CN207176679U - A kind of steel-pipe pile plants pile driving construction system - Google Patents

A kind of steel-pipe pile plants pile driving construction system Download PDF

Info

Publication number
CN207176679U
CN207176679U CN201721201619.4U CN201721201619U CN207176679U CN 207176679 U CN207176679 U CN 207176679U CN 201721201619 U CN201721201619 U CN 201721201619U CN 207176679 U CN207176679 U CN 207176679U
Authority
CN
China
Prior art keywords
steel
pile
pipe pile
plants
construction system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721201619.4U
Other languages
Chinese (zh)
Inventor
符强
吕芝林
侯刚
余晓川
周克云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd, China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201721201619.4U priority Critical patent/CN207176679U/en
Application granted granted Critical
Publication of CN207176679U publication Critical patent/CN207176679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of steel-pipe pile and plants pile driving construction system, and it includes steel-pipe pile, and the steel-pipe pile is fixed on riverbed vertically, and Bailey beam is supported by between the top of the steel-pipe pile and riverbed;Pile foundation equipment erecting bed is installed at the top of Bailey beam, the end of the pile foundation equipment erecting bed is fixedly connected with rigid mount by pin, hoist engine is fixed with pile foundation equipment erecting bed, steel wire rope is connected with the hoist engine, the other end of the steel wire rope is connected with tup around supporting construction.It can solve the problem that the problems such as cultivation stake security risk waterborne is big, construction is cumbersome, cost is higher in the prior art.

Description

A kind of steel-pipe pile plants pile driving construction system
Technical field
It the utility model is related to a kind of steel-pipe pile construction system, and in particular to a kind of steel-pipe pile plants pile driving construction system, belongs to Underwater construction field.
Background technology
Trestle or platform generally require steel-pipe pile as brace foundation in water, conventional implementation be vibration hammer inserting piling with Meet requirement for bearing capacity, use vibration hammer inserting piling construct necessary condition for inserting piling position must be fulfilled for must coating want Ask, for the geological conditions such as shallow overburden, naked rock or cobble, boulder, erratic boulder, can not be realized by vibration hammer inserting piling, it is necessary to logical Cross cultivation stake technique pile.Current cultivation stake waterborne plants stake, the party by pontoon or buoyancy tank transportation by driving rig to stake position, pore-forming is planted mostly Method is floating operation, and security risk is big, and material need to be transported repeatedly, also needs lifting appliance waterborne to complete, and construction is cumbersome, cost compared with It is high.
Chinese patent literature 201410345487.7(Application number)Describe a kind of steel pile casting and draw hole cultivation pile constructing process, only Describe the method planted stake by drawing hole and realize that casing takes root, construction precision requires higher, realize it is more difficult, and be not directed to as What borehole cleaning, guiding construction effect is little, and operating expenses is higher.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of steel-pipe pile and plants pile driving construction system, can solve the problem that existing The problems such as stake security risk is big, construction is cumbersome, cost is higher are planted in technology reclaimed water.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:A kind of steel-pipe pile is planted stake and applied Work system, it includes steel-pipe pile, and the steel-pipe pile is fixed on riverbed vertically, is supported between the top of the steel-pipe pile and riverbed There is Bailey beam;Pile foundation equipment erecting bed is installed at the top of Bailey beam, the end of the pile foundation equipment erecting bed passes through pin Rigid mount is fixedly connected with, hoist engine is fixed with pile foundation equipment erecting bed, steel wire rope is connected with the hoist engine, it is described The other end of steel wire rope is connected with tup around supporting construction.
One end of the rigid mount is supported in Bailey beam, is extended outside the other end on the water surface.
The supporting construction includes fixed mount, standing wire axle wheel is provided with the top of the fixed mount, in the end of rigid mount Cable pulley is installed, the steel wire rope bypasses standing wire axle wheel and cable pulley simultaneously.
The rigid mount uses shaped steel frame, two is arranged in Bailey beam, its spacing exceedes steel-pipe pile diameter.
It is connected at the mating connection of the pile foundation equipment erecting bed and rigid mount using ledge structure staggeredly.
The cable pulley is demountable structure, and surface end is extended outside rigid mount.
The tup diameter is more than steel-pipe pile diameter.
The utility model has the advantages that:
A kind of steel-pipe pile provided by the utility model plants pile driving construction system, can be in existing platform or place by Overwater floating Operation is completely converted into fixed platform operation, no submarine survey work, overcomes precipitous riverbed pore-forming hardly possible by small stroke punching Problem, using most of boring mud in slag cylinder cleaning eye is drawn, change water body proportion in hole by launching bagged cement part pulping, it is real Existing bottom boring mud suspends, and so as to remove bottom hole boring mud, ensure that pile foundation quality.The structure of the utility model device is simple, applies Work is easy for installation, and measurement and positioning is simple, securely and reliably.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is overall structure diagram of the present utility model.
In figure:Bailey beam 1, steel-pipe pile 2, pile foundation equipment erecting bed 3, hoist engine 4, steel wire rope 5, standing wire axle wheel 6, fixed mount 7th, rigid mount 8, cable pulley 9, pin 10, tup 11, riverbed 12.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
Referring to Fig. 1, a kind of steel-pipe pile plants pile driving construction system, and it includes steel-pipe pile 2, and the steel-pipe pile 2 is fixed on river vertically On bed 12, Bailey beam 1 is supported by between the top of the steel-pipe pile 2 and riverbed 12;Pile foundation is installed at the top of Bailey beam 1 to set Standby erecting bed 3, the end of the pile foundation equipment erecting bed 3 are fixedly connected with rigid mount 8 by pin 10, are installed in pile foundation equipment Hoist engine 4 is fixed with platform 3, steel wire rope 5 is connected with the hoist engine 4, the other end of the steel wire rope 5 bypasses supporting construction It is connected with tup 11.
Further, one end of the rigid mount 8 is supported in Bailey beam 1, is extended outside the other end on the water surface.
Further, the supporting construction includes fixed mount 7, and the top of the fixed mount 7 is provided with standing wire axle wheel 6, The end of rigid mount 8 is provided with cable pulley 9, and the steel wire rope 5 bypasses standing wire axle wheel 6 and cable pulley 9 simultaneously.Pass through described support knot Structure ensure that steel wire rope 5 can be pulled smoothly, while be effectively reduced frictional force.
Further, the rigid mount 8 uses shaped steel frame, two is arranged in Bailey beam 1, its spacing exceedes steel-pipe pile 2 Diameter.It ensure that the intensity of total.
Further, the pile foundation equipment erecting bed 3 at the mating connection of rigid mount 8 using ledge structure staggeredly with being matched somebody with somebody Close connection.Fixed effect is ensure that by using ledge structure staggeredly.
Further, the cable pulley 9 is demountable structure, and surface end is extended outside rigid mount 8.Outside described Stretch end and ensure that tup 11 is located at the water surface.
Further, the diameter of tup 11 is more than the diameter of steel-pipe pile 2.And then larger impulsive force is ensure that, it ensure that Impact effect.
The construction technology of pile driving construction device is planted using steel-pipe pile, is comprised the following steps:
The first, pile foundation equipment platform 3 and rigid mount 8 are installed, by measurement, design steel pipe need to be set by being found out on rigid mount 8 2 centers of stake, install and fix cable pulley 9, it is ensured that the vertical stretching rear center position of steel wire rope 5 is identical with pile center position;
The 2nd, hoist engine 4, steel wire rope 5 are installed, tup 11 is lifted by crane to construction hole position and and steel wire rope using the crane on platform 5 fix, and transfer tup 11, and small stroke punching is to designing hole depth;
3rd, drawing slag cylinder cleaning boring mud using crane lifting can not extremely clear up, then toward putting into bagged cement, the small punching of tup in hole Cheng Chong is pounded, and local pulping in hole, bottom hole boring mud is suspended in cement grout;
The 4th, first sealing concrete hopper and conduit are installed on rigid mount 8, pour underwater concrete, after the completion of remove at once First sealing concrete hopper and conduit, leading truck is installed, crane lifting vibration hammer, clamps steel-pipe pile 2, the heavy steel-pipe pile 2 that shakes is to design Absolute altitude.
The above embodiments are only optimal technical scheme of the present utility model, and are not construed as limit of the present utility model System, the technical scheme that the scope of protection of the utility model should be recorded with claim, including the technical scheme that claim is recorded The equivalents of middle technical characteristic are protection domain.Equivalent substitution i.e. within this range is improved, also in the utility model Protection domain within.

Claims (7)

1. a kind of steel-pipe pile plants pile driving construction system, it is characterised in that:It includes steel-pipe pile(2), the steel-pipe pile(2)It is vertical fixed In riverbed(12)On, the steel-pipe pile(2)And riverbed(12)Top between be supported by Bailey beam(1);In Bailey beam(1)Top Portion is provided with pile foundation equipment erecting bed(3), the pile foundation equipment erecting bed(3)End pass through pin(10)It is fixedly connected with just Property frame(8), in pile foundation equipment erecting bed(3)On be fixed with hoist engine(4), the hoist engine(4)On be connected with steel wire rope(5), The steel wire rope(5)The other end be connected with tup around supporting construction(11).
2. a kind of steel-pipe pile plants pile driving construction system according to claim 1, it is characterised in that:The rigid mount(8)One end It is supported on Bailey beam(1)On, extended outside the other end on the water surface.
3. a kind of steel-pipe pile plants pile driving construction system according to claim 1, it is characterised in that:The supporting construction includes fixing Frame(7), the fixed mount(7)Top standing wire axle wheel is installed(6), in rigid mount(8)End cable pulley is installed(9), institute State steel wire rope(5)Bypass standing wire axle wheel simultaneously(6)And cable pulley(9).
4. a kind of steel-pipe pile plants pile driving construction system according to claim 1, it is characterised in that:The rigid mount(8)Using type Steelframe, in Bailey beam(1)Upper arrangement two, its spacing exceedes steel-pipe pile(2)Diameter.
5. a kind of steel-pipe pile plants pile driving construction system according to claim 1, it is characterised in that:The pile foundation equipment erecting bed (3)With rigid mount(8)Mating connection at using staggeredly ledge structure be connected.
6. a kind of steel-pipe pile plants pile driving construction system according to claim 3, it is characterised in that:The cable pulley(9)To be detachable Structure, installed in rigid mount(8)Extend surface end outside.
7. a kind of steel-pipe pile plants pile driving construction system according to claim 1, it is characterised in that:The tup(11)Diameter is more than Steel-pipe pile(2)Diameter.
CN201721201619.4U 2017-09-19 2017-09-19 A kind of steel-pipe pile plants pile driving construction system Active CN207176679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721201619.4U CN207176679U (en) 2017-09-19 2017-09-19 A kind of steel-pipe pile plants pile driving construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721201619.4U CN207176679U (en) 2017-09-19 2017-09-19 A kind of steel-pipe pile plants pile driving construction system

Publications (1)

Publication Number Publication Date
CN207176679U true CN207176679U (en) 2018-04-03

Family

ID=61746773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721201619.4U Active CN207176679U (en) 2017-09-19 2017-09-19 A kind of steel-pipe pile plants pile driving construction system

Country Status (1)

Country Link
CN (1) CN207176679U (en)

Similar Documents

Publication Publication Date Title
CN102839666B (en) Bottom-supported floating pile-driving platform
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
CN105464117B (en) Rotary marine piling saddle and multi-column pier foundation piling technique waterborne
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN205917719U (en) Marine anemometer tower of multi -bucket negative -pressure barrel formula
CN104563119A (en) Rotating type floating pile driving guide frame
CN105178861A (en) Drilling hole enlarging mechanism
CN109811767A (en) Suction barrel base piling positioning frame
CN104975612B (en) Open caisson construction new technology waterborne
CN110185057B (en) Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation
CN101962946A (en) Method for arranging hoisting points and floating-supported conduit frame with skirt pile sleeves
CN102094454B (en) Improved dredging boat for large-diameter sewage pipe
CN109024660B (en) Pile foundation dismantling method for offshore foundation and offshore foundation dismantling method
CN108222069A (en) A kind of underwater immersed tube, the device and construction method for setting up underwater immersed tube
CN103556972A (en) Self-installed ocean floor drilling template and installation method thereof
CN207176679U (en) A kind of steel-pipe pile plants pile driving construction system
CN204510221U (en) Rotary marine piling saddle
CN206736920U (en) A kind of internal-expansion type pipe drawing device
CN113356179B (en) Treatment method of hydraulic structure foundation
CN206467659U (en) Large-scale U-shaped steel sheet pile construction leading truck
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN204551494U (en) Construction equipment is transferred in a kind of steel sheet-pile cofferdam inner support superposition
CN211228573U (en) Temporary locking device for skirt pile type jacket and steel pipe pile by using rear pile method
CN207512767U (en) A kind of pull wire grounding device of bracing wire anemometer tower and the installation system of the device
CN106759201B (en) Wind-powered electricity generation and the embedding rock jack up operation platform of bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant