CN207142776U - A kind of artificial digging pile is unearthed lifting device - Google Patents
A kind of artificial digging pile is unearthed lifting device Download PDFInfo
- Publication number
- CN207142776U CN207142776U CN201721077975.XU CN201721077975U CN207142776U CN 207142776 U CN207142776 U CN 207142776U CN 201721077975 U CN201721077975 U CN 201721077975U CN 207142776 U CN207142776 U CN 207142776U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- connecting rod
- pole
- chutes
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Structure Of Belt Conveyors (AREA)
Abstract
The utility model discloses a kind of unearthed lifting device of artificial digging pile,Including base and caisson,The two side ends of support are fixedly connected with the base,The caisson is located at the lower section of support,The utility model is by adding support,Head rod,Travelling gear,The structure such as the second connecting rod and the second pole,By connecting external power source,Start driving motor,Drive conveyer belt rotation,Native slag or earth and stone material are put into containing case by staff in caisson,It is sent to by conveyer belt rotation on base,Reuse muck haulage car and transport working region,The progress to be worked with borehole,Hole deepens,Now,Utilize positive and negative switch,Start regulation motor,Rotate screw rod,So that the 3rd connecting rod is moved to the left,It has adjusted the distance of the 3rd connecting rod and the second connecting rod,Decline the height of the conveyer belt in caisson,It is more beneficial for being unearthed for artificial digging pile.
Description
Technical field
Bridge hole-digging pile construction field is the utility model is related to, specially a kind of artificial digging pile is unearthed lifting device.
Background technology
In Road Bridge Pile Foundation construction, a bridge block pier is designed and constructed by more pile bases, to meet quickly to apply
Work, more pile foundations are excavated simultaneously, are created conditions to bridge bearing platform construction, are typically made using machine drilling stake and artificial digging pile pore-forming
Industry.In the case where geological conditions allows to accelerate construction, more using artificial digging pile.Because pile foundation compares in construction operation
Deep, hand excavation earth and stone material side and material, equipment lifting are restricted, and such as lift job mix artificial construction, cost with crane
Height, hoistman can not see bottom hole operation, it is necessary to which a people, which specially commands, could complete lifting operation, from current domestic highway bridge
Beam pile foundation excavation pile construction situation sees that construction period still manually coordinates autocrane to complete, and machinery input wastes, and work is strong
Degree is big, and security risk is high, and man-machine cooperation is difficult, and work efficiency is low, and speed of application is slow.
Utility model content
The purpose of this utility model is to provide a kind of artificial digging pile unearthed lifting device, to solve above-mentioned background technology
The problem of middle proposition.
A kind of artificial digging pile is unearthed lifting device, including base and caisson, and support is fixedly connected with the base
Two side ends, the caisson are located at the lower section of support, and the lower surface of one section of the support level is fixedly connected with head rod
Upper end, the lower end of the head rod are vertically fixedly connected with one end of the first pole, and the other end of first pole is fixed
The bottom of driving motor is connected, the output end of the driving motor is fixedly connected with the center of travelling gear, and the travelling gear is nibbled
The rack of connection conveyer belt reverse side is closed, the front of the conveyer belt is provided with two the first chutes, and the reverse side of the conveyer belt is provided with
Two the second chutes and a rack, and rack, between two the second chutes, the front of the conveyer belt is fixedly connected with
Some containing cases, and containing case, between two the first chutes, being fixedly connected sequentially from left to right on the base has two
4th connecting rod, the second connecting rod and bearing, and two the 4th connecting rods are located at the right side of caisson, the 4th connecting rod
Upper end is vertically fixedly connected with one end of the 4th pole, and the other end of two the 4th poles is rotatably connected to the first cunning
Wheel, and two first pulleys are connected with two the first slides respectively, the upper end of second connecting rod is vertically fixedly connected
There is the second pole, second pole is through the center of two second pulleys, and two second pulleys are slided with two second respectively
Groove is slidably connected, and the middle part of sliding channel of second connecting rod is fixedly connected with the 3rd pole, and the 3rd pole runs through two the 3rd
The center of pulley, and two the 3rd pulleys are connected with two the second slides respectively, the upper end of the bearing offers bar shaped
Chute, the lower end for the 3rd connecting rod that is slidably connected in the bar shaped chute, the upper end of the 3rd connecting rod is vertically fixedly connected
There is the 5th pole, the 5th pole runs through two the 4th pulleys, and two the 4th pulleys are connected with two the second slides,
3rd connecting rod is threaded with screw rod, and one end of the screw rod is fixedly connected with the output end of regulation motor, the screw rod
The other end be rotatably connected in the side wall of second support bar, the upper surface of the lower end of the second support bar and bearing, which is fixed, to be connected
Connect, the bottom of the regulation motor is fixedly connected on the side wall of first support bar, the lower end of the first support bar and bearing
Upper surface is fixedly connected, and the upper surface of the base is provided with muck haulage car.
Preferably, the muck haulage parking stall is between the second connecting rod and bearing.
Preferably, the rack is located on the center line of conveyer belt.
Preferably, the opening of the containing case is provided with lid.
Compared with prior art, the beneficial effects of the utility model are:The utility model is by adding support, the first connection
The structures such as bar, travelling gear, the second connecting rod and the second pole, by connecting external power source, start driving motor, drive transmission
Native slag or earth and stone material are put into containing case by band rotation, staff in caisson, are sent to by conveyer belt rotation on base,
Reuse muck haulage car and transport working region, with the progress that borehole works, hole deepens, and now, using positive and negative switch, starts and adjusts
Save motor, rotate screw rod so that the 3rd connecting rod is moved to the left, have adjusted the 3rd connecting rod and the second connecting rod away from
From the height for the conveyer belt for making to be located in caisson declines, and is more beneficial for being unearthed for artificial digging pile.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is A-A sectional views;
Fig. 3 is B-B sectional views;
Fig. 4 is conveyer belt front elevation;
Fig. 5 is conveyer belt reverse side figure.
In figure:Base 1, caisson 2, conveyer belt 3, containing case 4, support 5, head rod 6, travelling gear 7, second connect
Extension bar 8, the second pole 9, muck haulage car 10, the 3rd connecting rod 11, first support bar 12, regulation motor 13, screw rod the 14, the 4th connect
Bar 15, the first chute 16, the second chute 17, rack 18.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:
A kind of artificial digging pile is unearthed lifting device, including base 1 and caisson 2, and support 5 is fixedly connected with base 1
Two side ends, caisson 2 are located at the lower section of support 5, and the lower surface of one section of 5 level of support is fixedly connected with the upper end of head rod 6,
The lower end of head rod 6 is vertically fixedly connected with one end of the first pole, and the other end of the first pole is fixedly connected with driving motor
Bottom, the output end of driving motor is fixedly connected with the center of travelling gear 7, the engagement connection reverse side of conveyer belt 3 of travelling gear 7
Rack 18, the front of conveyer belt 3 are provided with two the first chutes 16, and the reverse side of conveyer belt 3 is provided with two the second chutes 17 and one
Rack 18, and rack 18, between two the second chutes 17, rack 18 is located on the center line of conveyer belt 3, the front of conveyer belt 3
Some containing cases 4 are fixedly connected with, and containing case 4, between two the first chutes 16, the opening of containing case 4 is provided with lid
Son, being fixedly connected sequentially from left to right on base 1 has two the 4th connecting rods 15, the second connecting rod 8 and bearing, and two the 4th
Connecting rod 15 is located at the right side of caisson 2, and the upper end of the 4th connecting rod 15 is vertically fixedly connected with one end of the 4th pole, two
The other end of 4th pole is rotatably connected to first pulley, and two first pulleys are slided with two the first chutes 16 connect respectively
Connecing, the upper end of the second connecting rod 8 is vertically fixedly connected with the second pole 9, and the second pole 9 runs through the center of two second pulleys,
And two second pulleys are slidably connected with two the second chutes 17 respectively, the middle part of sliding channel of the second connecting rod 8 is fixedly connected with the 3rd
Pole, the 3rd pole is through the center of two the 3rd pulleys, and two the 3rd pulleys slide with two the second chutes 17 connect respectively
Connect, the upper end of bearing offers bar shaped chute, the lower end for the 3rd connecting rod 11 that is slidably connected in bar shaped chute, the 3rd connecting rod 11
Upper end be vertically fixedly connected with the 5th pole, the 5th pole runs through two the 4th pulleys, and two the 4th pulleys and two
Two chutes 17 are slidably connected, and the 3rd connecting rod 11 is threaded with screw rod 14, and one end of screw rod 14 is fixedly connected with regulation motor 13
Output end, the other end of screw rod 14 is rotatably connected in the side wall of second support bar, the lower end of second support bar and bearing
Upper surface is fixedly connected, and the bottom of regulation motor 13 is fixedly connected on the side wall of first support bar 12, under first support bar 12
End is fixedly connected with the upper surface of bearing, and the upper surface of base 1 is provided with muck haulage car 10, and muck haulage car 10 is located at the He of the second connecting rod 8
Between bearing.
Operation principle:By connecting external power source, start driving motor, drive conveyer belt 3 to rotate, staff is in borehole
Native slag or earth and stone material are put into containing case 4 in stake 2, is sent to by the rotation of conveyer belt 3 on base 1, is reused muck haulage car 10 and transport
Go out working region, with the progress that borehole works, hole deepens, and now, using positive and negative switch, starts regulation motor 13, makes spiral shell
Bar 14 rotates, so that the 3rd connecting rod 11 is moved to the left, have adjusted the distance of the 3rd connecting rod 11 and the second connecting rod 8, makes
The height of conveyer belt 3 in caisson 2 declines, and is more beneficial for being unearthed for artificial digging pile.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (4)
- The lifting device 1. a kind of artificial digging pile is unearthed, including base (1) and caisson (2), it is characterised in that:The base (1) two side ends of support (5) are fixedly connected with, the caisson (2) is located at the lower section of support (5), support (5) level one The lower surface of section is fixedly connected with the upper end of head rod (6), and the lower end of the head rod (6) is vertically fixedly connected with first One end of pole, the other end of first pole are fixedly connected with the bottom of driving motor, and the output end of the driving motor is consolidated Surely the center of travelling gear (7), the rack (18) of described travelling gear (7) engagement connection conveyer belt (3) reverse side, the biography are connected The front of band (3) is sent to be provided with two the first chutes (16), the reverse side of the conveyer belt (3) is provided with two the second chutes (17) and one Individual rack (18), and rack (18) is between two the second chutes (17), the conveyer belt (3) if front be fixedly connected with Dry containing case (4), and containing case (4) is fixed successively from left to right between two the first chutes (16) on the base (1) Two the 4th connecting rods (15), the second connecting rod (8) and bearing are connected with, and two the 4th connecting rods (15) are located at caisson (2) right side, the upper end of the 4th connecting rod (15) are vertically fixedly connected with one end of the 4th pole, two described 4th The other end of bar is rotatably connected to first pulley, and two first pulleys are slidably connected with two the first chutes (16) respectively, The upper end of second connecting rod (8) is vertically fixedly connected with the second pole (9), and second pole (9) runs through two second The center of pulley, and two second pulleys are slidably connected with two the second chutes (17) respectively, in second connecting rod (8) Portion's side wall is fixedly connected with the 3rd pole, and the 3rd pole is through the center of two the 3rd pulleys, and two the 3rd pulleys are distinguished It is slidably connected with two the second chutes (17), the upper end of the bearing offers bar shaped chute, the interior company of slip of the bar shaped chute Connecing the lower end of the 3rd connecting rod (11), the upper end of the 3rd connecting rod (11) is vertically fixedly connected with the 5th pole, and described Five poles run through two the 4th pulleys, and two the 4th pulleys are slidably connected with two the second chutes (17), the 3rd connection Bar (11) is threaded with screw rod (14), and one end of the screw rod (14) is fixedly connected with the output end of regulation motor (13), described The other end of screw rod (14) is rotatably connected in the side wall of second support bar, the lower end of the second support bar and the upper end of bearing Face is fixedly connected, and the bottom of the regulation motor (13) is fixedly connected on the side wall of first support bar (12), first support The lower end of bar (12) is fixedly connected with the upper surface of bearing, and the upper surface of the base (1) is provided with muck haulage car (10).
- The lifting device 2. a kind of artificial digging pile according to claim 1 is unearthed, it is characterised in that:The muck haulage car (10) Positioned at the second connecting rod (8) between bearing.
- The lifting device 3. a kind of artificial digging pile according to claim 1 is unearthed, it is characterised in that:Rack (18) position In on the center line of conveyer belt (3).
- The lifting device 4. a kind of artificial digging pile according to claim 1 is unearthed, it is characterised in that:The containing case (4) Opening be provided with lid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721077975.XU CN207142776U (en) | 2017-08-27 | 2017-08-27 | A kind of artificial digging pile is unearthed lifting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721077975.XU CN207142776U (en) | 2017-08-27 | 2017-08-27 | A kind of artificial digging pile is unearthed lifting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207142776U true CN207142776U (en) | 2018-03-27 |
Family
ID=61670061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721077975.XU Expired - Fee Related CN207142776U (en) | 2017-08-27 | 2017-08-27 | A kind of artificial digging pile is unearthed lifting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207142776U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107459001A (en) * | 2017-08-27 | 2017-12-12 | 贵州新联爆破工程集团有限公司 | A kind of artificial digging pile is unearthed lifting device |
CN108824438A (en) * | 2018-05-07 | 2018-11-16 | 中铁大桥局集团第工程有限公司 | A kind of deep basal pit takes indigenous equipment and construction method |
-
2017
- 2017-08-27 CN CN201721077975.XU patent/CN207142776U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107459001A (en) * | 2017-08-27 | 2017-12-12 | 贵州新联爆破工程集团有限公司 | A kind of artificial digging pile is unearthed lifting device |
CN107459001B (en) * | 2017-08-27 | 2023-05-26 | 保利新联爆破工程集团有限公司 | Manual hole digging pile soil outlet lifting device |
CN108824438A (en) * | 2018-05-07 | 2018-11-16 | 中铁大桥局集团第工程有限公司 | A kind of deep basal pit takes indigenous equipment and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374500B (en) | Grouped drilling and pile planting construction method | |
CN113006042B (en) | Construction process for reinforcing foundation of large hydraulic structure on construction waste land layer | |
CN207142776U (en) | A kind of artificial digging pile is unearthed lifting device | |
CN110965937A (en) | Double-power whole-course pump suction reverse circulation punching equipment and construction process | |
CN207934087U (en) | A kind of water mill bores the constructing structure of cooperation manually digging hole | |
CN107288171A (en) | Bore support integral type shaft pore-forming device | |
CN107459001A (en) | A kind of artificial digging pile is unearthed lifting device | |
CN104196072A (en) | Plateau mountain foundation pit excavation construction device | |
CN206844193U (en) | Bore support integral type pile hole forming device | |
CN108468334B (en) | Gravel stratum dry-excavation clay dado pore-forming bored concrete pile construction device | |
CN210530738U (en) | Pile system is planted in drilling in groups | |
CN110331936B (en) | Combined drilling bottom-expanding pile-planting construction method | |
CN103147437A (en) | Section steel soil cement mixing pile with longitudinal displacement mechanism | |
CN110259373B (en) | Low headroom rotary drill | |
CN110295596A (en) | A kind of constructing device for prefabricated anchor Rods In Tied Double Retaining Walls | |
CN113006088B (en) | Deep foundation reinforcing device and treatment method thereof | |
CN211874383U (en) | Double dynamical whole journey pump suction reverse circulation punching equipment | |
CN210529685U (en) | Hollow drill rod excavator | |
CN209483357U (en) | A kind of opened type shield machine for jacking construction | |
CN210141093U (en) | Synchronous follow-up power device for full casing of drilling machine | |
CN203513129U (en) | Lifting device for conveying digging pile construction materials | |
CN205998933U (en) | A kind of building multifunctional lifting platform | |
CN206646570U (en) | A kind of multi-angle loading machine discharge chute | |
CN108824438A (en) | A kind of deep basal pit takes indigenous equipment and construction method | |
CN201835747U (en) | Drilling machine with screw anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou. Patentee after: POLY XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd. Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou. Patentee before: GUIZHOU XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180327 |
|
CF01 | Termination of patent right due to non-payment of annual fee |