind of structural representation of construction supervision construction wall water test device of the utility model;
Fig. 2 is a kind of structural representation of the crane of construction supervision construction wall water test device of the utility model
Figure;
Fig. 3 is a kind of structural representation of the Rose Box of construction supervision construction wall water test device of the utility model
Figure.
In figure:1- bottom plates, 2- baffle plates, 3- water tanks, 4- pedestals, 5- handrails, the drainpipes of 6- the 3rd, the control valves of 7- first, 8-
Rose Box, 81- screen packs, the filter layers of 82- first, the filter layers of 83- second, 84- communicating pipes, 9- filler pipes, 10- water pumps, 11- enter
Water pipe, 12- cranes, 121- guide rails, 13- motors, 14- leading screws, 15- bearings, 16- elevator chambers, the electric expansions of 17- first dress
Put, the expansion links of 18- first, 19- water covers, the water injectors of 20- first, the water spouts of 21- first, 22- osculums, 23- first rows
Water pipe, the drainpipes of 231- second, the connecting tubes of 24- first, the control valves of 25- second, 26- drip trays, 27- support bars, the electricity of 28- second
Dynamic retractor device, the expansion links of 29- second, the water injectors of 30- second, the water spouts of 31- second, the connecting tubes of 32- second, 33- the 3rd
Control valve, 34- universal wheels, 35- service brakes.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Fig. 1~3, a kind of construction supervision construction wall water test device, including bottom plate 1 are referred to, the bottom plate 1
Top is sequentially provided with baffle plate 2, water tank 3 and pedestal 4 from left to right, and the left-hand end of the baffle plate 2 is fixedly connected with handrail 5, described to help
Hand 5 is that U-shape structure designs, and the drainpipe 6 of bottom through connection the 3rd of the water tank 3, the 3rd drainpipe 6 penetrates bottom plate 1
Upper and lower end face, the 3rd drainpipe 6 is provided with the first control valve 7, and the inner chamber roof side of the water tank 3 is fixedly connected with Rose Box
8, the top left hand through connection filler pipe 9 of the water tank 3, the top right side of water tank 3 is provided with water pump 10, and the water pump 10 enters
Water end (W.E.) passes through water inlet pipe 11 and the through connection of water tank 1, the first connecting tube of water side through connection 24 and second of the water pump 10
Connecting tube 32, the second drainpipe of top through connection 231 of the Rose Box 8, through connection the at the top of a side of Rose Box 8
One drainpipe 23, the inner chamber of Rose Box 8 are sequentially provided with screen pack 81, the first filter layer 82 and the second filter layer 83 from top to bottom,
The bottom through connection communicating pipe 84 of Rose Box 8, first filter layer 82 are micro- ceramic filter layers, second filter layer 83
It is activated carbon filter layer;The top of the pedestal 4 is fixedly connected with motor 13 and crane 12, and the motor 13 is fixed on pedestal
4 top end face center, the crane 12 are the U-shaped structure designs of back-off, and crane 12 is set in the outside of motor 13, described
The motor shaft of motor 13 is fixedly connected with leading screw 14, and the top of the leading screw 14 is rotatablely connected on crane 12 by bearing 15, risen
Drop frame 12 inner chamber left and right sidewall be arranged with guide rail 121, the guide rail 121 is T-shaped guide rail, be arranged with the leading screw 14 with
The elevator chamber 16 that guide rail 121 is engaged, it is to be threadedly coupled between the elevator chamber 16 and leading screw 14, elevator chamber 16 and guide rail 121
Between be to be slidably connected, the front end face of the elevator chamber 16 is fixedly connected with the first electrical retractor 17, and described first electronic stretches
The expansion link of compression apparatus 17 is fixedly connected with water cover 19, and the first water injector 20, first spray are provided with the water cover 19
Some first water spouts 21 are uniformly provided with water installations 20, the other end of first connecting tube 24 is fixedly connected with the first water spray
Device 20, the first connecting tube 24 are provided with the second control valve 25, and the inner chamber downside wall of the water cover 19 is provided with osculum 22, institute
The other end through connection osculum 22 of the first drainpipe 23 is stated, the length of the drainpipe 23 of the first connecting tube 24 and first is equal
More than the height of crane 12, the top of the crane 12 is fixedly connected with drip tray 26, and the inner chamber of the drip tray 26 passes through
Support bar 27 is fixedly connected with the second electrical retractor 28, and the second expansion link 29 of second electrical retractor 28, which is fixed, to be connected
The second water injector 30 is connect, some second water spouts 31, second connection are uniformly provided with second water injector 30
The second water injector of other end through connection 30 of pipe 32, the length of the second connecting tube 32 are more than the highest of the second water injector 30
Highly, the second connecting tube 32 is provided with the 3rd control valve 33, the other end through connection drip tray of second drainpipe 231
26, the length of the second drainpipe 231 is more than the height of drip tray 26, and the bottom of the bottom plate 1 is uniformly provided with some universal wheels
34, the universal wheel 34 is provided with service brake 35.
Operation principle of the present utility model:When needing offside wall to carry out permeability performance test, opened according to highly desirable
Dynamic motor 13 drives leading screw 14 to rotate, and so as to promote elevator chamber 16 to move up and down, water cover 19 is directed at the wall for needing to test
Position, start the first electrical retractor 17, promote water cover 19 to cover wall to be tested, start water pump 10, open the second control
Valve 25 processed, current are acted on wall by the first water injector 20, wall are tested, the current collision wall of injection
Afterwards, flow back, entered by osculum 22 through the first drainpipe 23 in Rose Box 8, in last reflux tank 3 again;When needs pair
When crown wall plate carries out water test, the second water injector 30 is lifted by the second electrical retractor 28, alignment needs what is tested
Crown wall plate is sprayed water, and is tested, and after the current collision wall of injection, is flowed back, is fallen into drip tray 26 again, through the second drainpipe
231 enter in Rose Box 8, in last reflux tank 3.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge
Various changes can be made.
Claims (8)
1. a kind of construction supervision construction wall water test device, it is characterised in that including bottom plate(1), bottom plate(1)Top
Baffle plate is sequentially provided with from left to right(2), water tank(3)And pedestal(4), baffle plate(2)Left-hand end be fixedly connected with handrail(5), handrail
(5)It is that U-shape structure designs, water tank(3)Inner chamber roof side be fixedly connected with Rose Box(8), water tank(3)Top left hand insertion
Connect filler pipe(9), water tank(3)Top on the right side of be provided with water pump(10), water pump(10)Water inlet end pass through water inlet pipe(11)With
Water tank(1)Through connection, water pump(10)The connecting tube of water side through connection first(24)With the second connecting tube(32), pedestal
(4)Top be fixedly connected with motor(13)And crane(12), motor(13)It is fixed on pedestal(4)Top end face center, rise
Frame drops(12)It is set in motor(13)Outside, motor(13)Motor shaft be fixedly connected with leading screw(14), leading screw(14)Top
Pass through bearing(15)It is rotatablely connected crane(12)On, crane(12)Inner chamber left and right sidewall be arranged with guide rail(121), lead
Rail(121)It is T-shaped guide rail, leading screw(14)On be arranged with and guide rail(121)The elevator chamber being engaged(16), elevator chamber(16)With silk
Thick stick(14)Between be threaded connection, elevator chamber(16)With guide rail(121)Between be to be slidably connected, elevator chamber(16)Front end face consolidate
Surely the first electrical retractor is connected(17), the first electrical retractor(17)Expansion link be fixedly connected with water cover(19), spray
Water cover(19)Inside it is provided with the first water injector(20), the first water injector(20)On be uniformly provided with some first water spouts
(21), the first connecting tube(24)The other end be fixedly connected with the first water injector(20), the first connecting tube(24)It is provided with second
Control valve(25), water cover(19)Inner chamber downside wall be provided with osculum(22), the first drainpipe(23)The other end insertion connect
Run in water hole(22), crane(12)Top be fixedly connected with drip tray(26), drip tray(26)Inner chamber pass through support bar
(27)It is fixedly connected with the second electrical retractor(28), the second electrical retractor(28)The second expansion link(29)It is fixedly connected
Second water injector(30), the second water injector(30)On be uniformly provided with some second water spouts(31), the second connecting tube
(32)The water injector of other end through connection second(30), the second connecting tube(32)It is provided with the 3rd control valve(33), second
Drainpipe(231)Other end through connection drip tray(26), bottom plate(1)Bottom be uniformly provided with some universal wheels(34),
Universal wheel(34)It is provided with service brake(35).
A kind of 2. construction supervision according to claim 1 construction wall water test device, it is characterised in that Rose Box
(8)The drainpipe of top through connection second(231), Rose Box(8)A side at the top of the drainpipe of through connection first(23),
Rose Box(8)Inner chamber be sequentially provided with screen pack from top to bottom(81), the first filter layer(82)With the second filter layer(83), filtering
Case(8)Bottom through connection communicating pipe(84), the first filter layer(82)It is micro- ceramic filter layer, the second filter layer(83)It is living
Property charcoal filter layer.
A kind of 3. construction supervision according to claim 1 construction wall water test device, it is characterised in that water tank
(3)The drainpipe of bottom through connection the 3rd(6), the 3rd drainpipe(6)Penetrate bottom plate(1)Upper and lower end face, the 3rd drainpipe
(6)It is provided with the first control valve(7).
A kind of 4. construction supervision according to claim 1 construction wall water test device, it is characterised in that crane
(12)It is the U-shaped structure design of back-off.
5. a kind of construction supervision according to claim 1 construction wall water test device, it is characterised in that first connects
Adapter(24)With the first drainpipe(23)Length be all higher than crane(12)Height.
6. a kind of construction supervision according to claim 1 construction wall water test device, it is characterised in that second connects
Adapter(32)Length be more than the second water injector(30)Maximum height.
A kind of 7. construction supervision according to claim 1 construction wall water test device, it is characterised in that second row
Water pipe(231)Length be more than drip tray(26)Height.
A kind of 8. construction supervision according to claim 1 construction wall water test device, it is characterised in that bottom plate
(1)Bottom be uniformly provided with four universal wheels(34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721124015.4U CN207180950U (en) | 2017-09-04 | 2017-09-04 | A kind of construction supervision construction wall water test device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721124015.4U CN207180950U (en) | 2017-09-04 | 2017-09-04 | A kind of construction supervision construction wall water test device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207180950U true CN207180950U (en) | 2018-04-03 |
Family
ID=61742369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721124015.4U Expired - Fee Related CN207180950U (en) | 2017-09-04 | 2017-09-04 | A kind of construction supervision construction wall water test device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207180950U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109163853A (en) * | 2018-08-24 | 2019-01-08 | 北京中联环建设工程管理有限公司 | Project supervision external wall and window side water test device |
CN112067525A (en) * | 2020-09-09 | 2020-12-11 | 雷成平 | Diversified building outer wall and window limit infiltration detection device |
CN113008458A (en) * | 2021-02-24 | 2021-06-22 | 新疆卓越工程项目管理有限公司 | Building outer wall infiltration testing arrangement for building supervision |
-
2017
- 2017-09-04 CN CN201721124015.4U patent/CN207180950U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109163853A (en) * | 2018-08-24 | 2019-01-08 | 北京中联环建设工程管理有限公司 | Project supervision external wall and window side water test device |
CN112067525A (en) * | 2020-09-09 | 2020-12-11 | 雷成平 | Diversified building outer wall and window limit infiltration detection device |
CN113008458A (en) * | 2021-02-24 | 2021-06-22 | 新疆卓越工程项目管理有限公司 | Building outer wall infiltration testing arrangement for building supervision |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107687920A (en) | A kind of construction supervision construction wall water test device | |
CN207180950U (en) | A kind of construction supervision construction wall water test device | |
CN103061384B (en) | Secondary-pressurizing energy-saving water-supply system for high-rise building and energy-saving water supply method | |
CN106289662A (en) | A kind of steel pipe sealing inflating pressure detection device | |
CN204461702U (en) | A kind of device for detecting sealability of pressure vessel peculiar to vessel | |
CN108413032A (en) | A kind of tower pressure vessel and its working method | |
CN208140362U (en) | Process pipe pressure testing device | |
CN203488154U (en) | Portable oil well casing gas recovery device | |
CN106768649B (en) | A kind of positive and negative pressure test method of steel storage tank | |
CN104329562B (en) | A kind of movable hydraulic substation car | |
CN202250002U (en) | High pressure skid-mounted integrated water injection device for oil field | |
CN202250020U (en) | Skid-mounted gas-liquid airtight separation device for cluster well field oil test and production | |
CN214158620U (en) | Transformer oil filtering and micro-water treatment device | |
CN203882773U (en) | Vertical oil storage device for transformer | |
CN203352009U (en) | Oil pressing device for replacing transformer bushing | |
CN102445306B (en) | On-site water tightness detector for building external window | |
CN201137786Y (en) | Hermetic pipeline liquid injecting device | |
CN206384409U (en) | A kind of tank used for storing ammonia and its sealing device | |
CN203756655U (en) | Liquid supply system for high-flow pump | |
CN205672616U (en) | New Forestry pouring filter | |
CN218900918U (en) | Oil circuit bubble removing device | |
CN105820852B (en) | Bubble elimination device | |
CN210483674U (en) | Rod lifting system with speed pipe column function | |
CN103075210A (en) | Method for improving starting speed of seal oil high-pressure back-up gear oil pump of turboset and adopted oiler device | |
CN209405996U (en) | A kind of whirlwind absorption tower for waste treatment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180403 |
|
CF01 | Termination of patent right due to non-payment of annual fee |