CN207177031U - The integrated mounting structure of indoor suspended ceiling - Google Patents
The integrated mounting structure of indoor suspended ceiling Download PDFInfo
- Publication number
- CN207177031U CN207177031U CN201720869557.8U CN201720869557U CN207177031U CN 207177031 U CN207177031 U CN 207177031U CN 201720869557 U CN201720869557 U CN 201720869557U CN 207177031 U CN207177031 U CN 207177031U
- Authority
- CN
- China
- Prior art keywords
- block
- balladeur train
- chute
- mounting structure
- integrated mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model provides a kind of integrated mounting structure of indoor suspended ceiling, wherein, wall top face is provided with the first balladeur train, the first chute along length is offered on first balladeur train, multiple second balladeur trains are slidably connected in first chute, the top of second balladeur train has the first block, first block is slidably connected in the first chute, the bottom of second balladeur train has the second block, the bottom of second block opens up the second chute of oriented first block extension, the cross section of second chute is in inverted T-shaped, the 3rd balladeur train is slidably connected in second chute, 3rd balladeur train is in inverted T-shaped, the bottom of 3rd balladeur train has the 3rd block, two relative installation grooves are formed between 3rd block and the second block, the first reset portion is installed in installation groove, the bottom of 3rd block is provided with ceiling board.The utility model can solve the technical problem of yielding furred ceiling in the prior art, construction flexibility and stability difference.
Description
Technical field
A kind of installation of ceiling technology is the utility model is related to, in particular to a kind of integrated peace of indoor suspended ceiling
Assembling structure.
Background technology
As society saves sustainable development again again, the increasing the commercial house of in the market is delivered using hard-cover, reduces two
Waste and environmental pollution caused by secondary finishing.It is past due to construction technology and the missing of construction reference at present in fine fitment house
Exist when in disorder, overall inaesthetic common quality defect of arranging generally be present toward there is the installation of top surface furred ceiling equipment end, and radiating
Larger potential safety hazard.
In traditional top surface decorative engineering, furred ceiling main purpose is for concealing device, pipeline, pipeline etc..It is domestic at present
Outside this technology application show Multiple Shape, more materials, diversification trend, have plasterboard emulsion paint furred ceiling, have steel construction
Furred ceiling, there is aluminium sheet aluminium side to lead to furred ceiling, have the multiple pasting board furred ceiling of mineral wool board.In current furred ceiling technology, major defect is:1) furred ceiling
On the part such as the light trough that opens up, the metaboly of furred ceiling is easily caused during long-time use, influence furred ceiling uses the longevity
Life;2) the cabling equipment such as indoor water power, HVAC it is more, it is necessary to when adjusting cabling, the flexibility of ceiling construction is not high, and stably
There is also problem for property.
Utility model content
In consideration of it, the utility model provides a kind of integrated mounting structure of indoor suspended ceiling, it is intended to solves existing skill
The technical problem that furred ceiling is yielding in art, construction flexibility and stability are poor.
Therefore, the utility model provides a kind of integrated mounting structure of indoor suspended ceiling, it includes some pieces of furred ceilings
Plate, the bottom of ceiling board offer light trough, and ceiling board is lifted on wall top face, and wall top face is provided with the first balladeur train, the first balladeur train
On offer the first chute along length, multiple second balladeur trains, the top tool of the second balladeur train are slidably connected in the first chute
There is the first block, the first block is slidably connected in the first chute, and the bottom of the second balladeur train has the second block, the second block
Bottom opens up the second chute of oriented first block extension, and the cross section of the second chute is in inverted T-shaped, is slided in the second chute
The 3rd balladeur train is connected with, the 3rd balladeur train is in inverted T-shaped, and the bottom of the 3rd balladeur train has the 3rd block, the 3rd block and second
Relative two installations grooves are formed between block, installs and the first reset portion is installed in groove, the first reset portion connects the respectively
Three blocks and the second block, the bottom of the 3rd block are provided with ceiling board.
Further, the cross section of above-mentioned first block is in inverted trapezoidal.
Further, above-mentioned second block is rectangular blocks, and two first are offered respectively on two pairs of both sides of the second block
Fillet surface.
Further, two second fillet surfaces, the 3rd balladeur train are offered respectively on relative two cell walls of above-mentioned second chute
Shape with the second chute.
Further, the bottom of above-mentioned 3rd balladeur train is set with the second reset portion.
Further, the side wall of above-mentioned second block is provided with first lacing wire at the top for being obliquely extended to ceiling board.
Further, the second lacing wire extended in ceiling board is connected with the middle part of above-mentioned first lacing wire.
Further, embedded part, the bottom connection embedded part of the second lacing wire are provided with above-mentioned ceiling board.
The integrated mounting structure of a kind of indoor suspended ceiling provided by the utility model, mainly there is provided some pieces of furred ceilings
Plate, the bottom of ceiling board offer light trough, and ceiling board is lifted on wall top face, and wall top face is provided with the first balladeur train, the first balladeur train
On offer the first chute along length, multiple second balladeur trains, the top tool of the second balladeur train are slidably connected in the first chute
There is the first block, the first block is slidably connected in the first chute, and the bottom of the second balladeur train has the second block, the second block
Bottom opens up the second chute of oriented first block extension, and the cross section of the second chute is in inverted T-shaped, is slided in the second chute
The 3rd balladeur train is connected with, the 3rd balladeur train is in inverted T-shaped, and the bottom of the 3rd balladeur train has the 3rd block, the 3rd block and second
Relative two installations grooves are formed between block, installs and the first reset portion is installed in groove, the first reset portion connects the respectively
Three blocks and the second block, the bottom of the 3rd block are provided with ceiling board;By the setting of said structure, using the first balladeur train,
The mutually sliding characteristic of second balladeur train and the 3rd balladeur train so that construction flexibility and stability are improved, while utilize the
The collaboration of the mutually sliding characteristic and multiple blocks and the first reset portion of one balladeur train, the second balladeur train and the 3rd balladeur train is made
Industry so that ceiling board obtain rear portion skeleton can varicose support force so that the power to skeleton formed during the deformation of ceiling board
Be able to using the first reset portion and multiple blocks can reset feature be cancelled, hung in the prior art so as to efficiently solve
Push up the technical problem of yielding, construction flexibility and stability difference.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area
Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to this practicality
New limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural representation for the integrated mounting structure of indoor suspended ceiling that the utility model embodiment provides.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
Referring to Fig. 1, the integrated mounting structure of indoor suspended ceiling that the utility model embodiment provides is shown in figure, its
Including some pieces of ceiling boards 1, the bottom of ceiling board 1 offers light trough 11, is used to dispose the grade light fixture of reflector lamp 111 in light trough 11,
Ceiling board 1 is lifted on wall top face 2, and wall top face 2 is provided with the first balladeur train 31, and along length is offered on the first balladeur train 31
One chute 311, multiple second balladeur trains 32 is slidably connected in the first chute 311, the top of the second balladeur train 32 has the first block
3211, the first block 3211 is slidably connected in the first chute 311, and the bottom of the second balladeur train 32 has the second block 321, and second
The bottom of block 321 opens up the second chute 322 that oriented first block 3211 extends, and the cross section of the second chute 322 is in inversion
T-shaped, slidably connect the 3rd balladeur train 33 in the second chute 322, the 3rd balladeur train 33 is in inverted T-shaped, the bottom of the 3rd balladeur train 33
Portion has the 3rd block 331, and two relative installation grooves 332 are formed between the 3rd block 331 and the second block 321, and installation is logical
First reset portion 333 (being specifically as follows spring etc.) is installed, the first reset portion 333 connects the 3rd block 331 respectively in groove 332
With the second block 321, the bottom of the 3rd block 331 is provided with ceiling board 1.
The integrated mounting structure of a kind of indoor suspended ceiling that the present embodiment is provided, mainly there is provided some pieces of furred ceilings
Plate, the bottom of ceiling board offer light trough, and ceiling board is lifted on wall top face, and wall top face is provided with the first balladeur train, the first balladeur train
On offer the first chute along length, multiple second balladeur trains, the top tool of the second balladeur train are slidably connected in the first chute
There is the first block, the first block is slidably connected in the first chute, and the bottom of the second balladeur train has the second block, the second block
Bottom opens up the second chute of oriented first block extension, and the cross section of the second chute is in inverted T-shaped, is slided in the second chute
The 3rd balladeur train is connected with, the 3rd balladeur train is in inverted T-shaped, and the bottom of the 3rd balladeur train has the 3rd block, the 3rd block and second
Relative two installations grooves are formed between block, installs and the first reset portion is installed in groove, the first reset portion connects the respectively
Three blocks and the second block, the bottom of the 3rd block are provided with ceiling board;By the setting of said structure, using the first balladeur train,
The mutually sliding characteristic of second balladeur train and the 3rd balladeur train so that construction flexibility and stability are improved, while utilize the
The collaboration of the mutually sliding characteristic and multiple blocks and the first reset portion of one balladeur train, the second balladeur train and the 3rd balladeur train is made
Industry so that ceiling board obtain rear portion skeleton can varicose support force so that the power to skeleton formed during the deformation of ceiling board
Be able to using the first reset portion and multiple blocks can reset feature be cancelled, hung in the prior art so as to efficiently solve
Push up the technical problem of yielding, construction flexibility and stability difference.
With continued reference to Fig. 1, the cross section of the first block 3211 is in inverted trapezoidal, and the triangle using trapezoidal both sides is convex
Go out portion, more preferably grip can be formed in chute, when sliding, the keeping a firm hand on to surrounding at the top of overall skeleton can be formed
Effect so that the integrated support power of skeleton is stronger, so as to further overcome the metaboly of lower section ceiling board.
With continued reference to Fig. 1, the second block 321 is rectangular blocks, and two are offered respectively on two pairs of both sides of the second block 321
First fillet surface 323;Two second fillet surfaces 324, the 3rd balladeur train 33 are offered respectively on relative two cell walls of second chute 322
Shape with the second chute 322., can be by air-flow to ceiling board using the setting of multiple fillet surfaces by the setting of the structure
End water conservancy diversion, reduce the stress of skeleton and ceiling board, so as to improve integrally-built steadiness.
With continued reference to Fig. 1, the bottom of the 3rd balladeur train 33 is set with the second reset portion 334, is specifically as follows spring etc., utilizes
The effect of second reset portion, it can make it that the varicose ability of overall skeleton is strengthened, so as to effectively prevent ceiling board
Metaboly.
With continued reference to Fig. 1, the side wall of the second block 321 is provided with first lacing wire at the top for being obliquely extended to ceiling board 1
41;The middle part of first lacing wire 41 is connected with the second lacing wire 42 extended in ceiling board 1;Embedded part 43 is provided with ceiling board 1, the
The bottom connection embedded part 43 of two lacing wires 42.Pass through the effect of above-mentioned multiple hangs muscles so that overall skeleton and the structure of furred ceiling are more
It is firm, while the bindiny mechanism of the second lacing wire and embedded part, the stress of furred ceiling can be exported to both side ends, reduce skeleton and hang
The stress of top plate, so as to improve integrally-built steadiness.
Obviously, those skilled in the art can carry out various changes and modification without departing from this practicality to the utility model
New spirit and scope.So, if these modifications and variations of the present utility model belong to the utility model claims and
Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these changes and modification.
Claims (8)
1. the integrated mounting structure of indoor suspended ceiling, it is characterised in that including some pieces of ceiling boards (1), the ceiling board (1)
Bottom offer light trough (11), the ceiling board (1) is lifted on wall top face (2), and the wall top face (2) is provided with the first cunning
Frame (31), offers the first chute (311) along length on first balladeur train (31), sliding in first chute (311)
Dynamic to be connected with multiple second balladeur trains (32), the top of second balladeur train (32) has the first block (3211), described first piece
Body (3211) is slidably connected in first chute (311), and the bottom of second balladeur train (32) has the second block
(321), the bottom of second block (321) opens up the second chute (322) of oriented first block (3211) extension, institute
The cross section for stating the second chute (322) is in inverted T-shaped, and the 3rd balladeur train (33) is slidably connected in second chute (322),
3rd balladeur train (33) is in inverted T-shaped, and the bottom of the 3rd balladeur train (33) has the 3rd block (331), and the described 3rd
Two relative installation grooves (332) are formed between block (331) and second block (321), the installation groove (332) is interior
First reset portion (333) is installed, first reset portion (333) connects the 3rd block (331) and described second respectively
Block (321), the bottom of the 3rd block (331) are provided with the ceiling board (1).
2. the integrated mounting structure of indoor suspended ceiling according to claim 1, it is characterised in that first block
(3211) cross section is in inverted trapezoidal.
3. the integrated mounting structure of indoor suspended ceiling according to claim 1, it is characterised in that second block
(321) it is rectangular blocks, offers two first fillet surfaces (323) on two pairs of both sides of second block (321) respectively.
4. the integrated mounting structure of indoor suspended ceiling according to claim 1 or 3, it is characterised in that described second slides
Two second fillet surfaces (324), the 3rd balladeur train (33) matching described second are offered on relative two cell walls of groove (322) respectively
The shape of chute (322).
5. the integrated mounting structure of indoor suspended ceiling according to claim 1, it is characterised in that the 3rd balladeur train
(33) bottom is set with the second reset portion (334).
6. the integrated mounting structure of indoor suspended ceiling according to claim 1, it is characterised in that second block
(321) side wall is provided with first lacing wire (41) at the top for being obliquely extended to the ceiling board (1).
7. the integrated mounting structure of indoor suspended ceiling according to claim 6, it is characterised in that first lacing wire
(41) the second lacing wire (42) extended in the ceiling board (1) is connected with the middle part of.
8. the integrated mounting structure of indoor suspended ceiling according to claim 7, it is characterised in that the ceiling board (1)
Embedded part (43) is inside provided with, the bottom of second lacing wire (42) connects the embedded part (43).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869557.8U CN207177031U (en) | 2017-07-18 | 2017-07-18 | The integrated mounting structure of indoor suspended ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869557.8U CN207177031U (en) | 2017-07-18 | 2017-07-18 | The integrated mounting structure of indoor suspended ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207177031U true CN207177031U (en) | 2018-04-03 |
Family
ID=61736002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720869557.8U Active CN207177031U (en) | 2017-07-18 | 2017-07-18 | The integrated mounting structure of indoor suspended ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207177031U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268863A (en) * | 2017-07-18 | 2017-10-20 | 苏州美瑞德建筑装饰有限公司 | The integrated mounting structure of indoor suspended ceiling |
-
2017
- 2017-07-18 CN CN201720869557.8U patent/CN207177031U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268863A (en) * | 2017-07-18 | 2017-10-20 | 苏州美瑞德建筑装饰有限公司 | The integrated mounting structure of indoor suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207177031U (en) | The integrated mounting structure of indoor suspended ceiling | |
CN206815646U (en) | A kind of lightgage steel joist sub-assembly | |
CN107268863A (en) | The integrated mounting structure of indoor suspended ceiling | |
CN203569780U (en) | Overlap joint type skeleton structure | |
CN207727831U (en) | A kind of furred ceiling aluminum-pinch for kitchen ceiling | |
CN205782390U (en) | A kind of LED artistic view lamp installation system | |
CN209891530U (en) | Prefabricated aluminum honeycomb panel's assembled furred ceiling | |
CN204983333U (en) | Light gauge steel rolls over light trough structure | |
CN203569766U (en) | Inside and outside buckled type ceiling structure | |
CN202658823U (en) | Integrated suspended ceiling provided with curved panels | |
CN205012539U (en) | Lacing film lamp support | |
CN209744310U (en) | Finished lamp trough | |
CN205014207U (en) | Supporting lamp of square tube C type | |
CN208363503U (en) | A kind of wear-resisting type geothermal board | |
CN209053322U (en) | A kind of light gauge steel structure being easily installed | |
CN204983343U (en) | Wall brick and top surface close device | |
CN102644353A (en) | Mineral wool board attached suspended ceiling structure | |
CN208668854U (en) | A kind of assembled wall wood veneer mounting structure | |
CN205116525U (en) | Supporting lamp of square tube | |
CN207812750U (en) | The hard-cover space indoor sound absorption inorganic keel combined baffle wall structure of customization | |
CN202047513U (en) | Swallow-shaped keel and wing-shaped hanging piece combined ceiling device | |
CN205840097U (en) | Baking vanish lightgage steel joist node structure | |
CN206267416U (en) | A kind of honeycomb partition wall | |
CN204876102U (en) | Various steel sheet anchor clamps with glass glues | |
CN205690319U (en) | A kind of package assembly of hard lamp bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |