CN207175252U - A kind of artificial panel turnover machine for being used to overturn prefabricated panel - Google Patents

A kind of artificial panel turnover machine for being used to overturn prefabricated panel Download PDF

Info

Publication number
CN207175252U
CN207175252U CN201721098006.2U CN201721098006U CN207175252U CN 207175252 U CN207175252 U CN 207175252U CN 201721098006 U CN201721098006 U CN 201721098006U CN 207175252 U CN207175252 U CN 207175252U
Authority
CN
China
Prior art keywords
turning
bracket
rod
artificial
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721098006.2U
Other languages
Chinese (zh)
Inventor
蓬永刚
刘浩强
王立
杨保弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Construction Industry Co Ltd
Original Assignee
Xi'an Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Construction Industry Co Ltd filed Critical Xi'an Construction Industry Co Ltd
Priority to CN201721098006.2U priority Critical patent/CN207175252U/en
Application granted granted Critical
Publication of CN207175252U publication Critical patent/CN207175252U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开的一种用于翻转预制墙板的人工翻板机,包括翻转托架和互相平行且呈前后设置的一对支架,每个支架均包括呈上下设置的顶架和底架,且每个顶架两端均通过设置的连接杆与底架连接,两个底架的两端分别通过侧架连接,每个顶架上均设置有轴承座,两个轴承座之间设置有转动轴,翻转托架通过转动轴水平设置于两个轴承座上,翻转托架底端上侧竖直设置有底托,翻转托架顶端下侧对称铰接有两个对拉杆,两个对拉杆的另一端分别铰接于靠近翻转托架顶端的侧架上;本实用新型的人工翻板机,其结构简单,方便拆卸,且可固定于任何施工场地,另外,将预制墙板平行放置于本实用新型的人工翻板机上,使得预制墙板的运输更为方便,提高了施工效率。

The utility model discloses an artificial turning machine for turning over prefabricated wallboards, which comprises a turning bracket and a pair of parallel and front-to-back brackets, and each bracket includes a top frame and a bottom frame that are arranged up and down. And both ends of each top frame are connected with the bottom frame through connecting rods provided, and the two ends of the two bottom frames are respectively connected through side frames, each top frame is provided with a bearing seat, and a bearing seat is arranged between the two bearing seats. The rotating shaft and the flipping bracket are horizontally arranged on the two bearing seats through the rotating shaft. A bottom support is vertically arranged on the upper side of the bottom end of the flipping bracket. The other ends of the two sides are respectively hinged on the side frames near the top of the turning bracket; the artificial turning machine of the utility model has a simple structure, is easy to disassemble, and can be fixed on any construction site. In addition, the prefabricated wall panels are placed parallel to the The utility model artificial turning machine makes the transportation of prefabricated wall panels more convenient and improves the construction efficiency.

Description

一种用于翻转预制墙板的人工翻板机An artificial turning machine for turning over prefabricated wall panels

技术领域technical field

本实用新型属于建筑施工设备技术领域,涉及一种用于翻转预制墙板的人工翻板机。The utility model belongs to the technical field of building construction equipment and relates to an artificial turning machine for turning over prefabricated wall panels.

背景技术Background technique

目前,随着建筑产业工业化的发展,现代化的制造、运输、安装和科学管理的大工业的生产方式代替传统建筑业中分散的、低水平的、低效率的手工业生产方式,特别是采用预制混凝土墙板建造装配式大板建筑,可以提高工厂化、机械化施工程度,减少现场湿作业,节约现场用工,克服季节影响,缩短建筑施工周期。At present, with the development of the industrialization of the construction industry, modern manufacturing, transportation, installation and scientific management of large-scale industrial production methods replace the scattered, low-level, and inefficient handicraft production methods in the traditional construction industry, especially the use of prefabricated concrete The construction of prefabricated large-slab buildings with wall panels can improve the degree of factory and mechanized construction, reduce on-site wet operations, save on-site labor, overcome seasonal influences, and shorten the construction period.

由于现有条件的影响,施工现场很难将平放运输的预制混凝土墙板立起来安装,通常是预制混凝土墙板在工厂内竖起来,放在预制墙板运输架上再运到施工现场。由于预制混凝土墙板一般高度在3米左右,再加上运输车高度,对于预制混凝土墙板的运输造成很大障碍。而工厂内的翻板机为液压驱动的大型翻转设备,很难应用于施工现场,因此,研制一种适用于施工现场的预制墙板翻板机,是预制墙板应用施工厄待解决的主要问题。Due to the influence of the existing conditions, it is difficult to erect the precast concrete wall panels transported flat on the construction site. Usually, the precast concrete wall panels are erected in the factory, placed on the precast wall panel transport racks, and then transported to the construction site. Since the precast concrete wall panel is generally about 3 meters high, and the height of the transport vehicle is added, it poses a great obstacle to the transportation of the precast concrete wall panel. However, the turning machine in the factory is a large-scale turning equipment driven by hydraulic pressure, which is difficult to apply to the construction site. Therefore, developing a prefabricated wall panel turning machine suitable for the construction site is the main problem to be solved in the construction of prefabricated wall panels. question.

实用新型内容Utility model content

本实用新型的目的是提供一种用于翻转预制墙板的人工翻板机,结构简单,能够适用于施工现场。The purpose of the utility model is to provide an artificial turning machine for turning prefabricated wall panels, which has a simple structure and can be applied to construction sites.

本实用新型所采用的技术方案是,一种用于翻转预制墙板的人工翻板机,包括翻转托架和互相平行且呈前后设置的一对支架,每个支架均包括呈上下设置的顶架和底架,且每个顶架两端均通过设置的连接杆与底架连接,两个底架的两端分别通过侧架连接,每个顶架上均设置有轴承座,两个轴承座之间设置有转动轴,翻转托架通过转动轴水平设置于两个轴承座上,翻转托架底端上侧竖直设置有底托,翻转托架顶端下侧对称铰接有两个对拉杆,两个对拉杆的另一端分别铰接于靠近翻转托架顶端的侧架上。The technical solution adopted by the utility model is an artificial turning machine for turning over prefabricated wallboards, including a turning bracket and a pair of brackets parallel to each other and arranged front and back, each bracket includes a top set up and down. frame and bottom frame, and the two ends of each top frame are connected with the bottom frame through the set connecting rods, the two ends of the two bottom frames are respectively connected by side frames, each top frame is provided with a bearing seat, and two bearings There is a rotating shaft between the seats, and the flipping bracket is horizontally arranged on the two bearing seats through the rotating shaft. The upper side of the bottom of the flipping bracket is vertically provided with a bottom support, and the lower side of the top of the flipping bracket is symmetrically hinged with two pairs of pull rods. , the other ends of the two tie rods are respectively hinged on the side frames near the top of the flip bracket.

本实用新型的特点还在于:The utility model is also characterized in that:

翻转托架底端下侧设置有支撑杆。A supporting rod is arranged on the lower side of the bottom end of the turning bracket.

支撑杆包括固定杆和螺杆,固定杆顶端内设置有内螺纹孔,固定杆通过螺纹与螺杆配合连接。The support rod includes a fixed rod and a screw rod, an internal thread hole is arranged in the top end of the fixed rod, and the fixed rod is connected with the screw rod through threads.

每个对拉杆包括中间杆和两个螺杆,中间杆的两端内部均开设有内螺纹孔,且两个内螺纹孔的螺纹相反,中间杆两端均通过螺纹与两个螺杆配合连接。Each tie rod includes an intermediate rod and two screw rods. Both ends of the intermediate rod are provided with internally threaded holes, and the threads of the two internally threaded holes are opposite. Both ends of the intermediate rod are connected to the two screw rods through threads.

中间杆上设置有转动杆,且转动杆穿过中间杆上开设的固定孔。A rotating rod is arranged on the intermediate rod, and the rotating rod passes through the fixing hole provided on the intermediate rod.

每个轴承座左偏心设置于顶架上。Each bearing seat is left eccentrically arranged on the top frame.

翻转托架的两侧设置有绑带板。Binding plates are arranged on both sides of the turning bracket.

两个底架之间设置有限位槽钢。Limiting channel steel is arranged between the two underframes.

每个支架内还设置有加强杆,每个加强杆的上下两端分别固定于顶架和底架上。A reinforcing rod is also arranged in each bracket, and the upper and lower ends of each reinforcing rod are respectively fixed on the top frame and the bottom frame.

顶架、底架和加强杆一体化设置。The top frame, the bottom frame and the reinforcing bar are integrated.

本实用新型的有益效果是:The beneficial effects of the utility model are:

(1)本实用新型的人工翻板机,通过将装有预制墙板的翻转托架通过转动轴固定于支架上设置的轴承底座上,借助铰接于翻转托架与底架之间的对拉杆实现预制墙板的翻转,其结构简单,方便拆卸,且可固定于任何施工场地,同时适用于生产单位和施工单位,另外,将预制墙板平行放置于本实用新型的人工翻板机上,使得预制墙板的运输更为方便,提高了施工效率。(1) The manual turning machine of the utility model fixes the turning bracket equipped with the prefabricated wallboard on the bearing base provided on the bracket through the rotating shaft, and the pull rod hinged between the turning bracket and the bottom frame Realize the overturning of prefabricated wall panels, its structure is simple, easy to disassemble, and can be fixed on any construction site, and is suitable for production units and construction units at the same time. The transportation of prefabricated wall panels is more convenient and the construction efficiency is improved.

(2)本实用新型的人工翻板机,通过在翻转托架底端下侧设置伸缩式支撑杆,可提高翻转托架的稳固性;在对拉杆中间设置转动杆使得对拉杆的伸缩更为方便快捷,进而提高了工作效率,另外,将轴承座左偏心设置于顶架上,能保证去掉支撑杆时,翻转托架重心偏右,使其具有向右倾倒的趋势,再结合对拉杆的伸缩有效实现了翻转支架的快速翻转到位;整个支架一体化设置,使得结构更为简单,且方便搬运。(2) The manual turning machine of the utility model can improve the stability of the turning bracket by setting the telescopic support rod on the lower side of the bottom end of the turning bracket; It is convenient and fast, which improves the work efficiency. In addition, the left eccentric setting of the bearing seat on the top frame can ensure that when the support rod is removed, the center of gravity of the flip bracket is to the right, so that it has a tendency to tilt to the right. The telescoping effectively realizes the rapid flipping of the flip bracket; the whole bracket is integrated to make the structure simpler and easier to carry.

附图说明Description of drawings

图1是本实用新型一种用于翻转预制墙板的人工翻板机中翻转托架平行于顶架的主视图;Fig. 1 is a front view of the flipping bracket parallel to the top frame in a manual turning machine for flipping prefabricated wallboards of the present invention;

图2是本实用新型一种用于翻转预制墙板的人工翻板机中翻转托架平行于顶架的俯视图;Fig. 2 is a top view of the flipping bracket parallel to the top frame in a manual turning machine for flipping prefabricated wallboards of the present invention;

图3是本实用新型一种用于翻转预制墙板的人工翻板机中翻转托架垂直于顶架的主视图;Fig. 3 is a front view of the flipping bracket perpendicular to the top frame in a manual turning machine for flipping prefabricated wallboards of the present invention;

图4是本实用新型一种用于翻转预制墙板的人工翻板机中翻转托架垂直于顶架的俯视图。Fig. 4 is a top view of the turnover bracket perpendicular to the top frame in a manual turning machine for turning prefabricated wallboards of the present invention.

图中,1.支架,1-1.顶架,1-2.底架,1-3.连接杆,1-4.侧架,2.轴承座,3.转动轴,4.翻转托架,5.底托,6.对拉杆,7.支撑杆,7-1.固定杆,7-2.螺杆,8.转动杆,9.绑带板,10.限位槽钢,11.加强杆,12.定位销,13.预制墙板,14.地脚螺栓。In the figure, 1. Bracket, 1-1. Top frame, 1-2. Bottom frame, 1-3. Connecting rod, 1-4. Side frame, 2. Bearing seat, 3. Rotating shaft, 4. Turning bracket , 5. Bottom bracket, 6. Tie rod, 7. Support rod, 7-1. Fixed rod, 7-2. Screw rod, 8. Rotating rod, 9. Banding plate, 10. Limiting channel steel, 11. Reinforcement Rod, 12. positioning pin, 13. prefabricated wall panel, 14. anchor bolt.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

本实用新型一种用于翻转预制墙板的人工翻板机,如图1所示,包括翻转托架4和互相平行且呈前后设置的一对支架1,每个支架1均包括呈上下设置的顶架1-1和底架1-2,且每个顶架1-1两端均通过设置的连接杆1-3与底架1-2连接,两个底架1-2的两端分别通过侧架1-4连接,如图2所示;每个顶架1-1上均设置有轴承座2,两个轴承座2之间设置有转动轴3,翻转托架4通过转动轴3水平设置于两个轴承座2上,翻转托架4底端上侧竖直设置有底托5,翻转托架4顶端下侧对称铰接有两个对拉杆6,两个对拉杆6的另一端分别铰接于靠近翻转托架4顶端的侧架1-4上。The utility model is an artificial turning machine for turning over prefabricated wall panels, as shown in Figure 1, comprising a turning bracket 4 and a pair of brackets 1 parallel to each other and arranged front and back, each bracket 1 includes a vertically arranged The top frame 1-1 and the bottom frame 1-2, and the two ends of each top frame 1-1 are connected with the bottom frame 1-2 through the connecting rod 1-3 provided, and the two ends of the two bottom frames 1-2 They are respectively connected by side frames 1-4, as shown in Figure 2; each top frame 1-1 is provided with a bearing seat 2, and a rotating shaft 3 is arranged between the two bearing seats 2, and the turning bracket 4 passes through the rotating shaft 3 is horizontally arranged on the two bearing seats 2, and the upper side of the bottom end of the flipping bracket 4 is vertically provided with a bottom support 5, and the lower side of the top end of the flipping bracket 4 is symmetrically hinged with two pair of tie rods 6, and the other of the two pair of tie rods 6 One end is respectively hinged on the side frames 1-4 near the top of the turning bracket 4.

翻转托架4底端下侧设置有支撑杆7,且该支撑杆7通过定位销12固定于翻转托架4底端下侧,在翻转托架4平行于顶架1-1时,支撑杆7的设置可提高翻转托架4的稳固性。The lower side of the bottom end of the overturn bracket 4 is provided with a support rod 7, and the support rod 7 is fixed on the underside of the bottom end of the overturn bracket 4 by a positioning pin 12. When the overturn bracket 4 was parallel to the top frame 1-1, the support rod 7 The setting of 7 can improve the stability of turning bracket 4.

每个支撑杆7包括固定杆7-1和螺杆7-2,固定杆7-1顶端内设置有内螺纹孔,固定杆7-1通过螺纹与螺杆7-2配合连接;固定杆7-1和螺杆7-2的螺纹配合设置,实现了支撑杆7的可伸缩,在即将翻转预知墙板时,通过拧动螺杆7-2,使得支撑杆7与翻转托架4之间留出空隙,方便取出定位销12和支撑杆7。Each support rod 7 comprises a fixed rod 7-1 and a screw rod 7-2, and an internally threaded hole is arranged in the top of the fixed rod 7-1, and the fixed rod 7-1 is connected with the screw rod 7-2 by threads; the fixed rod 7-1 Cooperating with the screw thread of the screw rod 7-2, the telescopic support rod 7 is realized. When the predictive wallboard is about to be turned over, the screw rod 7-2 is turned to leave a gap between the support rod 7 and the flip bracket 4. It is convenient to take out the positioning pin 12 and the support rod 7.

每个对拉杆6包括中间杆和两个螺杆,中间杆两端内部均开设有内螺纹孔,且两个所述内螺纹孔的螺纹相反,中间杆两端均通过螺纹与两个螺杆配合连接,保证了两个螺纹杆相对于中间杆做相对或相反运动,实现对拉杆6的伸缩功能。Each pair of tie rods 6 includes an intermediate rod and two screw rods, internally threaded holes are provided at both ends of the intermediate rod, and the threads of the two internally threaded holes are opposite, and both ends of the intermediate rod are connected to the two screw rods through threads. , to ensure that the two threaded rods do relative or opposite movement with respect to the middle rod, so as to realize the telescopic function of the pull rod 6 .

中间杆上设置有转动杆8,且转动杆8穿过中间杆上开设的固定孔;转动杆8的设置使得对拉杆6的伸缩更为方便快捷,进而提高了工作效率。The middle rod is provided with a rotating rod 8, and the rotating rod 8 passes through the fixed hole provided on the middle rod; the setting of the rotating rod 8 makes the stretching of the pull rod 6 more convenient and quick, thereby improving the working efficiency.

每个轴承座2左偏心设置于顶架1-1上,该设计保证了去掉支撑杆7时,翻转托架4重心偏右,使其具有向右倾倒的趋势,再结合对拉杆6的伸缩有效实现了翻转支架4的快速翻转到位。Each bearing seat 2 is left eccentrically arranged on the top frame 1-1. This design ensures that when the support rod 7 is removed, the center of gravity of the flip bracket 4 is to the right, making it have a tendency to tilt to the right, combined with the expansion and contraction of the tie rod 6 The rapid flipping of the flip bracket 4 into place is effectively realized.

翻转托架4的两侧设置有绑带板9,用于固定预制墙板。Both sides of the turning bracket 4 are provided with strap plates 9 for fixing the prefabricated wall panels.

两个底架1-2之间设置有限位槽钢10,用于限定翻转托架4的翻转角度。A limiting channel steel 10 is arranged between the two underframes 1-2 to limit the turning angle of the turning bracket 4 .

每个支架1内还设置有加强杆11,每个加强杆11的上下两端分别固定于顶架1-1和底架1-2上;加强杆11的设置提高了支架1的承重能力。Each support 1 is also provided with a reinforcing rod 11, and the upper and lower ends of each reinforcing rod 11 are respectively fixed on the top frame 1-1 and the bottom frame 1-2;

顶架1-1、底架1-2和加强杆11一体化设置,使得结构更为简单,且方便搬运。The top frame 1-1, the bottom frame 1-2 and the reinforcing rod 11 are integrally arranged, which makes the structure simpler and convenient to carry.

如图1所示,本实用新型的人工翻板机的连接杆1-3底端通过地脚螺栓14固定于地面上。As shown in Figure 1, the bottom end of the connecting rod 1-3 of the manual turning machine of the present utility model is fixed on the ground by anchor bolts 14.

本实用新型一种用于翻转预制墙板的人工翻板机的工作原理是:The working principle of a manual turning machine for turning prefabricated wallboards of the utility model is:

将预制墙板13平吊放置翻转托架4上,预制墙板13一侧与底托5平齐接触,再用绳索穿过绑扎板9将预制墙板13紧固于翻转托架4上,反向旋转转动杆8,使对拉杆6收缩,同时拧动螺杆7-2,使支撑杆7收缩,翻转托架4一侧翘起,拔掉定位销12,去掉支撑杆7,然后正向旋转转动杆8使翻转托架4慢慢翻转,直至翻转托架4底端接触限位槽钢10为止,如图2和图3所示,连接吊具,松开穿入绑扎板9的绳索,吊出预制墙板13,预制墙板13翻转完成。Hang the prefabricated wallboard 13 horizontally and place it on the overturning bracket 4, one side of the prefabricated wallboard 13 is in flush contact with the bottom bracket 5, and then use a rope to pass through the binding plate 9 to fasten the prefabricated wallboard 13 on the overturning bracket 4, Rotate the rotating rod 8 in the opposite direction to shrink the tie rod 6, and at the same time turn the screw rod 7-2 to shrink the support rod 7, turn one side of the bracket 4 up, pull out the positioning pin 12, remove the support rod 7, and then forward Rotate the turning rod 8 to make the turning bracket 4 turn over slowly until the bottom of the turning bracket 4 touches the limit channel steel 10, as shown in Figure 2 and Figure 3, connect the sling, loosen the rope that penetrates the binding plate 9 , the prefabricated wall panel 13 is hung out, and the prefabricated wall panel 13 is overturned to complete.

通过上述方式,本实用新型一种用于翻转预制墙板的人工翻板机,通过将装有预制墙板13的翻转托架4通过转动轴3固定于轴承底座2上,借助铰接于翻转托架4与底架1-2之间的对拉杆6实现预制墙板13的翻转,其结构简单,方便拆卸,且可固定于任何施工场地,同时适用于生产单位和施工单位,另外,将预制墙板13平行放置于本实用新型的人工翻板机上,使得预制墙板13的运输更为方便,提高了施工效率。Through the above method, the utility model is an artificial turning machine for turning over prefabricated wallboards. By fixing the turning bracket 4 equipped with prefabricated wallboards 13 on the bearing base 2 through the rotating shaft 3, and hinged to the turning bracket The tie rod 6 between the frame 4 and the bottom frame 1-2 realizes the overturning of the prefabricated wall panel 13. Its structure is simple, easy to disassemble, and can be fixed on any construction site. It is suitable for both production units and construction units. In addition, the prefabricated wall panels The wall panels 13 are placed in parallel on the manual turnover machine of the present utility model, which makes the transportation of the prefabricated wall panels 13 more convenient and improves the construction efficiency.

Claims (10)

1.一种用于翻转预制墙板的人工翻板机,其特征在于,包括翻转托架(4)和互相平行且呈前后设置的一对支架(1),每个所述支架(1)均包括呈上下设置的顶架(1-1)和底架(1-2),且每个所述顶架(1-1)两端均通过设置的连接杆(1-3)与底架(1-2)连接,两个底架(1-2)的两端分别通过侧架(1-4)连接,每个所述顶架(1-1)上均设置有轴承座(2),两个所述轴承座(2)之间设置有转动轴(3),所述翻转托架(4)通过转动轴(3)水平设置于两个所述轴承座(2)上,所述翻转托架(4)底端上侧竖直设置有底托(5),所述翻转托架(4)顶端下侧对称铰接有两个对拉杆(6),两个所述对拉杆(6)的另一端分别铰接于靠近所述翻转托架(4)顶端的侧架(1-4)上。1. An artificial panel turnover machine for overturning prefabricated wallboards, characterized in that it comprises an overturn bracket (4) and a pair of supports (1) that are parallel to each other and are arranged front and back, each of the supports (1) Both include a top frame (1-1) and a bottom frame (1-2) arranged up and down, and the two ends of each top frame (1-1) are connected to the bottom frame through the connecting rods (1-3) provided. (1-2) connection, the two ends of the two bottom frames (1-2) are respectively connected by side frames (1-4), and each top frame (1-1) is provided with a bearing seat (2) , a rotating shaft (3) is arranged between the two bearing seats (2), and the flipping bracket (4) is horizontally arranged on the two bearing seats (2) through the rotating shaft (3). Bottom support (5) is vertically arranged on the upper side of the bottom end of the overturning bracket (4), and two pairs of tie rods (6) are symmetrically hinged on the underside of the top end of the overturning bracket (4). ) are respectively hinged on the side frame (1-4) near the top of the flip bracket (4). 2.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,所述翻转托架(4)底端下侧设置有支撑杆(7)。2. An artificial turning machine for turning over prefabricated wall panels according to claim 1, characterized in that, a support rod (7) is provided on the underside of the bottom end of the turning bracket (4). 3.如权利要求2所述的一种用于翻转预制墙板的人工翻板机,其特征在于,所述支撑杆(7)包括固定杆(7-1)和螺杆(7-2),所述固定杆(7-1)顶端内设置有内螺纹孔,所述固定杆(7-1)通过螺纹与螺杆(7-2)配合连接。3. A kind of artificial turning machine for turning prefabricated wall panels as claimed in claim 2, is characterized in that, described support bar (7) comprises fixed bar (7-1) and screw rod (7-2), An internal thread hole is arranged in the top end of the fixing rod (7-1), and the fixing rod (7-1) is connected with the screw rod (7-2) through threads. 4.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,每个所述对拉杆(6)包括中间杆和两个螺杆,所述中间杆的两端内部均开设有内螺纹孔,且两个所述内螺纹孔的螺纹相反,所述中间杆两端均通过螺纹与两个螺杆配合连接。4. A kind of artificial turning machine for turning prefabricated wallboards as claimed in claim 1, is characterized in that, each described pair of tie rods (6) comprises middle rod and two screw rods, and the two of described middle rods Both ends are provided with internal threaded holes, and the threads of the two internal threaded holes are opposite, and both ends of the intermediate rod are connected with the two screw rods through threads. 5.如权利要求4所述的一种用于翻转预制墙板的人工翻板机,其特征在于,所述中间杆上设置有转动杆(8),且所述转动杆(8)穿过中间杆上开设的固定孔。5. A kind of artificial turning machine for turning over prefabricated wallboards as claimed in claim 4, it is characterized in that, described middle bar is provided with turning bar (8), and described turning bar (8) passes through The fixing hole opened on the middle rod. 6.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,每个所述轴承座(2)左偏心设置于所述顶架(1-1)上。6. An artificial turning machine for turning over prefabricated wall panels according to claim 1, characterized in that, each of the bearing seats (2) is left eccentrically arranged on the top frame (1-1) . 7.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,所述翻转托架(4)的两侧设置有绑带板(9)。7. An artificial turning machine for turning over prefabricated wall panels according to claim 1, characterized in that strapping plates (9) are arranged on both sides of the turning bracket (4). 8.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,两个所述底架(1-2)之间设置有限位槽钢(10)。8 . The artificial turning machine for turning prefabricated wall panels according to claim 1 , characterized in that, a limiting channel steel ( 10 ) is arranged between the two underframes ( 1 - 2 ). 9.如权利要求1所述的一种用于翻转预制墙板的人工翻板机,其特征在于,每个所述支架(1)内还设置有加强杆(11),每个所述加强杆(11)的上下两端分别固定于所述顶架(1-1)和底架(1-2)上。9. A kind of artificial turning machine for turning prefabricated wallboards as claimed in claim 1, characterized in that, each said bracket (1) is also provided with a reinforcing bar (11), and each said reinforcing bar The upper and lower ends of the rod (11) are respectively fixed on the top frame (1-1) and the bottom frame (1-2). 10.如权利要求9所述的一种用于翻转预制墙板的人工翻板机,其特征在于,所述顶架(1-1)、底架(1-2)和加强杆(11)一体化设置。10. A kind of artificial turning machine for turning over prefabricated wall panels as claimed in claim 9, characterized in that, the top frame (1-1), the bottom frame (1-2) and the reinforcing bar (11) All-in-one settings.
CN201721098006.2U 2017-08-30 2017-08-30 A kind of artificial panel turnover machine for being used to overturn prefabricated panel Expired - Fee Related CN207175252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721098006.2U CN207175252U (en) 2017-08-30 2017-08-30 A kind of artificial panel turnover machine for being used to overturn prefabricated panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721098006.2U CN207175252U (en) 2017-08-30 2017-08-30 A kind of artificial panel turnover machine for being used to overturn prefabricated panel

Publications (1)

Publication Number Publication Date
CN207175252U true CN207175252U (en) 2018-04-03

Family

ID=61739522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721098006.2U Expired - Fee Related CN207175252U (en) 2017-08-30 2017-08-30 A kind of artificial panel turnover machine for being used to overturn prefabricated panel

Country Status (1)

Country Link
CN (1) CN207175252U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111704090A (en) * 2020-05-06 2020-09-25 中铁六局集团有限公司 Prefabricated part overturning method
CN113685038A (en) * 2021-07-24 2021-11-23 浙江龙马建设有限公司 Installation device and construction method of prefabricated wall panel
CN115872288A (en) * 2022-09-30 2023-03-31 上海核工程研究设计院股份有限公司 Mechanical overturning device and method for nuclear fuel assembly container

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111704090A (en) * 2020-05-06 2020-09-25 中铁六局集团有限公司 Prefabricated part overturning method
CN113685038A (en) * 2021-07-24 2021-11-23 浙江龙马建设有限公司 Installation device and construction method of prefabricated wall panel
CN113685038B (en) * 2021-07-24 2023-08-25 浙江龙马建设有限公司 Installation device and construction method of prefabricated wallboard
CN115872288A (en) * 2022-09-30 2023-03-31 上海核工程研究设计院股份有限公司 Mechanical overturning device and method for nuclear fuel assembly container

Similar Documents

Publication Publication Date Title
CN108951962A (en) A kind of autoclaved aerated concrete slab exterior wall and construction method
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN207175252U (en) A kind of artificial panel turnover machine for being used to overturn prefabricated panel
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN205171994U (en) A stencil assembly for clear water concrete construction
CN106760073A (en) Assembly concrete lining structural assembly
CN207348095U (en) The special bearing diagonal component of piping lane
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN205976468U (en) Shear force wall structural distortion seam construction formwork assembly
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN205024884U (en) Compound shear force wall of welded steel fabric frame
CN207714742U (en) A quick-detachable concrete plane formwork installation support device
CN216552610U (en) Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need
CN106836255B (en) Integral prefabricated structure and construction method of reinforcement mesh in sump pit of basement floor
CN205712565U (en) A kind of prefabricated two-sided wall
CN206928642U (en) A kind of safety and environmental protection movable formwork support
CN207332338U (en) A kind of assembled architecture wallboard adjustment mechanism
CN207295478U (en) Steel pipe column bracket seat connection apparatus
CN207392715U (en) A kind of overhanging inclined support structure
CN208604922U (en) A kind of building template
CN205711974U (en) A kind of Retaining Wall
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN205688778U (en) A kind of elevating scaffold special over sling structure
CN102587404B (en) Construction method of large-scale blast furnace foundation
CN202299419U (en) Extensible supporting device for moldboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403