CN207177168U - The dried hanging hang structure of wood veneer - Google Patents

The dried hanging hang structure of wood veneer Download PDF

Info

Publication number
CN207177168U
CN207177168U CN201721204978.5U CN201721204978U CN207177168U CN 207177168 U CN207177168 U CN 207177168U CN 201721204978 U CN201721204978 U CN 201721204978U CN 207177168 U CN207177168 U CN 207177168U
Authority
CN
China
Prior art keywords
wood veneer
inside groove
fixed
plate
shovel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721204978.5U
Other languages
Chinese (zh)
Inventor
马达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing City Construction Great Wall Building Decoration Engineering Co Ltd
Original Assignee
Beijing City Construction Great Wall Building Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing City Construction Great Wall Building Decoration Engineering Co Ltd filed Critical Beijing City Construction Great Wall Building Decoration Engineering Co Ltd
Priority to CN201721204978.5U priority Critical patent/CN207177168U/en
Application granted granted Critical
Publication of CN207177168U publication Critical patent/CN207177168U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of dried hanging hang structure of wood veneer,Its drip irrigation device is to include wall,The plank base being fixed on by keel on the wall and some wood veneers being fixed on outside the plank base,The surface of the plank base is installed with fixture,The back side of the wood veneer is installed with the plug connector coordinated with the fixture grafting,The fixture includes fixed plate,The shovel plate being extend horizontally away from fixed plate lower end,The shovel plate upper surface offers slot,The slot includes the notch at the shovel plate top surface edge and the inside groove connected with the notch set along the shovel plate length direction,The plug connector includes vertical portion,The horizontal part being extend horizontally away from vertical portion upper end,The horizontal lower surface is provided with inserted block,The inserted block, which moves horizontally, to be inserted into the inside groove through the notch and is abutted against with the interior groove sidewall.With the advantages of quick and easy for installation, solid and reliable, finishing effect is perfect.

Description

The dried hanging hang structure of wood veneer
Technical field
The utility model belongs to wall decoration technology, more particularly to a kind of dried hanging hang structure of wood veneer.
Background technology
Decoration panel is that into certain thickness thin slice natural timber or Recombinant Wood slicing are adhered into face veneer, then A kind of surfacing for being used for interior decoration or Furniture manufacture that hot pressing forms.Wood veneer is a kind of facing made of timber Plate, has the advantages that light, environmentally friendly, is widely used in building decoration area.
The existing Chinese patent for authorizing Publication No. CN203977789U discloses a kind of wooden faced wall and its wooden facing Simple cladding component, the wooden facing simply cladding component include corner brace, dry hanging article, into trough floor, into chute panel, anchoring piece and lock Determine part;Corner brace is fixed on the wall by anchoring piece, and dry hanging article is fixedly connected by locking piece with corner brace;On after assembling Under adjacent two pieces of wood veneers respectively with it with the corresponding upper cladding groove formed into trough floor and grooving panel and under cladding groove, correspondence It is stuck in the upper extension portion and lower extension portion of the dry hanging article.
But the installation of above-mentioned wood veneer needs first to install corner brace on wall, dry hanging article is set up in corner brace, in wood Decoration panel upper portion side wall installs into trough floor and into chute panel, and trough floor and grooving are installed into wood veneer lower sides Panel, cause installation steps cumbersome, efficiency of construction is not high.
Utility model content
The purpose of this utility model is to provide a kind of dried hanging hang structure of wood veneer, and the dried hanging hang structure can be conveniently Wood veneer is installed on plank base.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of dried hanging hang structure of wood veneer, including wall, be fixed on by keel plank base on the wall and Some wood veneers being fixed on outside the plank base, the surface of the plank base are installed with fixture, the wood veneer The back side is installed with the plug connector coordinated with the fixture grafting, and the fixture includes fixed plate, horizontal from fixed plate lower end The shovel plate extended, the shovel plate upper surface offer slot, and the slot includes being located at shovel plate upper surface side Notch at edge and the inside groove connected with the notch along shovel plate length direction setting, the plug connector include vertical Portion, the horizontal part being extend horizontally away from vertical portion upper end, the horizontal lower surface are provided with inserted block, and the inserted block moves horizontally It is inserted into the inside groove through the notch and is abutted against with the interior groove sidewall, the horizontal lower surface and the shovel plate Upper surface fits.
By using such scheme, fixture is fixed on plank base, plug connector is fixed on wood veneer, will be inserted Block is inserted into inside groove through notch, realizes and wood veneer installation is fixed on plank base, and whole process is simple to operate, convenient Fast, efficiency of construction is improved.
Preferably, it is additionally provided with the baffle plate parallel with the shovel plate, the shovel plate and institute above the shovel plate State the thickness that the distance between baffle plate is equal to the level board.
By using such scheme, baffle plate plays position-limiting action, when horizontal part is inserted between shovel plate and baffle plate, inserts Block is inserted into slot, and horizontal part upper surface abuts against with baffle plate lower surface, and horizontal lower surface offsets with shovel plate upper surface Connect so that horizontal part can not move up and down, and prevent coming off for wood veneer.
Preferably, the baffle plate is offering the first mounting hole inside groove position directly above, the horizontal part is in place The second mounting hole is offered inside groove position directly above, first mounting hole, second mounting hole, the inside groove are formed Run-though space in be inserted with and prevent the non-slipping block that is moved horizontally along the inside groove of inserted block.
By using such scheme, non-slipping block prevents inserted block from being moved horizontally along inside groove, and then prevents the edge of wood veneer Shovel plate length direction moves horizontally.
Preferably, the non-slipping block includes insertion section, location division and grip part, the insertion section is inserted into the first installation In the run-though space that hole, the second mounting hole and inside groove three are formed, the insertion section entirely falls in institute in the projection of vertical direction State in the projection of location division in vertical direction, it is described fixed when the insertion lower surface is inconsistent with the inside groove bottom Position lower surface fits with the baffle plate upper surface.
By using such scheme, insertion section has the function that to prevent inserted block from moving horizontally along inside groove, and work is informed in location division Whether people insertion section is inserted into inside groove bottom, and grip part facilitates worker to install and remove non-slipping block.
Preferably, the plug connector is arranged at the top at the wood veneer back side.
By using such scheme, facilitate worker that non-slipping block is installed above wood veneer, and facilitate worker's observation to insert The grafting situation of fitting and fixture.
Preferably, the fixed plate is bolted on the plank base by first;The vertical portion passes through the second spiral shell Bolt is fixed on the wood veneer.
By using such scheme, fixture is fixed on plank base, plug connector is fixed on wood veneer.
Preferably, the fixture and the plug connector are made by aluminum alloy materials.
By using such scheme, aluminum alloy materials have intensity compared with it is high, density is small, easy to process, corrosion resistance is good etc. Advantage so that upper angled piece is unlikely to deform with lower angled piece, overall weight is relatively light, is not easy to get rusty.
Preferably, L-shaped top bar is offered on the upper surface of the wood veneer, the wood veneer lower surface Offer and get out of a predicament or an embarrassing situation, the adjacent wood veneer in the vertical direction passes through top bar and splicing of getting out of a predicament or an embarrassing situation.
By using such scheme, during installation, the splicing of adjacent two layers wood veneer is fixed, the wood decorations wall surface levelling being spliced into Spend, decorative effect is more perfect.
In summary, the utility model has the advantages that:
1. by the fixture and plug connector of setting, conveniently wood veneer can be installed on plank base;
2. by the baffle plate of setting, position-limiting action is played, prevents wood veneer from moving up and down, enhancing wood veneer installation Steadiness;
3. by the non-slipping block of setting, prevent wood veneer from being moved horizontally along shovel plate length direction, further enhance wood The steadiness of decoration panel installation;
4. being fixed between adjacent wood veneer by splicing, mounted wood decorations metope surfacing, decorative effect is more It is perfect.
Brief description of the drawings
Fig. 1 is the front view of the present embodiment;
Fig. 2 is the structural representation of the fixture of the present embodiment;
Fig. 3 is the structural representation of the plug connector of the present embodiment;
Fig. 4 is the structural representation of the non-slipping block of the present embodiment;
Fig. 5 is the top view of the present embodiment;
Fig. 6 be in Fig. 5 A-A to sectional view;
Fig. 7 is the structural representation of the wood veneer of the present embodiment.
In figure, 1, wall;2nd, keel;3rd, plank base;4th, wood veneer;41st, top bar;42nd, upper groove;43rd, get out of a predicament or an embarrassing situation; 5th, fixture;51st, fixed plate;511st, the first bolt hole;512nd, the first bolt;52nd, shovel plate;521st, slot;5211st, notch; 5212nd, inside groove;53rd, baffle plate;531st, the first mounting hole;6th, plug connector;61st, vertical portion;611st, the second bolt hole;612nd, the second spiral shell Bolt;62nd, horizontal part;621st, inserted block;622nd, the second mounting hole;7th, non-slipping block;71st, insertion section;72nd, location division;73rd, grip part.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of dried hanging hang structure of wood veneer 4, as shown in figure 1, including the wall 1, keel 2, plank base 3 that set gradually, Plank base 3 is fixed on wall 1 by keel 2, and some wood veneers 4 are fixed with outside plank base 3.It is fixed with plank base 3 Determine part 5, the back side of wood veneer 4 is fixed with plug connector 6, and fixture 5 and plug connector 6 can be coordinated with grafting so as to by wood veneer 4 It is articulated on plank base 3.
With reference to shown in Fig. 1 and Fig. 2, fixture 5 includes fixed plate 51, the shovel plate being extend horizontally away from the lower end of fixed plate 51 52.Two the first bolts hole 511 are offered in fixed plate 51 along its length, the first spiral shell is provided with the first bolt hole 511 Bolt 512, fixed plate 51 are fixed in the side wall of plank base 3 by the first bolt 512.The middle part upper surface of shovel plate 52 offers L-shaped Slot 521, slot 521 includes the notch 5211 at the top surface edge of shovel plate 52 and set along the length direction of shovel plate 52 The inside groove 5212 connected with notch 5211 put, plug connector 6 are inserted into inside groove 5212 through notch 5211.
With reference to shown in Fig. 1 and Fig. 3, plug connector 6 is fixed on wood veneer 4 in the upper portion side wall of plank base 3, including perpendicular Straight portion 61, the horizontal part 62 being extend horizontally away from the upper end of vertical portion 61.Vertical portion 61 offers two second along its length Bolt hole 611, the second bolt hole 611 are provided with the second bolt 612, and vertical portion 61 is fixed to wooden facing by the second bolt 612 On plate 4.
With reference to shown in Fig. 2 and Fig. 3, the lower surface of horizontal part 62 is provided with inserted block 621, and plug connector 6 is plugged on fixture 5 Slot 521 in when, inserted block 621 first moves horizontally to the direction of plank base 3, is inserted into through notch 5211 in inside groove 5212, then edge Inside groove 5212 moves horizontally to away from the direction of notch 5211, is finally fitted with side wall of the inside groove 5212 away from the end of notch 5211.
Fixture 5 and plug connector 6 are made by aluminum alloy materials so that fixture 5 and the intensity of plug connector 6 are good, quality compared with Gently.
As shown in Fig. 2 to prevent horizontal part 62 from being moved up and down relative to shovel plate 52, at a certain distance from shovel plate 52 Fixed plate 51 on be provided with rectangular baffle plate 53, baffle plate 53 is parallel with shovel plate 52.Between baffle plate 53 and shovel plate 52 Distance be equal to the thickness of level board, when inserted block 621 is inserted into slot 521, the upper surface of horizontal part 62 and the following table of baffle plate 53 Face abuts against, and the lower surface of horizontal part 62 abuts against with the upper surface of shovel plate 52 so that horizontal part 62 can not move up and down.
To avoid inserted block 621 from being slided along inside groove 5212 is horizontal, it is located in baffle plate 53 at the position directly above of inside groove 5212 and opens up There is the first mounting hole 531, be located in horizontal part 62 at the position directly above of inside groove 5212 and offer the second mounting hole 622, the first peace Non-slipping block 7 is inserted with the run-though space that dress hole 531, the second mounting hole 622, the three of inside groove 5212 are formed.
As shown in figure 4, non-slipping block 7 includes insertion section 71, location division 72 and grip part 73.Insertion section 71 is inserted into the first peace In the run-though space that dress hole 531, the second mounting hole 622, the three of inside groove 5212 are formed, location division 72 is located at directly over insertion section 71 And insertion section 71 entirely falls in the projection of location division 72 in vertical direction in the projection of vertical direction.As shown in fig. 6, when slotting When entering the upper surface of portion 71 and the inconsistent bottom of inside groove 5212, the lower surface of location division 72 fits with the upper surface of baffle plate 53, so as to rise To positioning action.The setting of grip part 73, worker is facilitated to install and remove non-slipping block 7.
In addition, as shown in fig. 7, the upper end surface of wood veneer 4 offers the L-shaped top bar 41 close to plank base 3, The lower surface of wood veneer 4 offers away from plank base 3 and step-like gets out of a predicament or an embarrassing situation 43.Top bar 41 forms with wood veneer 4 Upper groove 42, get out of a predicament or an embarrassing situation 43 is adapted with upper groove 42 so that the neighbouring in the vertical direction of wood veneer 4 is by appearing on the stage Rank 41 and 43 close splicings of getting out of a predicament or an embarrassing situation are fixed together.
Pass through the inserted block 621 and slot 521 of setting so that wood veneer 4 it is quick and easy for installation, substantially increase work Efficiency;By the baffle plate 53 of setting, prevent wood veneer 4 from moving up and down, improve the steadiness of wood veneer 4;Pass through setting Non-slipping block 7, prevent length direction of the wood veneer 4 along shovel plate 52 from moving horizontally, further increase the steady of wood veneer 4 Solidity.Adjacent two pieces of wood veneers 4 splicing is fixed, not only easy to operate, and mounted wood decorations degree of plainness for wall surface is high, has Perfect finishing effect.
Installation process:As shown in figure 1, install plug connector close to the back side of top bar 41 on the top of wood veneer 4 first 6, secondly corresponding position installs fixture 5 on plank base 3.The horizontal part 62 of plug connector 6 is set to be directed at baffle plate 53 and holding Space between plate 52, the notch 5211 of the alignment 521 of inserted block 621.
Plug connector 6 is moved horizontally to the direction of plank base 3, until inserted block 621 is by notch 5211 and the face of inside groove 5212 The side wall of notch 5211 abuts against.Plug connector 6 is moved horizontally along inside groove 5212 to the direction away from notch 5211, until inserted block 621 abut against with side wall of the inside groove 5212 away from notch 5211.After the completion of grafting, in the first mounting hole 531, the second mounting hole 622 and inside groove 5212 formed run-though space in plug non-slipping block 7.
After the installation for completing the wooden boards of the bottom, second layer wood veneer 4 is fixed on plank base 3 according to preceding method, As shown in fig. 7, getting out of a predicament or an embarrassing situation for second layer wood veneer 4 43 is inserted into the upper groove 42 of bottom wood veneer 4 so that adjacent The two pieces of in the vertical direction of wood veneer 4 splicings are fixed.So in layer, the splicing of whole wood decorations metope is completed.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (8)

1. a kind of dried hanging hang structure of wood veneer, including wall(1), pass through keel(2)It is fixed on the wall(1)On wooden base Layer(3)And it is fixed on the plank base(3)Outer some wood veneers(4), the plank base(3)Surface be installed with fixation Part(5), the wood veneer(4)The back side be installed with and the fixture(5)The plug connector that grafting coordinates(6), its feature exists In:The fixture(5)Including fixed plate(51), from fixed plate(51)The shovel plate that lower end is extend horizontally away(52), the support Hold plate(52)Upper surface offers slot(521), the slot(521)Including positioned at the shovel plate(52)At top surface edge Notch(5211)With along the shovel plate(52)Length direction set with the notch(5211)The inside groove of connection(5212), The plug connector(6)Including vertical portion(61), from vertical portion(61)The horizontal part that upper end is extend horizontally away(62), the horizontal part (62)Lower surface is provided with inserted block(621), the inserted block(621)Move horizontally through the notch(5211)It is inserted into the inside groove (5212)In and with the inside groove(5212)Side wall abuts against, the horizontal part(62)Lower surface and the shovel plate(52)Upper table Face fits.
2. the dried hanging hang structure of wood veneer according to claim 1, it is characterised in that:The shovel plate(52)Top is also set It is equipped with and the shovel plate(52)Parallel baffle plate(53), the shovel plate(52)With the baffle plate(53)The distance between etc. In the thickness of the level board.
3. the dried hanging hang structure of wood veneer according to claim 2, it is characterised in that:The baffle plate(53)Positioned inside groove (5212)The first mounting hole is offered at position directly above(531), the horizontal part(62)Positioned inside groove(5212)Surface Opening position offers the second mounting hole(622), first mounting hole(531), the second mounting hole(622)And inside groove(5212)Shape Into run-though space in be inserted with prevention inserted block(621)Along the inside groove(5212)The non-slipping block moved horizontally(7).
4. the dried hanging hang structure of wood veneer according to claim 3, it is characterised in that:The non-slipping block(7)Including insertion Portion(71), location division(72)And grip part(73), the insertion section(71)It is inserted into the first mounting hole(531), the second mounting hole (622)And inside groove(5212)In the run-though space that three is formed, the insertion section(71)Entirely fallen in the projection of vertical direction The location division(72)In projection in vertical direction, when the insertion section(71)Lower surface and the inside groove(5212)Bottom When inconsistent, the location division(72)Lower surface and the baffle plate(53)Upper surface fits.
5. the dried hanging hang structure of wood veneer according to claim 1, it is characterised in that:The plug connector(6)It is arranged at institute State wood veneer(4)The top at the back side.
6. the dried hanging hang structure of wood veneer according to claim 1, it is characterised in that:The fixed plate(51)Pass through first Bolt(512)Fixed to the plank base(3)On;The vertical portion(61)Pass through the second bolt(612)Fixed to the wood decorations Panel(4)On.
7. the dried hanging hang structure of wood veneer according to claim 1, it is characterised in that:The fixture(5)Inserted with described Fitting(6)It is made by aluminum alloy materials.
8. the dried hanging hang structure of wood veneer according to claim 1, it is characterised in that:The wood veneer(4)Upper end L-shaped top bar is offered on face(41), the wood veneer(4)Lower surface, which offers, gets out of a predicament or an embarrassing situation(43), it is adjacent described Wood veneer(4)In the vertical direction passes through top bar(41)With get out of a predicament or an embarrassing situation(43)Splicing.
CN201721204978.5U 2017-09-19 2017-09-19 The dried hanging hang structure of wood veneer Expired - Fee Related CN207177168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721204978.5U CN207177168U (en) 2017-09-19 2017-09-19 The dried hanging hang structure of wood veneer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721204978.5U CN207177168U (en) 2017-09-19 2017-09-19 The dried hanging hang structure of wood veneer

Publications (1)

Publication Number Publication Date
CN207177168U true CN207177168U (en) 2018-04-03

Family

ID=61747898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721204978.5U Expired - Fee Related CN207177168U (en) 2017-09-19 2017-09-19 The dried hanging hang structure of wood veneer

Country Status (1)

Country Link
CN (1) CN207177168U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560817A (en) * 2018-04-15 2018-09-21 安徽昊森新材料科技有限公司 The plastic-wood wallboard of anti-vibration
CN108661264A (en) * 2018-04-15 2018-10-16 安徽昊森新材料科技有限公司 It is capable of the plastic-wood wallboard of fast cooling
CN108678320A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of noise isolating sound
CN108678319A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of simple and fast installation
CN108678321A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of high temperature resistant waterproof
CN109594736A (en) * 2018-12-26 2019-04-09 浙江添锦建筑装饰工程有限公司 Assembled ceramic tile metope and its construction method
CN113107153A (en) * 2021-04-08 2021-07-13 苏州美瑞德建筑装饰有限公司 Dampproofing drainage honeycomb design structure of assembled wood veneer

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560817A (en) * 2018-04-15 2018-09-21 安徽昊森新材料科技有限公司 The plastic-wood wallboard of anti-vibration
CN108661264A (en) * 2018-04-15 2018-10-16 安徽昊森新材料科技有限公司 It is capable of the plastic-wood wallboard of fast cooling
CN108678320A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of noise isolating sound
CN108678319A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of simple and fast installation
CN108678321A (en) * 2018-04-15 2018-10-19 安徽昊森新材料科技有限公司 The plastic-wood wallboard of high temperature resistant waterproof
CN109594736A (en) * 2018-12-26 2019-04-09 浙江添锦建筑装饰工程有限公司 Assembled ceramic tile metope and its construction method
CN113107153A (en) * 2021-04-08 2021-07-13 苏州美瑞德建筑装饰有限公司 Dampproofing drainage honeycomb design structure of assembled wood veneer

Similar Documents

Publication Publication Date Title
CN207177168U (en) The dried hanging hang structure of wood veneer
EP0890331B1 (en) System for connecting juxtapposed sectional boards
ES2247389T3 (en) ZOCALO (RODAPIE) OR DECORATIVE CROWNING MOLDING.
CA2380303A1 (en) Floor covering plate
US4367616A (en) Wooden beam suspended ceiling assembly
US5470140A (en) Interlocking tile edge for countertops
US5778610A (en) Modular stair jack system
CN106609583A (en) A functional wall surface plastic panel
CN205637430U (en) Movable decoration wallboard and wallboard installation pendant
CN207177177U (en) Wood veneer cladding system
RU2003130075A (en) DECORATIVE ELEMENT FOR ORANGE
CN207296277U (en) A kind of wood veneer cladding system
CN210622231U (en) Novel stainless steel skirting line
TWM639371U (en) Building material board body connector
CN209145113U (en) A kind of type unitized curtain wall dried hanging hang structure
CN205822684U (en) A kind of anti-deformation solid wood composite board
CN210395921U (en) Assembled dry-process fine-assembling system
CA3123628C (en) Lightweight noncombustible decorative mantel
CN108374537B (en) Wall and floor decoration module
CN208586855U (en) A kind of anti-terrestrial heat solid wood floor of waterproof
CN102953517B (en) Wooden wall-mounted plate
CN204163311U (en) A kind of trim components, decoration board mounting structure
CN220620899U (en) Luminous skirting line structure
CN218323629U (en) Large-scale clear water concrete exterior wall cladding connecting device
CN212478380U (en) Integral background wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20200919