CN207130344U - A kind of pipeline portal structure for depending on electrolytic cell body - Google Patents
A kind of pipeline portal structure for depending on electrolytic cell body Download PDFInfo
- Publication number
- CN207130344U CN207130344U CN201721025695.4U CN201721025695U CN207130344U CN 207130344 U CN207130344 U CN 207130344U CN 201721025695 U CN201721025695 U CN 201721025695U CN 207130344 U CN207130344 U CN 207130344U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- electrolytic cell
- cell body
- hole
- depending
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of pipeline portal structure for depending on electrolytic cell body, including electrolytic cell body, conduit bracket is installed below the electrolytic cell body, the conduit bracket is connected with electrolytic cell body by built-in connection, pipeline bridge plate is installed below the conduit bracket, Pipe installing framework is installed on the inside of the conduit bracket, and being internally provided with for Pipe installing framework first is pulled strings hole, pipeline is installed on the inside of the Pipe installing framework, the flange includes flange connector, bolt hole and plate of pulling strings, and the inside for plate of pulling strings is pulled strings hole provided with second, described second hole of pulling strings is connected with the first hole of pulling strings by rope.The utility model tubular service and installation are all more convenient.It is avoided that pipeline is influenceed that corrosion phenomenon occurs by electrolytic cell, improves service life, while pipeline is not limited by material, there is stronger practicality.
Description
Technical field
Electrolytic cell pipe installation technology field is the utility model is related to, specifically a kind of pipeline for depending on electrolytic cell body
Portal structure.
Background technology
Electrolytic cell is made up of cell body, anode and negative electrode, and majority is separated anode chamber and cathode chamber with barrier film.By electrolyte
Difference is divided into aqueous solution electrolytic cell, fusion electrolysis groove and the class of nonaqueous solution electrolysis groove three.When direct current passes through electrolytic cell,
With oxidation reaction occurs at solution interface reduction reaction occurs at negative electrode and solution interface for anode, to produce required product.It is right
Cell construction optimizes design, reasonable selection electrode and diaphragm material, is to improve current efficiency, reduce tank voltage, save
The key of energy consumption.Electrolytic cell body material can be steel, cement, ceramics etc. simultaneously.Steel are alkaline-resisting, are most widely used.It is right
With linings such as lead, synthetic resin or rubber inside the strong electrolyte of corrosivity, steel tank.But must be in cell body in electric tank working
Neighbouring pipe laying, in order to save space, pipeline must be depended on electrolytic cell body, but potroom in currently available technology
For pipeline crane span structure using ground as foot, being one needs otherwise designed, construction, the conveyance system of installation.It has many deficiencies
Part, such as:Installation and dismounting inconvenience;Material selection is limited to, and decay resistance is poor etc..
Utility model content
The purpose of this utility model is to provide a kind of pipeline portal structure for depending on electrolytic cell body, existing to solve
Installation and dismounting inconvenience in technology;The problems such as material selection is limited to, and decay resistance is poor.
To achieve the above object, the utility model provides following technical scheme:A kind of pipeline for depending on electrolytic cell body
Portal structure, including electrolytic cell body, conduit bracket, the conduit bracket and electrolysis are installed below the electrolytic cell body
Groove cell body is connected by built-in connection, and pipeline bridge plate, and the lower section peace of pipeline bridge plate are provided with below the conduit bracket
Equipped with concrete base layer, electrolytic cell heap course is installed on the outside of the conduit bracket, is provided with the inside of the conduit bracket
Pipe installing framework, and being internally provided with for Pipe installing framework first is pulled strings hole, the inner side installation of the Pipe installing framework
There is pipeline, and connected between adjacent channel by flange, is bolted between the adjacent flanges, the flange includes method
Blue connector, bolt hole and plate of pulling strings, the bolt hole are arranged on the inside of flange, and the plate of pulling strings is installed in the outer of flange
End, and the inside for plate of pulling strings is pulled strings hole provided with second, the described second hole of pulling strings are connected with the first hole of pulling strings by rope.
Preferably, the junction of the flange and pipeline is provided with O-ring.
Preferably, the pipeline is provided with multiple.
Preferably, the conduit bracket is fixed together by welding with pipeline bridge plate.
Preferably, the conduit bracket is made with pipeline bridge plate using fiberglass.
Preferably, the specification of the conduit bracket can be configured according to the size of pipeline.
Preferably, the built-in connection is made by stainless steel material, and is passed through with electrolytic cell body and conduit bracket
Bolt connection.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple and reasonable, using flange
Formula connecting pipe, so that tubular service and installation are all more convenient.This kind depends on the pipeline portal structure of electrolytic cell body
It is connected when designing pipeline location using the second hole of pulling strings with the first hole of pulling strings by rope, makes pipeline vacantly in Pipe installing frame
Internal side, so as to avoid pipeline from being influenceed generation corrosion phenomenon by electrolytic cell, service life is improved, while make pipeline not by material
Material limitation, has stronger practicality.The bottom of the device is additionally provided with concrete base layer, the device is existed by concrete base layer
It is more steady during installation, while there is stronger fastness.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model pipeline.
Fig. 3 is the structural representation of the utility model flange.
In figure:1- Pipe installings framework, 2- first pull strings hole, 3- ropes, 4- conduit brackets, 5- concrete base layers, 6- pipe
Road bridge plate, 7- electrolytic cell heaps course, 8- pipelines, 9- flanges, 10- electrolytic cell bodies, 11- built-in connections, 12- bolts, 13- methods
Pull strings hole, 16- of blue connector, 14- bolts hole, 15- second pulls strings plate.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1~3, in the utility model embodiment, a kind of pipeline portal structure for depending on electrolytic cell body, bag
Electrolytic cell body 10 is included, the lower section of electrolytic cell body 10 is provided with conduit bracket 4, and conduit bracket 4 is used for the electrolysis for connecting upper end
Groove cell body 10 and the pipeline bridge plate 6 of lower end, conduit bracket 4 are connected with electrolytic cell body 10 by built-in connection 11, pipe holding
The lower section of frame 4 is provided with pipeline bridge plate 6, and the lower section of pipeline bridge plate 6 is provided with concrete base layer 5, and concrete base layer 5 is used to carry
For stable installation site, the outside of conduit bracket 4 is provided with electrolytic cell heap course 7, and electrolytic cell heap course 7 is used as electrolytic bath
The support of body 10, the inner side of conduit bracket 4 are provided with Pipe installing framework 1, Pipe installing framework 1 protect inside pipeline 8 not by
Corrosion, and being internally provided with for Pipe installing framework 1 first is pulled strings hole 2, first pulls strings hole 2 and the first hole 2 of pulling strings passes through rope 3
It is connected, makes pipeline 8 vacantly on the inside of Pipe installing framework 1, so as to avoid being damaged and corrode.Pipe installing framework 1
Inner side is provided with pipeline 8, and is connected between adjacent channel 8 by flange 9, is connected between adjacent flanges 9 by bolt 12, flange
9 are arranged on the inside of flange 9 including flange connector 13, bolt hole 14 and plate 16 of pulling strings, bolt hole 14, and plate 16 of pulling strings is arranged on
The outer end of flange 9, and the inside for plate 16 of pulling strings is pulled strings hole 15 provided with second, second pulls strings hole 15 and the first hole 2 of pulling strings passes through rope
Rope 3 connects.The junction of flange 9 and pipeline 8 is provided with O-ring.Pipeline 8 is provided with multiple.Conduit bracket 4 is logical with pipeline bridge plate 6
Cross and be welded and fixed together.Conduit bracket 4 is made with pipeline bridge plate 6 using fiberglass.The specification of conduit bracket 4 can be according to pipeline
8 size is configured.Built-in connection 11 is made by stainless steel material, and logical with electrolytic cell body 10 and conduit bracket 4
Cross bolt connection.
Operation principle of the present utility model is:The equipment when in use, by electrolytic cell heap course 7 pacified by electrolytic cell body 10
Mounted in ground upper end, while there is good working environment, entered between electrolytic cell body 10 and pipeline 8 by conduit bracket 4
Row is connected, and pipeline 8 is attached on electrolytic cell body 10, makes total more neat.Pipeline is connected by flange 9, and method
Orchid 9 is attached with Pipe installing framework 1 by rope 3, makes pipeline 8 vacantly as the inner side of Pipe installing framework 1, so that it is guaranteed that
Pipeline is not influenceed by electrolytic cell, avoids being corroded, and in the lower end of Pipe installing framework 1 is provided with pipeline bridge plate 6, makes pipeline
8 again by and from protection.It is to be carried out by flange 9 connected between pipeline 8, makes that it is dismantled and maintenance is all more convenient fast
It is prompt.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (7)
1. a kind of pipeline portal structure for depending on electrolytic cell body, including electrolytic cell body (10), it is characterised in that:The electricity
Conduit bracket (4) is installed, the conduit bracket (4) passes through pre-buried company with electrolytic cell body (10) below solution groove cell body (10)
Fitting (11) connects, and is provided with pipeline bridge plate (6) below the conduit bracket (4), and be provided with below pipeline bridge plate (6)
Concrete base layer (5), is provided with electrolytic cell heap course (7) on the outside of the conduit bracket (4), the conduit bracket (4) it is interior
Side is provided with Pipe installing framework (1), and being internally provided with for Pipe installing framework (1) first is pulled strings hole (2), the pipeline peace
Frame up and pipeline (8) is installed on the inside of body (1), and pass through flange (9) between adjacent channel (8) and connect, the adjacent flanges (9)
Between connected by bolt (12), the flange (9) includes flange connector (13), bolt hole (14) and plate of pulling strings (16), institute
The inside that bolt hole (14) is arranged on flange (9) is stated, the plate of pulling strings (16) is arranged on the outer end of flange (9), and plate of pulling strings
(16) inside is pulled strings hole (15) provided with second, and the described second hole (15) of pulling strings passes through rope (3) even with the first hole (2) of pulling strings
Connect.
A kind of 2. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:The method
Blue (9) and the junction of pipeline (8) are provided with O-ring.
A kind of 3. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:The pipe
Road (8) is provided with multiple.
A kind of 4. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:The pipe
Road bracket (4) is fixed together by welding with pipeline bridge plate (6).
A kind of 5. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:The pipe
Road bracket (4) is made with pipeline bridge plate (6) using fiberglass.
A kind of 6. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:The pipe
The specification of road bracket (4) can be configured according to the size of pipeline (8).
A kind of 7. pipeline portal structure for depending on electrolytic cell body according to claim 1, it is characterised in that:It is described pre-
Bury connector (11) to be made by stainless steel material, and be bolted with electrolytic cell body (10) and conduit bracket (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721025695.4U CN207130344U (en) | 2017-08-16 | 2017-08-16 | A kind of pipeline portal structure for depending on electrolytic cell body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721025695.4U CN207130344U (en) | 2017-08-16 | 2017-08-16 | A kind of pipeline portal structure for depending on electrolytic cell body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207130344U true CN207130344U (en) | 2018-03-23 |
Family
ID=61634944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721025695.4U Expired - Fee Related CN207130344U (en) | 2017-08-16 | 2017-08-16 | A kind of pipeline portal structure for depending on electrolytic cell body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207130344U (en) |
-
2017
- 2017-08-16 CN CN201721025695.4U patent/CN207130344U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201148467Y (en) | Combined anode and cathode protection apparatus | |
CN207130344U (en) | A kind of pipeline portal structure for depending on electrolytic cell body | |
CN201245707Y (en) | Oil pipe anti-corrosive device | |
CN201109797Y (en) | Deep well anode antisepsis protective equipment | |
CN217419724U (en) | Embedded submarine cable protection pipe structure of offshore wind power jacket foundation | |
CN106544680A (en) | A kind of erosion protection system for essential service water system of nuclear power station pipeline | |
CN206345918U (en) | A kind of erosion protection system for essential service water system of nuclear power station pipeline | |
CN108707910A (en) | A kind of oil tube cathode protector | |
CN204371413U (en) | A kind of highstrenghtpiston's pipe for escaping | |
CN105274559B (en) | A kind of two-tube meshed anode | |
CN203419987U (en) | Combined type titanium alloy deep-well anode ground bed device | |
CN202899725U (en) | Electric line electric pole anti-corrosion pulling rod | |
CN208394851U (en) | A kind of tube type electrolytic tank suitable for electrolytic sewage processing | |
CN203568239U (en) | Novel underground horizontal tank | |
CN207316327U (en) | A kind of municipal administration supplying drainage pipeline connecting structure | |
CN209100805U (en) | A kind of reinforced steel plastic double flat Hollow wall tube with corrosion proof function | |
CN219363806U (en) | Forced current cathode protection device | |
CN105329570A (en) | Novel underground horizontal storage tank | |
CN201010693Y (en) | Oil well anti-corrosion device | |
CN220867518U (en) | Intelligent cathode protection system for lower pipeline of grounding electrode discharge | |
CN205373780U (en) | Intelligence weir | |
CN204826177U (en) | Prefabricated pump station base with anti float, self -cleaning function | |
CN217560320U (en) | Concentrated purification device of battery level lithium carbonate | |
CN204879098U (en) | Resistant scraping polyethylene pipe | |
CN210490532U (en) | Solar energy storage device for monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180323 Termination date: 20180816 |
|
CF01 | Termination of patent right due to non-payment of annual fee |