CN207160249U - Structure is built in a kind of interim room in quick detachable building site - Google Patents

Structure is built in a kind of interim room in quick detachable building site Download PDF

Info

Publication number
CN207160249U
CN207160249U CN201721101704.3U CN201721101704U CN207160249U CN 207160249 U CN207160249 U CN 207160249U CN 201721101704 U CN201721101704 U CN 201721101704U CN 207160249 U CN207160249 U CN 207160249U
Authority
CN
China
Prior art keywords
ladder
pillar
snap ring
top plate
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721101704.3U
Other languages
Chinese (zh)
Inventor
卢彬龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chutian Construction Co ltd
Original Assignee
Wenzhou Chutian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Chutian Construction Co Ltd filed Critical Wenzhou Chutian Construction Co Ltd
Priority to CN201721101704.3U priority Critical patent/CN207160249U/en
Application granted granted Critical
Publication of CN207160249U publication Critical patent/CN207160249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of quick detachable interim room in building site to build structure, including pillar, fastening assembly, pole and top plate, pole is provided with the outer wall of the pillar, the pole is connected by fastening assembly with pillar, and the top of the pillar is provided with top plate.Structure is built in the quick detachable interim room in building site, when the unexpected personnel of generation need to flee from, by pull handle vertical rod can be driven to be rotated in the second snap ring, by vertical rod contiguous block can be driven to pull the first ladder to rotate down, the first ladder can be made to be rotated down in the first snap ring, the first ladder can be made to be in vertical state with the second ladder, personnel can be climbed, by pushing up upper lid rotating shaft can be driven to be rotated on top plate, upper lid can be opened, people can be left in pillar by upper lid, personal security can be not only facilitated to leave but also can be breathed freely in column by upper lid, it is dangerous that personnel including when avoiding catching fire flee from difficult generation.

Description

Structure is built in a kind of interim room in quick detachable building site
Technical field
Construction engineering technical field is the utility model is related to, structure is built in specially a kind of interim room in quick detachable building site.
Background technology
In general, the interim room in building site is typically all the interim inhabitation use for workmen, as this kind of house is typically all Spliced by thermal insulation board and steel construction, be fastenedly connected by bolt, but due to exposing to the weather, by the shadow of environment Ringing, steel construction is easy to get rusty, particularly bolt, using being difficult to be dismantled again after a period of time, much all goes out of use, The waste of resource, such as the utility model of Application No. 201520724991.8, including supporting mechanism and top mechanism are caused, Supporting mechanism includes connecting by fastening assembly between pole and pillar, bracing piece and pillar, and top mechanism inclines including two pieces The top plate and supporting plate tiltedly set, is connected between supporting plate and bracing piece, top plate and pillar by fastening assembly, although entirely Structure is avoided being connected by screw bolts so that it is more convenient that dismounting is safeguarded, but ventilative poor-performing, causes room air not It is good, while interim room is easy to that fire accident occurs during inhabitation, when catching fire including personnel flee from difficulty, can be right Personnel bring danger, and security is relatively low.
Utility model content
The purpose of this utility model is that providing a kind of interim room in quick detachable building site builds structure, to solve above-mentioned background technology The problem of middle proposition.
To achieve the above object, the utility model provides following technical scheme:Structure is built in a kind of interim room in quick detachable building site, Including pillar, fastening assembly, pole and top plate, pole is installed on the outer wall of the pillar, the pole passes through fastening assembly It is connected with pillar, the top of the pillar is provided with top plate, and the top of the top plate is provided with upper lid, the upper lid by rotating shaft Bottom connecting rod is installed, the bottom of the connecting rod is provided with sucker, and staircase dress is provided with the left of the bottom of the top plate Put, the escalator device includes connecting plate, and the bottom of the connecting plate is provided with the second ladder, the bottom peace of second ladder Equipped with the first snap ring, the first ladder is installed on the right side of first snap ring, first snap ring passes through the first connecting shaft and the One ladder is connected, and contiguous block is provided with the right side of first ladder, and the bottom of the contiguous block is provided with vertical rod, the vertical rod Bottom the second snap ring is installed, second snap ring is connected by the second connecting shaft with vertical rod, the bottom of second snap ring Handle is installed.
Preferably, the left and right sides of the pillar is fitted with protective plate, and the protective plate hinders including degradable poly acid amides Interlayer, the lower surface pressing of the degradable poly acid amides barrier layer have polyurethane water-proof paint layer, the polyurethane water-proof paint The lower surface pressing of layer has fire-retardant rubberised layer, and the lower surface of the fire-retardant rubberised layer, which presses, high pressure flame retardant coating, and the high pressure is resistance to The lower surface pressing of fire bed has glass layer.
Preferably, fixture block is installed on the right side of the bottom of the upper lid, neck is provided with the right side of the upper surface of the top plate, it is described Neck matches with fixture block.
Preferably, rubber sleeve is wrapped up on the outer wall of the handle.
Compared with prior art, the beneficial effects of the utility model are:Structure is built in the quick detachable interim room in building site, works as generation When it is unexpected that personnel need to flee from, by pull handle vertical rod can be driven to be rotated in the second snap ring, can be driven by vertical rod Contiguous block pulls the first ladder to rotate down, and the first ladder can be made to be rotated down in the first snap ring, can make the first ladder Vertical state is in the second ladder, personnel can be climbed, can be folded, be inhaled by sucker when not in use It is attached on contiguous block, the stability of the second ladder can be strengthened, is not take up normally using space, can by pushing up upper lid To drive rotating shaft to be rotated on top plate, upper lid can be opened, people can be left in pillar by upper lid, by upper lid not only Can facilitate personal security leave and also can give column in breathe freely, when avoiding catching fire including personnel flee from difficult generation Danger, security are higher.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is top plate internal structure schematic diagram of the present utility model;
Fig. 3 is escalator device structural representation of the present utility model;
Fig. 4 is protection plate structure schematic diagram of the present utility model.
In figure:1st, pillar, 2, protective plate, 201, degradable poly acid amides barrier layer, 202, polyurethane water-proof paint layer, 203, Fire-retardant rubberised layer, 204, high pressure flame retardant coating, 205, glass layer, 3, fastening assembly, 4, pole, 5, rotating shaft, 6, upper lid, 7, top Plate, 8, escalator device, the 801, first ladder, the 802, second ladder, 803, connecting plate, the 804, first snap ring, the 805, first connection Axle, 806, vertical rod, the 807, second connecting shaft, 808, contiguous block, the 809, second snap ring, 810, handle, 811, rubber sleeve, 9, card Block, 10, neck, 11, connecting rod, 12, sucker.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:Structure is built in a kind of interim room in quick detachable building site, bag Include pillar 1, fastening assembly 3, pole 4 and top plate 7, pole 4 be installed on the outer wall of pillar 1, pole 4 by fastening assembly 3 with Pillar 1 is connected, and the top of pillar 1 is provided with top plate 7, and the top of top plate 7 is provided with upper lid 6 by rotating shaft 5, by pushing up Upper lid 6 can drive rotating shaft 5 to be rotated on top plate 7, can open upper lid 6, and people can be left in pillar 1 by upper lid 6, Fixture block 9 is installed on the right side of the bottom of upper lid 6, neck 10 is provided with the right side of the upper surface of top plate 7, neck 10 matches with fixture block 9, leads to Cross neck 10 with fixture block 9 to match, the stability of top plate 7 and the upper support of lid 6 can be strengthened, the bottom of upper lid 6 is provided with connection Bar 11, the bottom of connecting rod 11 are provided with sucker 12, are provided with escalator device 8 on the left of the bottom of top plate 7, escalator device 8 includes Connecting plate 803, the bottom of connecting plate 803 are provided with the second ladder 802, and the bottom of the second ladder 802 is provided with the first snap ring 804, the right side of the first snap ring 804 is provided with the first ladder 801, and the first snap ring 804 passes through the first connecting shaft 805 and the first ladder 801 are connected, and the right side of the first ladder 801 is provided with contiguous block 808, and the bottom of contiguous block 808 is provided with vertical rod 806, vertical rod 806 Bottom the second snap ring 809 is installed, the second snap ring 809 is connected by the second connecting shaft 807 with vertical rod 806, the second snap ring 809 Bottom handle 810 is installed, by pull handle 810 vertical rod 806 can be driven to be rotated in the second snap ring 809, by vertical Bar 806 can drive contiguous block 808 to pull the first ladder 801 to rotate down, and can make the first ladder 801 in the first snap ring 804 Inside rotate down, the first ladder 801 can be made to be in vertical state with the second ladder 802, personnel can be climbed, handle Rubber sleeve 811 is wrapped up on 810 outer wall, not only can be with anti-skidding but also can prevent that handle 810 from fraying hand by rubber sleeve 811 The palm, the left and right sides of pillar 1 are fitted with protective plate 2, and protective plate 2 includes degradable poly acid amides barrier layer 201, degradable polyamides The lower surface pressing of amine barrier layer 201 has polyurethane water-proof paint layer 202, the lower surface pressing of polyurethane water-proof paint layer 202 There is fire-retardant rubberised layer 203, the lower surface pressing of fire-retardant rubberised layer 203 has high pressure flame retardant coating 204, the following table of high pressure flame retardant coating 204 Face pressure, which is closed, glass layer 205, can be hindered the materials such as vapor and carbon dioxide by degradable poly acid amides barrier layer 601 Every can effectively carry out waterproof, the effect of waterproof can be strengthened by polyurethane water-proof paint layer 202, pass through fire-retardant gluing Layer 203, high pressure flame retardant coating 204 and glass layer 205 can effective fire resistant, extend the service life of pillar 1, And security performance can be strengthened.
When unexpected personnel occur and need to flee from or opening upper lid 6 and breathe freely, pull downward on handle 810 can drive it is vertical Bar 806 rotates in the second snap ring 809, and vertical rod 806 can drive contiguous block 808 to pull the first ladder 801 to rotate down, can be with The first ladder 801 is rotated down in the first snap ring 804, the first ladder 801 can be made vertical with the second ladder 802 State, personnel can be climbed, can be folded when not in use, adsorbed by sucker 12 on contiguous block 808, can To strengthen the stability of the second ladder 802, space is not take up, pushing up lid 6 can drive rotating shaft 5 to be rotated on top plate 7, Upper lid 6 can be opened, people can be left in pillar 1 by upper lid 6 or be breathed freely in column 1.
In description of the present utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " in Portion ", " other end ", " on ", " side ", " top ", " interior ", " front portion ", " center ", the orientation of the instruction such as " both ends " or position close It is to be described based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplifying, rather than Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore can not It is interpreted as to limitation of the present utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for describing purpose, and it is not intended that instruction or Relative importance or the implicit quantity for indicating indicated technical characteristic are implied, thus, defines " first ", " second ", " the Three ", at least one this feature can be expressed or be implicitly included to the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu Calmly ", the term such as " spinning " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally; Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be with It is connection or the interaction relationship of two elements of two element internals, is limited unless otherwise clear and definite, for this area For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. structure, including pillar are built in a kind of interim room in quick detachable building site(1), fastening assembly(3), pole(4)And top plate(7), institute State pillar(1)Outer wall on pole is installed(4), the pole(4)Pass through fastening assembly(3)With pillar(1)It is connected, the branch Post(1)Top top plate is installed(7), it is characterised in that:The top plate(7)Top pass through rotating shaft(5)Lid is installed (6), the upper lid(6)Bottom connecting rod is installed(11), the connecting rod(11)Bottom sucker is installed(12), it is described Top plate(7)Bottom on the left of escalator device is installed(8), the escalator device(8)Including connecting plate(803), the connecting plate (803)Bottom the second ladder is installed(802), second ladder(802)Bottom the first snap ring is installed(804), institute State the first snap ring(804)Right side the first ladder is installed(801), first snap ring(804)Pass through the first connecting shaft(805) With the first ladder(801)It is connected, first ladder(801)Right side contiguous block is installed(808), the contiguous block(808) Bottom vertical rod is installed(806), the vertical rod(806)Bottom the second snap ring is installed(809), second snap ring (809)Pass through the second connecting shaft(807)With vertical rod(806)It is connected, second snap ring(809)Bottom handle is installed (810).
2. structure is built in a kind of quick detachable interim room in building site according to claim 1, it is characterised in that:The pillar(1)'s The left and right sides is fitted with protective plate(2), the protective plate(2)Including degradable poly acid amides barrier layer(201), it is described degradable Polyamide barrier layer(201)Lower surface pressing have polyurethane water-proof paint layer(202), the polyurethane water-proof paint layer (202)Lower surface pressing have fire-retardant rubberised layer(203), the fire-retardant rubberised layer(203)Lower surface pressing have high pressure fire resisting Layer(204), the high pressure flame retardant coating(204)Lower surface pressing have glass layer(205).
3. structure is built in a kind of quick detachable interim room in building site according to claim 1, it is characterised in that:The upper lid(6)'s Fixture block is installed on the right side of bottom(9), the top plate(7)Upper surface on the right side of be provided with neck(10), the neck(10)With fixture block (9)Match.
4. structure is built in a kind of quick detachable interim room in building site according to claim 1, it is characterised in that:The handle(810) Outer wall on wrap up rubber sleeve(811).
CN201721101704.3U 2017-08-30 2017-08-30 Structure is built in a kind of interim room in quick detachable building site Active CN207160249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721101704.3U CN207160249U (en) 2017-08-30 2017-08-30 Structure is built in a kind of interim room in quick detachable building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721101704.3U CN207160249U (en) 2017-08-30 2017-08-30 Structure is built in a kind of interim room in quick detachable building site

Publications (1)

Publication Number Publication Date
CN207160249U true CN207160249U (en) 2018-03-30

Family

ID=61718873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721101704.3U Active CN207160249U (en) 2017-08-30 2017-08-30 Structure is built in a kind of interim room in quick detachable building site

Country Status (1)

Country Link
CN (1) CN207160249U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868911A (en) * 2019-02-23 2019-06-11 浙江华锦建筑装饰设计有限公司 Structure is built in a kind of interim room in quick detachable building site
CN114197920A (en) * 2022-01-10 2022-03-18 罗春梅 Green waterproof assembled lightweight steel villa of environmental protection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868911A (en) * 2019-02-23 2019-06-11 浙江华锦建筑装饰设计有限公司 Structure is built in a kind of interim room in quick detachable building site
CN114197920A (en) * 2022-01-10 2022-03-18 罗春梅 Green waterproof assembled lightweight steel villa of environmental protection
CN114197920B (en) * 2022-01-10 2024-01-23 罗春梅 Environment-friendly waterproof assembled light steel villa

Similar Documents

Publication Publication Date Title
CN207160249U (en) Structure is built in a kind of interim room in quick detachable building site
CN206158309U (en) Wire pole vertical ladder anti -climb device that stretches out and draws back
CN103007453B (en) High building fire fighting rescue system
CN108756721B (en) A kind of cement shaft tower Anti-drop ladder structure
CN110331848B (en) High building steel construction platform
CN207403882U (en) A kind of security guardrail device and safety barrier
CN206621673U (en) Regularization escape device for temporary building
CN214994840U (en) Fire prevention heat preservation safety type steel construction
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN206319504U (en) Portable safety emergency ladder
CN212296135U (en) Novel fire window
CN108277972A (en) A kind of safety-type hanging basket of construction
CN210714100U (en) Prefabricated assembled prevents hot wall
CN204502160U (en) A kind of device for rescuing from storied house
CN206034970U (en) Husky sentry box on duty is prevent wind to a high position
CN209194969U (en) A kind of building outside climbing type CONSTRUCTION OPERATIONS platform
CN208685787U (en) A kind of assembled architecture that can temporarily build
CN207581303U (en) A kind of manned lift hanging basket with anti-drop function
CN206814325U (en) One kind is easy to high building air-conditioning external hanging device
CN215926657U (en) Construction engineering site operation platform
CN206220839U (en) A kind of gas well data maintenance INCREASEDSAFETY portable folding ladder
CN217206144U (en) Novel burglary-resisting window convenient to flee
CN218714986U (en) Totally-enclosed climbing frame pocket net structure of super high-rise building
CN219081369U (en) Aluminium alloy window with fire-fighting function
CN219100809U (en) Novel fire-retardant close mesh formula safety is found net

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 402, Building 2, Jinxiu Huating Commercial and Residential Building, No. 5000, Central Avenue, Liushi Town, Leqing City, Wenzhou City, Zhejiang Province, 325600

Patentee after: Zhejiang Chutian Construction Co.,Ltd.

Address before: Room 402, Building 2, Jinxiu Huating Commercial and Residential Building, No. 5000 Central Avenue, Liushi Town, Leqing City, Wenzhou City, Zhejiang Province, 325604

Patentee before: WENZHOU CHUTIAN CONSTRUCTION Co.,Ltd.