CN207129116U - Raising of a wreck rubber floating buoy - Google Patents
Raising of a wreck rubber floating buoy Download PDFInfo
- Publication number
- CN207129116U CN207129116U CN201720571769.8U CN201720571769U CN207129116U CN 207129116 U CN207129116 U CN 207129116U CN 201720571769 U CN201720571769 U CN 201720571769U CN 207129116 U CN207129116 U CN 207129116U
- Authority
- CN
- China
- Prior art keywords
- floating buoy
- rubber floating
- rubber
- buoy
- tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of raising of a wreck rubber floating buoy, belong to raising of a wreck field, including rubber floating buoy, tie and hanging beam, rubber floating buoy cylinder is bundled on hanging beam by hoisting rope, tie is tied up in rubber floating buoy, tie is provided with more, and rubber floating buoy is tied after carrying out doubling before putting down water with tie, is put into hanging beam in water.Raising of a wreck of the present utility model can be used for installing large-scale salvaging rubber floating buoy under the hydrological environment of complexity with rubber floating buoy, coordinate floating drum hoisting rope and floating drum tie using special floating drum installation hanging beam, floating drum is tied up and lifted, make rubber floating buoy smaller by water currents, it is easy to that floating drum is hung in place and diver installs under water, fundamentally solves the problems, such as to hang encountered in water and underwater inflation installation process.
Description
Technical field
Raising of a wreck field is the utility model is related to, specifically, the utility model is related to a kind of raising of a wreck rubber
Floating drum.
Background technology
In South Korea " generation more number " Salvage, according to shipwreck itself cabin breakage, external floating drum may be used
Aid in salvaging to provide extra buoyancy.Although traditional steel floating drum could be used that, but due to uniform specification and size
It is larger, higher are required to application conditions.Rubber floating drum due to can be manufactured according to actual demands of engineering according to design size,
Therefore application is more convenient, and limiting factor is less.But large-scale rubber floating buoy is larger due to self structure characteristic, overall dimensions
(23 meters are always about, 3.5 meters of diameter), outer wall is flexible rubber, and inside does not set separation, is installed under water in gas replenishment process, outside
The more difficult control of shape.If installation method is improper, the underwater floading condition of rubber floating buoy can be caused bad, inflation is not completely filled with, is used
Effect is had a greatly reduced quality.Simultaneously as floading condition is bad, local pressure mistake may also occur in the suspender belt of rubber floating buoy and the outside string bag
Greatly, so as to cause suspender belt be broken or string bag breakage after rubber floating buoy floating to the water surface major accident.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of lighthouse buoy of salvaging, and the floating drum can be in water
Under be inflated and install.
In order to solve the above-mentioned technical problem, technical scheme is used by the utility model:Raising of a wreck rubber floating buoy,
Including rubber floating buoy, tie and hanging beam, the rubber floating buoy cylinder is bundled on hanging beam by hoisting rope, and tie is tied up in rubber
On floating drum, the tie is provided with more, and rubber floating buoy is tied after carrying out doubling before putting down water with tie, with hanging beam
It is put into water.
Preferably, the both ends of the rubber floating buoy set inflation inlet.
Preferably, the bottom of the rubber floating buoy sets more suspension suspender belts.
Using the technical solution of the utility model, following beneficial effect can be obtained:
Raising of a wreck of the present utility model can install large-scale salvaging with rubber floating buoy under the hydrological environment of complexity and use
Rubber floating buoy, coordinate floating drum hoisting rope and floating drum tie using special floating drum installation hanging beam, floating drum tie up and
Lifting, makes rubber floating buoy smaller by water currents, is easy to that floating drum is hung in place and diver installs under water.Using gas tube certainly
Rubber floating buoy both ends are synchronously inflated, and coordinate hanging beam to be adjusted the underwater posture of floating drum, and it is not in unilateral gas to make floating drum
Body accumulates the more unsafe condition for causing unbalance stress, so as to ensure that what floating drum inflated under water smoothly completes, fundamentally solves
Determine and hung water and underwater the problem of inflating encountered in installation process.
Brief description of the drawings
Brief description is made to the content expressed by each accompanying drawing of this specification and the mark in figure below:
Fig. 1 is the state diagram that this rubber floating buoy uses step A;
Fig. 2 is the state diagram that this rubber floating buoy uses step B;
Fig. 3 is the state diagram that this rubber floating buoy uses step C;
Fig. 4 is the state diagram that this rubber floating buoy uses step D;
Fig. 5 is the state diagram that this rubber floating buoy uses step E;
Fig. 6 is the state diagram that this rubber floating buoy uses step F;
Mark in above-mentioned figure is:1st, rubber floating buoy;2nd, hanging beam;3rd, tie;4th, hoisting rope;5th, guide rope;6th, it is
Gu steel wire;7th, shipwreck;8th, suspender belt is hung;9th, diver;10th, gas tube.
Embodiment
Below against accompanying drawing, by the description to embodiment, to specific embodiment of the present utility model as involved
Mutual alignment and annexation, the effect of each several part and operation principle between the shape of each component, construction, each several part etc. make into
The detailed description of one step.
As shown in Fig. 2 this raising of a wreck includes rubber floating buoy 1, tie 3 and hanging beam 2, rubber floating buoy 1 with rubber floating buoy
Cylinder is bundled on hanging beam 2 by hoisting rope 4, and tie 3 is tied up in rubber floating buoy 1, and tie 3 is provided with more, and rubber floating buoy 1 is put
Tied with tie 3 after carrying out doubling before lower water, be put into hanging beam 2 in water, so can be in the hydrological environment of complexity
It is lower to place large-scale salvaging rubber floating buoy 1, prevent rubber floating buoy 1 from waving with ripples to be difficult to place.The both ends of rubber floating buoy 1 are set
Inflation inlet is put, the both ends of rubber floating buoy 1 can be inflated, can so keep rubber floating buoy 1 to keep balance in inflation,
The bottom of rubber floating buoy 1 sets more suspension suspender belts 8, and suspension suspender belt 8 is used to fix with the hull of shipwreck 7.
The application method of this raising of a wreck rubber floating buoy, step are as follows:
As shown in figure 1, diver 9 the installation exercise window of rubber floating buoy 1 arrival before, in advance in the installation position of rubber floating buoy 1
A both ends respectively piece guide rope 5 of connection is put, guiding in place is transferred as rubber floating buoy 1.
As shown in Fig. 2 workmen by rubber floating buoy 1 along the doubling of long side direction forward direction once, then reverse doubling one again
It is secondary, rubber floating buoy 1 is tied up together every a segment distance using tie 3, the rubber floating buoy 1 independently tied up is reused into lifting
Rope 4 is tied up to hanging beam 2, completes the button-up operations of 2 times water of lifting, when 2 times water operation windows arrivals are lifted, by rubber
Floating drum 1 hangs lower water.
As shown in figure 3, the suspension suspender belt 8 of rubber floating buoy 1 is connected by diver 9 with the underwater mounted solid steel wire 6 of system,
The position of rubber floating buoy 1 can be adjusted using hanging beam 2, so that diver 9 connects the solid steel wire 6 of system.
As shown in figure 4, after completing the solid connection of steel wire 6 of all systems, diver 9 at the both ends of rubber floating buoy 1, respectively fill by connection one
Tracheae 10, the tie 3 of rubber floating buoy 1 is all removed, and the hoisting rope 4 of the middle part of hanging beam 2 connection is removed, left behind and hang
The hoisting rope 4 at the both ends of beam 2, diver 9 command the loop wheel machine on operation ship, the both ends of rubber floating buoy 1 are carried into height slightly, more than completion
After operation, diver 9 goes to the safety zone away from rubber floating buoy 1 to wait, and operation ship is with less aeration quantity to rubber floating buoy 1
Partial inflation is carried out, after inflation pause, diver 9 goes rubber floating buoy 1 to check, if gas is more equably accumulated in rubber and floated
1 both ends of cylinder, then can remove the hoisting rope 4 at both ends, if gas is simply accumulated in the middle part of rubber floating buoy 1, will be filled with rubber
Gas inside glue floating drum 1 is released, and the state of rubber floating buoy 1 is adjusted using hanging beam 2, it is ensured that the both ends energy of rubber floating buoy 1
Enough it is in of a relatively high position;
As shown in figure 5, after checking that confirmation 1 local floading condition of rubber floating buoy is good, and winding is not present, diver 9 will
The hoisting rope 4 at the both ends of rubber floating buoy 1 is also removed, and hanging beam 2 is recycled to deck by operation ship, and continues to inflate rubber floating buoy 1,
By the depth-sounding pipe being connected on gas tube 10 in gas replenishment process, the both ends depth of water of rubber floating buoy 1 is monitored in real time, and can pass through
The feedback pressure of gas tube 10 reads the internal pressure of rubber floating buoy 1, when the inside and outside differential pressure of rubber floating buoy 1 reaches means for operation pressure of safety valve
80% or so after, you can stop inflation.
As shown in fig. 6, diver 9 is checked the state of rubber floating buoy 1,1 each suspension centre of rubber floating buoy stress is confirmed
And after bulk expansion state is preferable, you can confirm that the rubber floating buoy 1 under water complete by inflation, diver 9 removes and reclaims inflation
Pipeline, so far, the underwater installation exercise of the rubber floating buoy 1 are fully completed.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model specific implementation not by
The limitation of aforesaid way, as long as employing changing for the various unsubstantialities that methodology and technical scheme of the present utility model are carried out
Enter, or it is not improved by it is of the present utility model design and technical scheme directly apply to other occasions, in the utility model
Protection domain within.
Claims (3)
1. raising of a wreck rubber floating buoy, it is characterised in that:Including rubber floating buoy, tie and hanging beam, the rubber floating buoy cylinder
Body is bundled on hanging beam by hoisting rope, and tie is tied up in rubber floating buoy, and the tie is provided with more, and rubber floating buoy puts down water
Tied with tie after carrying out doubling before, be put into hanging beam in water.
2. raising of a wreck rubber floating buoy according to claim 1, it is characterised in that:The both ends of the rubber floating buoy are set
Inflation inlet.
3. raising of a wreck rubber floating buoy according to claim 2, it is characterised in that:The bottom of the rubber floating buoy is set
More suspension suspender belts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720571769.8U CN207129116U (en) | 2017-05-22 | 2017-05-22 | Raising of a wreck rubber floating buoy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720571769.8U CN207129116U (en) | 2017-05-22 | 2017-05-22 | Raising of a wreck rubber floating buoy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207129116U true CN207129116U (en) | 2018-03-23 |
Family
ID=61631161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720571769.8U Active CN207129116U (en) | 2017-05-22 | 2017-05-22 | Raising of a wreck rubber floating buoy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207129116U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107176273A (en) * | 2017-05-22 | 2017-09-19 | 交通运输部上海打捞局 | Raising of a wreck rubber floating buoy application method |
-
2017
- 2017-05-22 CN CN201720571769.8U patent/CN207129116U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107176273A (en) * | 2017-05-22 | 2017-09-19 | 交通运输部上海打捞局 | Raising of a wreck rubber floating buoy application method |
CN107176273B (en) * | 2017-05-22 | 2023-09-29 | 交通运输部上海打捞局 | Using method of rubber buoy for sunken ship salvage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1932160A (en) | Component assembling construction auxiliary apparatus in hydraulic engineering and using method thereof | |
CN101649928A (en) | Method for installing pipelines assisted by air bags | |
CN113247202B (en) | Underwater test guaranteeing device and testing method | |
CN109098692A (en) | A kind of installation method of underwater hovering clump formula manifold | |
CN103422483A (en) | Float-over mounting method for jacket in shallow water | |
CN107541732A (en) | A kind of marine stretching anode system and its installation method | |
CN105952967B (en) | A kind of immersed tube operational method using floating ball sinking pipeline | |
CN207129116U (en) | Raising of a wreck rubber floating buoy | |
CN106005311A (en) | Deep-sea adaptive rising device | |
CN205632934U (en) | Platform of upwards going on board based on surface of water | |
CN106744258B (en) | A kind of adjustable latent device suspension centre external hanging type of structure lays recyclable device and method | |
CN101691893A (en) | Underwater construction method of steel tube | |
CN101282028B (en) | Method and apparatus for laying subaqueous cable | |
CN107176273A (en) | Raising of a wreck rubber floating buoy application method | |
CN105620689A (en) | Life buoy used on ship | |
CN111692426B (en) | Offshore welded junction loosening treatment method for large-diameter HDPE pipeline | |
CN105782568A (en) | Mounting method of stand tube and protection tube | |
CN100535251C (en) | Earth pit for prefabricating members for use in hydraulic engineering, float transferring device therefore, and their using method | |
CA1197385A (en) | Buoyancy-supported struts for ocean platforms | |
CN109695780A (en) | One kind, which subtracts, holds formula submarine pipeline active flexion control device | |
CN104542396B (en) | Waterproof remote control inflating floating valve | |
CN210315565U (en) | Device for laying underwater film bag | |
CN207108302U (en) | Possesses the special cantilever crane of port and pier of life-saving functions | |
CN209881247U (en) | Double-floating-pillow air bag floating support | |
CN215253308U (en) | Auxiliary tool capable of enabling construction of sewage inspection well and pipeline detection to be free of guide drainage |