CN207129116U - Raising of a wreck rubber floating buoy - Google Patents

Raising of a wreck rubber floating buoy Download PDF

Info

Publication number
CN207129116U
CN207129116U CN201720571769.8U CN201720571769U CN207129116U CN 207129116 U CN207129116 U CN 207129116U CN 201720571769 U CN201720571769 U CN 201720571769U CN 207129116 U CN207129116 U CN 207129116U
Authority
CN
China
Prior art keywords
floating buoy
rubber floating
rubber
buoy
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720571769.8U
Other languages
Chinese (zh)
Inventor
蒋岩
王伟平
陈世海
金锋
龚晓明
金鑫
刘雨
金桐君
姜大正
彭忠卫
王金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SALVAGE Co
Original Assignee
SHANGHAI SALVAGE Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SALVAGE Co filed Critical SHANGHAI SALVAGE Co
Priority to CN201720571769.8U priority Critical patent/CN207129116U/en
Application granted granted Critical
Publication of CN207129116U publication Critical patent/CN207129116U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of raising of a wreck rubber floating buoy, belong to raising of a wreck field, including rubber floating buoy, tie and hanging beam, rubber floating buoy cylinder is bundled on hanging beam by hoisting rope, tie is tied up in rubber floating buoy, tie is provided with more, and rubber floating buoy is tied after carrying out doubling before putting down water with tie, is put into hanging beam in water.Raising of a wreck of the present utility model can be used for installing large-scale salvaging rubber floating buoy under the hydrological environment of complexity with rubber floating buoy, coordinate floating drum hoisting rope and floating drum tie using special floating drum installation hanging beam, floating drum is tied up and lifted, make rubber floating buoy smaller by water currents, it is easy to that floating drum is hung in place and diver installs under water, fundamentally solves the problems, such as to hang encountered in water and underwater inflation installation process.

Description

Raising of a wreck rubber floating buoy
Technical field
Raising of a wreck field is the utility model is related to, specifically, the utility model is related to a kind of raising of a wreck rubber Floating drum.
Background technology
In South Korea " generation more number " Salvage, according to shipwreck itself cabin breakage, external floating drum may be used Aid in salvaging to provide extra buoyancy.Although traditional steel floating drum could be used that, but due to uniform specification and size It is larger, higher are required to application conditions.Rubber floating drum due to can be manufactured according to actual demands of engineering according to design size, Therefore application is more convenient, and limiting factor is less.But large-scale rubber floating buoy is larger due to self structure characteristic, overall dimensions (23 meters are always about, 3.5 meters of diameter), outer wall is flexible rubber, and inside does not set separation, is installed under water in gas replenishment process, outside The more difficult control of shape.If installation method is improper, the underwater floading condition of rubber floating buoy can be caused bad, inflation is not completely filled with, is used Effect is had a greatly reduced quality.Simultaneously as floading condition is bad, local pressure mistake may also occur in the suspender belt of rubber floating buoy and the outside string bag Greatly, so as to cause suspender belt be broken or string bag breakage after rubber floating buoy floating to the water surface major accident.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of lighthouse buoy of salvaging, and the floating drum can be in water Under be inflated and install.
In order to solve the above-mentioned technical problem, technical scheme is used by the utility model:Raising of a wreck rubber floating buoy, Including rubber floating buoy, tie and hanging beam, the rubber floating buoy cylinder is bundled on hanging beam by hoisting rope, and tie is tied up in rubber On floating drum, the tie is provided with more, and rubber floating buoy is tied after carrying out doubling before putting down water with tie, with hanging beam It is put into water.
Preferably, the both ends of the rubber floating buoy set inflation inlet.
Preferably, the bottom of the rubber floating buoy sets more suspension suspender belts.
Using the technical solution of the utility model, following beneficial effect can be obtained:
Raising of a wreck of the present utility model can install large-scale salvaging with rubber floating buoy under the hydrological environment of complexity and use Rubber floating buoy, coordinate floating drum hoisting rope and floating drum tie using special floating drum installation hanging beam, floating drum tie up and Lifting, makes rubber floating buoy smaller by water currents, is easy to that floating drum is hung in place and diver installs under water.Using gas tube certainly Rubber floating buoy both ends are synchronously inflated, and coordinate hanging beam to be adjusted the underwater posture of floating drum, and it is not in unilateral gas to make floating drum Body accumulates the more unsafe condition for causing unbalance stress, so as to ensure that what floating drum inflated under water smoothly completes, fundamentally solves Determine and hung water and underwater the problem of inflating encountered in installation process.
Brief description of the drawings
Brief description is made to the content expressed by each accompanying drawing of this specification and the mark in figure below:
Fig. 1 is the state diagram that this rubber floating buoy uses step A;
Fig. 2 is the state diagram that this rubber floating buoy uses step B;
Fig. 3 is the state diagram that this rubber floating buoy uses step C;
Fig. 4 is the state diagram that this rubber floating buoy uses step D;
Fig. 5 is the state diagram that this rubber floating buoy uses step E;
Fig. 6 is the state diagram that this rubber floating buoy uses step F;
Mark in above-mentioned figure is:1st, rubber floating buoy;2nd, hanging beam;3rd, tie;4th, hoisting rope;5th, guide rope;6th, it is Gu steel wire;7th, shipwreck;8th, suspender belt is hung;9th, diver;10th, gas tube.
Embodiment
Below against accompanying drawing, by the description to embodiment, to specific embodiment of the present utility model as involved Mutual alignment and annexation, the effect of each several part and operation principle between the shape of each component, construction, each several part etc. make into The detailed description of one step.
As shown in Fig. 2 this raising of a wreck includes rubber floating buoy 1, tie 3 and hanging beam 2, rubber floating buoy 1 with rubber floating buoy Cylinder is bundled on hanging beam 2 by hoisting rope 4, and tie 3 is tied up in rubber floating buoy 1, and tie 3 is provided with more, and rubber floating buoy 1 is put Tied with tie 3 after carrying out doubling before lower water, be put into hanging beam 2 in water, so can be in the hydrological environment of complexity It is lower to place large-scale salvaging rubber floating buoy 1, prevent rubber floating buoy 1 from waving with ripples to be difficult to place.The both ends of rubber floating buoy 1 are set Inflation inlet is put, the both ends of rubber floating buoy 1 can be inflated, can so keep rubber floating buoy 1 to keep balance in inflation, The bottom of rubber floating buoy 1 sets more suspension suspender belts 8, and suspension suspender belt 8 is used to fix with the hull of shipwreck 7.
The application method of this raising of a wreck rubber floating buoy, step are as follows:
As shown in figure 1, diver 9 the installation exercise window of rubber floating buoy 1 arrival before, in advance in the installation position of rubber floating buoy 1 A both ends respectively piece guide rope 5 of connection is put, guiding in place is transferred as rubber floating buoy 1.
As shown in Fig. 2 workmen by rubber floating buoy 1 along the doubling of long side direction forward direction once, then reverse doubling one again It is secondary, rubber floating buoy 1 is tied up together every a segment distance using tie 3, the rubber floating buoy 1 independently tied up is reused into lifting Rope 4 is tied up to hanging beam 2, completes the button-up operations of 2 times water of lifting, when 2 times water operation windows arrivals are lifted, by rubber Floating drum 1 hangs lower water.
As shown in figure 3, the suspension suspender belt 8 of rubber floating buoy 1 is connected by diver 9 with the underwater mounted solid steel wire 6 of system, The position of rubber floating buoy 1 can be adjusted using hanging beam 2, so that diver 9 connects the solid steel wire 6 of system.
As shown in figure 4, after completing the solid connection of steel wire 6 of all systems, diver 9 at the both ends of rubber floating buoy 1, respectively fill by connection one Tracheae 10, the tie 3 of rubber floating buoy 1 is all removed, and the hoisting rope 4 of the middle part of hanging beam 2 connection is removed, left behind and hang The hoisting rope 4 at the both ends of beam 2, diver 9 command the loop wheel machine on operation ship, the both ends of rubber floating buoy 1 are carried into height slightly, more than completion After operation, diver 9 goes to the safety zone away from rubber floating buoy 1 to wait, and operation ship is with less aeration quantity to rubber floating buoy 1 Partial inflation is carried out, after inflation pause, diver 9 goes rubber floating buoy 1 to check, if gas is more equably accumulated in rubber and floated 1 both ends of cylinder, then can remove the hoisting rope 4 at both ends, if gas is simply accumulated in the middle part of rubber floating buoy 1, will be filled with rubber Gas inside glue floating drum 1 is released, and the state of rubber floating buoy 1 is adjusted using hanging beam 2, it is ensured that the both ends energy of rubber floating buoy 1 Enough it is in of a relatively high position;
As shown in figure 5, after checking that confirmation 1 local floading condition of rubber floating buoy is good, and winding is not present, diver 9 will The hoisting rope 4 at the both ends of rubber floating buoy 1 is also removed, and hanging beam 2 is recycled to deck by operation ship, and continues to inflate rubber floating buoy 1, By the depth-sounding pipe being connected on gas tube 10 in gas replenishment process, the both ends depth of water of rubber floating buoy 1 is monitored in real time, and can pass through The feedback pressure of gas tube 10 reads the internal pressure of rubber floating buoy 1, when the inside and outside differential pressure of rubber floating buoy 1 reaches means for operation pressure of safety valve 80% or so after, you can stop inflation.
As shown in fig. 6, diver 9 is checked the state of rubber floating buoy 1,1 each suspension centre of rubber floating buoy stress is confirmed And after bulk expansion state is preferable, you can confirm that the rubber floating buoy 1 under water complete by inflation, diver 9 removes and reclaims inflation Pipeline, so far, the underwater installation exercise of the rubber floating buoy 1 are fully completed.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model specific implementation not by The limitation of aforesaid way, as long as employing changing for the various unsubstantialities that methodology and technical scheme of the present utility model are carried out Enter, or it is not improved by it is of the present utility model design and technical scheme directly apply to other occasions, in the utility model Protection domain within.

Claims (3)

1. raising of a wreck rubber floating buoy, it is characterised in that:Including rubber floating buoy, tie and hanging beam, the rubber floating buoy cylinder Body is bundled on hanging beam by hoisting rope, and tie is tied up in rubber floating buoy, and the tie is provided with more, and rubber floating buoy puts down water Tied with tie after carrying out doubling before, be put into hanging beam in water.
2. raising of a wreck rubber floating buoy according to claim 1, it is characterised in that:The both ends of the rubber floating buoy are set Inflation inlet.
3. raising of a wreck rubber floating buoy according to claim 2, it is characterised in that:The bottom of the rubber floating buoy is set More suspension suspender belts.
CN201720571769.8U 2017-05-22 2017-05-22 Raising of a wreck rubber floating buoy Active CN207129116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720571769.8U CN207129116U (en) 2017-05-22 2017-05-22 Raising of a wreck rubber floating buoy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720571769.8U CN207129116U (en) 2017-05-22 2017-05-22 Raising of a wreck rubber floating buoy

Publications (1)

Publication Number Publication Date
CN207129116U true CN207129116U (en) 2018-03-23

Family

ID=61631161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720571769.8U Active CN207129116U (en) 2017-05-22 2017-05-22 Raising of a wreck rubber floating buoy

Country Status (1)

Country Link
CN (1) CN207129116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107176273A (en) * 2017-05-22 2017-09-19 交通运输部上海打捞局 Raising of a wreck rubber floating buoy application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107176273A (en) * 2017-05-22 2017-09-19 交通运输部上海打捞局 Raising of a wreck rubber floating buoy application method
CN107176273B (en) * 2017-05-22 2023-09-29 交通运输部上海打捞局 Using method of rubber buoy for sunken ship salvage

Similar Documents

Publication Publication Date Title
CN1932160A (en) Component assembling construction auxiliary apparatus in hydraulic engineering and using method thereof
CN101649928A (en) Method for installing pipelines assisted by air bags
CN113247202B (en) Underwater test guaranteeing device and testing method
CN109098692A (en) A kind of installation method of underwater hovering clump formula manifold
CN103422483A (en) Float-over mounting method for jacket in shallow water
CN107541732A (en) A kind of marine stretching anode system and its installation method
CN105952967B (en) A kind of immersed tube operational method using floating ball sinking pipeline
CN207129116U (en) Raising of a wreck rubber floating buoy
CN106005311A (en) Deep-sea adaptive rising device
CN205632934U (en) Platform of upwards going on board based on surface of water
CN106744258B (en) A kind of adjustable latent device suspension centre external hanging type of structure lays recyclable device and method
CN101691893A (en) Underwater construction method of steel tube
CN101282028B (en) Method and apparatus for laying subaqueous cable
CN107176273A (en) Raising of a wreck rubber floating buoy application method
CN105620689A (en) Life buoy used on ship
CN111692426B (en) Offshore welded junction loosening treatment method for large-diameter HDPE pipeline
CN105782568A (en) Mounting method of stand tube and protection tube
CN100535251C (en) Earth pit for prefabricating members for use in hydraulic engineering, float transferring device therefore, and their using method
CA1197385A (en) Buoyancy-supported struts for ocean platforms
CN109695780A (en) One kind, which subtracts, holds formula submarine pipeline active flexion control device
CN104542396B (en) Waterproof remote control inflating floating valve
CN210315565U (en) Device for laying underwater film bag
CN207108302U (en) Possesses the special cantilever crane of port and pier of life-saving functions
CN209881247U (en) Double-floating-pillow air bag floating support
CN215253308U (en) Auxiliary tool capable of enabling construction of sewage inspection well and pipeline detection to be free of guide drainage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant