CN207143688U - A kind of bituminous paving pours mould structure - Google Patents

A kind of bituminous paving pours mould structure Download PDF

Info

Publication number
CN207143688U
CN207143688U CN201721122944.1U CN201721122944U CN207143688U CN 207143688 U CN207143688 U CN 207143688U CN 201721122944 U CN201721122944 U CN 201721122944U CN 207143688 U CN207143688 U CN 207143688U
Authority
CN
China
Prior art keywords
block
opening position
movable block
plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721122944.1U
Other languages
Chinese (zh)
Inventor
王淮
王丽虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongyang Xinhui Building Materials Co ltd
Original Assignee
Dongyang New Yue Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongyang New Yue Construction Co Ltd filed Critical Dongyang New Yue Construction Co Ltd
Priority to CN201721122944.1U priority Critical patent/CN207143688U/en
Application granted granted Critical
Publication of CN207143688U publication Critical patent/CN207143688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of bituminous paving to pour mould structure, mould including being arranged on both sides of the road, the mould includes bottom plate, opening position of the plate top surface close to right side is provided with fixed block, opening position at the top of the fixed block is provided with movable block, the fixed block is left, right two sides are provided with shifting groove close to position in the middle, the movable block, which is internally provided with, coordinates the shifting block for moving groove, the shifting block and the movable block are integral type structure, the shifting block is T-shaped, opening position on the right side of the movable block is provided with stereotype plate, opening position between the stereotype plate and the movable block is provided with fix bar;The device is by being provided with two symmetrically arranged moulds, middle road surface is during compression, unnecessary certainly will extrude toward both sides, then the stop of mould is passed through, so that the both sides of road form solid and attractive in appearance edge, the structure of the present apparatus is relatively simple, and cost is more cheap, is adapted to promote the use of.

Description

A kind of bituminous paving pours mould structure
Technical field
It the utility model is related to a kind of bituminous paving and pour mould structure.
Background technology
Bituminous paving refers to various types of road surfaces that bitumen for road use material making is mixed in mineral material, and pitch combines Material improves the ability paved the way and damaged with pellet resistance driving and natural cause road pavement, evenness of road surface is lacked dirt, waterproof, warp Durable long, therefore, bituminous paving is a kind of high class pavement being the most widely used in road construction.
But road surface often have ignored the both sides of road during asphalt, if both sides of the road without Processing, entered automobile and rolled for a long time, and road surface will be made to be damaged by both sides, based on above mentioned problem, it is desirable to provide a kind of Can solve problem pours mould structure.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of bituminous paving and pours mould structure, and the device passes through Two symmetrically arranged moulds are provided with, during compression, unnecessary certainly will extrude toward both sides, then pass through on middle road surface The stop of mould so that the both sides of road form solid and attractive in appearance edge.
The utility model is achieved through the following technical solutions:
A kind of bituminous paving pours mould structure, including is arranged on the mould of both sides of the road, and two moulds are symmetrically set Put on the both sides of road, the mould includes bottom plate, and opening position of the plate top surface close to right side is provided with fixed block, described It is welded and fixed between fixed block and the bottom plate, the opening position that the plate top surface is located on the left of the fixed block is provided with four Fixed screw, the opening position at the top of the fixed block are provided with movable block, and the opening position of the movable block bottom surface is provided with cooperation The neck of the fixed block, the fixed block arranged on left and right sides face are provided with shifting groove close to position in the middle, and the shifting groove is vertical Through the fixed block, the movable block, which is internally provided with, coordinates the shifting block for moving groove, and the shifting block and the movable block are Integral structure, the shifting block is T-shaped, and the opening position on the right side of the movable block is provided with stereotype plate, the stereotype plate with it is described Opening position between movable block is provided with fix bar.
Preferably, the bottom plate is provided with more than two pieces, is bonded and sets between more than two pieces of the bottom plate;Pass through setting There is polylith bottom plate, can secure a base plate in advance on road surface, on the one hand make it that road surface is straight, be on the other hand moved easily block It is mobile.
Preferably, the movable block left surface is provided with baffle plate close to position in the middle, and the baffle plate, which is tilted to the left, to be set Put, the opening position on the right side of the baffle plate is provided with contiguous block, and the opening position of the movable block left surface, which is provided with, coordinates the company Connect the mounting hole of block;By being provided with baffle plate, it is therefore prevented that pitch is directly dropped on fixed screw.
Preferably, the opening position between the stereotype plate left surface and the bottom plate is provided with support block, the support block It is welded and fixed between the stereotype plate;By being provided with support block, the intensity of stereotype plate is added, prevents stereotype plate bottom from leaking Material.
The beneficial effects of the utility model are:The device is existed by being provided with two symmetrically arranged moulds, middle road surface During compression, unnecessary certainly will extrude toward both sides, then pass through the stop of mould so that the both sides of road form solid And edge attractive in appearance, the structure of the present apparatus is relatively simple, and cost is more cheap, is adapted to promote the use of.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is front view of the present utility model;
Fig. 2 is sectional view of the present utility model;
Fig. 3 is the exploded view of mould.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine in any way.
Any feature disclosed in this specification (including any accessory claim, summary and accompanying drawing), except non-specifically chatting State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
A kind of bituminous paving as shown in Figure 1, Figure 2 and Figure 3 pours mould structure, including is arranged on the mould of both sides of the road 1, two moulds 1 are symmetricly set on the both sides of road, and the mould 1 includes bottom plate 101, and the top surface of bottom plate 101 is close The opening position on right side is provided with fixed block 102, is welded and fixed between the fixed block 102 and the bottom plate 101, the bottom plate Opening position of 101 top surfaces positioned at the left side of fixed block 102 is provided with four fixed screws 103, the top of fixed block 102 Opening position is provided with movable block 104, and the opening position of the bottom surface of movable block 104 is provided with the neck for coordinating the fixed block 102 105, the arranged on left and right sides face of fixed block 102 is provided with close to position in the middle moves groove 106, and the shifting groove 106 vertically runs through The fixed block 102, the movable block 104, which is internally provided with, coordinates the shifting block 107 for moving groove 106, the shifting block 107 and institute It is integral type structure to state movable block 104, and the shifting block 107 is T-shaped, and the opening position on the right side of movable block 104 is provided with sizing Plate 2, the opening position between the stereotype plate 2 and the movable block 104 are provided with fix bar 201.
A preferred embodiment in the utility model, the bottom plate 101 are provided with more than two pieces, more than two pieces described It is bonded and sets between bottom plate 101;It by being provided with polylith bottom plate, can secure a base plate on road surface, on the one hand cause in advance Road surface is straight, is on the other hand moved easily the movement of block.
A preferred embodiment in the utility model, the left surface of movable block 104 are set close to position in the middle There is a baffle plate 3, the baffle plate 3 is tilted to the left setting, and the opening position on the right side of baffle plate 3 is provided with contiguous block 301, the movable block The opening position of 301 left surfaces is provided with the mounting hole 302 for coordinating the contiguous block 301;By being provided with baffle plate, it is therefore prevented that pitch Directly drop on fixed screw.
A preferred embodiment in the utility model, the position between the left surface of stereotype plate 2 and the bottom plate 101 Place is provided with support block 202, is welded and fixed between the support block 202 and the stereotype plate 2;By being provided with support block, increase Add the intensity of stereotype plate, prevent stereotype plate bottom material leakage.
The beneficial effects of the utility model are:The device is existed by being provided with two symmetrically arranged moulds, middle road surface During compression, unnecessary certainly will extrude toward both sides, then pass through the stop of mould so that the both sides of road form solid And edge attractive in appearance, the structure of the present apparatus is relatively simple, and cost is more cheap, is adapted to promote the use of.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any change or replacement expected without creative work, should all cover within the scope of protection of the utility model. Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of bituminous paving pours mould structure, it is characterised in that:Mould including being arranged on both sides of the road, two moulds Tool is symmetricly set on the both sides of road, and the mould includes bottom plate, and opening position of the plate top surface close to right side is provided with solid Determine block, be welded and fixed between the fixed block and the bottom plate, the plate top surface is located at the opening position on the left of the fixed block It is provided with four fixed screws, the opening position at the top of the fixed block is provided with movable block, the opening position of the movable block bottom surface The neck for coordinating the fixed block is provided with, the fixed block arranged on left and right sides face is provided with shifting groove, institute close to position in the middle State shifting groove and vertically run through the fixed block, the movable block, which is internally provided with, coordinates the shifting block for moving groove, the shifting block and institute It is integral type structure to state movable block, and the shifting block is T-shaped, and the opening position on the right side of the movable block is provided with stereotype plate, described fixed Opening position between template and the movable block is provided with fix bar.
2. bituminous paving according to claim 1 pours mould structure, it is characterised in that:The bottom plate be provided with two pieces with On, it is bonded and sets between more than two pieces of the bottom plate.
3. bituminous paving according to claim 1 pours mould structure, it is characterised in that:The movable block left surface is close Position in the middle is provided with baffle plate, and the baffle plate is tilted to the left setting, and the opening position on the right side of the baffle plate is provided with contiguous block, The opening position of the movable block left surface is provided with the mounting hole for coordinating the contiguous block.
4. bituminous paving according to claim 1 pours mould structure, it is characterised in that:The stereotype plate left surface and institute State the opening position between bottom plate and be provided with support block, be welded and fixed between the support block and the stereotype plate.
CN201721122944.1U 2017-09-04 2017-09-04 A kind of bituminous paving pours mould structure Active CN207143688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721122944.1U CN207143688U (en) 2017-09-04 2017-09-04 A kind of bituminous paving pours mould structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721122944.1U CN207143688U (en) 2017-09-04 2017-09-04 A kind of bituminous paving pours mould structure

Publications (1)

Publication Number Publication Date
CN207143688U true CN207143688U (en) 2018-03-27

Family

ID=61677179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721122944.1U Active CN207143688U (en) 2017-09-04 2017-09-04 A kind of bituminous paving pours mould structure

Country Status (1)

Country Link
CN (1) CN207143688U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726354A (en) * 2020-12-29 2021-04-30 张玉香 Repair equipment and repair method for road surface expansion joint for highway maintenance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726354A (en) * 2020-12-29 2021-04-30 张玉香 Repair equipment and repair method for road surface expansion joint for highway maintenance

Similar Documents

Publication Publication Date Title
CN1172188A (en) Method of Paving with asphalt mix
CN207143688U (en) A kind of bituminous paving pours mould structure
CN207633178U (en) A kind of municipal road construction pitch spreads out and puts on machine
CN207958936U (en) Tiltable formula for improving spreading evenness assists ironing machine
CN212199980U (en) Port construction is with interlocking piece shop interval positioning control device
CN204590545U (en) Can be used for the floor gun of floor rabbet
CN208009183U (en) Highway Pavement Structures
CN205399141U (en) Prevent device of educing before paver on baffle
CN214245267U (en) Highway road surface crack pitch repair equipment
CN205804125U (en) A kind of road surface in-situ heat regeneration paving box
CN211897730U (en) Highway engineering is with small-size road surface evener
CN206011384U (en) A kind of high intensity curb stone mould
CN204054358U (en) A kind of device improving broken spelling processing of stone and efficiency of construction
CN209099091U (en) A kind of pavement structure of suitable water country and town style and features
CN207646560U (en) A kind of general slope accessory plate
CN202595601U (en) Anti-segregation stopper device for paver
CN206070251U (en) A kind of anti-seismic rail board
CN205115961U (en) Striker plate before paver material conveying spirals with adjustment interval function
CN215289567U (en) Permeable asphalt pavement
CN206015491U (en) A kind of curb stone mould
CN205295891U (en) Paver helical tooth roller box dam device
CN205905281U (en) Mould case is used to foaming mold utensil
CN207260000U (en) A kind of adjustable road stake of road construction
CN204098459U (en) A kind of wall floating device
CN213625144U (en) Fine control leveling device for asphalt pavement flatness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230808

Address after: Room 3050, Building A4, No. 3 Gutan Avenue, Economic Development Zone, Gaochun District, Nanjing City, Jiangsu Province, 210000

Patentee after: Nanjing Road Yunchang New Building Materials Co.,Ltd.

Address before: 322100 Pansong village, Liushi street, Dongyang City, Jinhua City, Zhejiang Province

Patentee before: DONGYANG CITY XINYUE CONSTRUCTION CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240429

Address after: 322100 Pansong Village, Liushi Street, Dongyang City, Jinhua City, Zhejiang Province (self declared)

Patentee after: Dongyang Xinhui Building Materials Co.,Ltd.

Country or region after: China

Address before: Room 3050, Building A4, No. 3 Gutan Avenue, Economic Development Zone, Gaochun District, Nanjing City, Jiangsu Province, 210000

Patentee before: Nanjing Road Yunchang New Building Materials Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right