CN207130561U - Big temperature difference area Substation Station inner concrete anticracking pavement structure - Google Patents

Big temperature difference area Substation Station inner concrete anticracking pavement structure Download PDF

Info

Publication number
CN207130561U
CN207130561U CN201720638009.4U CN201720638009U CN207130561U CN 207130561 U CN207130561 U CN 207130561U CN 201720638009 U CN201720638009 U CN 201720638009U CN 207130561 U CN207130561 U CN 207130561U
Authority
CN
China
Prior art keywords
concrete
layer
base layer
temperature difference
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720638009.4U
Other languages
Chinese (zh)
Inventor
蒋旭辉
张牮
范军
石裕玖
姜鹏
毛生海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electrical Construction Group Chongqing Engineering Co., Ltd.
Original Assignee
CHONGQING POWER CONSTRUCTION Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING POWER CONSTRUCTION Co filed Critical CHONGQING POWER CONSTRUCTION Co
Priority to CN201720638009.4U priority Critical patent/CN207130561U/en
Application granted granted Critical
Publication of CN207130561U publication Critical patent/CN207130561U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses big temperature difference area Substation Station inner concrete anticracking pavement structure, including bottoming and concrete base layer, also include fibre reinforced concrete top layer, waterproof layer is provided between the bottoming and concrete base layer, fiber grid screen is provided between the fibre reinforced concrete top layer and concrete base layer.Concrete road surface structure of the present utility model is by setting fiber grid screen, adding reinforcing fiber and precrack in concrete surface layer, the cracking resistance become can be effectively improved, the utility model is set in concrete base layer to be covered fiber reinforcement cloth and can effectively improve the intensity of concrete base layer, and then road surface bulk strength is improved, avoid ftractureing;The utility model sets waterproof layer in bottoming upper surface, can effectively prevent roadbed subsidence.

Description

Big temperature difference area Substation Station inner concrete anticracking pavement structure
Technical field
Construction field is the utility model is related to, more specifically to big temperature difference area Substation Station inner concrete Anticracking pavement structure.
Background technology
Road surface is higher to anti crack performance in Substation Station, but northwest plateau area morning and evening and Seasonal Temperature Difference change are greatly, road Chang Yinwei Pavement Structure Designs are unreasonable during surface construction or use or construction method improper two cracks, and influence road surface Service life.
Utility model content
In view of this, the purpose of this utility model is to provide coagulation in a kind of Substation Station suitable for big temperature difference area Native anticracking pavement structure.
In order to achieve the above object, the utility model provides following technical scheme:
Big temperature difference area Substation Station inner concrete anticracking pavement structure, including bottoming and concrete base layer, are also wrapped Fibre reinforced concrete top layer is included, waterproof layer, the fiber reinforcement coagulation are provided between the bottoming and concrete base layer Fiber grid screen is provided between native top layer and concrete base layer.
Further, multiple enhancing steel wires are provided with inside the concrete base layer.
Further, fibre reinforced concrete top layer upper surface is prefabricated is not surpassed by cutting crackle, the depth of the crackle Cross 1/3rd of fibre reinforced concrete skin depth.
Further, the waterproof layer is frp layer.
Further, the enhancing steel wire net surface is provided with fiber reinforcement cloth.
Concrete road surface structure of the present utility model is by setting fiber grid screen, adding reinforcing fiber in concrete surface layer And precrack, the cracking resistance become can be effectively improved, the utility model is set in concrete base layer covers fiber reinforcement cloth The intensity of concrete base layer can be effectively improved, and then improves road surface bulk strength, avoids ftractureing;The utility model is in bottoming Upper surface sets waterproof layer, can effectively prevent roadbed subsidence.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art.
Fig. 1 is the utility model structure diagram.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
It refer to Fig. 1, the big temperature difference area Substation Station inner concrete anticracking pavement structure of the present embodiment, including bottoming 3 and concrete base layer 2, in addition to fibre reinforced concrete top layer 1, it is provided between the bottoming 3 and concrete base layer 2 anti- Water layer 5, fiber grid screen 4 is provided between the fibre reinforced concrete top layer 1 and concrete base layer 2.
Further, the inside of concrete base layer 2 is provided with multiple enhancing steel wires 6.
Further, the upper surface of fibre reinforced concrete top layer 1 is prefabricated is not surpassed by cutting crackle, the depth of the crackle Cross 1/3rd of the thickness of fibre reinforced concrete top layer 1.
Further, the waterproof layer 5 is frp layer.
Further, enhancing steel wire 6 surface is provided with fiber reinforcement cloth.
Concrete road surface structure of the present utility model is by setting fiber grid screen, adding reinforcing fiber in concrete surface layer And precrack, the cracking resistance become can be effectively improved, the utility model is set in concrete base layer covers fiber reinforcement cloth The intensity of concrete base layer can be effectively improved, and then improves road surface bulk strength, avoids ftractureing;The utility model is in bottoming Upper surface sets waterproof layer, can effectively prevent roadbed subsidence.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (5)

1. big temperature difference area Substation Station inner concrete anticracking pavement structure, including bottoming(3)And concrete base layer(2), It is characterized in that:Also include fibre reinforced concrete top layer(1), the bottoming(3)And concrete base layer(2)Between be provided with Waterproof layer(5), the fibre reinforced concrete top layer(1)And concrete base layer(2)Between be provided with fiber grid screen(4).
2. big temperature difference area Substation Station inner concrete anticracking pavement structure according to claim 1, it is characterised in that:It is described Concrete base layer(2)Inside is provided with multiple enhancing steel wires(6).
3. big temperature difference area Substation Station inner concrete anticracking pavement structure according to claim 1, it is characterised in that:It is described Fibre reinforced concrete top layer(1)Upper surface is prefabricated to be no more than fibre reinforced concrete by cutting crackle, the depth of the crackle Top layer(1)/ 3rd of thickness.
4. big temperature difference area Substation Station inner concrete anticracking pavement structure according to claim 2, it is characterised in that:It is described Waterproof layer(5)For frp layer.
5. big temperature difference area Substation Station inner concrete anticracking pavement structure according to claim 2, it is characterised in that:Enter one Step, the enhancing steel wire(6)Surface is provided with fiber reinforcement cloth.
CN201720638009.4U 2017-06-05 2017-06-05 Big temperature difference area Substation Station inner concrete anticracking pavement structure Active CN207130561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720638009.4U CN207130561U (en) 2017-06-05 2017-06-05 Big temperature difference area Substation Station inner concrete anticracking pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720638009.4U CN207130561U (en) 2017-06-05 2017-06-05 Big temperature difference area Substation Station inner concrete anticracking pavement structure

Publications (1)

Publication Number Publication Date
CN207130561U true CN207130561U (en) 2018-03-23

Family

ID=61631687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720638009.4U Active CN207130561U (en) 2017-06-05 2017-06-05 Big temperature difference area Substation Station inner concrete anticracking pavement structure

Country Status (1)

Country Link
CN (1) CN207130561U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235174A (en) * 2018-10-19 2019-01-18 东南大学 A kind of seamless pavement structure based on fiber reinforcement type cement-base composite material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235174A (en) * 2018-10-19 2019-01-18 东南大学 A kind of seamless pavement structure based on fiber reinforcement type cement-base composite material

Similar Documents

Publication Publication Date Title
CN103953148B (en) Large-space saddle-shaped overall greening roof system
CN207130561U (en) Big temperature difference area Substation Station inner concrete anticracking pavement structure
CN205711605U (en) Permeable pavement structure
CN204715586U (en) A kind of reinforced immature soil wall body structure
CN208328665U (en) A kind of full assembled light abutment
CN204266453U (en) For the environment friendly pervious brick that cobblestone garden path is laid
CN104947948B (en) A kind of reinforcement means of rammed earth body of wall
CN207498927U (en) A kind of fixed geotechnical grid
CN204850520U (en) Loam wall body reinforced structure
CN209456825U (en) A kind of flexible asphalt pavement structure for arterial highway reparation
CN102337727B (en) A kind of method that on composite algorithm maintenance bridge type steel expansion joint backrest, leukorrhea damages
CN204080747U (en) A kind of chute of hydraulic engineering
CN206289517U (en) The hollow slab beam structure of ultra-high performance concrete hinge seam link
CN204343774U (en) A kind of electric pole steel ring protective device
CN105220593B (en) A kind of cement concrete pavement structure of stabilization
CN204023495U (en) A kind of water conservancy slope protection net
CN205990574U (en) A kind of subsidence area resistance to deformation express highway pavement structure
CN207160122U (en) A kind of water storage module and the water storage osmotic cell comprising the module
CN211079797U (en) Way brick structure for municipal construction
CN203373636U (en) Pavement reinforced net
CN204703185U (en) A kind of precast reinforced concrete structure
CN211547150U (en) High-rigidity anti-crack patch
CN214033225U (en) Bituminous paving structure for municipal construction
CN211227911U (en) Municipal administration road local reinforcement structure
CN218375478U (en) Integrative slope parcel formula stone strip floor reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 400000 Nanzi village, Nanping District, Chongqing 101

Patentee after: China Electrical Construction Group Chongqing Engineering Co., Ltd.

Address before: 400000 Nanzi village, Nanping District, Chongqing 101

Patentee before: Chongqing Power Construction Company