CN207165435U - A kind of 10KV electrical verifications insulating bar - Google Patents

A kind of 10KV electrical verifications insulating bar Download PDF

Info

Publication number
CN207165435U
CN207165435U CN201720744694.9U CN201720744694U CN207165435U CN 207165435 U CN207165435 U CN 207165435U CN 201720744694 U CN201720744694 U CN 201720744694U CN 207165435 U CN207165435 U CN 207165435U
Authority
CN
China
Prior art keywords
electrical verification
electrical
action bars
connecting plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720744694.9U
Other languages
Chinese (zh)
Inventor
左飞梦
李彬
谢宽
陈忠昌
苏少辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU QINGBAIJIANG POWER SUPPLYING BRANCH OF STATE GRID SICHUAN ELECTRIC POWER Co
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Original Assignee
CHENGDU QINGBAIJIANG POWER SUPPLYING BRANCH OF STATE GRID SICHUAN ELECTRIC POWER Co
CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU QINGBAIJIANG POWER SUPPLYING BRANCH OF STATE GRID SICHUAN ELECTRIC POWER Co, CHENGDU POWER SUPPLY Co OF STATE GRID SICHUAN ELECTRIC POWER Corp filed Critical CHENGDU QINGBAIJIANG POWER SUPPLYING BRANCH OF STATE GRID SICHUAN ELECTRIC POWER Co
Priority to CN201720744694.9U priority Critical patent/CN207165435U/en
Application granted granted Critical
Publication of CN207165435U publication Critical patent/CN207165435U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model discloses a kind of 10KV electrical verifications insulating bar, solves prior art and lacks the electrical verification process confirmed after operation to circuit-breaker status, easily causes maloperation event to occur, and existing electrical verification mode has the problem of larger potential safety hazard.The present invention includes action bars (1), it is arranged on the electrical verification probe (2) on action bars (1) top, the electrical verification display (4) being connected by connecting lead wire (3) with electrical verification probe (2), the electrical verification display (4) are fixed on action bars (1) by connection fixture (5).The utility model has the advantages that safe and reliable, easy to operate, using flexible, practical, has larger application value.

Description

A kind of 10KV electrical verifications insulating bar
Technical field
The present invention relates to electroscopy equipment, and in particular to a kind of 10KV electrical verifications insulating bar.
Background technology
With the continuous quickening of power grid construction, distribution line also becomes to become increasingly complex, and for operation teams and groups, faces All kinds of grid switching operations it is more and more frequent.On distribution line, block switch, demarcation switch and prepayment metering switch are equal on post It is the integration apparatus that vacuum circuit breaker combines with disconnecting link.Find that switch exists during grid switching operation by long-term practice The situation that breaker just draws (conjunction) disconnecting link in false isloation state, this will bring serious potential safety hazard.
According to distribution《Safety》5.2.6.7 the regulation of bar:Position detection should be with equipment physical location after controller switching equipment operation It is defined, when can not see physical location, indirect method such as plant machinery position instruction, electrically instruction, powered display dress should be passed through Put, the change of the signal such as instrument and various remote measurements, remote signalling judges device location.During judgement, should at least there are two non-same originals Manage or corresponding change occurs for non-homogeneous instruction, and the instruction of all these determinations occurs to correspond to change simultaneously, can confirm The equipment has operated in place.
According to the characteristics of 10kV distribution line upper switch, breaker operator is judged with round-about way in practical operation Whether in place when, following drawback be present:
Whether first, being operated in place for outdoor breaker switch, operating personnel can only uniquely lean on the machinery instruction of " seeing " switch Position judges, lacks the electrical verification process confirmed after operation to circuit-breaker status, is just drawn disconnecting link the operation of (conjunction) lock, if , will there is serious security hidden trouble when vacation point phenomenon occurs in breaker.
Second, on-pole switch installation site is higher, operating personnel can not enter on ground to the physical location after breaker operator Row electrical verification, if realizing that electrical verification works using bar mode is stepped on, and there is certain potential safety hazard, also increase operating personnel's Labor intensity and the relatively low situation of efficiency.
Although third, being equipped with mechanical locking device between breaker and disconnecting link, operating switch has quite a few Blocking device has damaged, and the divide-shut brake machinery indicators for also having some switches have come off or indicated not in place, indivedual behaviour in addition Make personnel and the performance of switch is understood not deep enough, the behavior of misoperation happens occasionally, and whether in place to judge breaker operator, such as Fruit is only judged that the behavior for easily inducing operation against rules occurs, and is transported to distribution only with round-about way in the prior art Dimension leaves potential potential safety hazard, it is possible to the maloperation event of on-load broaching tool lock occurs.
The content of the invention
It is an object of the invention to solve prior art to lack the electrical verification process for confirming circuit-breaker status after operation, easily Maloperation event is caused to occur, and the problem of larger potential safety hazard be present in existing electrical verification mode, the present invention provides a kind of 10KV and tested Electricity insulating bar.
The present invention is achieved through the following technical solutions:
A kind of 10KV electrical verifications insulating bar, including action bars, the electrical verification probe on action bars top is arranged on, passes through company Lead and the electrical verification display of electrical verification probe connection are connect, the electrical verification display is fixed on action bars by connection fixture.
The setting of the structure in the present invention, operation and the electrical verification work for the controller switching equipment being effectively applicable on 10kV circuits, Particularly divide-shut brake machinery indicator has been come off or has indicated breaker not in place, has been increased to the shape after breaker grid switching operation The electrical verification operating procedure of state, the accuracy of judgement is effectively ensured, also, the present invention can prolong according to work on the spot needs, action bars Length, operating personnel is carried out the operation and can of eminence equipment on ground and carry out electrical verification work, the present invention can Need to mitigate operating personnel on electric pole or framework to continue up step on bar, transposition could complete the labor intensity that electrical verification works, Greatly reduce the labor intensity of operating personnel.
The present invention is suitable for transformer on isolation switch, the grid switching operation of fuse switch and electrical verification work and stand Electrical verification, electrical verification can also be carried out to the high and low pressure side of transformer using 0.4~10kV electrical verifications head.
Further, electrical verification probe includes being socketed in the cap body on action bars top, be connected with cap body and with action bars The vertically disposed probe in axis.
By the setting of said structure, the effect for effectively reaching electrical verification is not only only capable of, and electrical verification operation can also be made more It is convenient, suitable under different electrical verification operational circumstances, effect is more notable, it can accurately and effectively judge whether switch occurs Vacation point (vacation is closed) phenomenon, avoids on-load from drawing the dangerous situation of (conjunction) disconnecting link to occur.Moreover, for joint use, this hair The bright electrical verification for passing through lower floor's alive circuit completion to upper layer circuit, i.e. structure of the invention are carried out to the state after grid switching operation Electrical verification confirmation is very convenient, and electrical verification operation is more comprehensively and effective.
Also, by the setting of said structure, in addition to the electroscope function of energy realization itself, also expect not with following The technique effect arrived, i.e. the optimal design-aside of the structure can also effectively realize that 10kV matches somebody with somebody the back brake of online installation site higher device Operation, avoid manually stepping on bar progress grid switching operation, operation is more safe and simple.
Further, the cap body top is additionally provided with rain cover connection end, and rain-proof is connected with the rain cover connection end Cover.The present invention also solves the problem of electroscope electrical verification of misty rain day is without rain cover using the action bars with rain cover.
Further, the connection fixture includes insulation connecting plate, the card being fixed on the side of insulation connecting plate Tooth group;The latch group includes being fixed on the first latch that insulation connecting plate is used to be fixedly connected with action bars wherein on one side Group, and be fixed on insulation connecting plate another side and be used for the second latch group that electrical verification display is fixedly connected.The insulation Connecting plate is epoxy resins insulation plate.
As one of which set-up mode, the quantity of pvc pipe card is arranged to two in the latch group, the insulation connecting plate its In the size of pvc pipe card that sets on a surface be Φ 32, the pvc pipe card set on another surface of insulation connecting plate Size is Φ 40.
As another set-up mode, the pvc pipe card is mutually combined rear one closed annular of Inner Constitution including two The arcuate member of structure, wherein one end end of two arcuate members are hinged, and one of arcuate member is fixed on insulation connecting plate On, another arcuate member middle part is arranged through the bolt fastener of the arcuate member;This is fixed on the arc on insulation connecting plate One interior fastener of other end end set of shape part, the other end end of another arcuate member then set one to coordinate with interior fastener The outer fastener of connection.
Preferably, the outer fastener with the connector buckled by forming, and the interior fastener is by for being articulated in connector The coupler body that buckles form.By the optimal design-aside of said structure, different size of action bars can be effectively applicable to and tested The connection of electric display, the scope of application are more extensive.
In order to ensure the security of electrical verification, accuracy and the flexibility of operation, electrical verification display is lived by connection fixture The lower section of the dynamic electrical verification probe for being fixed on insulating bar, its structural integrity, original electric property are not destroyed.The action bars is adopted Formed with isolation material.
The present invention compared with prior art, has the following advantages and advantages:
1st, the present invention can realize the operation and electrical verification work of controller switching equipment on 10kV circuits simultaneously, just do it is safer, It is easy;
2nd, by the experiment to the present invention and on probation, the present invention with safe and reliable, easy to operate, using flexible, The advantages that practical, there is larger application value.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of pvc pipe card in embodiment 3.
Mark and corresponding parts title in accompanying drawing:
1- action bars, 2- electrical verifications probe, 3- connecting lead wires, 4- electrical verification displays, 5- connection fixtures;
21- caps, 22- probes, 23- rain covers connection end;
51- insulation connecting plates, 52- latch groups.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
A kind of 10KV electrical verifications insulating bar, as shown in figure 1, including action bars 1, it is arranged on testing for the top of action bars 1 Electric probe 2, the electrical verification display 4 being connected by connecting lead wire 3 with electrical verification probe 2, the electrical verification display 4 is by being connected Part 5 is fixed on action bars 1.
Electrical verification probe 2 includes being socketed in the cap bodies 21 on the top of action bars 1, be connected with cap body and with action bars 1 The vertically disposed probe 22 of axis, the top of cap body 21 is additionally provided with rain cover connection end 23.The rain cover connection end 23 On be connected with rain cover.
The top of cap body 21 is provided with the connecting rod overlapped with the axis of action bars 1 in the present embodiment, and the connecting rod top is Rain cover connection end 23 in the present invention, the probe 22 are also rod-like structure, and the end of probe 22 of the rod-like structure is connected to company Close to the opening position on top on bar.
Cap body 21, connecting rod in the present embodiment and probe 22 are formed in one structure, and the connection fixture 5 is by insulating materials It is made, to attended operation bar 1 and electrical verification display 4, and action bars 1 is also insulating bar, i.e., described action bars 1 uses insulation material Texture into, and then effectively make electrical verification operation it is safer.
In the present embodiment, between the action bars 1 and electrical verification probe 2, between action bars 1 and connection fixture 5, and connection Be Detachable connection structure between fixture 5 and electrical verification display 4, so effectively electrical verification display 4 and electrical verification probe 2 with When electrical verification operational requirements mismatch or damage, progress is more sliding in time, and operation is more flexible, effect is more notable.
Embodiment 2
The present embodiment and the difference of embodiment 1 are that the present embodiment optimizes the structure of latch group 52, specific to set such as Under:
Connection fixture 5 described in the present embodiment includes insulation connecting plate 51, is fixed on insulation connecting plate 51 side Latch group 52.The latch group 52 is two groups, is separately mounted on two surfaces of insulation connecting plate 51, every group of latch group 52 is equal It is made up of more than one pvc pipe card.That is, described connection fixture 5 includes insulation connecting plate 51, is fixed on insulation connecting plate 51 Side on latch group 52;The latch group 52 includes being fixed on insulation connecting plate 51 to be wherein used for and action bars on one side First latch group of 1 clamping, and it is fixed on the second card for being used for the clamping of electrical verification display 4 on insulation connecting plate 51 another side Tooth group.The insulation connecting plate 51 is epoxy resins insulation plate.
Embodiment 3
The present embodiment and the difference of embodiment 2 are that the present embodiment optimizes the structure of pvc pipe card, and specific setting is as follows:
Pvc pipe card uses existing structure in latch group in the present embodiment, as shown in Figure 1.Pvc pipe card in every group of latch group 52 Quantity be two, the size of the pvc pipe card set on 51 one of surface of insulation connecting plate be Φ 32, and the insulation connects The size of the pvc pipe card set on another surface of plate 51 is Φ 40, as shown in Figure 1.
Embodiment 4
The present embodiment and the difference of embodiment 2 are that the present embodiment optimizes the structure of pvc pipe card, and specific setting is as follows:
The quantity of pvc pipe card is two in latch group 52, and the pvc pipe card is mutually combined rear Inner Constitution one including two The arcuate member of individual closed annular structure, the interior fastener at an arcuate member both ends is disposed therein, is arranged on another arcuate member two End and the outer fastener for coordinating clamping with interior fastener, and pass through one of the bolt fastener of arcuate member middle part.Pvc pipe In card, one of arcuate member middle part is provided with bolt fastener, then another arcuate member is fixed on insulation connecting plate 51 On.
Embodiment 5
The present embodiment and the difference of embodiment 1 are, the structure of pvc pipe card is optimized in the present embodiment, specific to set such as Under:
The pvc pipe card includes two arcuate members for being mutually combined rear one closed annular structure of Inner Constitution, two arcs Wherein one end end of shape part is hinged, and one of arcuate member is fixed on insulation connecting plate 51, in another arcuate member Between position be arranged through the bolt fastener of the arcuate member;This is fixed on the other end end of the arcuate member on insulation connecting plate 51 One interior fastener is set, and the other end end of another arcuate member then sets an outer fastener being connected with interior fastener.Institute Outer fastener is stated by being formed with the connector buckled, the interior fastener is by the coupler body structure buckled for being articulated in connector Into as shown in Figure 2.
During installation, action bars 1 or electrical verification display 4 need to be only placed on to the closed annular structure of two arcuate member compositions In, interior fastener is then articulated in buckling for outer fastener, then swivel bolt fastener makes action bars 1 or electrical verification display 4 Fixation.During dismounting, swivel bolt fastener is only needed, excludes fastening of the bolt fastener to action bars 1 or electrical verification display 4 Effect, then removes interior fastener from buckling for outer fastener.
By the setting of the present embodiment, the installation that can be effectively applicable to the action bars 1 and electrical verification display 4 of different size is consolidated Fixed, installation is fixed more stable, and simplifies the installing/dismounting step of action bars 1 and electrical verification display 4, and operation is easier.
Above content is to combine the further description that specific preferred embodiment is made to the present invention, it is impossible to assert this The embodiment of invention is confined to these explanations.For general technical staff of the technical field of the invention, The other embodiment drawn in the case where not departing from technical scheme, should be included within the scope of the present invention.

Claims (6)

1. a kind of 10KV electrical verifications insulating bar, it is characterised in that including action bars (1), be arranged on action bars (1) top Electrical verification is popped one's head in (2), the electrical verification display (4) being connected by connecting lead wire (3) with electrical verification probe (2), the electrical verification display (4) It is fixed on by connection fixture (5) on action bars (1);
The connection fixture (5) includes insulation connecting plate (51), the latch group being fixed on the side of insulation connecting plate (51) (52);Including being fixed on, the connecting plate (51) that insulate is used for the latch group (52) wherein on one side and action bars (1) is fixed and connected The the first latch group connect, and be fixed on insulation connecting plate (51) another side and be used to be fixedly connected with electrical verification display (4) The second latch group;
The latch group (52) is formed by more than one pvc pipe card;
The pvc pipe card includes two arcuate members for being mutually combined rear one closed annular structure of Inner Constitution, two arcuate members Wherein one end end be hinged, one of arcuate member is fixed in insulation connecting plate (51), among another arcuate member Position is arranged through the bolt fastener of the arcuate member;This is fixed on the other end end of the arcuate member on insulation connecting plate (51) One interior fastener is set, and the other end end of another arcuate member then sets an outer fastener being connected with interior fastener.
2. a kind of 10KV electrical verifications insulating bar according to claim 1, it is characterised in that (2) are popped one's head in the electrical verification Cap body (21) including being socketed in action bars (1) top, be connected with cap body and with the vertically disposed spy in axis of action bars (1) Head (22).
A kind of 3. 10KV electrical verifications insulating bar according to claim 2, it is characterised in that cap body (21) top Rain cover connection end (23) is additionally provided with, rain cover is connected with the rain cover connection end (23).
A kind of 4. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that the insulation connecting plate (51) it is epoxy resins insulation plate.
A kind of 5. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that PVC in latch group (52) The quantity of pipe clamp is two.
A kind of 6. 10KV electrical verifications insulating bar according to claim 1, it is characterised in that the outer fastener by with The connector composition buckled, the interior fastener are made up of the coupler body buckled for being articulated in connector.
CN201720744694.9U 2017-06-23 2017-06-23 A kind of 10KV electrical verifications insulating bar Active CN207165435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720744694.9U CN207165435U (en) 2017-06-23 2017-06-23 A kind of 10KV electrical verifications insulating bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720744694.9U CN207165435U (en) 2017-06-23 2017-06-23 A kind of 10KV electrical verifications insulating bar

Publications (1)

Publication Number Publication Date
CN207165435U true CN207165435U (en) 2018-03-30

Family

ID=61711874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720744694.9U Active CN207165435U (en) 2017-06-23 2017-06-23 A kind of 10KV electrical verifications insulating bar

Country Status (1)

Country Link
CN (1) CN207165435U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113933546A (en) * 2021-10-11 2022-01-14 广东电网有限责任公司 Connecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113933546A (en) * 2021-10-11 2022-01-14 广东电网有限责任公司 Connecting device
CN113933546B (en) * 2021-10-11 2023-04-25 广东电网有限责任公司 Connecting device

Similar Documents

Publication Publication Date Title
US7345489B2 (en) Arc fault and ground fault circuit interrupter tester apparatus and method
CN109217151A (en) Electric substation's installation engineering method
CN109633384A (en) A kind of Intelligent insulating line thunder protection on-Line Monitor Device and method
CN104198832B (en) A kind of high pressure transformer and distribution power station Integrated Checkout test method
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN101403779B (en) Parameter measuring apparatus and system for high tension power line
CN201327509Y (en) High-voltage transmission line parameter measuring device and system thereof
CN106842448A (en) A kind of enterprising remaining cable case of cable insulation landing of transformer station
CN207165435U (en) A kind of 10KV electrical verifications insulating bar
CN108459196A (en) A kind of electrical verification easy device
CN2821588Y (en) Low voltage power line health detector
CN202231361U (en) 10kV multifunctional safe tool
JP2008216161A (en) High pressure terminal block for transformation apparatus test
CN109490633A (en) High pressure outside line porcelain insulator resistance measurement bar and its application method
CN111864559B (en) 400-volt bypass switch and nuclear phase current and voltage monitoring device and application method
CN205985893U (en) Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN104071036B (en) Urban rail transit contact rail traction system
CN206673141U (en) A kind of dual-purpose electricity testing grounding ring
CN114551092A (en) Special discharging device for power capacitor
CN204481356U (en) A kind of fast moving distribution integrated apparatus
CN209119512U (en) A kind of power supply line docking box
CN209542707U (en) High pressure outside line porcelain insulator resistance measurement bar
CN207398715U (en) A kind of power transmission and transformation line intelligent cleaning device
CN208013285U (en) A kind of electrical verification easy device
CN201616628U (en) Distribution box for construction technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant