CN207160380U - A kind of grid for suspended ceiling frame - Google Patents

A kind of grid for suspended ceiling frame Download PDF

Info

Publication number
CN207160380U
CN207160380U CN201721079090.3U CN201721079090U CN207160380U CN 207160380 U CN207160380 U CN 207160380U CN 201721079090 U CN201721079090 U CN 201721079090U CN 207160380 U CN207160380 U CN 207160380U
Authority
CN
China
Prior art keywords
main joist
false keel
card column
caulking groove
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721079090.3U
Other languages
Chinese (zh)
Inventor
葛汉彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Daikho Decorative Ltd By Share Ltd
Original Assignee
Jiangsu Daikho Decorative Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Daikho Decorative Ltd By Share Ltd filed Critical Jiangsu Daikho Decorative Ltd By Share Ltd
Priority to CN201721079090.3U priority Critical patent/CN207160380U/en
Application granted granted Critical
Publication of CN207160380U publication Critical patent/CN207160380U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)

Abstract

It the utility model is related to a kind of grid for suspended ceiling frame, including main joist and the false keel for being vertically connected at main joist, and both perpendicular to the hangs muscle that main joist and false keel are set, hangs muscle is connected with main joist, on the false keel, caulking groove is provided with itself and the main joist junction, the main joist connects with false keel sliding, and the false keel is provided with the fixed mechanism fixed with the main joist.Above-mentioned technical proposal of the present utility model, main joist are connected with false keel by the way of clamping, and influence of the pernicious gas such as fluoride and chloride to environment is produced in welding process high temperature electric arc so as to avoid prior welding mode;And, main joist connects with caulking groove sliding, so, when needing to adjust the relative position of main joist and false keel, main joist and caulking groove is set to slide into required position relatively, and be relatively fixed using fixed mechanism, so as to realize adjustment main joist and false keel surround grid size purpose, then make a false keel frame can be used for hanging various sizes of boatswain chair.

Description

A kind of grid for suspended ceiling frame
Technical field
Building decoration area is the utility model is related to, more particularly to a kind of grid for suspended ceiling frame.
Background technology
Keel shoe is a kind of construction material of fixed structure, is the skeleton and base material of construction and decoration structure, is made for supporting Type.
Notification number is that CN203475678U utility model patent discloses a kind of plane automatic lifting furred ceiling, its main joist It is fixedly connected with false keel, also, by installing electric expansion bar in the top of keel shoe, keel shoe is driven boatswain chair liter High or decline, and then adjust interior space size.
But the keel shoe used in the technical scheme, because its main joist with false keel is to be fixedly connected, so, It can only be used cooperatively with the boatswain chair being consistent with its size, and which limits the scope of application of the keel shoe of same model.When need , it is necessary to install different keel shoes when wanting to use the boatswain chair of different model, this adds increased the workload of staff.
Utility model content
The purpose of this utility model is to provide a kind of grid for suspended ceiling frame, and it can more easily adjust main joist and pair dragon Bone surrounds the size of the size of grid, makes a false keel frame can be used for hanging various sizes of boatswain chair, so as to improve keel shoe Versatility, expand use range.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of grid for suspended ceiling frame, including main joist and the false keel for being vertically connected at main joist, and both perpendicular to The hangs muscle that main joist and false keel are set, hangs muscle is connected with main joist, on the false keel, in itself and the main joist junction Caulking groove is provided with, the main joist connects with false keel sliding, and the false keel is provided with what is fixed with the main joist Fixed mechanism.
By using above-mentioned technical proposal, main joist connects with caulking groove sliding, so, is needing to adjust main joist and pair During the relative position of keel, main joist and caulking groove is set to slide into required position relatively, and it is using fixed mechanism that it is relatively solid It is fixed, so as to realize adjustment main joist and false keel surround grid size purpose, then make a false keel frame can For hanging various sizes of boatswain chair.
Further, slippage slot, the fixed machine are provided with along the false keel length direction in the side of the caulking groove Structure includes the card column that sliding is arranged in the slippage slot, and the hole clipping opened up through the main joist thickness, the hole clipping It is engaged with the card column, the hole clipping opens up several along main joist length direction, and the false keel is provided with described in driving The drive mechanism that card column moves to the slippage slot relative to side direction, and limit the limiting mechanism of its movement.
By using above-mentioned technical proposal, card column sliding is arranged in slippage slot, the size of the hole clipping opened up on main joist Be engaged with card column, so, under normality, card column be limited in slippage slot by limiting mechanism, when need by main joist with it is secondary When keel connect, the restriction effect for the mechanism that lifts restrictions, and drive card column to be moved to hole clipping direction using drive mechanism, inlay card exists In hole clipping, so as to which false keel is connected with main joist, false keel is avoided to be slid from main joist.
Further, the drive mechanism is included in the first bullet that the slippage slot is set away from described caulking groove one end Spring, first spring one end are connected with the end of the card column, and the other end is connected with the end of the slippage slot, the card column When being fully located in the slippage slot, first spring is in compressive state.
By using above-mentioned technical proposal, when card column is entirely limited in slippage slot using limiting mechanism, the first bullet Spring is in compressive state, and so, after the restriction effect for the mechanism that lifts restrictions, card column removes cunning under the restoring force of the first spring Move groove, and then can inlay card in hole clipping.
Further, the limiting mechanism includes being arranged in the slippage slot, close to pushing for described caulking groove one end Plate, the board that pushes are embedded between the card column and the caulking groove, and side abuts with the card column, it is described push plate and The false keel sliding connection, and moved along the vertical card column direction.
By using above-mentioned technical proposal, push plate and be located at slippage slot port, when being abutted with card column, card column shifting can be limited Go out slippage slot, push plate and connected with slippage slot sliding, when needing false keel being connected with main joist, make to push plate by external force Relative sliding groove slides, and releases the restriction effect to card column, then, card column can remove slippage slot.
Further, plate one end second spring that pushes is connected with the false keel, and the other end for pushing plate is set Have by compression leg, the outside that the false keel is passed by compression leg, it is described push be provided with plate with the card column coordinate run through Hole, when the second spring is in the normal state, the through hole mutually staggers with the card column.
By using above-mentioned technical proposal, pressing false keel top surface presses compression leg, makes to push the movement of plate Relative sliding groove, makes Through hole is moved to the height contour with card column, restriction effect of the mechanism that can then lift restrictions to card column, facilitates card column to move Go out slippage slot.
Further, it is described to push the side that plate abuts with the card column and be provided with some balls.
By using above-mentioned technical proposal, ball is set pushing the side that plate abuts with card column, can reduce and push plate Frictional force when being slid with respect to card column, reduce the abrasion of card column, improve the service life of card column.
Further, sealing strip, the sealing strip side and the caulking groove are provided with the two side of the caulking groove Side wall connects, and opposite side abuts with the main joist side wall.
By using above-mentioned technical proposal, sealing strip can strengthen the soundness that main joist is connected with false keel, avoid It is rocked relatively.
Further, the sealing strip is made up of elastomeric material.
By using above-mentioned technical proposal, sealing strip is flexible made of elastomeric material, its can with main joist In the case of close abutting, the relative movement of main joist and caulking groove is not influenceed.
In summary, the utility model has the advantages that:
1. by opening up slippage slot on false keel, allow main joist and the relative slip of false keel, and utilize fixed machine Structure is relatively fixed, can then adjust main joist and false keel surround grid size size, make a false keel frame can For hanging various sizes of boatswain chair;
2. by being set at the top for pushing plate by compression leg, and set what is coordinated with pressing compression leg in false keel relative position Pressing hole, through pressing hole and protrude false keel top surface by compression leg so that, it is only necessary to press compression leg, you can make card column from cunning Move in groove and skid off, engage with the hole clipping on main joist, and then realize the connection of false keel and main joist.
Brief description of the drawings
Fig. 1 is a kind of grid for suspended ceiling frame overall structure diagram in embodiment;
Fig. 2 is false keel partial structural diagram in embodiment, is mainly used in showing the structure of caulking groove and card column;
False keel lateral partial structurtes sectional view in Fig. 3 embodiments, it is mainly used in showing the structure in slippage slot;
Fig. 4 is A-A in Fig. 2 to sectional view.
In figure:1st, main joist;11st, hole clipping;2nd, false keel;21st, caulking groove;22nd, slippage slot;23rd, card column;24th, the first bullet Spring;25th, plate is pushed;251st, second spring;252nd, by compression leg;253rd, through hole;254th, ball;26th, pressing hole;27th, sealing strip; 28th, link slot;3rd, hangs muscle.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment:
The false keel 2, Yi Jiyu that a kind of grid for suspended ceiling frame, reference picture 1, including main joist 1 and vertical main joist 1 are set The hangs muscle 3 that main joist 1 is fixedly connected, the plane that hangs muscle 3 is formed perpendicular to main joist 1 and false keel 2, one end of hangs muscle 3 and master Keel 1 are fixedly connected, the other end and ceiling(Not shown in figure)Connection.When carrying out boatswain chair installation, by hangs muscle 3 and ceiling It is fixedly connected, so that main joist 1 and false keel 2 are sling by hangs muscle 3, afterwards by boatswain chair inlay card in main joist 1 and the shape of false keel 2 Into in grid, the installation of boatswain chair is realized.
Referring to Figures 1 and 2, caulking groove 21 is provided with false keel 2, if caulking groove 21 is provided with along the length direction of false keel 2 Dry, when needing false keel 2 being connected with main joist 1, by the inlay card of main joist 1 in caulking groove 21, and slided with caulking groove 21 Move connection.In order to strengthen the soundness that main joist 1 is connected with false keel 2, it is avoided to rock relatively, in the both sides of caulking groove 21 Sealing strip 27 made of elastomeric material are connected with wall, the side of sealing strip 27 is fixedly connected with the side wall of caulking groove 21, opposite side Abutted with the side wall of main joist 1.
Reference picture 1 and Fig. 3, in the side of caulking groove 21, slippage slot 22 is offered along the length direction of false keel 2, in false keel 2 The fixed mechanism of fixed false keel 2 and main joist 1 relative position is additionally provided between main joist 1, fixed mechanism is set including sliding The card column 23 in slippage slot 22 is put, and the hole clipping 11 opened up through the thickness direction of main joist 1, hole clipping 11 match with card column 23 Close, and several are provided with along the length direction of main joist 1.Reference picture 1 and Fig. 3, driving card column 23 is installed in slippage slot 22 and moved Drive mechanism, drive mechanism includes being arranged on the first spring 24 in slippage slot 22, the one end of the first spring 24 and slippage slot 22 It is fixedly connected away from one end end of caulking groove 21, the other end is fixedly connected with card column 23 away from the end of caulking groove 21.Work as card column 23 when being concealed in slippage slot 22 completely, and the first spring 24 is in compressive state.In caulking groove 21 and the opposite side of slippage slot 22 Side wall, along the length direction of false keel 2 be provided with card column 23 coordinate link slot 28.Drive mechanism drives card column 23 in slippage slot Moved in 22, and slippage slot 22 is protruded in part, through hole clipping 11, inserts in link slot 28, so as to which the one end of card column 23 is positioned at sliding In groove 22, the other end is stretched into link slot 28, and the inlay card of hole clipping 11 of main joist 1 is outside the card column 23 between the two side of caulking groove 21 In week, the connection of false keel 2 and main joist 1 is realized, be relatively fixed the position of false keel 2 and main joist 1.Main joist 1 and inlay card The sliding connection of groove 21, and offers several hole clippings 11 on main joist 1, so, between needing to adjust two false keels 2 away from From when, it is only necessary to slide false keel 2, make the card column 23 in false keel 2 and the corresponding clamping of hole clipping 11.
Reference picture 1 and Fig. 3, in order to avoid card column 23 removes slippage slot 22 under the restoring force of the first spring 24, into card In caulking groove 21, the installation of main joist 1 is influenceed, the limiting mechanism that limitation card column 23 moves is provided with false keel 2.Reference picture 1, figure 3 and Fig. 4, limiting mechanism used is to push plate 25 close to what the one end of caulking groove 21 was set in slippage slot 22 in the present embodiment, is pushed The sliding of plate 25 is arranged in false keel 2, and can be moved relative to false keel 2 in vertical direction.Push plate 25 and deviate from caulking groove 21 Side abutted with card column 23, and the side is provided with some balls 254, under the motive force of card column 23, pushes the inlay card of plate 25 Between card column 23 and the side wall of caulking groove 21.Plate 25 is pushed close to one end of the bottom surface of false keel 2, by second spring 251 with False keel 2 connects.It is fixedly connected with the top for pushing plate 25 and is provided with by compression leg 252, the top surface of false keel 2 with matching somebody with somebody by compression leg 252 The pressing hole 26 of conjunction, it is fixedly connected by the one end of compression leg 252 with pushing the top of plate 25, the other end protrudes false keel through pressing hole 26 2 top surfaces.Push the middle part of plate 25 and be provided with the through hole 253 being engaged with card column 23.Under normality, second spring 251 will push plate 25 Promoted to the top surface direction of false keel 2, protrude the top surface of false keel 2 by the part of compression leg 252, the height of through hole 253 is higher than card column 23 Height, card column 23 is pushed plate 25 and stopped, and then is limited in slippage slot 22, when needing to connect false keel 2 and main joist 1 When connecing, compression leg 252 is pressed, plate 25 is pushed and is moved to the bottom surface direction of false keel 2, through hole 253 is moved to contour with card column 23 Height, card column 23 under the restoring force of the first spring 24 to the direction of caulking groove 21 move, so as to protrude slippage slot 22, through master Hole clipping 11 on keel 1, is stretched into link slot 28, so as to realize the connection of false keel 2 and main joist 1.
Operation principle:When main joist 1 is connected with false keel 2, basis is actually needed the inlay card of main joist 1 in pair first On keel 2 in corresponding caulking groove 21, and sliding false keel 2 makes the inlay card of caulking groove 21 be pressed in the corresponding both sides of hole clipping 11, pressing Compression leg 252, make to push plate 25 and move, drive through hole 253 to be moved to the position contour with card column 23, and then card column 23 can be Through hole 253 is passed through under the restoring force of first spring 24, is skidded off out of slippage slot 22, and link slot 28 is stretched into through hole clipping 11 It is interior, and then realize the connection of main joist 1 and false keel 2.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of grid for suspended ceiling frame, including main joist(1)Be vertically connected at main joist(1)False keel(2), and simultaneously Perpendicular to main joist(1)And false keel(2)The hangs muscle of setting(3), hangs muscle(3)With main joist(1)Connection, it is characterised in that:Institute State false keel(2)On, in itself and the main joist(1)Junction is provided with caulking groove(21), the main joist(1)With the secondary dragon Bone(2)Sliding connection, the false keel(2)It is provided with and the main joist(1)Fixed fixed mechanism.
A kind of 2. grid for suspended ceiling frame according to claim 1, it is characterised in that:In the caulking groove(21)Side edge The false keel(2)Length direction is provided with slippage slot(22), the fixed mechanism is arranged on the slippage slot including sliding(22) Interior card column(23), and through the main joist(1)The hole clipping that thickness direction opens up(11), the hole clipping(11)With the card Post(23)It is engaged, the hole clipping(11)Along main joist(1)Length direction opens up several, the false keel(2)It is provided with and drives Move the card column(23)To the slippage slot(22)Relative to the drive mechanism of side direction movement, and limit the limitation machine of its movement Structure.
A kind of 3. grid for suspended ceiling frame according to claim 2, it is characterised in that:The drive mechanism is included in the cunning Move groove(22)Away from the caulking groove(21)The first spring that one end is set(24), first spring(24)One end and the card Post(23)End connection, the other end and the slippage slot(22)End connection, the card column(23)It is fully located at the cunning Move groove(22)When interior, first spring(24)In compressive state.
A kind of 4. grid for suspended ceiling frame according to claim 3, it is characterised in that:The limiting mechanism includes being arranged on institute State slippage slot(22)It is interior, close to the caulking groove(21)One end pushes plate(25), it is described to push plate(25)Inlay card is in the card Post(23)With the caulking groove(21)Between, and side and the card column(23)Abut, it is described to push plate(25)With the secondary dragon Bone(2)Sliding connection, and along the vertical card column(23)Move in direction.
A kind of 5. grid for suspended ceiling frame according to claim 4, it is characterised in that:It is described to push plate(25)The bullet of one end second Spring(251)With the false keel(2)Connection, it is described to push plate(25)The other end be provided with press compression leg(252), it is described to press compression leg (252)Pass the false keel(2)Outside, it is described to push plate(25)On be provided with and the card column(23)The through hole of cooperation (253), the second spring(251)When being in the normal state, the through hole(253)With the card column(23)Mutually stagger.
A kind of 6. grid for suspended ceiling frame according to claim 5, it is characterised in that:It is described to push plate(25)With the card column (23)The side of abutting is provided with some balls(254).
7. according to a kind of any described grid for suspended ceiling framves of claim 2-6, it is characterised in that:In the caulking groove(21)'s Two side is provided with sealing strip(27), the sealing strip(27)Side and the caulking groove(21)Side wall connects, opposite side and institute State main joist(1)Side wall abuts.
A kind of 8. grid for suspended ceiling frame according to claim 7, it is characterised in that:The sealing strip(27)By elastomeric material It is made.
CN201721079090.3U 2017-08-25 2017-08-25 A kind of grid for suspended ceiling frame Expired - Fee Related CN207160380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721079090.3U CN207160380U (en) 2017-08-25 2017-08-25 A kind of grid for suspended ceiling frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721079090.3U CN207160380U (en) 2017-08-25 2017-08-25 A kind of grid for suspended ceiling frame

Publications (1)

Publication Number Publication Date
CN207160380U true CN207160380U (en) 2018-03-30

Family

ID=61719155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721079090.3U Expired - Fee Related CN207160380U (en) 2017-08-25 2017-08-25 A kind of grid for suspended ceiling frame

Country Status (1)

Country Link
CN (1) CN207160380U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111197372A (en) * 2018-11-20 2020-05-26 中建材创新科技研究院有限公司 Suspended ceiling system
CN111734040A (en) * 2020-07-02 2020-10-02 韩军奇 Quick splicing mechanism based on steel structure supporting keel for ceiling installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111197372A (en) * 2018-11-20 2020-05-26 中建材创新科技研究院有限公司 Suspended ceiling system
CN111734040A (en) * 2020-07-02 2020-10-02 韩军奇 Quick splicing mechanism based on steel structure supporting keel for ceiling installation
CN111734040B (en) * 2020-07-02 2021-08-24 深圳市绿意雅科技有限公司 Quick splicing mechanism based on steel structure supporting keel for ceiling installation

Similar Documents

Publication Publication Date Title
CN207160380U (en) A kind of grid for suspended ceiling frame
CN106088508B (en) It is a kind of that firm wallboard is installed
CN104162777B (en) Sealing ring assemble mechanism
CN206273927U (en) Furred ceiling component
CN206263059U (en) For the hole punched device of fire resistant doorsets connector
CN208137371U (en) A kind of patch floor tile installation
CN206112455U (en) Support frame and hanging equipment
CN2594369Y (en) Bayonet keel of wooden floor
CN209523416U (en) A kind of Multifunction wall board
CN207228536U (en) A kind of dry-hanging installation structure for vertical faces of stone materials
CN208965948U (en) A kind of decorative wall panels for indoor design
CN203307983U (en) Ceiling keel component
CN208499158U (en) A kind of support structure of wooden box base plate
CN215054731U (en) Prefabricated staircase
CN107487023A (en) A kind of drag chain cladding system
CN206829648U (en) A kind of curtain buildingses keel auxiliary installation device
CN220954158U (en) Keel fastener for connecting male and female grooves
CN221422355U (en) Dysmorphism aluminum plate curtain mounting structure
CN205678602U (en) A kind of LED panel lamp and border component
CN219253818U (en) Punching device for processing iron sheet of keyboard bottom plate
CN207812784U (en) A kind of high strength steel timber structure furred ceiling
CN111305583B (en) Assembly type building side fascia safety device
CN217400683U (en) Portable window frame subassembly for interior decoration
CN217439019U (en) Basement intercommunication mouth antiseep mechanism
CN221030929U (en) Clamping type subway ceiling plate based on BIM technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20210825