CN207165435U - A kind of 10KV electrical verifications insulating bar - Google Patents
A kind of 10KV electrical verifications insulating bar Download PDFInfo
- Publication number
- CN207165435U CN207165435U CN201720744694.9U CN201720744694U CN207165435U CN 207165435 U CN207165435 U CN 207165435U CN 201720744694 U CN201720744694 U CN 201720744694U CN 207165435 U CN207165435 U CN 207165435U
- Authority
- CN
- China
- Prior art keywords
- electrical verification
- electrical
- action bars
- connecting plate
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
The utility model discloses a kind of 10KV electrical verifications insulating bar, solves prior art and lacks the electrical verification process confirmed after operation to circuit-breaker status, easily causes maloperation event to occur, and existing electrical verification mode has the problem of larger potential safety hazard.The present invention includes action bars (1), it is arranged on the electrical verification probe (2) on action bars (1) top, the electrical verification display (4) being connected by connecting lead wire (3) with electrical verification probe (2), the electrical verification display (4) are fixed on action bars (1) by connection fixture (5).The utility model has the advantages that safe and reliable, easy to operate, using flexible, practical, has larger application value.
Description
Technical field
The present invention relates to electroscopy equipment, and in particular to a kind of 10KV electrical verifications insulating bar.
Background technology
With the continuous quickening of power grid construction, distribution line also becomes to become increasingly complex, and for operation teams and groups, faces
All kinds of grid switching operations it is more and more frequent.On distribution line, block switch, demarcation switch and prepayment metering switch are equal on post
It is the integration apparatus that vacuum circuit breaker combines with disconnecting link.Find that switch exists during grid switching operation by long-term practice
The situation that breaker just draws (conjunction) disconnecting link in false isloation state, this will bring serious potential safety hazard.
According to distribution《Safety》5.2.6.7 the regulation of bar:Position detection should be with equipment physical location after controller switching equipment operation
It is defined, when can not see physical location, indirect method such as plant machinery position instruction, electrically instruction, powered display dress should be passed through
Put, the change of the signal such as instrument and various remote measurements, remote signalling judges device location.During judgement, should at least there are two non-same originals
Manage or corresponding change occurs for non-homogeneous instruction, and the instruction of all these determinations occurs to correspond to change simultaneously, can confirm
The equipment has operated in place.
According to the characteristics of 10kV distribution line upper switch, breaker operator is judged with round-about way in practical operation
Whether in place when, following drawback be present:
Whether first, being operated in place for outdoor breaker switch, operating personnel can only uniquely lean on the machinery instruction of " seeing " switch
Position judges, lacks the electrical verification process confirmed after operation to circuit-breaker status, is just drawn disconnecting link the operation of (conjunction) lock, if
, will there is serious security hidden trouble when vacation point phenomenon occurs in breaker.
Second, on-pole switch installation site is higher, operating personnel can not enter on ground to the physical location after breaker operator
Row electrical verification, if realizing that electrical verification works using bar mode is stepped on, and there is certain potential safety hazard, also increase operating personnel's
Labor intensity and the relatively low situation of efficiency.
Although third, being equipped with mechanical locking device between breaker and disconnecting link, operating switch has quite a few
Blocking device has damaged, and the divide-shut brake machinery indicators for also having some switches have come off or indicated not in place, indivedual behaviour in addition
Make personnel and the performance of switch is understood not deep enough, the behavior of misoperation happens occasionally, and whether in place to judge breaker operator, such as
Fruit is only judged that the behavior for easily inducing operation against rules occurs, and is transported to distribution only with round-about way in the prior art
Dimension leaves potential potential safety hazard, it is possible to the maloperation event of on-load broaching tool lock occurs.
The content of the invention
It is an object of the invention to solve prior art to lack the electrical verification process for confirming circuit-breaker status after operation, easily
Maloperation event is caused to occur, and the problem of larger potential safety hazard be present in existing electrical verification mode, the present invention provides a kind of 10KV and tested
Electricity insulating bar.
The present invention is achieved through the following technical solutions:
A kind of 10KV electrical verifications insulating bar, including action bars, the electrical verification probe on action bars top is arranged on, passes through company
Lead and the electrical verification display of electrical verification probe connection are connect, the electrical verification display is fixed on action bars by connection fixture.
The setting of the structure in the present invention, operation and the electrical verification work for the controller switching equipment being effectively applicable on 10kV circuits,
Particularly divide-shut brake machinery indicator has been come off or has indicated breaker not in place, has been increased to the shape after breaker grid switching operation
The electrical verification operating procedure of state, the accuracy of judgement is effectively ensured, also, the present invention can prolong according to work on the spot needs, action bars
Length, operating personnel is carried out the operation and can of eminence equipment on ground and carry out electrical verification work, the present invention can
Need to mitigate operating personnel on electric pole or framework to continue up step on bar, transposition could complete the labor intensity that electrical verification works,
Greatly reduce the labor intensity of operating personnel.
The present invention is suitable for transformer on isolation switch, the grid switching operation of fuse switch and electrical verification work and stand
Electrical verification, electrical verification can also be carried out to the high and low pressure side of transformer using 0.4~10kV electrical verifications head.
Further, electrical verification probe includes being socketed in the cap body on action bars top, be connected with cap body and with action bars
The vertically disposed probe in axis.
By the setting of said structure, the effect for effectively reaching electrical verification is not only only capable of, and electrical verification operation can also be made more
It is convenient, suitable under different electrical verification operational circumstances, effect is more notable, it can accurately and effectively judge whether switch occurs
Vacation point (vacation is closed) phenomenon, avoids on-load from drawing the dangerous situation of (conjunction) disconnecting link to occur.Moreover, for joint use, this hair
The bright electrical verification for passing through lower floor's alive circuit completion to upper layer circuit, i.e. structure of the invention are carried out to the state after grid switching operation
Electrical verification confirmation is very convenient, and electrical verification operation is more comprehensively and effective.
Also, by the setting of said structure, in addition to the electroscope function of energy realization itself, also expect not with following
The technique effect arrived, i.e. the optimal design-aside of the structure can also effectively realize that 10kV matches somebody with somebody the back brake of online installation site higher device
Operation, avoid manually stepping on bar progress grid switching operation, operation is more safe and simple.
Further, the cap body top is additionally provided with rain cover connection end, and rain-proof is connected with the rain cover connection end
Cover.The present invention also solves the problem of electroscope electrical verification of misty rain day is without rain cover using the action bars with rain cover.
Further, the connection fixture includes insulation connecting plate, the card being fixed on the side of insulation connecting plate
Tooth group;The latch group includes being fixed on the first latch that insulation connecting plate is used to be fixedly connected with action bars wherein on one side
Group, and be fixed on insulation connecting plate another side and be used for the second latch group that electrical verification display is fixedly connected.The insulation
Connecting plate is epoxy resins insulation plate.
As one of which set-up mode, the quantity of pvc pipe card is arranged to two in the latch group, the insulation connecting plate its
In the size of pvc pipe card that sets on a surface be Φ 32, the pvc pipe card set on another surface of insulation connecting plate
Size is Φ 40.
As another set-up mode, the pvc pipe card is mutually combined rear one closed annular of Inner Constitution including two
The arcuate member of structure, wherein one end end of two arcuate members are hinged, and one of arcuate member is fixed on insulation connecting plate
On, another arcuate member middle part is arranged through the bolt fastener of the arcuate member;This is fixed on the arc on insulation connecting plate
One interior fastener of other end end set of shape part, the other end end of another arcuate member then set one to coordinate with interior fastener
The outer fastener of connection.
Preferably, the outer fastener with the connector buckled by forming, and the interior fastener is by for being articulated in connector
The coupler body that buckles form.By the optimal design-aside of said structure, different size of action bars can be effectively applicable to and tested
The connection of electric display, the scope of application are more extensive.
In order to ensure the security of electrical verification, accuracy and the flexibility of operation, electrical verification display is lived by connection fixture
The lower section of the dynamic electrical verification probe for being fixed on insulating bar, its structural integrity, original electric property are not destroyed.The action bars is adopted
Formed with isolation material.
The present invention compared with prior art, has the following advantages and advantages:
1st, the present invention can realize the operation and electrical verification work of controller switching equipment on 10kV circuits simultaneously, just do it is safer,
It is easy;
2nd, by the experiment to the present invention and on probation, the present invention with safe and reliable, easy to operate, using flexible,
The advantages that practical, there is larger application value.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application
Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of pvc pipe card in embodiment 3.
Mark and corresponding parts title in accompanying drawing:
1- action bars, 2- electrical verifications probe, 3- connecting lead wires, 4- electrical verification displays, 5- connection fixtures;
21- caps, 22- probes, 23- rain covers connection end;
51- insulation connecting plates, 52- latch groups.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment 1
A kind of 10KV electrical verifications insulating bar, as shown in figure 1, including action bars 1, it is arranged on testing for the top of action bars 1
Electric probe 2, the electrical verification display 4 being connected by connecting lead wire 3 with electrical verification probe 2, the electrical verification display 4 is by being connected
Part 5 is fixed on action bars 1.
Electrical verification probe 2 includes being socketed in the cap bodies 21 on the top of action bars 1, be connected with cap body and with action bars 1
The vertically disposed probe 22 of axis, the top of cap body 21 is additionally provided with rain cover connection end 23.The rain cover connection end 23
On be connected with rain cover.
The top of cap body 21 is provided with the connecting rod overlapped with the axis of action bars 1 in the present embodiment, and the connecting rod top is
Rain cover connection end 23 in the present invention, the probe 22 are also rod-like structure, and the end of probe 22 of the rod-like structure is connected to company
Close to the opening position on top on bar.
Cap body 21, connecting rod in the present embodiment and probe 22 are formed in one structure, and the connection fixture 5 is by insulating materials
It is made, to attended operation bar 1 and electrical verification display 4, and action bars 1 is also insulating bar, i.e., described action bars 1 uses insulation material
Texture into, and then effectively make electrical verification operation it is safer.
In the present embodiment, between the action bars 1 and electrical verification probe 2, between action bars 1 and connection fixture 5, and connection
Be Detachable connection structure between fixture 5 and electrical verification display 4, so effectively electrical verification display 4 and electrical verification probe 2 with
When electrical verification operational requirements mismatch or damage, progress is more sliding in time, and operation is more flexible, effect is more notable.
Embodiment 2
The present embodiment and the difference of embodiment 1 are that the present embodiment optimizes the structure of latch group 52, specific to set such as
Under:
Connection fixture 5 described in the present embodiment includes insulation connecting plate 51, is fixed on insulation connecting plate 51 side
Latch group 52.The latch group 52 is two groups, is separately mounted on two surfaces of insulation connecting plate 51, every group of latch group 52 is equal
It is made up of more than one pvc pipe card.That is, described connection fixture 5 includes insulation connecting plate 51, is fixed on insulation connecting plate 51
Side on latch group 52;The latch group 52 includes being fixed on insulation connecting plate 51 to be wherein used for and action bars on one side
First latch group of 1 clamping, and it is fixed on the second card for being used for the clamping of electrical verification display 4 on insulation connecting plate 51 another side
Tooth group.The insulation connecting plate 51 is epoxy resins insulation plate.
Embodiment 3
The present embodiment and the difference of embodiment 2 are that the present embodiment optimizes the structure of pvc pipe card, and specific setting is as follows:
Pvc pipe card uses existing structure in latch group in the present embodiment, as shown in Figure 1.Pvc pipe card in every group of latch group 52
Quantity be two, the size of the pvc pipe card set on 51 one of surface of insulation connecting plate be Φ 32, and the insulation connects
The size of the pvc pipe card set on another surface of plate 51 is Φ 40, as shown in Figure 1.
Embodiment 4
The present embodiment and the difference of embodiment 2 are that the present embodiment optimizes the structure of pvc pipe card, and specific setting is as follows:
The quantity of pvc pipe card is two in latch group 52, and the pvc pipe card is mutually combined rear Inner Constitution one including two
The arcuate member of individual closed annular structure, the interior fastener at an arcuate member both ends is disposed therein, is arranged on another arcuate member two
End and the outer fastener for coordinating clamping with interior fastener, and pass through one of the bolt fastener of arcuate member middle part.Pvc pipe
In card, one of arcuate member middle part is provided with bolt fastener, then another arcuate member is fixed on insulation connecting plate 51
On.
Embodiment 5
The present embodiment and the difference of embodiment 1 are, the structure of pvc pipe card is optimized in the present embodiment, specific to set such as
Under:
The pvc pipe card includes two arcuate members for being mutually combined rear one closed annular structure of Inner Constitution, two arcs
Wherein one end end of shape part is hinged, and one of arcuate member is fixed on insulation connecting plate 51, in another arcuate member
Between position be arranged through the bolt fastener of the arcuate member;This is fixed on the other end end of the arcuate member on insulation connecting plate 51
One interior fastener is set, and the other end end of another arcuate member then sets an outer fastener being connected with interior fastener.Institute
Outer fastener is stated by being formed with the connector buckled, the interior fastener is by the coupler body structure buckled for being articulated in connector
Into as shown in Figure 2.
During installation, action bars 1 or electrical verification display 4 need to be only placed on to the closed annular structure of two arcuate member compositions
In, interior fastener is then articulated in buckling for outer fastener, then swivel bolt fastener makes action bars 1 or electrical verification display 4
Fixation.During dismounting, swivel bolt fastener is only needed, excludes fastening of the bolt fastener to action bars 1 or electrical verification display 4
Effect, then removes interior fastener from buckling for outer fastener.
By the setting of the present embodiment, the installation that can be effectively applicable to the action bars 1 and electrical verification display 4 of different size is consolidated
Fixed, installation is fixed more stable, and simplifies the installing/dismounting step of action bars 1 and electrical verification display 4, and operation is easier.
Above content is to combine the further description that specific preferred embodiment is made to the present invention, it is impossible to assert this
The embodiment of invention is confined to these explanations.For general technical staff of the technical field of the invention,
The other embodiment drawn in the case where not departing from technical scheme, should be included within the scope of the present invention.
Claims (6)
1. a kind of 10KV electrical verifications insulating bar, it is characterised in that including action bars (1), be arranged on action bars (1) top
Electrical verification is popped one's head in (2), the electrical verification display (4) being connected by connecting lead wire (3) with electrical verification probe (2), the electrical verification display (4)
It is fixed on by connection fixture (5) on action bars (1);
The connection fixture (5) includes insulation connecting plate (51), the latch group being fixed on the side of insulation connecting plate (51)
(52);Including being fixed on, the connecting plate (51) that insulate is used for the latch group (52) wherein on one side and action bars (1) is fixed and connected
The the first latch group connect, and be fixed on insulation connecting plate (51) another side and be used to be fixedly connected with electrical verification display (4)
The second latch group;
The latch group (52) is formed by more than one pvc pipe card;
The pvc pipe card includes two arcuate members for being mutually combined rear one closed annular structure of Inner Constitution, two arcuate members
Wherein one end end be hinged, one of arcuate member is fixed in insulation connecting plate (51), among another arcuate member
Position is arranged through the bolt fastener of the arcuate member;This is fixed on the other end end of the arcuate member on insulation connecting plate (51)
One interior fastener is set, and the other end end of another arcuate member then sets an outer fastener being connected with interior fastener.
2. a kind of 10KV electrical verifications insulating bar according to claim 1, it is characterised in that (2) are popped one's head in the electrical verification
Cap body (21) including being socketed in action bars (1) top, be connected with cap body and with the vertically disposed spy in axis of action bars (1)
Head (22).
A kind of 3. 10KV electrical verifications insulating bar according to claim 2, it is characterised in that cap body (21) top
Rain cover connection end (23) is additionally provided with, rain cover is connected with the rain cover connection end (23).
A kind of 4. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that the insulation connecting plate
(51) it is epoxy resins insulation plate.
A kind of 5. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that PVC in latch group (52)
The quantity of pipe clamp is two.
A kind of 6. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that the outer fastener by with
The connector composition buckled, the interior fastener are made up of the coupler body buckled for being articulated in connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720744694.9U CN207165435U (en) | 2017-06-23 | 2017-06-23 | A kind of 10KV electrical verifications insulating bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720744694.9U CN207165435U (en) | 2017-06-23 | 2017-06-23 | A kind of 10KV electrical verifications insulating bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207165435U true CN207165435U (en) | 2018-03-30 |
Family
ID=61711874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720744694.9U Active CN207165435U (en) | 2017-06-23 | 2017-06-23 | A kind of 10KV electrical verifications insulating bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207165435U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113933546A (en) * | 2021-10-11 | 2022-01-14 | 广东电网有限责任公司 | Connecting device |
-
2017
- 2017-06-23 CN CN201720744694.9U patent/CN207165435U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113933546A (en) * | 2021-10-11 | 2022-01-14 | 广东电网有限责任公司 | Connecting device |
CN113933546B (en) * | 2021-10-11 | 2023-04-25 | 广东电网有限责任公司 | Connecting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7345489B2 (en) | Arc fault and ground fault circuit interrupter tester apparatus and method | |
CN109217151A (en) | Electric substation's installation engineering method | |
CN109633384A (en) | A kind of Intelligent insulating line thunder protection on-Line Monitor Device and method | |
CN104198832B (en) | A kind of high pressure transformer and distribution power station Integrated Checkout test method | |
CN104868403A (en) | Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof | |
CN101403779B (en) | Parameter measuring apparatus and system for high tension power line | |
CN201327509Y (en) | High-voltage transmission line parameter measuring device and system thereof | |
CN106842448A (en) | A kind of enterprising remaining cable case of cable insulation landing of transformer station | |
CN207165435U (en) | A kind of 10KV electrical verifications insulating bar | |
CN108459196A (en) | A kind of electrical verification easy device | |
CN2821588Y (en) | Low voltage power line health detector | |
CN202231361U (en) | 10kV multifunctional safe tool | |
JP2008216161A (en) | High pressure terminal block for transformation apparatus test | |
CN109490633A (en) | High pressure outside line porcelain insulator resistance measurement bar and its application method | |
CN111864559B (en) | 400-volt bypass switch and nuclear phase current and voltage monitoring device and application method | |
CN205985893U (en) | Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle | |
CN104071036B (en) | Urban rail transit contact rail traction system | |
CN206673141U (en) | A kind of dual-purpose electricity testing grounding ring | |
CN114551092A (en) | Special discharging device for power capacitor | |
CN204481356U (en) | A kind of fast moving distribution integrated apparatus | |
CN209119512U (en) | A kind of power supply line docking box | |
CN209542707U (en) | High pressure outside line porcelain insulator resistance measurement bar | |
CN207398715U (en) | A kind of power transmission and transformation line intelligent cleaning device | |
CN208013285U (en) | A kind of electrical verification easy device | |
CN201616628U (en) | Distribution box for construction technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |