CN207111053U - Shale gas collection gas integral is prized - Google Patents

Shale gas collection gas integral is prized Download PDF

Info

Publication number
CN207111053U
CN207111053U CN201721072140.5U CN201721072140U CN207111053U CN 207111053 U CN207111053 U CN 207111053U CN 201721072140 U CN201721072140 U CN 201721072140U CN 207111053 U CN207111053 U CN 207111053U
Authority
CN
China
Prior art keywords
heating
shale gas
entrance
acquisition process
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721072140.5U
Other languages
Chinese (zh)
Inventor
王房杰
李清方
刘天义
汪威
王克文
胡朋
谢成杰
陈春梅
董健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Jianghan Petroleum Engineering Design Co Ltd
Original Assignee
Sinopec Energy and Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Energy and Environmental Engineering Co Ltd filed Critical Sinopec Energy and Environmental Engineering Co Ltd
Priority to CN201721072140.5U priority Critical patent/CN207111053U/en
Application granted granted Critical
Publication of CN207111053U publication Critical patent/CN207111053U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of shale gas collection gas integral sled, and it includes heating furnace, multiple acquisition process mechanism, collecting pipe and skids.The first heating module that heating furnace has heating chamber and is arranged in heating chamber, and the quantity of the first heating module is identical with the quantity of acquisition process mechanism.Each acquisition process mechanism includes:Air inlet pipeline, entrance are used to connect with a shale gas well, and outlet connects with the entrance of first heating module;First throttle valve, the outlet of entrance and one first heating module;The outlet of separator, entrance and first throttle valve;The outlet of branch pipe, entrance and separator;And first flowmeter, it is arranged on branch pipe.The outlet of the branch pipe of each acquisition process mechanism connects with collecting pipe.Heating furnace, the multiple acquisition process mechanism and collecting pipe are arranged in skid.

Description

Shale gas collection gas integral is prized
Technical field
It the utility model is related to the defeated field of shale gas collection, more particularly to a kind of shale gas collection gas integral sled.
Background technology
The research of equipment skidization is being tried to explore in Domestic Oil And Gas Fields exploitation at present, but also very imperfect.Domestic skid Equipment is mainly characterized in that single devices into sled, and device functionality is not strong, is prized without integration group, can not adapt to the production of shale gas individual well Measure low, pressure decline speed is fast, aerogenesis containing sand is more, early stage returns the features such as discharge opeing is more, meanwhile, without fundamentally solution equipment The problems such as rolling development and floor space.
Utility model content
In view of problem present in background technology, the purpose of this utility model is to provide a kind of shale gas collection gas integral Sled, it is highly integrated that it collects airway dysfunction, compact dimensions, saves floor occupying area, while be easy to dismount, and possesses stronger versatility and mutually It is transsexual, simplify the operation and maintenance work of gas gathering station.
To achieve these goals, the utility model provides a kind of shale gas collection gas integral sled, it include heating furnace, Multiple acquisition process mechanism, collecting pipe and skids.The first heating that heating furnace has heating chamber and is arranged in heating chamber Module, and the quantity of the first heating module is identical with the quantity of acquisition process mechanism.
Each acquisition process mechanism includes:Air inlet pipeline, entrance are used to connect with a shale gas well, exported and one first The entrance connection of heating module;First throttle valve, the outlet of entrance and one first heating module;Separator, enter Mouth and the outlet of first throttle valve;The outlet of branch pipe, entrance and separator;And first flowmeter, it is arranged on branch Guan Shang.
The outlet of the branch pipe of each acquisition process mechanism connects with collecting pipe.Heating furnace, the multiple acquisition process mechanism And collecting pipe is arranged in skid.
The beneficial effects of the utility model are as follows:When needing acquisition process shale gas, by shale gas of the present utility model Collect gas integral and prize integral installation to the predeterminated position of gas gathering station, then by the entrance of each air inlet pipeline of acquisition process mechanism point Do not linked together with corresponding shale gas well.Shale gas in each shale gas well flows into the first of heating furnace by air inlet pipeline Heating module is heated, and is depressured after the completion of heating into first throttle valve, and the shale gas after decompression enters in separator Separating treatment is carried out, to remove the gravel and drop in shale gas;Shale gas after separation is pooled in collecting pipe by branch pipe, And first flowmeter can the real time measure shale well correspond to the flow of shale gas.The outlet of collecting pipe and the other of gas gathering station set Connection is applied, the shale gas in multiple shale wells is converged and is output to other facilities.Skid can support heating furnace, acquisition process Mechanism and collecting pipe, it is easy to handling, the installation of whole shale gas collection gas integral sled.
In a word, shale gas collection gas integral sled of the present utility model can enter to the shale gas of multiple shale gas wells output simultaneously Row heating, pressure regulation, separation and metering, and shale gas after processing can be collected output, therefore, shale gas collection of the present utility model The collection airway dysfunction of gas integral sled is highly integrated, compact dimensions, saves floor occupying area, while is also convenient for dismounting, and possesses stronger Versatility and interchangeability, simplify the operation and maintenance work of gas gathering station.
Brief description of the drawings
Fig. 1 is the schematic diagram prized according to shale gas collection gas integral of the present utility model.
Wherein, description of reference numerals is as follows:
The collecting pipe of 1 heating furnace 3
The skid of 11 heating chamber 4
The flange of 12 first heating module 5
The gate valve of 121 heating tube 6
The second throttle of 13 combustion chamber 7
The fuel gas pipeline of 14 second heating module 8 first
The fuel gas pipeline of 2 acquisition process mechanism 9 second
21 air inlet pipeline A pressure regulator valves
22 first throttle valve B filters
23 separator C second flowmeters
24 branch pipe D pressure-control valves
25 first flowmeters
Embodiment
Prized with reference to the accompanying drawings to describe shale gas collection gas integral of the present utility model in detail.
Reference picture 1, heating furnace 1, multiple acquisition processors are included according to shale gas collection gas integral of the present utility model sled Structure 2, collecting pipe 3 and skid 4.Heating furnace 1 has heating chamber 11 and the first heating module 12 being arranged in heating chamber 11, And first heating module 12 quantity it is identical with the quantity of acquisition process mechanism 2.
Each acquisition process mechanism 2 includes:Air inlet pipeline 21, entrance are used to connect with a shale gas well, exported and one The entrance connection of first heating module 12;First throttle valve 22, the outlet of entrance and one first heating module 12; Separator 23, entrance and the outlet of first throttle valve 22;Branch pipe 24, the outlet of entrance and separator 23;And the Flow meters 25, it is arranged on branch pipe 24.
The outlet of the branch pipe 24 of each acquisition process mechanism 2 connects with collecting pipe 3.Heating furnace 1, the multiple acquisition process Mechanism 2 and collecting pipe 3 are arranged in skid 4.
When needing acquisition process shale gas, shale gas collection gas integral of the present utility model is prized into integral installation to gas collection The predeterminated position stood, then the entrance of each air inlet pipeline 21 of acquisition process mechanism 2 is connected with corresponding shale gas well respectively Together.The first heating module 12 that shale gas in each shale gas well flows into heating furnace 1 by air inlet pipeline 21 is heated, It is depressured after the completion of heating into first throttle valve 22, the shale gas after decompression, which enters, carries out separating treatment in separator 23, To remove the gravel and drop in shale gas;Shale gas after separation is pooled in collecting pipe 3 by branch pipe 24, and first flow Meter 25 can the real time measure shale well correspond to the flow of shale gas.The outlet of collecting pipe 3 and other facilities of gas gathering station connect, Other facilities are output to so that the shale gas in multiple shale wells to be converged.Skid 4 can support heating furnace 1, acquisition process mechanism 2 With collecting pipe 3, it is easy to handling, the installation of whole shale gas collection gas integral sled.
Shale gas collection gas integral sled of the present utility model can add to the shale gas of multiple shale gas wells output simultaneously Heat, pressure regulation, separation and metering, and shale gas after processing can be collected output, therefore, shale gas gas collection one of the present utility model The collection airway dysfunction (heating, pressure regulation, separation and metering) of bodyization sled is highly integrated, compact dimensions, saves floor occupying area, while also just In dismounting, possess stronger versatility and interchangeability, simplify the operation and maintenance work of gas gathering station.
In addition, shale gas collection gas integral sled of the present utility model both can be used for the pilot production of shale gas early stage, it is also possible to In the production procedure that the later stage is formal.
First heating module 12 can prevent shale gas cryogenic condensation from blocking pipeline shale gas heating.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, the air inlet of each acquisition process mechanism 2 The porch of pipeline 21 is provided with flange 5;The exit of collecting pipe 3 is provided with flange 5.The flange 5 of the porch of air inlet pipeline 21 is easy to Air inlet pipeline 21 connects with the output channel of shale gas well, and the flange 5 in the exit of collecting pipe 3 is easy to collecting pipe 3 and gas gathering station Other facility connections.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, the air inlet of each acquisition process mechanism 2 Pipeline 21 is provided with gate valve 6.Gate valve 6 can control the break-make of air inlet pipeline 21.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, separator 23 is vertical separator; First flowmeter 25 is orifice flowmeter.The space that vertical separator takes is small, is easy to implement shale gas collection gas integral sled Compact Layout.Contained diamond dust easily produces noise in gas separation process in shale gas, and by optimizing separator 23 Structure and operational factor can reach the purpose of noise reduction.The draining of separator 23 uses the form of drain valve, can arrange automatically Go out liquid and gravel, while gravel blocking can also be avoided the occurrence of.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, each first heating module 12 includes two Individual heating tube 121, and two heating tubes 121 are connected by being arranged on the second throttle 7 outside heating furnace 1.Shale gas passes through One heating tube 121 flows into second throttle 7 after heating and is tentatively depressured, and then, the shale gas after preliminary decompression enters another One heating tube 121 carries out reheating, and finally, the shale gas after reheating carries out secondary drop into first throttle valve 22 Pressure.Therefore, shale gas collection gas integral sled of the present utility model can realize two-step heating, two-stage pressure-regulating.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, each heating tube 121 is spiral coil. Spiral coil in heating furnace 1 it is compact-sized, be easy to integrate, heat transfer efficiency is high.The inlet and outlet of spiral coil, which are arranged at, to be added The side of the furnace wall of hot stove 1.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, heating furnace 1 is water batch heater.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, heating furnace 1 also has:Combustion chamber 13, for being heated to heating chamber 11;And second heating module 14, it is arranged in heating chamber 11.The shale gas gas collection one Changing sled also includes:First fuel gas pipeline 8, entrance connect with collecting pipe 3, and outlet connects with the entrance of the second heating module 14;With And second fuel gas pipeline 9, the outlet of entrance and the second heating module 14, outlet connects with combustion chamber 13.In collecting pipe 3 Part shale gas can be preheated (removing liquid object) by the first fuel gas pipeline 8 into the second heating module 14, after preheating Shale gas by the second fuel gas pipeline 9 enter heating furnace 1 combustion chamber 13, shale gas combustion heat release in combustion chamber 13, so as to The first heating module 12 in heating chamber 11 and the second heating module 14 are heated.Shale gas gas collection one of the present utility model Bodyization prizes the fuel directly using the shale gas of collection as heating furnace 1, solves the problems, such as the fuel of heating furnace 1, simplifies structure simultaneously Reduce energy consumption.
There is heat-conducting medium (such as water), caused heat is delivered to via heat-conducting medium in combustion chamber 13 in heating chamber 11 First heating module 12 and the second heating module 14.Heating furnace 1 can also have premix chamber, by the air of outside and the second combustion gas The shale gas that pipeline 9 inputs is passed through combustion chamber 13 again after being sufficiently mixed, improve efficiency of combustion.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, set successively on the second fuel gas pipeline 9 It is equipped with pressure regulator valve A, filter B, second flowmeter C and pressure-control valve D.Pressure regulator valve A is by after shale gas pressure regulation to 0.4MPa Filtered into filter B, measured subsequently into second flowmeter C, heating is finally entered after pressure-control valve D The combustion chamber 13 of stove 1.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, filter B is basket filter, the Two flowmeter C are turbine flowmeter.
Shale gas collection gas integral sled configuration high-performance of the present utility model monitors, control system.PLC is using heat Standby redundant configuration, the reality of production process parameters (for example, first flowmeter 25 and the flow of second flowmeter C detections etc.) can be achieved When acquisition control, urgent interlocking shut-off (ESD) etc. multiple functions of safety means, ensure that field apparatus is accurately monitored, controlled, And the stabilization, reliable of system overall operation.Using technology of Internet of things, the technology such as integrated intelligent instrument, wireless telecommunications, intelligence is formed Energyization prizes block assembly, realizes long-range monitoring, the information issue of Site Detection data., can be with using monitoring, management information networking The running situation of remote monitoring shale gas collection gas integral sled of the present utility model, the operation conditions of equipment is fully understanded in time, And on-line fault diagnosis, analysis are carried out, provide the user the service such as fault pre-alarming, troubleshooting.
In being prized according to shale gas collection gas integral of the present utility model, reference picture 1, acquisition process mechanism 2 is four groups.When So, according to demand, acquisition process mechanism 2 is also three groups, six groups etc..Can according to shale gas collection gas integral of the present utility model sled The aerogenesis of the multiple shale gas wells of acquisition process simultaneously, can effectively solve the problems, such as that single shale gas well yield is low.

Claims (10)

1. a kind of shale gas collection gas integral sled, it is characterised in that including heating furnace (1), multiple acquisition process mechanisms (2), converge Flow tube (3) and skid (4);
Heating furnace (1) has heating chamber (11) and the first heating module (12) being arranged in heating chamber (11), and first adds The quantity of thermal modules (12) is identical with the quantity of acquisition process mechanism (2);
Each acquisition process mechanism (2) includes:
Air inlet pipeline (21), entrance are used to connect with a shale gas well, outlet and the entrance of first heating module (12) Connection;
First throttle valve (22), entrance and the outlet of one first heating module (12);
Separator (23), entrance and the outlet of first throttle valve (22);
Branch pipe (24), the outlet of entrance and separator (23);And
First flowmeter (25), it is arranged on branch pipe (24);
The outlet of the branch pipe (24) of each acquisition process mechanism (2) connects with collecting pipe (3);
Heating furnace (1), the multiple acquisition process mechanism (2) and collecting pipe (3) are arranged in skid (4).
2. shale gas collection gas integral sled according to claim 1, it is characterised in that
The porch of the air inlet pipeline (21) of each acquisition process mechanism (2) is provided with flange (5);
The exit of collecting pipe (3) is provided with flange (5).
3. shale gas collection gas integral sled according to claim 1, it is characterised in that each acquisition process mechanism (2) are entered Air pipe (21) is provided with gate valve (6).
4. shale gas collection gas integral sled according to claim 1, it is characterised in that
Separator (23) is vertical separator;
First flowmeter (25) is orifice flowmeter.
5. shale gas collection gas integral sled according to claim 1, it is characterised in that each first heating module (12) includes Two heating tubes (121), and two heating tubes (121) are connected by being arranged on the outside second throttle (7) of heating furnace (1).
6. shale gas collection gas integral sled according to claim 5, it is characterised in that each heating tube (121) is helical disk Pipe.
7. shale gas collection gas integral sled according to claim 1, it is characterised in that heating furnace (1) is water batch heater.
8. shale gas collection gas integral sled according to claim 1, it is characterised in that
Heating furnace (1) also has:Combustion chamber (13), for being heated to heating chamber (11);And second heating module (14), set In heating chamber (11);
The shale gas collection gas integral sled also includes:
First fuel gas pipeline (8), entrance connect with collecting pipe (3), and outlet connects with the entrance of the second heating module (14);And
The outlet of second fuel gas pipeline (9), entrance and the second heating module (14), outlet connect with combustion chamber (13).
9. shale gas collection gas integral sled according to claim 8, it is characterised in that on the second fuel gas pipeline (9) successively It is provided with pressure regulator valve (A), filter (B), second flowmeter (C) and pressure-control valve (D).
10. shale gas collection gas integral sled according to claim 1, it is characterised in that acquisition process mechanism (2) is four Group.
CN201721072140.5U 2017-08-24 2017-08-24 Shale gas collection gas integral is prized Active CN207111053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721072140.5U CN207111053U (en) 2017-08-24 2017-08-24 Shale gas collection gas integral is prized

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721072140.5U CN207111053U (en) 2017-08-24 2017-08-24 Shale gas collection gas integral is prized

Publications (1)

Publication Number Publication Date
CN207111053U true CN207111053U (en) 2018-03-16

Family

ID=61577718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721072140.5U Active CN207111053U (en) 2017-08-24 2017-08-24 Shale gas collection gas integral is prized

Country Status (1)

Country Link
CN (1) CN207111053U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607322A (en) * 2022-03-29 2022-06-10 重庆非常规油气研究院有限公司 High-pressure shale gas well trial production integrated mining and transportation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607322A (en) * 2022-03-29 2022-06-10 重庆非常规油气研究院有限公司 High-pressure shale gas well trial production integrated mining and transportation method

Similar Documents

Publication Publication Date Title
CN103242924B (en) Tubular oil-gas separator and oil-gas separation method
CN104594855B (en) Shale gas high pressure mining integrates skid-mounted unit and its mining technique and installation method
CN109340570B (en) Skid-mounted oil-gas mixing and conveying device
CN104295269B (en) Integral well group boosting integration device
CN104785466B (en) A kind of intelligent circulating cooling water- to-water heat exchanger automatic on-line purging system and method
RU77405U1 (en) INSTALLING AN INTEGRATED GAS PREPARATION
CN207111053U (en) Shale gas collection gas integral is prized
CN209084411U (en) A kind of sledge dress oil gas combined transportation device
CN205532514U (en) Defeated modularization of cluster well station collection sled dress device
CN205225237U (en) Oily water mixing of collection sled
CN104727784A (en) Oil gathering and ball collecting all-in-one integrated device and technological method thereof
CN202125357U (en) Prepositioned module for gas system
CN108086968B (en) Coal bed gas cluster well skid-mounted device
CN206600614U (en) Shale gas platform integration sledge dress gas collecting apparatus
CN105065909B (en) A kind of metering method of intelligent metering sled
CN106753519B (en) A kind of system and method improving multi-purpose station crude oil dehydration efficiency
CN208471998U (en) A kind of integration skid-mounted unit of multi-purpose station oil vapor treatment equipment
CN115751716A (en) Oil and gas field ground gathering and transportation system and gathering and transportation method
CN213177697U (en) Short-flow natural gas gathering and transportation system
CN208667627U (en) A kind of associated gas liquid separation metering integrated integrating device
CN203603871U (en) Oil gas throttling, heat preservation, separation and measurement integrated equipment
CN103603649A (en) Oil gas throttling, heat-preserving and separation metering integrated equipment
CN2913808Y (en) Movable metering switch oil extraction station
CN205896696U (en) Novel digital pressure boost sled device
CN109611690B (en) Well group falls back pressure metering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.38-2, Tangxun Hubei Road, Donghu New Technology Development Zone, Wuhan, Hubei 430223

Patentee after: SINOPEC PETROLEUM ENGINEERING JIANGHAN Corp.

Address before: No.38-2, Tangxun Hubei Road, Donghu New Technology Development Zone, Wuhan, Hubei 430223

Patentee before: SINOPEC ENERGY CONSERVATION AND ENVIRONMENTAL PROTECTION ENGINEERING TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder