CN207122664U - A kind of tubular construction through walls with new drag piece - Google Patents
A kind of tubular construction through walls with new drag piece Download PDFInfo
- Publication number
- CN207122664U CN207122664U CN201720820268.9U CN201720820268U CN207122664U CN 207122664 U CN207122664 U CN 207122664U CN 201720820268 U CN201720820268 U CN 201720820268U CN 207122664 U CN207122664 U CN 207122664U
- Authority
- CN
- China
- Prior art keywords
- drag piece
- drag
- piece
- hole
- walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
It the utility model is related to a kind of tubular construction through walls with new drag piece, wall pipe is embedded in reinforced concrete wall, passed through for cable through walls, drag piece component is fixed on one end of wall pipe, drag piece component is recline the first drag piece of wall pipe and the second drag piece of the first drag piece that reclines, the middle part of first drag piece has circular through hole and at least two first semicircular through-holes, and first semicircular through-holes connect with circular through hole;The second drag piece has at least two grooves, and the groove caves inward from the periphery of the second drag piece, and the bottom of the groove is formed as the second semicircular through-holes;Second semicircular through-holes are with the first semicircular through-holes diametrically contraposition so that cable through walls passes through in the inner.According to the wall pipe of different-diameter and the cable through walls of varying number, the utility model can come maximum efficiency ensure construction quality by the first drag piece with semicircular through-holes and the second drag piece, reduce cost.
Description
Technical field
Civil air defense constructions and installations wall pipe is the utility model is related to, relates more specifically to a kind of wall pipe knot with new drag piece
Structure.
Background technology
Various pipelines be present and wall passed through on the outside of the building into inside people's air defense protective zone in civil air defense constructions and installations, or from people
One protective zone of preventing engineering enters another protective zone.According to civil air defense constructions and installations specification, drag chip architecture is required to prevent
Only shock wave damages to protective zone inside.
Existing drag piece only disclosure satisfy that the requirement for passing through a cable through walls, when needing to wear more cables through walls
When, generally require pre-buried more wall pipes.This not only adds cost, and also increase the risk of leakage.
Utility model content
Cost during in order to solve to install more cables through walls existing for above-mentioned prior art and disclosure risk is increased asks
Topic, the utility model aim to provide a kind of tubular construction through walls with new drag piece.
Tubular construction through walls described in the utility model with new drag piece, including reinforced concrete wall, wall pipe,
Cable through walls and drag piece component, wherein, wall pipe is embedded in reinforced concrete wall, is passed through for cable through walls, drag
Piece component is fixed on one end of wall pipe, drag piece component be recline wall pipe the first drag piece and recline first anti-
Second drag piece of power piece, the middle part of the first drag piece have circular through hole and at least two first semicircular through-holes, should
First semicircular through-holes connect with circular through hole;The second drag piece has at least two grooves, and the groove resists from second
The periphery of power piece caves inward, and the bottom of the groove is formed as the second semicircular through-holes;Second semicircular through-holes and first
Semicircular through-holes diametrically contraposition passes through in the inner for cable through walls.
The first fastener through hole is additionally provided with first drag piece, being additionally provided with the second fastener on the second drag piece passes through
Through hole, fastener pass through the first fastener through hole and the second fastener through hole that drag piece component is fixed on into wall pipe
On.
At least two first semicircular through-holes are evenly distributed on the circumference of circular through hole.
First drag piece and the second drag piece have circular body respectively.
First drag piece and the second drag piece have consistent exterior contour.
The number of first semicircular through-holes and groove is respectively two, three or four.
The fire prevention for also including being packed in wall pipe is filled out embedding.
Be additionally included in close on the fire prevention that the side of exterior wall is packed in wall pipe fill out it is embedding and in the side for closing on protective zone
The waterproof being packed in wall pipe is filled out embedding.
According to the wall pipe of different-diameter and the cable through walls of varying number, the utility model can be by with semicircle
The the first drag piece and the second drag piece of through hole ensure construction quality with carrying out maximum efficiency, reduce cost.
Brief description of the drawings
Fig. 1 is the entirety according to the tubular construction through walls with new drag piece of a preferred embodiment of the present utility model
Schematic diagram;
Fig. 2 is the structural representation of Fig. 1 drag piece component.
Embodiment
Below in conjunction with the accompanying drawings, preferred embodiment of the present utility model is provided, and is described in detail.
Fig. 1 is the entirety according to the tubular construction through walls with new drag piece of a preferred embodiment of the present utility model
Schematic diagram, including reinforced concrete wall 1, wall pipe 2, cable through walls 3, drag piece component 4, fire prevention fill out embedding 5 and waterproof fill out it is embedding
6.Wherein, wall pipe 2 is embedded in reinforced concrete wall 1, is passed through for cable 3 through walls.In protective zone, drag piece group
Part 4 is fixed on one end of wall pipe 2.In wall pipe 2, the side for closing on exterior wall is packed with fire prevention and fills out embedding 5, is closing on
The side of protective zone is packed with waterproof and fills out embedding 6.The fire prevention fill out embedding 5 and waterproof fill out embedding 6 direct neighbor.
Fig. 2 is the structural representation of Fig. 1 drag piece component 4, including the relatively independent stacked He of the first drag piece 41
Second drag piece 42, wherein, the first drag piece 41 reclines one end of wall pipe 2, the first drag piece and the second drag piece 42 reclines
41 are installed.
First drag piece 41 has circular body 41a, and its middle part has a circular through hole 411 and three the first half
Circular through hole 412, this three the first semicircular through-holes 412 are evenly distributed on the circumference of circular through hole 411, and
Connected with circular through hole 411.In addition, two on straight line are additionally provided with the body 41a of the first drag piece 41
First fastener through hole 413.
Second drag piece 42 has circular body 42a.The body 41a of body 42a and the first drag piece 41 size
Corresponding, it has three grooves 421, and three grooves 421 are uniformly distributed, and is recessed respectively from body 42a circumference towards the center of circle
Formed, the bottom of its groove is formed as the second semicircular through-holes 422.Second semicircular through-holes 422 and first are semicircle
The diametrically contraposition of through hole 412 forms a circle, so that cable 3 (referring to Fig. 1) through walls is by the way that and circular through hole 411 is by recessed
Body 42a between groove is blocked, to prevent shock wave from being damaged to protective zone inside.In addition, the second drag piece 42
Body 42a on be provided with two the second fastener through holes 423 on straight line.
In the present embodiment, drag piece component 4 passes through for three cables 3 through walls.It should be understood that it is arranged as required to phase
The semicircular through-holes 412 and groove 421 of number are answered, the cable through walls 3 of required number can be set to pass through drag piece component 4.
In this way, according to the wall pipe 2 of different-diameter and the cable through walls 3 of varying number, the utility model can pass through different patterns
Drag piece component 4 ensures construction quality with carrying out maximum efficiency, reduces cost.
In the present embodiment, the first fastener through hole 413 and the second fastener through hole 423 are defined as ribbon supply circle spiral shell
Bar passes through.
It is above-described, preferred embodiment only of the present utility model, the scope of the utility model is not limited to, this
Above-described embodiment of utility model can also make a variety of changes.I.e. every claims according to the present utility model application and
Simple, the equivalent changes and modifications that description is made, fall within the claims of the utility model patent.This
The not detailed description of utility model is routine techniques content.
Claims (10)
1. a kind of tubular construction through walls with new drag piece, including reinforced concrete wall, wall pipe, cable through walls and drag
Piece component, wherein, wall pipe is embedded in reinforced concrete wall, is passed through for cable through walls, and drag piece component is mounted solid
Be scheduled on one end of wall pipe, it is characterised in that drag piece component be recline wall pipe the first drag piece and recline the first drag
Second drag piece of piece, the middle part of the first drag piece have circular through hole and at least two first semicircular through-holes, and this
One semicircular through-holes connect with circular through hole;The second drag piece has at least two grooves, and the groove is from the second drag
The periphery of piece caves inward, and the bottom of the groove is formed as the second semicircular through-holes;Second semicircular through-holes and the first half
Circular through hole diametrically contraposition passes through in the inner for cable through walls.
2. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that on the first drag piece also
The first fastener through hole is provided with, the second fastener through hole is additionally provided with the second drag piece, fastener is tight through first
Firmware through hole and the second fastener through hole are so that drag piece component is fixed on wall pipe.
3. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that at least two the first half
Circular through hole is evenly distributed on the circumference of circular through hole.
4. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that the first drag piece and
Two drag pieces have circular body respectively.
5. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that the first drag piece and
Two drag pieces have consistent exterior contour.
6. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that the first semicircle insertion
The number in hole is two, and the number of groove is two.
7. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that the first semicircle insertion
The number in hole is three, and the number of groove is three.
8. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that the first semicircle insertion
The number in hole is four, and the number of groove is four.
9. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that also include being packed in wearing
Fire prevention in wall coil is filled out embedding.
10. the tubular construction through walls according to claim 1 with new drag piece, it is characterised in that be additionally included in and close on
Waterproof that is embedding and being packed in the side for closing on protective zone in wall pipe is filled out in the fire prevention that the side of exterior wall is packed in wall pipe
Fill out embedding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720820268.9U CN207122664U (en) | 2017-07-07 | 2017-07-07 | A kind of tubular construction through walls with new drag piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720820268.9U CN207122664U (en) | 2017-07-07 | 2017-07-07 | A kind of tubular construction through walls with new drag piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207122664U true CN207122664U (en) | 2018-03-20 |
Family
ID=61612698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720820268.9U Active CN207122664U (en) | 2017-07-07 | 2017-07-07 | A kind of tubular construction through walls with new drag piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207122664U (en) |
-
2017
- 2017-07-07 CN CN201720820268.9U patent/CN207122664U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2008056185A3 (en) | Hybrid riser tower and methods of installing same | |
MY159495A (en) | Method of spooling a bi-metallic pipe | |
MY186173A (en) | T-piece preformer | |
CN205670671U (en) | Cable seal water repellent component | |
CN207122664U (en) | A kind of tubular construction through walls with new drag piece | |
CN202474788U (en) | Cable pipe orifice sealing device | |
CN208112187U (en) | A kind of wire and cable protective shell with water-proof function | |
CN203867488U (en) | Riser vortex-induced vibration suppression device capable of realizing automatic deformation response | |
CN202884287U (en) | Steel belt strengthening poly ethylene (PE) helical bellow | |
CN204959999U (en) | Energy -conserving wear outer wall sleeve structure | |
CN103696703A (en) | Heat-insulating oil pipe used for small-caliber oil well | |
CN206682434U (en) | A kind of clamp type wall-through tube based on architectural engineering | |
CN203760206U (en) | Cross-linking polyethylene power cable | |
CN208565924U (en) | A kind of novel heat insulation portable activity pipeline | |
CN209104704U (en) | A kind of cable bearer suitable for inside pipeline | |
CN203626625U (en) | Thermal insulated oil tube used for small-diameter oil well | |
CN104653879A (en) | Sealing structure of wall well wall | |
CN205026230U (en) | PE silicon core pipe | |
CN206903987U (en) | A kind of device for suppressing seabed vortex-induced vibration | |
CN204696179U (en) | A kind of Waterproof battery case | |
CN203286169U (en) | Concrete conveying pipeline | |
CN104061384B (en) | Pipe fitting connector structure | |
CN204361612U (en) | A kind of cable protection square round type pipe | |
CN207594175U (en) | A kind of polyurethane protection sleeve pipe pours device | |
GB2482812A (en) | Permeability flow balancing within integral screen joints |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |