CN207159927U - Building water-retaining structure - Google Patents
Building water-retaining structure Download PDFInfo
- Publication number
- CN207159927U CN207159927U CN201721053305.4U CN201721053305U CN207159927U CN 207159927 U CN207159927 U CN 207159927U CN 201721053305 U CN201721053305 U CN 201721053305U CN 207159927 U CN207159927 U CN 207159927U
- Authority
- CN
- China
- Prior art keywords
- baffle
- chute
- fixed mount
- mounting groove
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses building water-retaining structure,Including the first fixed mount (1),Second fixed mount (2),First baffle (3) and second baffle (4),The both ends of first baffle (3) are separately positioned in the first chute (5) and the second chute (6),The bottom of first baffle (3) sets the first sealing block (7),The bottom of first baffle (3) is used to be bonded with ground,The first mounting groove (8) is provided with the top of first baffle (3),Second baffle (4) is stacked from bottom to top,The both ends of second baffle (4) are arranged on the first chute (5) and the second chute (6),The second mounting groove (9) with the first mounting groove (8) shapes and sizes all same is provided with the top of second baffle (4),The bottom of second baffle (4) is provided with the second sealing block (10) that can be engaged with the second mounting groove (9).The beneficial effects of the utility model are:The dash effect of the application is good, and the water before building door is difficultly flowed into building, and the application also has the advantages of simple in construction, easy to use.
Description
Technical field
It the utility model is related to a kind of building water-retaining structure.
Background technology
Under the bigger weather of rainy day especially rain, tend to cause the accumulation of rainwater, as rainwater can not be timely
Discharge, it is likely that interior of building can be entered, to prevent rainwater from entering interior of building, it is necessary to which the setting in front of the door in building is kept off
Water-bound, mostly using baffle plate is set on the ground, one side and the ground of baffle plate are hinged existing water-retaining structure, work as building door
During preceding rain, flipping baffle, the water of organizing construction thing in front of the door enters in building, the sealing of the water-retaining structure of this structure
Poor, the water before building door is often infiltered in building from the gap between baffle plate both sides and baffle plate and ground, is caused
Water enters interior of building, and dash effect is poor.
The content of the invention
A kind of building water-retaining structure is the utility model is related to, is solved in the prior art because dash effect is poor, in the rainy day
Ponding before building door easily flows into the technological deficiency in building.
To solve the above problems, technical solution adopted in the utility model is:A kind of building water-retaining structure, including one
Individual the first fixed mount being vertically arranged on fixture, second fixed mount being vertically arranged on fixture, one first
Baffle plate and multiple second baffles, first be provided with towards the side of the second fixed mount on the first described fixed mount above and below it
Chute, the second chute above and below it is provided with towards the side of the first fixed mount on the second described fixed mount, described the
The both ends of one baffle plate are separately positioned in the first chute and the second chute and described first baffle can be in the first chute and the
Slided up and down in two chutes, the bottom of described first baffle is provided with along its length to be extended downwardly from and thickness is less than the
First sealing block of one Weir Plate Thickness, the bottom of first baffle is used to be bonded with ground, for the ground to be fitted with first baffle
The elongated slot for being engaged with the first sealing block is provided with face, the top of described first baffle is provided with first along its length
Mounting groove, described multiple second baffles are stacked from bottom to top, and the both ends of described second baffle are respectively arranged on the first cunning
Can move up and down in groove and the second chute and with respect to first chute and the second chute, be provided with the top of described second baffle and
Second mounting groove of the first mounting groove shapes and sizes all same, the bottom of described second baffle is provided with can be with the second mounting groove
The second sealing block being engaged.The application set can slip relative with the first fixed mount and the second fixed mount first baffle and the
Two baffle plates, the overall height of water fender can be adjusted according to the height of water level of ponding before building door, the application is due to setting first
Mounting groove, the second mounting groove, the first sealing block and the second sealing block and elongated slot on the ground, realize the first block and second
The sealing between sealing and the first block and ground between block, strengthen dash effect, the ponding before building door is difficult to
Flow into building, the dash effect of the application is good.
It is close that first is provided with as further improvement of the utility model, on the front and rear sides wall of the first described chute
Packing, is provided with the second sealing gasket on the front and rear sides wall of the second described chute, the first described sealing gasket and second close
Packing fits with first baffle and second baffle.
As further improvement of the utility model, two are respectively arranged with the front-rear side walls of the first described chute and is erected
The first straight card article, the first described sealing gasket are arranged between the first card article, and the thickness of the first described sealing gasket is more than the
The thickness of one card article, is respectively arranged with two the second vertical card articles on the front-rear side walls of the second described chute, and described the
Two sealing gaskets are arranged between the second card article, and the thickness of the second described sealing gasket is more than the thickness of the second card article.
As further improvement of the utility model, the side away from the second fixed mount is provided with the first described fixed mount
Multiple first mounting holes at left and right sides of it, the side away from the first fixed mount, which is provided with, on the second described fixed mount runs through
Multiple second mounting holes of its both sides.
It is provided with along its length as further improvement of the utility model, on described first baffle through its left and right
The first through hole at both ends, the second through hole through its left and right ends is provided with described second baffle along its length.
As further improvement of the utility model, the both ends of the first mounting groove at the top of described first baffle are respectively provided with
The third through-hole of one bottom connection first through hole, the both ends of the second mounting groove at the top of described second baffle are respectively provided with one
The fourth hole that bottom communicates with the second through hole.
As further improvement of the utility model, the first diaphragm seal is set in the first described mounting groove, described the
Second diaphragm seal is set in two mounting grooves.
In summary, the beneficial effects of the utility model are:The dash effect of the application is good, the shipwreck before building door with
Flow into building, and the application also has the advantages of simple in construction, easy to use.
Brief description of the drawings
Fig. 1 is the front view of the application.
Fig. 2 is Fig. 1 A-A sectional views.
Fig. 3 is the right view of the application.
Fig. 4 is Fig. 3 B-B sectional views.
Fig. 5 is the dimensional structure diagram of the application.
Fig. 6 is the three-dimensional exploded view of the application.
Fig. 7 is the three-dimensional exploded view of another angle of the application.
Wherein:1st, the first fixed mount;2nd, the second fixed mount;3rd, first baffle;4th, second baffle;5th, the first chute;6th,
Two chutes;7th, the first sealing block;8th, the first mounting groove;9th, the second mounting groove;10th, the second sealing block;11st, the first sealing gasket;12、
Second sealing gasket;13rd, the first card article;14th, the second card article;15th, the first mounting hole;16th, the second mounting hole;17th, first through hole;
18th, the second through hole;19th, third through-hole;20th, fourth hole.
Embodiment
Specific embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
Implement profit one:
Building water-retaining structure as shown in Fig. 1-Fig. 7, including first fixed mount being vertically arranged on fixture
1st, one is vertically arranged in fixture(Fixture in the application specifically refers to the metope of the preceding both sides of building door, can use
The ready-made metope in building door both sides, can also individually build out new metope, not shown in the accompanying drawing of the application)On it is second solid
Determine 2, first baffles 3 of frame and multiple second baffles 4, the height of the first fixed mount 1 and the second fixed mount 2 in the application can
Specifically determined according to the depth of the ponding before building door in most cases, the quantity of second baffle 4 can be according to the first fixed mount 1
Determine with the height of the second fixed mount 2, be provided with the first described fixed mount 1 towards the side of the second fixed mount 2 through thereon
Under the first chute 5, be provided with second sliding above and below it towards the side of the first fixed mount 1 on the second described fixed mount 2
Groove 6, the both ends of described first baffle 3 are separately positioned in the first chute 5 and the second chute 6 and described first baffle 3
It can be slided up and down in the first chute 5 and the second chute 6, the application is by the way that the both ends of first baffle 3 and second baffle 4 are set
Realized in the first chute 5 and the second chute 6 first baffle 3 and the fixed mount 1 of second baffle 4 and first and the second fixed mount 2 it
Between be detachably connected, the bottom of described first baffle 3 is provided with along its length to be extended downwardly from and thickness is less than the
First sealing block 7 of the thickness of one baffle plate 3, the bottom of first baffle 3 is used to be bonded with ground, for being fitted with first baffle 3
Ground on be provided with elongated slot for being engaged with the first sealing block 7(Not shown in figure), pass through elongated slot and the first sealing block 7
Coordinate, strengthen the sealing property between first baffle 3 and ground, prevent ponding from entering from the bottom of first baffle 3 in building
Portion, the top of described first baffle 3 are provided with the first mounting groove 8 along its length, described multiple second baffles 4 from it is lower to
Upper stacked, the both ends of described second baffle 4 are respectively arranged in the first chute 5 and the second chute 6 and can be with respect to first
The chute 6 of chute 5 and second moves up and down, and the top of described second baffle 4 is provided with homogeneous with the shapes and sizes of the first mounting groove 8
The second same mounting groove 9, the bottom of described second baffle 4 are provided with the second sealing block 10 that can be engaged with the second mounting groove 9,
The second sealing block 10 of a bottom bottom of second baffle 4 and first mounting groove 8 at the top of first baffle 3 match in the application
Close, realize the excellent sealing between first baffle 3 and a bottom second baffle 4, the second of other bottoms of second baffle 4
Sealing block 10 is engaged with the second mounting groove 9 below at the top of a second baffle, is realized close between second baffle 4
Envelope.
It is provided with the first sealing gasket 11 on the front and rear sides wall of first chute 5 described herein, described second
Be provided with the second sealing gasket 12 on the front and rear sides wall of chute 6, the first described sealing gasket 11 and the second sealing gasket 12 with
First baffle 3 and second baffle 4 fit, and pass through the first sealing gasket 11 and the second sealing gasket 12 and first baffle 3 and second gear
Fitting between plate 4, strengthen the sealing between the first chute 5 and the second chute 6 and first baffle 3 and second baffle 4, so as to
The sealing between first baffle 3 and the fixed mount 1 of second baffle 4 and first and the second fixed mount 2 is realized, prevents ponding from first gear
Interior of building is stretched into gap between plate 3 and the fixed mount 1 of second baffle 4 and first and the second fixed mount 2, further enhancing
The water-retaining capacity of the application.
Two the first vertical card articles 13, institute are respectively arranged with the front-rear side walls of first chute 5 described herein
The first sealing gasket 11 stated is arranged between the first card article 13, and the thickness of the first described sealing gasket 11 is more than the first card article 13
Thickness, two the second vertical card articles 14, the described second sealing are respectively arranged with the front-rear side walls of the second described chute 6
Pad 12 is arranged between the second card article 14, and the thickness of the second described sealing gasket 12 is more than the thickness of the second card article 14, by setting
The first card article 13 and the second card article 14 are put, facilitates the installation of the first sealing gasket 11 and the second sealing gasket 12, the first card in the application
Bar 13 is integrally formed with the first fixed mount 1, and the second card article 14 is integrally formed with the second fixed mount 2, to strengthen the He of the first fixed mount 1
The overall intensity of second fixed mount 2.
The side away from the second fixed mount 2 is provided with left and right sides of it on the first fixed mount 1 described herein
Multiple first mounting holes 15, the application facilitate the first fixed mount 1 and the installation of fixture, institute by setting the first mounting hole 15
The side away from the first fixed mount 1 is provided with multiple second mounting holes 16 through its both sides on the second fixed mount 2 stated, by opening
If the second mounting hole 16, facilitate the installation of the second fixed mount 2 and fixture, the first mounting hole 15 and the second mounting hole in the application
16 it is preferable use two stage steps hole, using in hexagon socket head cap screw the first mounting hole 15 of insertion and the second mounting hole 16 during use,
First fixed mount 1 and the second fixed mount 2 are detachably arranged on fixture, the peace of the first fixed mount 1 and the second fixed mount 2
Assembly and disassembly are more convenient.
The first through hole 17 through its left and right ends is provided with first baffle 3 described herein along its length,
The second through hole 18 through its left and right ends is provided with described second baffle 4 along its length, in first gear in the application
The through hole 18 of first through hole 17 and second is opened on plate 3 and second baffle 4 respectively, reduces the weight of first baffle 3 and second baffle 4,
The manufacturing cost of the application can also be reduced.
The both ends of first mounting groove 8 at the top of first baffle 3 described herein are respectively provided with a bottom connection first
The third through-hole 19 of through hole 17, the both ends of second mounting groove 9 at the described top of second baffle 4 are respectively provided with a bottom and second
The fourth hole 20 that through hole 18 communicates, the application open up third through-hole 19 and fourth hole 20, hook etc. can be used to hook the 3rd
On through hole 19, first baffle 3 is hung out out of the first chute 5 and the second chute 6, hooked with hook on fourth hole 20, can
Second baffle 4 is hung out out of the first chute 5 and the second chute 6, facilitates the peace installation and dismantling of first baffle 3 and second baffle 4
Unload.
The application sets the first diaphragm seal in the first described mounting groove 8(Not shown in figure), described second installation
Second diaphragm seal is set in groove 9(Not shown in figure), the further sealing strengthened between first baffle 3 and second baffle 4,
So as to further prevent gap penetration of the water between first baffle 3 and second baffle 4 in building, the gear of the application
Water effect is further strengthened.
The building water-retaining structure of the present embodiment specifically comprises the following steps for the method for dash before building door:
Step 1, using the bolt in the first mounting hole 15 of insertion and the second mounting hole 16 respectively by the first fixed mount 1 and the
On the fixture for the both sides that two fixed mounts 2 are fixed on building door.
Step 2, by the first sealing gasket 11 and the second sealing gasket 12 be separately mounted to the first card article 13 and the second card article 14 it
Between.
Step 3, outputed on the ground between the first fixed mount 1 and the second fixed mount 2 for matching with the first sealing block 7
The elongated slot of conjunction.
Step 4, the bottom at the both ends of first baffle 3 is individually positioned in the top of the first chute 5 and the second chute 6, and
Make first baffle 3 slide down to the first sealing block 7 of the bottom of first baffle 3 along the first chute 5 and the second chute 6 to be fastened on
In elongated slot on ground.
Step 5, as before building door water level continue to rise, by the way of step 4, by one of second baffle 4
Both ends are individually positioned in the first chute 5 and the second chute 6, and the second sealing block 10 to the bottom of second baffle 4 is fastened on
In first mounting groove 8 at the top of one baffle plate 3.
Step 6, as the water level before building door continues to raise, then repeat step 5, are installed again in the top of second baffle 4
One second baffle 4.
Step 7, when the water level descends, hooked respectively in third through-hole 19 with hook, by second baffle 4 from the first fixed mount
1 and second hangs out on fixed mount 2.
Step 8, when the water before building door all disperses, by the way of step 7, first baffle 3 is consolidated from first
Determine to hang out on the fixed mount 2 of frame 1 and second.
Step 9, the first fixed mount 1 and the second fixed mount 2 are removed.
The application can not remove the first fixed mount 1 and the second fixed mount 2, so need the dash using the application again later
When water before structure organization building door is entered in building, directly first baffle 3 and second baffle 4 can be consolidated installed in first
Determine on the fixed mount 2 of frame 1 and second, and second baffle 4 also not is required to use every time in the application, the water before building door
, can be without installing second baffle 4 again when installation first baffle 3 can organize the water to enter in building when position is relatively low.
It is prior art not do the part illustrated in description above, or can be realized by prior art.
And it is only preferably case study on implementation of the present utility model that case is embodied described in the utility model, is not used for limiting
Practical range of the present utility model.The equivalent changes and modifications that i.e. all contents according to present utility model application the scope of the claims are made,
It all should be used as technology category of the present utility model.
Claims (7)
- A kind of 1. building water-retaining structure, it is characterised in that:Including first fixed mount being vertically arranged on fixture (1), second fixed mount (2) being vertically arranged on fixture, a first baffle (3) and multiple second baffles (4), institute The first chute (5) above and below it is provided with towards the side of the second fixed mount (2) on the first fixed mount (1) stated, it is described On second fixed mount (2) the second chute (6) above and below it is provided with towards the side of the first fixed mount (1), described first The both ends of baffle plate (3) are separately positioned in the first chute (5) and the second chute (6) and described first baffle (3) can be the Slided up and down in one chute (5) and the second chute (6), the bottom of described first baffle (3) sets oriented along its length Lower stretching and thickness are less than first sealing block (7) of first baffle (3) thickness, and the bottom of first baffle (3) is used for and ground Fitting, it is described for being provided with the elongated slot for being engaged with the first sealing block (7) on the ground that is fitted with first baffle (3) The top of first baffle (3) be provided with the first mounting groove (8) along its length, described multiple second baffles (4) from it is lower to Upper stacked, the both ends of described second baffle (4) are respectively arranged in the first chute (5) and the second chute (6) and can phases First chute (5) and the second chute (6) are moved up and down, are provided with the top of described second baffle (4) and the first mounting groove (8) The second mounting groove (9) of shapes and sizes all same, the bottom of described second baffle (4) is provided with can be with the second mounting groove (9) The second sealing block (10) being engaged.
- 2. building water-retaining structure according to claim 1, it is characterised in that:Front and rear the two of described the first chute (5) The first sealing gasket (11) is provided with side wall, the second sealing is provided with the front and rear sides wall of described the second chute (6) Pad (12), described the first sealing gasket (11) and the second sealing gasket (12) are affixed with first baffle (3) and second baffle (4) Close.
- 3. building water-retaining structure according to claim 2, it is characterised in that:The front and rear side of described the first chute (5) Be respectively arranged with two vertical the first card articles (13) on wall, described the first sealing gasket (11) be arranged on the first card article (13) it Between, the thickness of described the first sealing gasket (11) is more than the thickness of the first card article (13), the front and rear side of described the second chute (6) Be respectively arranged with two vertical the second card articles (14) on wall, described the second sealing gasket (12) be arranged on the second card article (14) it Between, the thickness of described the second sealing gasket (12) is more than the thickness of the second card article (14).
- 4. building water-retaining structure according to claim 3, it is characterised in that:It is remote on described the first fixed mount (1) The side of second fixed mount (2) is provided with multiple first mounting holes (15) at left and right sides of it, described the second fixed mount (2) The upper side away from the first fixed mount (1) is provided with multiple second mounting holes (16) through its both sides.
- 5. building water-retaining structure according to claim 4, it is characterised in that:Grown on described first baffle (3) along it Degree direction is provided with the first through hole (17) through its left and right ends, is provided with and passes through along its length on described second baffle (4) Wear the second through hole (18) of its left and right ends.
- 6. building water-retaining structure according to claim 5, it is characterised in that:At the top of described first baffle (3) The both ends of one mounting groove (8) are respectively provided with the third through-hole (19) of a bottom connection first through hole (17), described second baffle (4) both ends of the second mounting groove (9) at the top of are respectively provided with the fourth hole (20) that a bottom communicates with the second through hole (18).
- 7. building water-retaining structure according to claim 6, it is characterised in that:Set in described the first mounting groove (8) First diaphragm seal, described the second mounting groove (9) is interior to set the second diaphragm seal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721053305.4U CN207159927U (en) | 2017-08-22 | 2017-08-22 | Building water-retaining structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721053305.4U CN207159927U (en) | 2017-08-22 | 2017-08-22 | Building water-retaining structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207159927U true CN207159927U (en) | 2018-03-30 |
Family
ID=61717461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721053305.4U Expired - Fee Related CN207159927U (en) | 2017-08-22 | 2017-08-22 | Building water-retaining structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207159927U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110735589A (en) * | 2018-07-19 | 2020-01-31 | 三久建材工业股份有限公司 | mouth water seepage prevention device |
-
2017
- 2017-08-22 CN CN201721053305.4U patent/CN207159927U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110735589A (en) * | 2018-07-19 | 2020-01-31 | 三久建材工业股份有限公司 | mouth water seepage prevention device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205712903U (en) | A kind of indoor facing wall mounting decoration panel and decoration panel hanging device | |
CN206737222U (en) | Cell cube section curtain wall installing device | |
CN104939529B (en) | A kind of locker | |
CN207159927U (en) | Building water-retaining structure | |
CN206677129U (en) | Save sand mold wind power product base shaping sandbox structure | |
CN109423983A (en) | Building water-retaining structure and its method for water blocking before building door | |
CN206477485U (en) | A kind of horizontal decorative strip installing structure in heavy in section | |
CN205348693U (en) | Horizontal big moulding of stone material curtain | |
CN203834867U (en) | Assembly for mounting large-sized ceramic plate on wall | |
CN206345453U (en) | A kind of pallet for mobile phone screen glass | |
CN201620697U (en) | Aluminum section steel capable of being fastened in pair | |
CN206448406U (en) | A kind of connection component of curtain wall cross beam and column | |
CN207553385U (en) | Type unitized curtain wall weights-hoist component | |
CN209637043U (en) | A kind of cross bar component of secured curtain wall plate | |
CN207427658U (en) | The mounting structure of frequency converter in a kind of control cabinet | |
CN208180911U (en) | A kind of rooftop luggage carrier | |
CN220429918U (en) | Wall-mounted charging pile | |
CN207809548U (en) | Kitchen truck headstock | |
CN221622173U (en) | Case is deposited with accessory to wind-powered electricity generation fortune dimension | |
CN206360342U (en) | A kind of rigidity having enough to meet the need hangs die device | |
CN208415651U (en) | The exceedingly high colored hoisting structure of circle | |
CN206956998U (en) | A kind of grid system in curtain wall system | |
CN1441216A (en) | Refrigerating equipment door and refrigerating equipment with said door | |
CN205513738U (en) | Quick assembly disassembly aluminum alloy frame | |
CN207724720U (en) | A kind of easy-to-mount moulding demal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180330 Termination date: 20180822 |