CN207148640U - A kind of intelligence control system for construction site - Google Patents

A kind of intelligence control system for construction site Download PDF

Info

Publication number
CN207148640U
CN207148640U CN201721224597.3U CN201721224597U CN207148640U CN 207148640 U CN207148640 U CN 207148640U CN 201721224597 U CN201721224597 U CN 201721224597U CN 207148640 U CN207148640 U CN 207148640U
Authority
CN
China
Prior art keywords
control system
intelligence control
distal end
construction site
intelligence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721224597.3U
Other languages
Chinese (zh)
Inventor
王梓霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Chun Chi Creative Technology Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721224597.3U priority Critical patent/CN207148640U/en
Application granted granted Critical
Publication of CN207148640U publication Critical patent/CN207148640U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of intelligence control system for construction site, it includes greening depositing dust spray intelligence control system, fire fighting supply intelligence control system, concrete mark supports room intelligence control system, daylighting illumination intelligence control system, power consumption intelligent monitor system, temperature difference of mass concrete intelligent monitor system, labour's intelligent data analysis system, eight big subsystem of alarm intelligent monitoring system, each subsystem is connected by control circuit with server and central control cabinet, by central control cabinet set instruction can each subsystem of independent control also control multiple subsystems simultaneously.The shortcomings that it can solve the single use of prior art prior art device and can not monitor in real time, it is impossible to which equipment is incorporated into the technical problem in a control platform.

Description

A kind of intelligence control system for construction site
Technical field
The utility model belongs to construction site " green energy conservation " intelligent control technology field.Its main application is to apply In terms of " green energy conservation " specific implementation of work enterprise in whole building construction process, final purpose is that work progress is green Colour circle is protected, enterprise is cost-effective, enhancing efficiency by relying on tapping internal latent power.
Background technology
With the development of construction industry, each side that takes part in building payes attention to all the more " green energy conservation " management, particularly construction enterprises, for Cost management and technical requirements in terms of " green energy conservation " propose higher standard.And under conventional management models, exist " people " Factor causes the drawbacks of waste of inevitable resource, increase of cost.Simultaneously outstanding building enterprise also quickly to Green building site, environmentally friendly building site, the transformation of intelligent building site, progressively change traditional architecture Construction management using science and technology.At present There are some products such as service rack, spray, haze detection device to be used for construction site on the market, but be all tables of equipment one be present The shortcomings that use, equipment can not be incorporated into a control platform.
Nowadays Internet technology and intelligent intelligent control technology develop rapidly, and how to allow the science and technology of current forefront Move towards " building site " to service for us, offered convenience for " green energy conservation " construction management of enterprise, to reduce resource consumption and environment Protection is made contributions, and can increase the core competitiveness of construction enterprises.A kind of intelligent control technology is needed now to solve to work as Before the problem of existing.
The content of the invention
The purpose of this utility model is the above-mentioned deficiency of customer service, there is provided a kind of intelligent control system for construction site System, by the comprehensive function of server, central control cabinet and each subsystem, can solve the problem that prior art device single use Shortcoming, it is impossible to which equipment is incorporated into the technical problem in a control platform.
The purpose of this utility model is implemented by following scheme:
A kind of intelligence control system for construction site, it includes server and central control cabinet, and server output connects Mouth link central control cabinet input interface, central control cabinet output interface link control circuit near-end, central control cabinet pass through control Room intelligence is supported with greening depositing dust spray intelligence control system, fire fighting supply intelligence control system, concrete mark in circuit distal end processed respectively Can control system, daylighting illumination intelligence control system, power consumption intelligent monitor system, temperature difference of mass concrete intelligent monitoring System, labour's intelligent data analysis system, the big subsystem input interface of alarm intelligent monitoring system eight are connected.
Above-mentioned control circuit distal end connects dust granules concentration sensor respectively and sprays the input interface of force (forcing) pump, spray Force (forcing) pump is arranged on feedwater piping, and feedwater piping water inlet is connected with cistern delivery port, and cistern water inlet goes out with water source The mouth of a river is connected, and control circuit distal end extends to the live spray head of depositing dust region and afforested areas.
Above-mentioned control circuit distal end connects frequency converter respectively and pressure gauge, fire-fighting force (forcing) pump and pressure gauge are arranged in feed pipe On road, feedwater piping water inlet is connected with cistern delivery port, and cistern water inlet is connected with water source delivery port, control circuit Distal end extends to fire-fighting delivery port.
Above-mentioned control circuit distal end is connected in the temperature sensor in large area concrete.
Above-mentioned control circuit distal end connection labour's data acquisition unit.
Above-mentioned control circuit distal end connection alarm inductor.
Above-mentioned control circuit distal end connects Temperature Humidity Sensor, heater access port in concrete Specimen Room respectively, adds Hot device line output is connected with power supply, and concrete sample ceiling is provided with live spray head, and live spray head is arranged at feedwater One of pipe end.
Above-mentioned control circuit distal end connection intensity of illumination sensor line input, intensity of illumination sensor line output end Contactor is connected, power supply connects contactor line input by power line, and contactor line output is connected by power line Lighting bulb.
Above-mentioned control circuit distal end connection intelligent electric meter input interface, intelligent electric meter input interface connect power supply output simultaneously Interface, intelligent electric meter output interface are connected respectively to material processing operation area work zone line input.
Above-mentioned feedwater piping initial end is arranged at water source, and first lateral of feedwater piping extends to concrete sample Interior, and end is provided with live spray head, second lateral of feedwater piping extends to depositing dust region and afforested areas, and Live spray head is provided with pipeline, the 3rd lateral of feedwater piping extends to fire-fighting delivery port.
Cistern is provided between above-mentioned first lateral of feedwater piping and second lateral, feedwater piping is defeated Go out end connection cistern water inlet, connect cistern delivery port connection feedwater piping delivery port.
The characteristics of the utility model, is:
1st, " green energy conservation " intelligence control system and corollary equipment have completed, and make in pilot construction site input With, and work well, stable equipment operation.In a manual mode, instruction is communicated to equipment by user by central control cabinet, if It is standby the running status of itself to be changed according to instruction;Under intelligent mode, user passes through server, central control cabinet and biography Sensor coordinated, the running status of equipment is made a change in real time.
2nd, operating personnel are realized remote control is carried out to construction site equipment in fixed-site, reduce labor intensity.
3rd, the integration of each equipment and system in identical platform is realized, forms a set of intelligent equipment.
4th, observation data are reflected on server display terminal in real time, and in default form, such as energy resource consumption form, prison Control data sheet etc. can export printing.
5th, enterprise in charge of construction " green energy conservation " engineering management, wound can operate with by actual use, intelligence control system Build " Green civilization building site " management, property " providing quality goods or brilliant " management etc..
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is overall structure diagram of the present utility model.
Embodiment
A kind of intelligence control system for construction site as shown in Figure 1, it includes server 1 and central control cabinet 2, clothes The business device 1 output interface link input interface of central control cabinet 2, the output interface of the central control cabinet 2 link near-end of control circuit 27, in Switch board 2 is entreated to spray intelligence control system, fire fighting supply intelligent control system with greening depositing dust respectively by the distal end of control circuit 27 System, concrete mark support room intelligence control system, daylighting illumination intelligence control system, power consumption intelligent monitor system, large volume Concrete temperature difference intelligent monitor system, labour's intelligent data analysis system, the input of eight big subsystem of alarm intelligent monitoring system Interface is connected.
The distal end of control circuit 27 connects the input interface of dust granules concentration sensor 4 and spray force (forcing) pump 3 respectively, Spray force (forcing) pump 3 is arranged on feedwater piping 26, and the water inlet of feedwater piping 26 is connected with the delivery port of cistern 11, and cistern 11 enters The mouth of a river is connected with the delivery port of water source 24, and the distal end of control circuit 27 extends to the scene spray of depositing dust region 29 and afforested areas 30 First 5.
The distal end of control circuit 27 connects frequency converter 8 respectively and pressure gauge 10, fire-fighting force (forcing) pump 6 and pressure gauge 10 are arranged On feedwater piping 26, the water inlet of feedwater piping 26 is connected with the delivery port of cistern 11, and the water inlet of cistern 11 goes out with water source 24 The mouth of a river is connected, and the distal end of control circuit 27 extends to fire-fighting delivery port 7.
The distal end of control circuit 27 is connected in the temperature sensor 19 in large area concrete 18.
The control circuit 27 distally connects labour's data acquisition unit 21.
The control circuit 27 distally connects alarm inductor 20.
Temperature Humidity Sensor 16, the heater 17 that the distal end of control circuit 27 connects in concrete Specimen Room 15 respectively connect Entrance, the line output of heater 17 are connected with power supply 25, and the top of concrete Specimen Room 15 is provided with live spray head 5, scene spray Leaching first 5 is arranged at one of end of feedwater piping 26.
The control circuit 27 distally connects the line input of intensity of illumination sensor 14, the circuit of intensity of illumination sensor 14 Output end connects contactor 12, and power supply 25 connects the line input of contactor 12, the circuit output of contactor 12 by power line 28 End connects lighting bulb 13 by power line 28.
The control circuit 27 distally connects the input interface of intelligent electric meter 9, and the input interface of intelligent electric meter 9 connects power supply simultaneously 25 output interfaces, the output interface of intelligent electric meter 9 are connected respectively to the material processing line input of 22 work zone of operation area 23.
The initial end of feedwater piping 26 is arranged at water source 24, and 26 first laterals of feedwater piping extend to coagulation In native Specimen Room 15, and end is provided with live spray head 5, and 26 second laterals of feedwater piping extend to depositing dust region 29 With afforested areas 30, and live spray head 5 is provided with pipeline, the 3rd lateral of feedwater piping 26 extends to fire-fighting water outlet Mouth 7.
Cistern 11, feedwater piping 26 are provided between 26 first laterals of feedwater piping and second lateral Output end connects the water inlet of cistern 11, connects the delivery port of the cistern 11 connection delivery port of feedwater piping 26.
Embodiment:
In a manual mode, instruction is communicated to equipment by user by central control cabinet, and equipment will change according to instruction The running status of itself;Under intelligent mode, user is coordinated by server, central control cabinet and sensor synergism, in real time The running status of equipment is made a change.
First, depositing dust spray intelligent control principle is afforested
Dust granules concentration sensor detects the concentration of live dust granules in real time, and data feedback is controlled to center Cabinet.We can preset in advance opening time limit value and spray dust granules pre-set limit on the server, when meeting following situations When:
Depositing dust region:When detectable concentration is less than or equal to pre-set limit, in spite of in set opening time limit value, Central control cabinet carries out closing control to spray force (forcing) pump.
Detectable concentration is more than pre-set limit, while also passes through central control cabinet pair in set opening time limit value Spray force (forcing) pump carries out unlatching control, spray head water spray;
Detectable concentration is more than pre-set limit, but not in set opening time limit value, by central control cabinet to spray Drench force (forcing) pump and carry out closing control.
Afforested areas:When in the opening time limit value in setting, central control cabinet carries out unlatching control to spray force (forcing) pump, Spray head is sprayed water.Otherwise carry out closing control.
2nd, fire fighting supply intelligent control principle
Fire-fighting delivery port is opened, and the pressure value of pressure gauge is less than pre-set limit on server.Central control cabinet is to frequency converter It is controlled, starts fire-fighting force (forcing) pump.Variation in water pressure feedback analog signal is to central control cabinet, central control cabinet foundation in pipeline Internal logic program adjusts frequency converter.
3rd, concrete mark supports room intelligent control principle
Temperature Humidity Sensor monitors the temperature and humidity that concrete mark supports room in real time, and feedback analog signal is controlled to center Cabinet processed.User presets humiture limit value on the server, when meeting following situations:
When humidity is less than pre-set limit, central control cabinet carries out unlatching control to spray force (forcing) pump, spray head water spray, carries High humility, closed after limit value;
When temperature is higher than pre-set limit, central control cabinet carries out unlatching control to spray force (forcing) pump, and spray head is sprayed water, Temperature is reduced, is closed after limit value;
When temperature is less than pre-set limit, central control cabinet carries out unlatching control to heater, raises temperature, until limit Closed after value;
4th, daylighting illumination intelligent control principle
Intensity of illumination sensor monitors the intensity of illumination in electricity consumption area in real time, and by data feedback to central control cabinet.User Intensity of illumination limit value and lighting bulb opening time limit value are preset on the server, when meeting following situations:
When actual measurement brightness is more than intensity of illumination limit value, in spite of in opening time limit value, central control cabinet docks Tentaculum is controlled, and closes illuminator;
When actual measurement brightness is less than intensity of illumination limit value, but not in opening/closing time limit value, central control cabinet is to contactor It is controlled, closes illuminator;
When actual measurement brightness is less than intensity of illumination limit value, and in setting opening time limit value, central control cabinet is to contact Device is controlled, and opens illuminator.
Power consumption intelligent monitoring principle:According to actual conditions, needing the region of electricity consumption according to certain criteria for classifying Several electricity consumption areas are divided into, and an intelligent electric meter is installed respectively in electricity consumption area, user presets each electricity consumption on the server Area's power consumption limit value.Power consumption can be fed back to central control cabinet by ammeter.When power consumption is higher than setting value, in Centre switch board, which is output signals on server, prompts power consumption exceeded.
Temperature difference of mass concrete intelligent monitoring principle
Temperature sensor monitors the internal temperature and surface temperature of mass concrete in real time, and analog signal is fed back to Central control cabinet.We can fiducial temperature limit value on the server, when meeting following situations:
When atmospheric temperature and the surface temperature of mass concrete differ by more than, central control cabinet outputs signals to server Upper prompting excessive temperature differentials;
When the internal temperature of mass concrete and the surface temperature of mass concrete differ by more than 20 DEG C, center control Cabinet) output signals to and excessive temperature differentials is prompted on server.
Labour's intelligent data analysis system principle
Labour's data acquisition unit can record daily into scene labor service personnel's quantity and enter time of appearance, and by number According to(Divided with the period, form number, work total time, construction speed completion value triadic relation figure).Feed back to server 1. We can pre-set limit on the server, when meeting following situations:
When labor service personnel's quantity measured value is less than setting value, central control cabinet, which is output signals to, prompts labor service on server It is undermanned;
When labor service personnel's activity duration measured value is less than setting value, central control cabinet outputs signals on server and prompted Labor service personnel's activity duration deficiency.
Alarm intelligent monitors principle:Inductor alarm in the opening time limit value set by server, central control cabinet Unlatching control just is carried out to alarm inductor, otherwise carries out closing control.

Claims (10)

1. a kind of intelligence control system for construction site, it includes server (1) and central control cabinet (2), its feature exist In:Server (1) output interface links central control cabinet (2) input interface, central control cabinet (2) output interface link control line Road(27)Near-end, central control cabinet (2) pass through control circuit(27)Distal end sprays intelligence control system with greening depositing dust respectively, disappeared Anti- water supply intelligence control system, concrete mark support room intelligence control system, daylighting illumination intelligence control system, power consumption intelligence Monitoring system, temperature difference of mass concrete intelligent monitor system, labour's intelligent data analysis system and alarm intelligent monitoring The input interface of system is connected.
A kind of 2. intelligence control system for construction site according to claim 1, it is characterised in that:The control line Road(27)Distal end connects dust granules concentration sensor respectively(4)With spray force (forcing) pump(3)Input interface, spray force (forcing) pump (3)It is arranged in feedwater piping(26)On, feedwater piping(26)Water inlet and cistern(11)Delivery port connects, cistern(11)Enter The mouth of a river and water source(24)Delivery port is connected, control circuit(27)Distal end extends to depositing dust region(29)And afforested areas(30)'s Live spray head(5).
A kind of 3. intelligence control system for construction site according to claim 1, it is characterised in that:The control line Road(27)Distal end connects frequency converter respectively(8)And pressure gauge(10), fire-fighting force (forcing) pump(6)And pressure gauge(10)It is arranged in feed pipe Road(26)On, feedwater piping(26)Water inlet and cistern(11)Delivery port connects, cistern(11)Water inlet and water source(24) Delivery port is connected, control circuit(27)Distal end extends to fire-fighting delivery port(7).
A kind of 4. intelligence control system for construction site according to claim 1 or 3, it is characterised in that:The control Circuit processed(27)Distal end is connected in large area concrete(18)Interior temperature sensor(19).
A kind of 5. intelligence control system for construction site according to claim 1 or 3, it is characterised in that:The control Circuit processed(27)Distal end connection labour's data acquisition unit(21);Control circuit(27)Distal end connection alarm inductor(20).
A kind of 6. intelligence control system for construction site according to claim 1, it is characterised in that:The control line Road(27)Distal end connects concrete Specimen Room respectively(15)Interior Temperature Humidity Sensor(16), heater(17)Access port, heating Device(17)Line output is connected with the first power supply(31), concrete Specimen Room(15)Top is provided with live spray head(5), scene Spray head(5)It is arranged at feedwater piping(26)One of end.
A kind of 7. intelligence control system for construction site according to claim 1, it is characterised in that:The control line Road(27)Distal end connection intensity of illumination sensor(14)Line input, intensity of illumination sensor(14)Line output connects Tentaculum(12), second source(32)Pass through power line(28)Connect contactor(12)Line input, contactor(12)Circuit is defeated Go out end and pass through power line(28)Connect lighting bulb(13).
A kind of 8. intelligence control system for construction site according to claim 1, it is characterised in that:The control line Road(27)Distal end connection intelligent electric meter(9)Input interface, intelligent electric meter(9)Input interface connects the 3rd power supply simultaneously(25)Output Interface, intelligent electric meter(9)Output interface is connected respectively to material processing operation area(22)Work zone(23)Line input.
A kind of 9. intelligence control system for construction site according to claim 2, it is characterised in that:The feed pipe Road(26)Initial end is arranged at water source(24)Place, feedwater piping(26)First lateral(33)Extend to concrete Specimen Room (15)It is interior, and end is provided with live spray head(5), feedwater piping(26)Second lateral(34)Extend to depositing dust region (29)And afforested areas(30), and live spray head is provided with pipeline(5), feedwater piping(26)3rd lateral(35) Extend to fire-fighting delivery port(7).
A kind of 10. intelligence control system for construction site according to claim 2, it is characterised in that:The feedwater Pipeline(26)Cistern is provided between first lateral and second lateral(11), feedwater piping(26)Output end Connect cistern(11)Water inlet, connect cistern(11)Delivery port connects feedwater piping(26)Delivery port.
CN201721224597.3U 2017-09-22 2017-09-22 A kind of intelligence control system for construction site Expired - Fee Related CN207148640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721224597.3U CN207148640U (en) 2017-09-22 2017-09-22 A kind of intelligence control system for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721224597.3U CN207148640U (en) 2017-09-22 2017-09-22 A kind of intelligence control system for construction site

Publications (1)

Publication Number Publication Date
CN207148640U true CN207148640U (en) 2018-03-27

Family

ID=61668526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721224597.3U Expired - Fee Related CN207148640U (en) 2017-09-22 2017-09-22 A kind of intelligence control system for construction site

Country Status (1)

Country Link
CN (1) CN207148640U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108803739A (en) * 2018-06-20 2018-11-13 中国五冶集团有限公司 A kind of wisdom building site spraying linkage management system
CN109949289A (en) * 2019-03-18 2019-06-28 四川轻化工大学 Concrete surface defect image identification system and method based on artificial intelligence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108803739A (en) * 2018-06-20 2018-11-13 中国五冶集团有限公司 A kind of wisdom building site spraying linkage management system
CN109949289A (en) * 2019-03-18 2019-06-28 四川轻化工大学 Concrete surface defect image identification system and method based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN208576042U (en) The premixing system remotely controlled
CN201321631Y (en) Secondary water supply safe intelligent management system
CN203748358U (en) Accurate irrigation device based on internet of things
CN203797782U (en) District heating distribution type monitoring management system
CN207148640U (en) A kind of intelligence control system for construction site
CN103977659A (en) Water-spray type dust suppression system and control device thereof
CN101269522A (en) Directly ventilated type full-automatic concrete constant-temperature moisture-keeping maintaining machine
CN101696820A (en) Gas heater with functions of wireless remote control and automatic monitoring of harmful gas
CN102759914A (en) Intelligent sewage treatment monitoring system based on ZigBee Internet of Things
CN103034222A (en) Integration-monitoring integrated construction energy saving electrical system
CN108744362A (en) A kind of fire fighting device engineering wireless real-time monitoring intelligent alarm and fire extinguishing system
CN112102598A (en) Fire-fighting system
CN208671151U (en) Heating energy consumption monitors system
CN104776489B (en) A kind of heat exchange station intelligent controller
CN207394967U (en) A kind of heat supply secondary network intelligent power saving and balance control system
CN111210687B (en) Operation and maintenance training platform for electromechanical equipment system of urban rail transit
CN213482651U (en) Intelligent safe energy-saving control system for office building
CN209605876U (en) A kind of water consumption monitoring device
CN104864482A (en) Energy-saving metering and controlling device for building heat supply
CN201508022U (en) Gas water heater with functions of wireless remote control and automatic harmful gas monitoring
CN208903464U (en) A kind of constant pressure water supply system actual training device
CN205475479U (en) Two drag three types intelligence variable frequency control cabinet and contain its constant pressure water supply system
CN207633421U (en) Non-negative pressure water-supply installation booster protective device
CN210434198U (en) Green construction net-shaped spraying automatic dust settling system
CN209686518U (en) A kind of cell pipe network subregion is without negative pressure Multi-stacking compaction energy-saving water supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180919

Address after: 433200 No. 6, 8 6, Hua Shi Yuan North Road, East Lake New Technology Development Zone, Wuhan, Hubei, China, 17

Patentee after: Wuhan Chun Chi Creative Technology Ltd.

Address before: 443100 Wangjiang garden, Wangjiang Road, Yiling District, Yichang, Hubei, China

Patentee before: Wang Zixiao

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20210922

CF01 Termination of patent right due to non-payment of annual fee