CN207121988U - A kind of integrated prefabricated pumping plant - Google Patents
A kind of integrated prefabricated pumping plant Download PDFInfo
- Publication number
- CN207121988U CN207121988U CN201720866492.1U CN201720866492U CN207121988U CN 207121988 U CN207121988 U CN 207121988U CN 201720866492 U CN201720866492 U CN 201720866492U CN 207121988 U CN207121988 U CN 207121988U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- pumping plant
- base
- erecting bed
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of integrated prefabricated pumping plant, it is related to water pump station apparatus field, its drip irrigation device is:A kind of integrated prefabricated pumping plant, including cylinder, water inlet and delivery port are respectively equipped with the side wall of cylinder both sides, cylinder side is provided with some hangers;Water inlet is provided with decontamination apparatus, and decontamination apparatus is fixed in cylinder by support;Water outlet is provided with sewage lifter;Side at the top of cylinder is provided with switch board;Cylinder body bottom is base, and base bottom is provided with prefabricated panel, and base edge is provided with some fixation kits for being used for the firm banking on prefabricated panel;Base includes main body and raises up to form the first erecting bed and the second erecting bed positioned at body rim and with the integrally formed shirt rim of main body, the bottom surface of main body;First erecting bed and the second erecting bed bottom are equipped with shrouding, and the overall bottom that shrouding is formed with main body is plane.The characteristics of device is that pumping plant cylinder is integrally formed, and antiseep effect is good.
Description
Technical field
Water pump station apparatus field is the utility model is related to, more particularly to a kind of integrated prefabricated pumping plant.
Background technology
With industrial development, chemical article uses in life increase, urban water pollution becomes increasingly severe, therefore goes out
Various sewage disposal devices are showed, pumping plant is one of them.Traditional pumping plant is built at the scene by concrete etc.
Form, construction period length, the time cost of consuming, material resources cost, human cost are big.And site operation needs traffic control,
Cause traffic congestion, in increasingly bustling city be possible to that unthinkable economic loss can be caused.Therefore, prefabricated pumping plant should
Transport and give birth to.
For prefabricated pumping plant, the existing following patent in China:
Patent announcement number:CN205116384U, discloses a kind of prefabricated pumping plant of intelligent integral, including fiber reinforced plastic barrel and
Pumping plant base, fiber reinforced plastic barrel are fixedly installed on pumping plant base, and fiber reinforced plastic barrel upper end is provided with opening, is provided with opening
Safety grids and well lid, well lid are arranged in safety grids, and fiber reinforced plastic barrel is internally provided with water pump, pressure pipeline, first led
Rail, the second guide rail, crushing grid, cat ladder and pressure sensor and protection pipe, cat ladder are arranged in glass fibre reinforced plastic cylinder body, fiberglass
Inner barrel upper base surface be provided with it is multiple be connected from lotus root base, pressure pipeline lower end with the delivery port of water pump, pressure pipe
The upper end in road is connected with being arranged on the outlet pipe of fiber reinforced plastic barrel side, and water inlet pipe is in the water inlet inside fiber reinforced plastic barrel
Crushing grid is provided with the pipeline at end.However, the pumping plant base of the utility model is separated with fiber reinforced plastic barrel, it is necessary to the company of assembling
Connect, easily trigger fluid seepage in pumping plant.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of integrated prefabricated pumping plant, its
Feature is that pumping plant cylinder is integrally formed, and antiseep effect is good.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of integrated prefabricated pump
Stand, including cylinder, be respectively equipped with water inlet and delivery port in the side wall of cylinder both sides, cylinder side is provided with some hangers;Enter
Decontamination apparatus is provided with the mouth of a river, decontamination apparatus is fixed in cylinder by support;Water outlet is provided with sewage lifter;Cylinder
The side at top is provided with switch board;Cylinder body bottom is base, and base bottom is provided with prefabricated panel, and base edge is provided with some be used for
The fixation kit of firm banking on prefabricated panel;Base includes main body and is integrally formed positioned at body rim and with main body
Shirt rim, the bottom surface of main body raises up to form the first erecting bed and the second erecting bed;Decontamination apparatus is installed on the first erecting bed
On;Sewage lifter is arranged on the second erecting bed;First erecting bed and the second erecting bed bottom are equipped with shrouding, shrouding with
The overall bottom that main body is formed is plane.
Pass through above-mentioned technical proposal, the cylinder of prefabricated pumping plant are integrally formed, and ensure that cylinder No leakage itself;Make main body
Bottom surface is raised up to form the first erecting bed and the second erecting bed, and decontamination apparatus and sewage lifter are respectively arranged at into first
On erecting bed and the second erecting bed, and the bottom of the first erecting bed and the second erecting bed is sealed using shrouding, on the one hand utilized
Space between shrouding and erecting bed can partially remove vibration when decontamination apparatus and sewage lifter work, pumping plant is existed
It is more stable during work;On the other hand, occurs hole unavoidably during assembling decontamination apparatus and sewage lifter, liquid in cylinder
Cognition is oozed out at hole;And shrouding can play a part of secondary seal, by the hydraulic seal of seepage on erecting bed in shrouding
Between erecting bed;Shirt rim is set up in the main body of the base of cylinder, increases stress point, makes pumping plant operationally more steady.
Preferably, the main body of base is back taper, and shirt rim is taper;Hollow part is provided with and filled out between base body and shirt rim
Thing is filled, shirt rim is provided with the grout hole for being used for that filler to be irrigated to hollow part.
Pass through above-mentioned technical proposal, make the setting of pumping plant more stable;Using triangle stability principle, base body is set
Back taper is set to, shirt rim is arranged to taper, and the section of hollow space is triangle between the main body of base and shirt rim, makes main body
It is more stable with the support of shirt rim;Hollow space in main body and shirt rim irrigates filling, strengthens whole pumping plant and bottom prefabricated panel
Bonding strength it is stronger, improve the stability of pumping station operation.
Preferably, fixation kit includes the built-in fitting being arranged on prefabricated panel and the pressing plate for being arranged at base edge;
Pressing plate is provided with screwed hole;Built-in fitting passes through the screwed hole of pressing plate and is connected with nut;Pressing plate is provided with limit away from built-in fitting side
Position bolt.
Pass through above-mentioned technical proposal, coordinated by built-in fitting and pressing plate, further enhance pumping plant entirety and prefabricated panel
Degree is completely embedded, and the stress on pressing plate is balanced by caging bolt, prevents pressing plate from tilting, influences the compression effect of pressing plate.
Preferably, decontamination apparatus is that bottom sets standoff crushing grid, and support is fixedly connected on the second erecting bed;Powder
Water inlet pipe is additionally provided with broken grid, water inlet pipe is arranged at the water inlet of cylinder.
Pass through above-mentioned technical proposal, realize decontamination function;By crushing grid to entering from water inlet pipe in the sewage of pumping plant
Wood chip, empty bottle, the debris rubbish such as pieces of cloth crushed, to protect other equipment in pumping plant to make its normal operation, solve rubbish
It is excessive to block water pump problem, the inconvenience of artificial timing cleaning is avoided, saves manpower financial capacity.
Preferably, sewage lifter includes some sewage lifting components, and sewage lifting component includes water pump, self coupling base
And pressure pipeline, water pump are arranged on self coupling base, self coupling base is fixedly connected with the second erecting bed;Pressure pipeline is set vertically
Put, one end connection of water pump and pressure pipeline, the other end of pressure pipeline is connected with check-valves, lock is also associated with check-valves
Valve.
Pass through above-mentioned technical proposal, realize the function of sewage lifting;Water pump extracts sewage from pumping plant bottom, and by sewage pump
Enter in the pressure pipeline being vertically arranged, so as to realize the lifting of sewage;Check-valves is set to prevent refluence and water hammer damage water pump;
The closing gate valve when water pump needs maintenance, can avoid water impact from further damaging water pump.
Preferably, sewage lifter includes three groups of sewage lifting components, and the gate valves of three groups of sewage lifting components is with one
Four-way pipe connects, and the vacant mouth of pipe of four-way pipe is arranged at the water outlet of cylinder.
Pass through above-mentioned technical proposal, set three groups of sewage lifting components on the one hand can improve the operating efficiency of pumping plant, separately
On the one hand three groups of sewage lifting components can be standby each other, once wherein a certain or certain two water pump go wrong, does not interfere with whole
The work of individual pumping plant.
Preferably, service platform is provided with the middle part of cylinder, self coupling base is connected with service platform.
Pass through above-mentioned technical proposal, by setting service platform, the assembling of the self coupling base of sewage lifter is set more may be used
Lean on.
Preferably, protection pipe is additionally provided with service platform, pressure sensor is provided with protection pipe.
Pass through above-mentioned technical proposal, utilize the liquid level in pressure sensor sensing cylinder, high sensitivity;Outside pressure sensor
Protection pipe is set, reduces the fault rate of pressure sensor.
Preferably, safety grids are provided with the top of cylinder, the cylinder in safety grids is provided with extending to helping for cylinder body bottom
Ladder.
Pass through above-mentioned technical proposal, staff can be entered in pumping plant by staircase, the parts such as the water pump in pumping plant entered
Row maintenance maintenance.
Preferably, it is additionally provided with ventilation duct at the top of cylinder.
Pass through above-mentioned technical proposal, can air circulation in holding cylinder body, avoid sewage from being sent out in cylinder to a certain extent
Ferment, emit bad smell.
The beneficial effects of the utility model are:A kind of integrated prefabricated pumping plant is provided, the cylinder of pumping plant is integrally formed, energy
Enough avoid liquid in pumping plant from oozing out, pollute the soil around pumping plant;Pumping plant is closely arranged on prefabricated panel, and the operation of pumping plant is steady
Qualitative height;Pump station structure is complete, has sewage lifting component standby each other, operating efficiency is high, highly reliable.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is the profile of embodiment;
Fig. 3 is the profile for being used to represent four-way pipe of embodiment.
Reference:1st, cylinder;2nd, switch board;3rd, ventilation duct;4th, safety grids;5th, handrail;6th, well lid;7th, water inlet;
8th, delivery port;9th, hanger is played;10th, base;11st, prefabricated panel;12nd, main body;13rd, shirt rim;14th, grout hole;15th, filler;16、
Built-in fitting;17th, pressing plate;18th, nut;19th, caging bolt;20th, the first erecting bed;21st, the second erecting bed;23rd, shrouding;25th, powder
Broken grid;26th, support;27th, flexible coupling;28th, water inlet pipe;29th, water pump;30th, service platform;31st, pressure pipeline;32nd, non-return
Valve;33rd, gate valve;34th, staircase;35th, protection pipe;36th, sewage lifting component;37th, four-way pipe;38th, outlet pipe;39th, the first self coupling
Base;40th, the second self coupling base;41st, motor.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Wherein identical parts are presented with like reference characters.It should be noted that the word used below in description
Language "front", "rear", "left", "right", "up" and "down" refer to the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and
" outer " is referred respectively to towards or away from the direction of particular elements geometric center.
A kind of integrated prefabricated pumping plant disclosed in the present embodiment, as shown in figure 1, including cylinder 1 and being arranged at the top of cylinder 1
The switch board 2 of side.The top of cylinder 1 is provided with ventilation duct 3, and the side of ventilation duct 3 is provided with safety grids 4, and the side of safety grids 4 is set
There is handrail 5, side of the safety grids 4 away from ventilation duct 3 is provided with well lid 6.The side of cylinder 1 is provided with water inlet 7, and opposite side is provided with out
The mouth of a river 8.The side of cylinder 1 is additionally provided with some hangers 9.The bottom of cylinder 1 is base 10, and the bottom of base 10 is provided with prefabricated panel
11。
As shown in Fig. 2 base 10 includes main body 12, main body 12 is back taper, and the edge of main body 12 is provided with and the one of main body 12
The shirt rim 13 of the taper of shaping.Some grout holes 14 are distributed with shirt rim 13, by injected hole between main body 12 and shirt rim 13
Hollow part perfusion filler 15, strengthen the bonding strength of whole pumping plant and bottom prefabricated panel 11, improve pumping station operation
Stability.Prefabricated panel 11 is provided with built-in fitting 16, be placed with above the base of shirt rim 13 provided with screwed hole and with built-in fitting 16
The pressing plate 17 of threaded connection.The built-in fitting 16 of the top of pressing plate 17 is provided with nut 18.Side of the pressing plate 17 away from built-in fitting 16 is set
Limited location bolt 19.The bottom surface of main body 12 raises up to form the first erecting bed 20 and the second erecting bed 21.First erecting bed 20
Shrouding 23 is equipped with the bottom of the second erecting bed 21, for sealing the space of the first erecting bed 20 and the second erecting bed 21, shrouding
The 23 overall bottoms formed with main body 12 are plane.
Grid 25 is crushed as shown in Fig. 2 being provided with water inlet 7, the bottom of grid 25 is crushed and is provided with support 26, the bottom of support 26
End is fixedly connected with the first erecting bed 20 in the main body 12 of the base 10 of cylinder 1.The motor 41 for crushing grid 25 is provided with first
Self coupling base 39.The top of first self coupling base 39 is fixedly connected with the cylinder 1 at well lid 6.The entrance for crushing grid 25 is set
Connected at the water inlet 7 of cylinder 1, and by flexible coupling 27 with water inlet pipe 28.Carried at the delivery port 8 of cylinder 1 provided with sewage
Component 36 is risen, sewage lifting component 36 includes the water pump 29 for being arranged at the bottom of cylinder 1.Water pump 29 includes but is not limited to centrifugal water pump
29.Water pump 29 is provided with the second self coupling base 40, and the bottom of the second self coupling base 40 is arranged on the second erecting bed 21, top with
The service platform 30 for being arranged at the middle part of cylinder 1 is fixedly connected.Water pump 29 is connected with the one end for the pressure pipeline 31 being vertically arranged.Pressure
The other end of hydraulic piping 31 is connected with check-valves 32.The check-valves 32 includes but is not limited to swing type rubber flap check valve.Non-return
Gate valve 33 is also associated with valve 32, the gate valve 33 includes but is not limited to blind rod type soft sealing gate valve.Staircase is additionally provided with cylinder 1
34, staircase 34 extends to the bottom of cylinder 1 at safety grids 4.The protection pipe 35 being vertically arranged is further fixed on service platform 30,
It is (not shown that pressure sensor is provided with protection pipe 35).
As shown in Fig. 2 ~ 3,3 groups of sewage lifting components 36, the lock of each sewage lifting component 36 are shared in the cylinder 1 of pumping plant
Valve 33 is connected with four-way pipe 37.Vacant port is arranged at the delivery port 8 of cylinder 1 on four-way pipe 37, and is connect by flexibility
First 27 connect with outlet pipe 38.
Controller is provided with switch board 2, pressure sensor is (not shown)It is electrically connected with the controller respectively with water pump 29.
The assembly method of the shrouding 23 of the pumping plant is as follows:The bottom bracket 26 for crushing grid 25 is first installed to the first installation
Platform 20, and after the second self coupling base 40 is installed into the second erecting bed 21, shrouding 23 is welded on the first erecting bed 20 and
On two erecting beds 21.
The working method of the pumping plant is as follows:Operating personnel are in advance by the default water level upper limit of pumping plant and the offline input of water level
Controller.Sewage enters from water inlet pipe 28 crushes grid 25.Grid 25 is crushed to crush the larger sundries blocking of particle in sewage.
Then, the sewage handled by crushing grid 25 enters in the cylinder 1 of pumping plant, and the water level in cylinder 1 gradually rises.Pass through pressure
Sensor is (not shown)Water level information in pumping plant is sent to controller in real time, judges that the water level in pumping plant is by controller
It is no to reach or more than the water level upper limit.If it is, opening water pump 29, sewage lifting operation is carried out.Treat water level decreasing under water level
After limit is following, 29 are switched off the pump.
Described above is only exemplary embodiment of the present utility model, not for limitation protection model of the present utility model
Enclose, the scope of protection of the utility model is determined by appended claim.
Claims (10)
1. a kind of integrated prefabricated pumping plant, including cylinder(1), cylinder(1)Water inlet is respectively equipped with the side wall of both sides(7)With go out
The mouth of a river(8), cylinder(1)Side is provided with some hangers(9);The water inlet(7)Place is provided with decontamination apparatus, the decontamination apparatus
Pass through support(26)It is fixed on cylinder(1)It is interior;The delivery port(8)Place is provided with sewage lifter;The cylinder(1)Top
Side is provided with switch board(2);It is characterized in that:The cylinder(1)Bottom is base(10), the base(10)Bottom is provided with prefabricated
Bottom plate(11), the base(10)Edge is provided with some be used in prefabricated panel(11)Upper firm banking(10)Fixation kit;
The base(10)Including main body(12)And positioned at main body(12)Edge and and main body(12)Integrally formed shirt rim(13),
The main body(12)Bottom surface raise up to form the first erecting bed(20)With the second erecting bed(21);The decontamination apparatus installation
In the first erecting bed(20)On;The sewage lifter is arranged at the second erecting bed(21)On;First erecting bed(20)
With the second erecting bed(21)Bottom is equipped with shrouding(23), the shrouding(23)With main body(12)The overall bottom formed is flat
Face.
2. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The base(10)Main body(12)For
Back taper, the shirt rim(13)For taper;The base(10)Main body(12)With shirt rim(13)Between hollow part be provided with filling
Thing(15), the shirt rim(13)It is provided with and is used to irrigate filler to the hollow part(15)Grout hole(14).
3. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The fixation kit is pre- including being arranged at
Bottom plate processed(11)On built-in fitting(16)And it is arranged at base(10)The pressing plate at edge(17);The pressing plate(17)It is provided with spiral shell
Pit;The built-in fitting(16)Through pressing plate(17)Screwed hole and and nut(18)Connection;The pressing plate(17)Away from pre-buried
Part(16)Side is provided with caging bolt(19).
4. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The decontamination apparatus is that bottom is provided with branch
Frame(26)Crushing grid(25), the support(26)It is fixedly connected on the second erecting bed(21)On;The crushing grid(25)
On be additionally provided with water inlet pipe(28), the water inlet pipe(28)It is arranged at cylinder(1)Water inlet(7)Place.
5. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The sewage lifter includes some
Sewage lifting component(36), the sewage lifting component(36)Including water pump(29), self coupling base(40)And pressure pipeline(31),
The water pump(29)It is arranged at self coupling base(40)On, the self coupling base(40)With the second erecting bed(21)It is fixedly connected;Institute
State pressure pipeline(31)It is vertically arranged, water pump(29)With pressure pipeline(31)One end connection, the pressure pipeline(31)It is another
One end is connected with check-valves(32), the check-valves(32)On be also associated with gate valve(33).
6. a kind of integrated prefabricated pumping plant according to claim 5, it is characterized in that:The sewage lifter includes three groups
Sewage lifting component(36), three groups of sewage lifting components(36)Gate valve(33)With a four-way pipe(37)Connection, four-way
Pipe(37)The vacant mouth of pipe is arranged at the delivery port of cylinder(8)Place.
7. a kind of integrated prefabricated pumping plant according to claim 5, it is characterized in that:The cylinder(1)Middle part is provided with service
Platform(30), the self coupling base(40)With service platform(30)Connection.
8. a kind of integrated prefabricated pumping plant according to claim 7, it is characterized in that:The service platform(30)On be additionally provided with
Protection pipe(35), the protection pipe(35)It is interior to be provided with pressure sensor.
9. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The cylinder(1)Top is provided with safety
Grid(4), the safety grids(4)Interior cylinder(1)It is provided with and extends to cylinder(1)The staircase of bottom(34).
10. a kind of integrated prefabricated pumping plant according to claim 1, it is characterized in that:The cylinder(1)Top be provided with it is logical
Airduct(3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720866492.1U CN207121988U (en) | 2017-07-17 | 2017-07-17 | A kind of integrated prefabricated pumping plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720866492.1U CN207121988U (en) | 2017-07-17 | 2017-07-17 | A kind of integrated prefabricated pumping plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207121988U true CN207121988U (en) | 2018-03-20 |
Family
ID=61612023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720866492.1U Active CN207121988U (en) | 2017-07-17 | 2017-07-17 | A kind of integrated prefabricated pumping plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207121988U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775068A (en) * | 2018-08-17 | 2018-11-09 | 上海海德隆流体设备制造有限公司 | A kind of prefabricated pumping plant anti-floating counter weight device |
CN110056075A (en) * | 2019-05-28 | 2019-07-26 | 南京淏源环保设备有限公司 | Integrated pump station |
CN110512713A (en) * | 2019-08-07 | 2019-11-29 | 杭州瑞沣环保科技有限公司 | A kind of base connector of prefabricated pumping plant |
CN113638483A (en) * | 2021-09-04 | 2021-11-12 | 浙江艮威水利建设有限公司 | Drainage pump station and construction method thereof |
CN114370103A (en) * | 2021-11-29 | 2022-04-19 | 江阴久盛市政工程有限公司 | Prefabricated pump station of integration sewage promotion |
-
2017
- 2017-07-17 CN CN201720866492.1U patent/CN207121988U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775068A (en) * | 2018-08-17 | 2018-11-09 | 上海海德隆流体设备制造有限公司 | A kind of prefabricated pumping plant anti-floating counter weight device |
CN110056075A (en) * | 2019-05-28 | 2019-07-26 | 南京淏源环保设备有限公司 | Integrated pump station |
CN110512713A (en) * | 2019-08-07 | 2019-11-29 | 杭州瑞沣环保科技有限公司 | A kind of base connector of prefabricated pumping plant |
CN113638483A (en) * | 2021-09-04 | 2021-11-12 | 浙江艮威水利建设有限公司 | Drainage pump station and construction method thereof |
CN113638483B (en) * | 2021-09-04 | 2022-11-29 | 浙江艮威水利建设有限公司 | Drainage pump station and construction method thereof |
CN114370103A (en) * | 2021-11-29 | 2022-04-19 | 江阴久盛市政工程有限公司 | Prefabricated pump station of integration sewage promotion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207121988U (en) | A kind of integrated prefabricated pumping plant | |
CN204225261U (en) | One is buried sewage lifting pump station integrally | |
CN205116383U (en) | Prefabricated pump station of integration with bobbin base is from cleaning device | |
CN207110015U (en) | A kind of integrated prefabricated pumping plant with automatic crushing function | |
CN105201070A (en) | Intelligent integrated prefabrication pump station | |
CN204023770U (en) | A kind of integrated prefabricated pumping plant | |
CN204435470U (en) | The prefabricated pumping plant of a kind of novel many pit shafts glass fiber reinforced plastic | |
CN208152232U (en) | A kind of integrated pump station being installed on urban parking area | |
CN205116384U (en) | Prefabricated pump station of intelligence integration | |
CN205369515U (en) | Integration pump station with adjustable bottom hydraulic pressure | |
CN209975621U (en) | Open caisson formula water hammer protective equipment | |
CN108867579A (en) | Lift adjustment dropping equipment and matched dam pressure regulation method | |
CN204435529U (en) | United villa subsurface stormwater concentrates discharge structure | |
CN207469194U (en) | Lift adjustment dropping equipment | |
CN207228304U (en) | A kind of overall pumping plant of intelligence | |
CN206267286U (en) | Integrated prefabricated pumping plant | |
CN205604432U (en) | Prefabricated pump station of integration with barrel strengthening rib | |
CN205116381U (en) | Prefabricated pump station of integration with antiskid top cap | |
CN209144872U (en) | A kind of well bore for fire-fighting detection of water supply and drainage | |
CN213114923U (en) | Buried pump station with external valve well | |
CN208717961U (en) | A kind of traffic construction fall arrest catch pit port device | |
CN205116380U (en) | Prefabricated pump station of integration with level control apparatus | |
CN208733795U (en) | One kind can remote monitoring intelligent pumping plant | |
CN207678509U (en) | A kind of automatic watering type Green protection fence | |
CN207582506U (en) | A kind of electric power plant circulating water pipeline multifunctional manhole |