CN207134682U - The waterproof cooling distribution box in building site is built in a kind of room - Google Patents
The waterproof cooling distribution box in building site is built in a kind of room Download PDFInfo
- Publication number
- CN207134682U CN207134682U CN201720972488.3U CN201720972488U CN207134682U CN 207134682 U CN207134682 U CN 207134682U CN 201720972488 U CN201720972488 U CN 201720972488U CN 207134682 U CN207134682 U CN 207134682U
- Authority
- CN
- China
- Prior art keywords
- distribution box
- main body
- escape pipe
- built
- building site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The utility model discloses the waterproof cooling distribution box that building site is built in a kind of room, including distribution box main body, chamber door is installed on the left of the distribution box main body, the top of the support base is provided with blower fan, second escape pipe is installed on the right side of the blower fan, the outer wall of the fixing pipe is provided with nozzle, and the outer wall upper and lower ends of the distribution box main body are equipped with gas outlet.The waterproof cooling distribution box in building site is built in the room, it is rotated down seal cap, seal cap is removed from the first escape pipe, by the external power supply for connecting blower fan, blower fan is operated generation wind, wind inside fixing pipe sprays from nozzle, wind quickly blows out heat caused by distribution box main body inside from gas outlet and the first escape pipe, it ensure that the radiating effect of distribution box is preferable, avoid that the internal temperature when electronic box works long hours is too high and the phenomenon that causes inner member primary election to damage, extend the service life of distribution box.
Description
Technical field
It the utility model is related to room and build technical field, the waterproof cooling distribution box in building site is built in specially a kind of room.
Background technology
At present, temporary distribution box would generally be disposed to carry out temporary energization by being built in room on building site, each to be supplied to
Electric power of equipment resource, is fitted with greatly vent window on existing distribution box, vent window be mainly electric elements in distribution box with
The window of heat exchange with outside, but existing room is built the waterproof cooling distribution box in building site and there is a problem, such as Application No.
201620122605.2 patent, including casing and chamber door, box house are hollow structure, and chamber door is hinged on the front end of casing
Face, the side of casing offer outlet window, and the bottom of outlet window is provided with air outlet, and air outlet connects with the thermovent on casing
Logical, the side of casing is provided with convex wall, and the bottom surface of convex wall offers heat emission hole, although simple in construction, the radiating of distribution box
Effect is poor, when distribution box works long hours internal temperature it is too high and cause inner member primary election damage phenomenon, reduce
The service life of distribution box.
Utility model content
The purpose of this utility model is to provide the waterproof cooling distribution box for building building site in a kind of room, to solve above-mentioned background
The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:The waterproof cooling that building site is built in a kind of room is matched somebody with somebody
Electronic box, including distribution box main body, chamber door, the top left hand peace of the distribution box main body are installed on the left of the distribution box main body
Equipped with support base, the top of the support base is provided with blower fan, is provided with the second escape pipe on the right side of the blower fan, and described second
Airway tube is installed, the airway tube runs through the outer wall of distribution box main body, the outer wall socket of the airway tube on the right side of escape pipe
There is the first retainer ring, be mounted on fixing pipe at left and right sides of first retainer ring, the bottom of the airway tube is provided with point
Inflator, connecting tube is mounted at left and right sides of the atmolysis cylinder, fixing pipe, the fixation are installed on the outside of the connecting tube
The outside upper and lower ends of pipe are socketed with the second retainer ring, and mounting seat, the fixation are provided with the outside of second retainer ring
The outer wall of pipe is provided with nozzle, and the outer wall upper and lower ends of the distribution box main body are equipped with gas outlet, the outside of the gas outlet
First escape pipe is installed, the bottom of first escape pipe is provided with seal cap, the seal cap and the first outlet pipe screw thread
Connection.
Preferably, the inside of second escape pipe is provided with screen pack.
Preferably, the junction of the airway tube and the second escape pipe is provided with sealing shroud.
Preferably, the bottom of the distribution box main body is provided with stabilizing base.
Preferably, the top left hand of the atmolysis cylinder is provided with fixture.
Compared with prior art, the beneficial effects of the utility model are:The waterproof cooling distribution box in building site is built in the room, to
Lower rotation seal cap, seal cap is removed from the first escape pipe, by connecting the external power supply of blower fan, blower fan is operated production
Raw wind, wind are blown into the inside of atmolysis cylinder by the second escape pipe and airway tube, and the wind inside atmolysis cylinder is blown into by connecting tube
To the inside of fixing pipe, the wind inside fixing pipe sprays from nozzle, and wind is by heat caused by inside distribution box main body quickly from going out
Gas port and the blowout of the first escape pipe, it is ensured that the radiating effect of distribution box is preferable, avoids inside when electronic box works long hours
The phenomenon that temperature is too high and causes inner member primary election to damage, extend the service life of distribution box.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1st, screen pack, 2, sealing shroud, 3, airway tube, the 4, first retainer ring, 5, fixing pipe, 6, connecting tube, 7, spray
Mouth, the 8, first escape pipe, 9, gas outlet, 10, seal cap, the 11, second retainer ring, 12, stabilizing base, 13, atmolysis cylinder, 14, distribution
Box main body, 15, fixing pipe, 16, mounting seat, 17, chamber door, 18, support base, 19, fixture, 20, blower fan, the 21, second escape pipe.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:The waterproof cooling distribution box in building site is built in a kind of room,
Including distribution box main body 14, the bottom of distribution box main body 14 is provided with stabilizing base 12, can increase distribution box master by stabilizing base 12
The stability that body 14 is placed, the left side of distribution box main body 14 are provided with chamber door 17, and the top left hand of distribution box main body 14 is provided with
Support base 18, the top of support base 18 are provided with blower fan 20, and blower fan 20 is connected by wire with external power supply, the right side of blower fan 20
Second escape pipe 21 is installed, the inside of the second escape pipe 21 is provided with screen pack 1, and gas can be carried out by screen pack 1
Filter, avoids occurring the phenomenon blocked at the second escape pipe 21, and the right side of the second escape pipe 21 is provided with airway tube 3, airway tube 3 with
The junction of second escape pipe 21 is provided with sealing shroud 2, and can increase airway tube 3 by sealing shroud 2 is connected with the second escape pipe 21
The stability at place, airway tube 3 run through the outer wall of distribution box main body 14, and the outer wall of airway tube 3 is socketed with the first retainer ring 4, passed through
First retainer ring 4 can increase the stability of the placement of airway tube 3, and the left and right sides of the first retainer ring 4 is mounted on fixing pipe 5, led
The bottom of tracheae 3 is provided with atmolysis cylinder 13, and the top left hand of atmolysis cylinder 13 is provided with fixture 19, can increased by fixture 19
Stability when bonus point inflator 13 works.The left and right sides of atmolysis cylinder 13 is mounted on connecting tube 6, the outside installation of connecting tube 6
There is fixing pipe 15, the outside upper and lower ends of fixing pipe 15 are socketed with the second retainer ring 11, can be to solid by the second retainer ring 11
Fixed tube 15 is fixed, and the outside of the second retainer ring 11 is provided with mounting seat 16, and the outer wall of fixing pipe 15 is provided with nozzle 7, leads to
The internal gas of fixing pipe 15 can be sprayed by crossing nozzle 7, and the outer wall upper and lower ends of distribution box main body 14 are equipped with gas outlet 9, gone out
The outside of gas port 9 is provided with the first escape pipe 8, and the bottom of the first escape pipe 8 is provided with seal cap 10, controllable by seal cap 10
The opening and closing of the first escape pipe 8 are made, seal cap 10 is threadedly coupled with the first escape pipe 8.
Seal cap 10 is rotated down, seal cap 10 is removed from the first escape pipe 8, by connecting the external of blower fan 20
Power supply, blower fan 20 are operated generation wind, and wind is blown into the inside of atmolysis cylinder 13 by the second escape pipe 21 and airway tube 3, point
Wind inside inflator 13 is blown into the inside of fixing pipe 15 by connecting tube 6, and the wind inside fixing pipe 15 sprays from nozzle 7, wind
By quickly from gas outlet 9 and first, escape pipe 8 is blown out heat caused by the inside of distribution box main body 14.
In description of the present utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
Portion ", " other end ", " on ", " side ", " top ", " interior ", " front portion ", " center ", the orientation of the instruction such as " both ends " or position close
It is to be described based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplifying, rather than
Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore can not
It is interpreted as to limitation of the present utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for describing purpose, and it is not intended that instruction or
Relative importance or the implicit quantity for indicating indicated technical characteristic are implied, thus, defines " first ", " second ", " the
Three ", at least one this feature can be expressed or be implicitly included to the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu
Calmly ", the term such as " spinning " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;
Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be with
It is connection or the interaction relationship of two elements of two element internals, is limited unless otherwise clear and definite, for this area
For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. the waterproof cooling distribution box in building site, including distribution box main body (14) are built in a kind of room, it is characterised in that:The distribution box
Chamber door (17) is installed, the top left hand of the distribution box main body (14) is provided with support base (18), institute on the left of main body (14)
The top for stating support base (18) is provided with blower fan (20), and the second escape pipe (21) is provided with the right side of the blower fan (20), described
Airway tube (3) is installed, the airway tube (3) runs through the outer wall of distribution box main body (14), institute on the right side of the second escape pipe (21)
The outer wall for stating airway tube (3) is socketed with the first retainer ring (4), is mounted on fixing at left and right sides of first retainer ring (4)
Manage (5), the bottom of the airway tube (3) is provided with atmolysis cylinder (13), the company of being mounted at left and right sides of the atmolysis cylinder (13)
Take over (6), fixing pipe (15) is installed on the outside of the connecting tube (6), the outside upper and lower ends of the fixing pipe (15) cover
The second retainer ring (11) is connected to, mounting seat (16) is installed on the outside of second retainer ring (11), the fixing pipe (15)
Outer wall is provided with nozzle (7), and the outer wall upper and lower ends of the distribution box main body (14) are equipped with gas outlet (9), the gas outlet
(9) the first escape pipe (8) is installed, the bottom of first escape pipe (8) is provided with seal cap (10), the sealing on the outside of
Cap (10) is threadedly coupled with the first escape pipe (8).
2. the waterproof cooling distribution box in building site is built in a kind of room according to claim 1, it is characterised in that:Described second goes out
The inside of tracheae (21) is provided with screen pack (1).
3. the waterproof cooling distribution box in building site is built in a kind of room according to claim 1, it is characterised in that:The airway tube
(3) junction with the second escape pipe (21) is provided with sealing shroud (2).
4. the waterproof cooling distribution box in building site is built in a kind of room according to claim 1, it is characterised in that:The distribution box
The bottom of main body (14) is provided with stabilizing base (12).
5. the waterproof cooling distribution box in building site is built in a kind of room according to claim 1, it is characterised in that:The atmolysis cylinder
(13) top left hand is provided with fixture (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720972488.3U CN207134682U (en) | 2017-08-05 | 2017-08-05 | The waterproof cooling distribution box in building site is built in a kind of room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720972488.3U CN207134682U (en) | 2017-08-05 | 2017-08-05 | The waterproof cooling distribution box in building site is built in a kind of room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207134682U true CN207134682U (en) | 2018-03-23 |
Family
ID=61640922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720972488.3U Expired - Fee Related CN207134682U (en) | 2017-08-05 | 2017-08-05 | The waterproof cooling distribution box in building site is built in a kind of room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207134682U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112271602A (en) * | 2020-11-25 | 2021-01-26 | 李波 | Block terminal for electrical engineering |
-
2017
- 2017-08-05 CN CN201720972488.3U patent/CN207134682U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112271602A (en) * | 2020-11-25 | 2021-01-26 | 李波 | Block terminal for electrical engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207134682U (en) | The waterproof cooling distribution box in building site is built in a kind of room | |
CN206931889U (en) | The waterproof cooling distribution box in building site is built in a kind of room | |
CN110730582A (en) | Refrigerating unit electrical appliance control box with built-in protection structure | |
CN207881081U (en) | A kind of air interchanger of green building body | |
CN206750113U (en) | A kind of unmanned plane housing | |
CN205666436U (en) | Ventilative high low -voltage electric cabinet that makes an uproar that falls | |
CN212210066U (en) | Outdoor moisture-proof type JP cabinet | |
CN210985282U (en) | Low-voltage switchgear with dust removal function | |
CN208797429U (en) | One kind having capacitance compensation Intelligent comprehensive power distribution cabinet | |
CN210100823U (en) | Heat radiator for silica gel make-up machine | |
CN205901140U (en) | Outdoor many function synthesis of combination formula block terminal | |
CN207691216U (en) | A kind of moisture-proof high-tension switch cabinet of insect prevention | |
CN207624870U (en) | A kind of accumulator ventilator | |
CN107732741B (en) | A kind of ventilating and radiating system for switch cabinet chamber of semi-buried box-type substation | |
CN206980995U (en) | A kind of electrostatic precipitator with novel hot-air purging system | |
CN205141970U (en) | Heat radiating structure of frequency converter | |
CN209516415U (en) | A kind of anti-dust distribution box of exchange filtering | |
CN216345481U (en) | Heat dissipation type LED lamp pearl | |
CN205536354U (en) | Novel power ventilator | |
CN208788895U (en) | A kind of energy-saving efficient paraffin die modeling ventilating and cooling frame | |
CN201018208Y (en) | Outdoor distributor box | |
CN206649405U (en) | A kind of computer power assembles governor motion | |
CN210723872U (en) | Outdoor high-voltage board | |
CN209358887U (en) | A kind of electrical engineering electric box | |
CN210723751U (en) | Outdoor switch board that water-proof effects is good |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180323 Termination date: 20210805 |