CN207121632U - A kind of photovoltaic conflux welding is quickly produced with new tinning stack - Google Patents

A kind of photovoltaic conflux welding is quickly produced with new tinning stack Download PDF

Info

Publication number
CN207121632U
CN207121632U CN201720918993.XU CN201720918993U CN207121632U CN 207121632 U CN207121632 U CN 207121632U CN 201720918993 U CN201720918993 U CN 201720918993U CN 207121632 U CN207121632 U CN 207121632U
Authority
CN
China
Prior art keywords
guide wheel
tin plating
welding
once
tin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720918993.XU
Other languages
Chinese (zh)
Inventor
李经泽
胡云宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sanysolar Materials Technology Co ltd
Canadian Solar Inc
Original Assignee
SUZHOU SAILI NEW MATERIAL TECHNOLOGY Co Ltd
Atlas Sunshine Power Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU SAILI NEW MATERIAL TECHNOLOGY Co Ltd, Atlas Sunshine Power Group Co Ltd filed Critical SUZHOU SAILI NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN201720918993.XU priority Critical patent/CN207121632U/en
Application granted granted Critical
Publication of CN207121632U publication Critical patent/CN207121632U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of photovoltaic conflux welding and quickly produced with new tinning stack, for the tin plating of photovoltaic conflux welding, including tinning stack, cool down tin system and tinning furnace, the T-shaped structure setting of the tinning stack is simultaneously correspondingly arranged in above the tinning furnace, the cooling tin system is in hollow structure and is correspondingly arranged in the longitudinal end of the tinning stack, welding is provided with the transverse end of the tinning stack and introduces guide wheel, tin plating guide wheel and welding draw guide wheel, the welding introduces guide wheel and welding draws the both sides that guide wheel is respectively arranged at the transverse end of tinning stack, the tin plating guide wheel includes once tin plating guide wheel and secondary tin plating guide wheel.The utility model reduces the product fraction defective caused by tin plating speed is fast and copper material standing time is grown;Directly comprising once tin plating and secondary tin plating, guarantee properties of product and quality, without doing over again, the time is saved, improves production efficiency.

Description

A kind of photovoltaic conflux welding is quickly produced with new tinning stack
Technical field
A kind of photovoltaic conflux welding is the utility model is related to quickly to produce with new tinning stack.
Background technology
With the developing of society, the progress of science and technology, automation, intelligent, integration have been increasingly becoming era development Trend, the operating type that Traditional Man is worked progressively is automated, intelligent, integrated technique replaces.Photovoltaic Component is used foreign currency the production of fluid welding band, and existing rapid production process is only once tin plating because tin plating speed is fast, therefore copper material is wanted Ask higher, the standing time of copper material directly affects product quality, and copper material standing time is longer, is more difficult to tin plating, and pin easily occurs in product , it is necessary to do over again again, the waste and product fraction defective for causing the production time raise phenomena such as hole leaks copper and do not plate tin.
Utility model content
The purpose of this utility model is that provide a kind of reduce causes because tin plating speed is fast and copper material standing time is long Product fraction defective;Directly comprising once tin plating and secondary tin plating, guarantee properties of product and quality, without doing over again, the time is saved, The photovoltaic conflux welding for improving production efficiency is quickly produced with new tinning stack.
The technical solution of the utility model is, a kind of photovoltaic conflux welding is quickly produced with new tinning stack, for light Lie prostrate the tin plating of welding that conflux, including tinning stack, cooling tin system and tinning furnace, the T-shaped structure setting of tinning stack And be correspondingly arranged in above the tinning furnace, the cooling tin system is in hollow structure and is correspondingly arranged in the tinning stack Longitudinal end on, be provided with that welding introduces guide wheel, tin plating guide wheel and welding draw guide wheel in the transverse end of the tinning stack, The welding introduces guide wheel and welding draws the both sides that guide wheel is respectively arranged at the transverse end of tinning stack, the tin plating guide wheel bag Include once tin plating guide wheel and secondary tin plating guide wheel, the once tin plating guide wheel be provided with three include first once tin plating guide wheel, Second once tin plating guide wheel and the 3rd once tin plating guide wheel, the secondary tin plating guide wheel, which is again provided with three, includes the one or two Secondary tin plating guide wheel, the second two tin plating guide wheels and the three or two tin plating guide wheels, the described 3rd once tin plating guide wheel and the one or two The inner side longitudinal direction section of secondary tin plating guide wheel is arranged between cooling tin system, on the tinning stack directly over the cooling tin system It is provided with a traction guide wheel, the photovoltaic conflux welding sequentially passes through welding and introduces guide wheel and first once under tin plating guide wheel Once the top of tin plating guide wheel and the 3rd is once behind the lower section of tin plating guide wheel for the first time through cooling tin system for side, second, afterwards Around the top of traction guide wheel, photovoltaic conflux welding second through cooling tin system, sequentially pass through afterwards the first two times it is tin plating The lower section of guide wheel, the top of the second two tin plating guide wheels, the lower section of the three or two tin plating guide wheel and welding are drawn under guide wheel Side.
In one preferred embodiment of the utility model, described first once tin plating guide wheel, second once tin plating guide wheel with And the 3rd once tin plating guide wheel be correspondingly arranged at equal intervals successively.
In one preferred embodiment of the utility model, the first two tin plating guide wheels, the second two tin plating guide wheels with And the three or two tin plating guide wheel is correspondingly arranged at equal intervals successively.
In one preferred embodiment of the utility model, the welding introduces guide wheel, first once tin plating guide wheel, the 2nd 1 Secondary tin plating guide wheel, the 3rd once tin plating guide wheel, the first two tin plating guide wheels, the second two tin plating guide wheels, tin plating lead for the three or two time Wheel and welding draw guide wheel and keep flushing setting.
In one preferred embodiment of the utility model, the transverse end of the tinning stack the welding introduce guide wheel, First once tin plating guide wheel, second once tin plating guide wheel, the 3rd once tin plating guide wheel, the first two tin plating guide wheels, the second two times Tin plating guide wheel, the three or two tin plating guide wheel and welding are drawn is provided with tin face marking line above guide wheel.
In one preferred embodiment of the utility model, the tinning stack is provided projectingly at the top of the traction guide wheel Over top.
Described in the utility model quickly produced for a kind of photovoltaic conflux welding is reduced with new tinning stack, the utility model The product fraction defective caused by tin plating speed is fast and copper material standing time is grown;Directly comprising once tin plating and secondary tin plating, Ensure properties of product and quality, without doing over again, save the time, improve production efficiency.
Brief description of the drawings
Fig. 1 is that the utility model photovoltaic conflux welding is quickly produced with the structure in the new preferred embodiment of tinning stack one Schematic diagram.
Embodiment
Preferred embodiment of the present utility model is described in detail below, so that advantages and features energy of the present utility model It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to the scope of protection of the utility model.
It is described in the utility model quickly to be produced with new tinning stack for a kind of photovoltaic conflux welding, as shown in figure 1, being used for Tin plating, including tinning stack 2, the cooling tin system 3 and tinning furnace of photovoltaic conflux welding 1(It is not drawn into accompanying drawing), the plating 2 T-shaped structure setting of tin device is simultaneously correspondingly arranged in above the tinning furnace, the cooling tin system 3 be in hollow structure simultaneously Be correspondingly arranged in the longitudinal end of the tinning stack 2, be provided with the transverse end of the tinning stack 2 welding introduce guide wheel 4, Tin plating guide wheel and welding draw guide wheel 5, and the welding introduces guide wheel 4 and welding draws guide wheel 5 and is respectively arranged at tinning stack 2 Transverse end both sides, the tin plating guide wheel include once tin plating guide wheel and secondary tin plating guide wheel, the once tin plating guide wheel are set Being equipped with three includes the first once tin plating guide wheel 6, second once tin plating guide wheel 7 and the 3rd once tin plating guide wheel 8, and described first Once once once tin plating guide wheel 8 is correspondingly arranged tin plating guide wheel 7 and the 3rd tin plating guide wheel 6, second at equal intervals successively, and described two Secondary tin plating guide wheel, which is again provided with three, includes the first two tin plating guide wheels 9, the second two tin plating guide wheels 10 and the three or two time Tin plating guide wheel 11, the first two tin plating guide wheels 9, the second two tin plating guide wheels 10 and the three or two tin plating guide wheel 11 are successively Be correspondingly arranged at equal intervals, the described 3rd once the inner side longitudinal direction section of tin plating guide wheel 8 and the first two tin plating guide wheels 9 be arranged at it is cold But between tin system 3, a traction guide wheel 12, the traction are provided with the tinning stack 2 directly over the cooling tin system 3 The top of guide wheel 12 be provided projectingly on the tinning stack 21, over top, the photovoltaic conflux welding 1 sequentially passes through welding Introduce lower section 6, the second once top of tin plating guide wheel 7 and the 3rd once tin plating guide wheel 8 of the once tin plating guide wheel of guide wheel 4 and first Lower section after for the first time through cooling tin system 3, worn for second around the top of traction guide wheel 12, photovoltaic conflux welding 1 afterwards Supercooling tin system 3, the lower sections of the first two tin plating guide wheels 9, the top of the second two tin plating guide wheels 10, are sequentially passed through afterwards The lower section of three or two tin plating guide wheels 11 and welding draw the lower section of guide wheel 5, and it is once tin plating that the welding introduces guide wheel 4, first Once tin plating guide wheel the 7, the 3rd once tin plating guide wheel 8, the first two tin plating guide wheels 9, the second two tin plating guide wheels of guide wheel 6, second 10th, the three or two tin plating guide wheel 11 and welding draw guide wheel 5 and keep flushing setting, and the transverse end of the tinning stack 2 is in institute State welding and introduce once tin plating guide wheel 6, second once tin plating guide wheel the 7, the 3rd once tin plating guide wheel the 8, the 1st of guide wheel 4, first The top that secondary tin plating guide wheel 9, the second two tin plating guide wheel 10, the 3rd 2 tin plating guide wheels 11 and welding draw guide wheels 5 is set There is tin face marking line 13.
Photovoltaic conflux welding is threaded by accompanying drawing mode, tinning stack is immersed into tinning furnace, tin face is reached tin face mark Line position, start tin plating;Photovoltaic conflux welding be first dipped into tinning furnace carry out it is once tin plating, it is then quick through supercooling tin system Cooling, it is secondary tin plating to be then immersed in the progress of tin stove.
It is described in the utility model quickly to be produced with new tinning stack for a kind of photovoltaic conflux welding, reduce because of tin plating speed Product fraction defective caused by length of fast and copper material standing time;Directly comprising once tin plating and secondary tin plating, guarantee product Energy and quality, without doing over again, the time is saved, improves production efficiency.
Specific embodiment of the present utility model is the foregoing is only, but the scope of protection of the utility model is not limited to This, any those skilled in the art, can be without creative work in the technical scope disclosed by the utility model The change or replacement expected, it should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model It should be determined by the scope of protection defined in the claims.

Claims (6)

1. a kind of photovoltaic conflux welding is quickly produced with new tinning stack, for the tin plating of photovoltaic conflux welding, including it is tin plating Device, cooling tin system and tinning furnace, it is characterised in that:The T-shaped structure setting of the tinning stack is simultaneously correspondingly arranged in institute State above tinning furnace, the cooling tin system is in hollow structure and is correspondingly arranged in the longitudinal end of the tinning stack, institute State and welding introducing guide wheel, tin plating guide wheel and welding extraction guide wheel, the welding introducing are provided with the transverse end of tinning stack Guide wheel and welding draw the both sides that guide wheel is respectively arranged at the transverse end of tinning stack, and the tin plating guide wheel includes once tin plating lead Wheel and secondary tin plating guide wheel, the once tin plating guide wheel, which is provided with three, includes the first once tin plating guide wheel, second once tin plating Guide wheel and the 3rd once tin plating guide wheel, the secondary tin plating guide wheel be again provided with three include the first two tin plating guide wheels, The second two tin plating guide wheels and the three or two tin plating guide wheels, the described 3rd once tin plating guide wheel and the first two tin plating guide wheels Inner side longitudinal direction section is arranged between cooling tin system, and being provided with one on the tinning stack directly over the cooling tin system leads Guide wheel, the photovoltaic conflux welding sequentially pass through that welding introduces guide wheel and first once the lower section of tin plating guide wheel, second be once The top of tin plating guide wheel and the 3rd is once behind the lower section of tin plating guide wheel for the first time through cooling tin system, afterwards around traction guide wheel Top, photovoltaic conflux welding second through cooling tin system, sequentially pass through afterwards the first two tin plating guide wheels lower section, the The top of two or two tin plating guide wheels, the lower section of the three or two tin plating guide wheel and welding draw the lower section of guide wheel.
2. photovoltaic conflux welding according to claim 1 is quickly produced with new tinning stack, it is characterised in that:Described One once tin plating guide wheel, second once tin plating guide wheel and the 3rd once tin plating guide wheel be correspondingly arranged at equal intervals successively.
3. photovoltaic conflux welding according to claim 1 is quickly produced with new tinning stack, it is characterised in that:Described One or two tin plating guide wheels, the second two tin plating guide wheels and the three or two tin plating guide wheel are correspondingly arranged at equal intervals successively.
4. photovoltaic conflux welding according to claim 1 is quickly produced with new tinning stack, it is characterised in that:The weldering Band introduce guide wheel, first once tin plating guide wheel, second once tin plating guide wheel, the 3rd once tin plating guide wheel, tin plating lead for the first two times Wheel, the second two tin plating guide wheels, the three or two tin plating guide wheel and welding draw guide wheel and keep flushing setting.
5. photovoltaic conflux welding according to claim 1 is quickly produced with new tinning stack, it is characterised in that:The plating The transverse end of tin device is the welding introduces guide wheel, first once once tin plating guide wheel, the 3rd once plate for tin plating guide wheel, second Tin guide wheel, the first two tin plating guide wheels, the second two tin plating guide wheels, the three or two tin plating guide wheels and welding draw the upper of guide wheel Side is provided with tin face marking line.
6. photovoltaic conflux welding according to claim 1 is quickly produced with new tinning stack, it is characterised in that:It is described to lead The over top of the tinning stack is provided projectingly at the top of guide wheel.
CN201720918993.XU 2017-07-27 2017-07-27 A kind of photovoltaic conflux welding is quickly produced with new tinning stack Active CN207121632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720918993.XU CN207121632U (en) 2017-07-27 2017-07-27 A kind of photovoltaic conflux welding is quickly produced with new tinning stack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720918993.XU CN207121632U (en) 2017-07-27 2017-07-27 A kind of photovoltaic conflux welding is quickly produced with new tinning stack

Publications (1)

Publication Number Publication Date
CN207121632U true CN207121632U (en) 2018-03-20

Family

ID=61613210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720918993.XU Active CN207121632U (en) 2017-07-27 2017-07-27 A kind of photovoltaic conflux welding is quickly produced with new tinning stack

Country Status (1)

Country Link
CN (1) CN207121632U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675118A (en) * 2017-11-10 2018-02-09 常州九天新能源科技有限公司 A kind of two-sided tin plating structure and tin plating method for photovoltaic welding belt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675118A (en) * 2017-11-10 2018-02-09 常州九天新能源科技有限公司 A kind of two-sided tin plating structure and tin plating method for photovoltaic welding belt
CN107675118B (en) * 2017-11-10 2023-11-21 常州九天新能源科技股份有限公司 Double-sided tin plating structure and tin plating method for photovoltaic solder strip

Similar Documents

Publication Publication Date Title
CN207121632U (en) A kind of photovoltaic conflux welding is quickly produced with new tinning stack
CN203917535U (en) Full-automatic pipe end forming device
CN106424613A (en) Copper rod continuous casting machine
CN207143302U (en) A kind of annealing copper strip device
CN206567667U (en) A kind of one-time formed water cooling of cross joint forces forming module
CN103023233B (en) Method and device for simplifying manufacture process of shade-pole motor stator
CN204724632U (en) For the pipe lining device of the online annealing operation of copper pipe
CN201729751U (en) Liquid-state glass cooling and transferring device
CN212904471U (en) Cooling duct is with circle welding area tin tumour detection device
CN103100238B (en) Wash oil water separation device
CN203830440U (en) Capillary copper tube drawing machine
CN203333716U (en) Fastener production cooling device
CN207233719U (en) String welding machine welding guide frame
CN207343837U (en) A kind of valve flange of hydraulic control valve is to pushing up boring device
CN206520293U (en) One kind inside contracts film material automatic punch
CN206567397U (en) A kind of automatic device of digging a pit, hole, etc. of metal tube drawing equipment
CN207171215U (en) A kind of online thickening fixture for friction-welding machine
CN206009790U (en) A kind of full-automatic stannum ball machine
CN206405208U (en) Photovoltaic module series welding machine interconnecting strip coalignment
CN203737967U (en) Crystallizer
CN205184171U (en) Snow melts automatic coil set installation of quick -witted evaporimeter
CN206216933U (en) A kind of take-up pulley cutting on line Buddha's warrior attendant line apparatus
CN207425546U (en) A kind of power transformer forced oil-circulation guide frame
CN209243149U (en) A kind of Tu Xiji copper strip thickness control mechanism
CN206028473U (en) Mould and lower bolster thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215500 Building 1, No.10, Guanghua Ring Road, Xinzhuang Town, Changshu City, Suzhou City, Jiangsu Province

Patentee after: SHANGHAI SANYSOLAR MATERIALS TECHNOLOGY Co.,Ltd.

Patentee after: Atlas sunshine Power Group Co.,Ltd.

Address before: 215500 Building 1, No.10, Guanghua Ring Road, Xinzhuang Town, Changshu City, Suzhou City, Jiangsu Province

Patentee before: SUZHOU SANYSOLAR MATERIALS TECHNOLOGY Co.,Ltd.

Patentee before: CSI SOLAR POWER GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder