CN207110958U - A kind of efficient piling machine of construction - Google Patents

A kind of efficient piling machine of construction Download PDF

Info

Publication number
CN207110958U
CN207110958U CN201720765441.XU CN201720765441U CN207110958U CN 207110958 U CN207110958 U CN 207110958U CN 201720765441 U CN201720765441 U CN 201720765441U CN 207110958 U CN207110958 U CN 207110958U
Authority
CN
China
Prior art keywords
piling machine
piling
drill bit
lever
opposite side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720765441.XU
Other languages
Chinese (zh)
Inventor
卢荣红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong nine strong group Co., Ltd.
Original Assignee
冯秀芬
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 冯秀芬 filed Critical 冯秀芬
Priority to CN201720765441.XU priority Critical patent/CN207110958U/en
Application granted granted Critical
Publication of CN207110958U publication Critical patent/CN207110958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of efficient piling machine of construction,Including piling machine,The piling motor spindle is provided with Rotatable base,The piling machine side is provided with operating room,And piling machine opposite side is provided with radiator,The piling machine is connected by main lever with drill bit lever,The main lever side is provided with one-level hydraulic press,And one-level hydraulic press side is provided with hydraulic stem one,In the utility model,With traditional piling machine Comparatively speaking,This new piling machine carries out piling work by using drill bit,Only need to select suitable drill bit,This piling machine can gets suitable drilling on the ground,Facilitate worker that pile is internally installed,Such operating process not only noise very little,Simultaneously,Operation is also very easily modified when piling goes wrong,Pile is extracted like that not necessarily like traditional piling machine,Reduce influence of the noise to surrounding,Accelerate the efficiency of construction.

Description

A kind of efficient piling machine of construction
Technical field
It the utility model is related to construction engineering technical field, more particularly to a kind of efficient piling machine of construction.
Background technology
Traditional piling machine is by the piling machinery on stake injection stratum, by pile monkey, pile frame and auxiliary device using impulsive force Deng composition.Pile monkey is attached between the anterior two parallel vertical guide rods of pile frame, hangs liter with lifting hook, pile frame is a steel construction Pylon, behind portion be provided with hoist engine, to lift by crane stake and pile monkey, the leading truck being made up of before pile frame two guide rods, to Control piling direction, make stake according to design orientation injection stratum exactly, pylon and leading truck can deflection together, it is oblique to beat Stake.Leading truck can also be extended downwards along pylon, to beat snag along embankment or harbour.Pile frame can rotate, and can also divide a word with a hyphen at the end of a line.Piling The basic fundamental parameter of machine is impact moiety by weight, impact kinetic energy and frequency of impact.Pile monkey can be divided into by the power resources of motion Drop hammer, steam hammer, diesel hammer, hydraulic hammer etc..
Due to traditional piling machine during the piling caused by noise it is very big, in the regulation of present various laws and regulations Under, traditional piling machine has used sizable limitation, the situation of disturbing residents not so easily occurs, and present building Field, needs speed and quality again while guarantee can show one's talent, therefore, it is necessary to is done using other novel piling machines To this point.
Utility model content
The purpose of this utility model is to solve shortcoming present in prior art, and a kind of construction proposed is used Efficient piling machine.
To achieve these goals, the utility model employs following technical scheme:A kind of construction is efficiently beaten Stake machine, including piling machine, the piling motor spindle are provided with Rotatable base, and the piling machine side is provided with operating room, and Piling machine opposite side is provided with radiator, and the piling machine is connected by main lever with drill bit lever, the main lever side peace Equipped with one-level hydraulic press, and one-level hydraulic press side is provided with hydraulic stem one, and the main lever opposite side is provided with 2-level hydraulic Device, and 2-level hydraulic device opposite side is connected by hydraulic stem two with main lever, and three-level hydraulic press is provided with above the main lever, The three-level hydraulic press side is provided with hydraulic stem three, and hydraulic stem three is connected by drill bit lever controller with drill bit lever, The drill bit lever opposite side is welded with damper, and the damper opposite side is connected by connecting shaft with drilling rod, the drilling rod Opposite side has portrayed cross bit, and the damper is internally provided with motor, and the motor side is provided with fixator, and Motor opposite side is welded with damping spring.
As further describing for above-mentioned technical proposal:
The hydraulic stem is provided with two altogether, and two hydraulic stems one are symmetrical on piling machine axis.
As further describing for above-mentioned technical proposal:
The connecting shaft is electrically connected with motor.
As further describing for above-mentioned technical proposal:
The one-level hydraulic press, 2-level hydraulic device and three-level hydraulic press and piling machine are electrically connected with.
As further describing for above-mentioned technical proposal:
The radiator is electrically connected with piling machine.
In the utility model, and traditional piling machine is Comparatively speaking, and this new piling machine enters by using drill bit Row piling work, it is only necessary to select suitable drill bit, this piling machine can gets suitable drilling on the ground, facilitates work People internally installs pile, such operating process not only noise very little, meanwhile, it is also very easy when piling goes wrong It is modified operation, it is not necessary to extract pile as traditional piling machine, reduce influence of the noise to surrounding, accelerate construction Efficiency.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction efficient piling machine front view;
Fig. 2 be the utility model proposes a kind of construction efficient piling machine drill bit part structural representation;
Fig. 3 be the utility model proposes a kind of construction efficient piling machine damper structural representation.
Marginal data:
1- piling machines, 11- operating rooms, 12- Rotatable bases, 13- radiators, 14- main levers, 15- drill bits lever, 2- mono- Level hydraulic press, 21- hydraulic stems one, 3- 2-level hydraulics device, 31- hydraulic stems two, 4- three-levels hydraulic press, 41- hydraulic stems three, 42- are bored Head lever controller, 5- drilling rods, 51- connecting shafts, 52- dampers, 53- cross bits, 54- motor, 55- fixators, 56- subtract Shake spring.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1-3, a kind of efficient piling machine of construction, including piling machine 1, the bottom of piling machine 1 is provided with can Rotating base 12, the side of piling machine 1 is provided with operating room 11, and the opposite side of piling machine 1 is provided with radiator 13, and piling machine 1 is logical Cross main lever 14 to be connected with drill bit lever 15, the side of main lever 14 is provided with one-level hydraulic press 2, and the side of one-level hydraulic press 2 is set Hydraulic stem 1 is equipped with, the opposite side of main lever 14 is provided with 2-level hydraulic device 3, and the opposite side of 2-level hydraulic device 3 passes through hydraulic stem 2 31 are connected with main lever 14, and the top of main lever 14 is provided with three-level hydraulic press 4, and the side of three-level hydraulic press 4 is provided with hydraulic stem 3 41, and hydraulic stem 3 41 is connected by drill bit lever controller 42 with drill bit lever 15, the opposite side of drill bit lever 15 is welded with Damper 52, the opposite side of damper 52 are connected by connecting shaft 51 with drilling rod 5, and the opposite side of drilling rod 5 has portrayed cross bit 53, subtracts Shake device 52 is internally provided with motor 54, and the side of motor 54 is provided with fixator 55, and the opposite side of motor 54 is welded with and subtracted Shake spring 56.
Hydraulic stem 1 is provided with two altogether, and two hydraulic stems 1 are symmetrical on the axis of piling machine 1.
Connecting shaft 51 is electrically connected with motor 54.
One-level hydraulic press 2,2-level hydraulic device 3 and three-level hydraulic press 4 are electrically connected with piling machine 1.
Radiator 13 is electrically connected with piling machine 1.
Connecting shaft 51 is rotary structure, and after drilling rod 5 is connected with connecting shaft 51, connecting shaft 51 drives the work of cross bit 53 Make, damper 52 is made up of the fixator 55 of horizontal direction and the damping spring 56 of vertical direction, can by damping spring 56 To reduce the vibrations that motor 54 is subject to.
Operation principle:In use, first selecting suitable drilling rod 5 to access connecting shaft 51, start machine, one-level hydraulic press 2, two Level hydraulic press 3 and three-level hydraulic press 4 work, and apply active force, hydraulic stem to main lever 14 and drill bit lever 15 from different directions One 21, hydraulic stem 2 31 and hydraulic stem 3 41 support main lever 14 and drill bit lever 15, and when being driven piles, connecting shaft 51 is by electricity Motivation 54 controls, and drives drilling rod 5 and cross bit 53 to rotate, the fixator 55 of the both sides of motor 54 is kept away for fixed motor 54 Exempt from it to drop, the damping spring 56 of the bottom of motor 54 is used to reduce the vibrations that motor 54 is subject to.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (5)

1. a kind of efficient piling machine of construction, including piling machine(1), it is characterised in that the piling machine(1)Bottom is set It is equipped with Rotatable base(12), the piling machine(1)Side is provided with operating room(11), and piling machine(1)Opposite side is provided with Radiator(13), the piling machine(1)Pass through main lever(14)With drill bit lever(15)Connection, the main lever(14)Pacify side Equipped with one-level hydraulic press(2), and one-level hydraulic press(2)Side is provided with hydraulic stem one(21), the main lever(14)Opposite side It is provided with 2-level hydraulic device(3), and 2-level hydraulic device(3)Opposite side passes through hydraulic stem two(31)With main lever(14)Connection, institute State main lever(14)Top is provided with three-level hydraulic press(4), the three-level hydraulic press(4)Side is provided with hydraulic stem three(41), And hydraulic stem three(41)Pass through drill bit lever controller(42)With drill bit lever(15)Connection, the drill bit lever(15)Opposite side It is welded with damper(52), the damper(52)Opposite side passes through connecting shaft(51)With drilling rod(5)Connection, the drilling rod(5) Opposite side has portrayed cross bit(53), the damper(52)It is internally provided with motor(54), the motor(54)One Side is provided with fixator(55), and motor(54)Opposite side is welded with damping spring(56).
A kind of 2. efficient piling machine of construction according to claim 1, it is characterised in that the hydraulic stem one (21)Two, and two hydraulic stems one are provided with altogether(21)On piling machine(1)Axis is symmetrical.
A kind of 3. efficient piling machine of construction according to claim 1, it is characterised in that the connecting shaft(51) With motor(54)It is electrically connected with.
A kind of 4. efficient piling machine of construction according to claim 1, it is characterised in that the one-level hydraulic press (2), 2-level hydraulic device(3)With three-level hydraulic press(4)With piling machine(1)It is electrically connected with.
A kind of 5. efficient piling machine of construction according to claim 1, it is characterised in that the radiator(13) With piling machine(1)It is electrically connected with.
CN201720765441.XU 2017-06-28 2017-06-28 A kind of efficient piling machine of construction Active CN207110958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720765441.XU CN207110958U (en) 2017-06-28 2017-06-28 A kind of efficient piling machine of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720765441.XU CN207110958U (en) 2017-06-28 2017-06-28 A kind of efficient piling machine of construction

Publications (1)

Publication Number Publication Date
CN207110958U true CN207110958U (en) 2018-03-16

Family

ID=61588445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720765441.XU Active CN207110958U (en) 2017-06-28 2017-06-28 A kind of efficient piling machine of construction

Country Status (1)

Country Link
CN (1) CN207110958U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550310A (en) * 2021-09-22 2021-10-26 雷迈建材江苏有限公司 Pile driver for building engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550310A (en) * 2021-09-22 2021-10-26 雷迈建材江苏有限公司 Pile driver for building engineering

Similar Documents

Publication Publication Date Title
CN106522223B (en) A kind of Purely mechanical piling machine for building
CN206245314U (en) A kind of portable civil engineering piling machine
CN102747951A (en) Follow-up drilling machine for sleeve of down-the-hole hammer
CN107461150A (en) A kind of piling machine for bridge construction
CN207110958U (en) A kind of efficient piling machine of construction
CN207727572U (en) A kind of foundation pile driver of simple operation
CN210396626U (en) CFG drilling machine
KR20150131414A (en) pile driver for ground reinforcement pipe
CN109853562A (en) A kind of efficient piling machine
CN207362841U (en) A kind of construction piling machine
CN107461145A (en) A kind of construction piling equipment
CN202788610U (en) Down-hole hammer sleeve follow-up drilling machine
CN201972594U (en) Multifunctional hydraulic pile driver
CN206530307U (en) A kind of lift dust guard drilled for piling machine
CN209277153U (en) Flood control piling machine
CN107448150A (en) A kind of screw pile driver liftable device native clearly
CN205822187U (en) Compound piling machine
CN104988921B (en) Multifunction guard rail breakdown van
CN205844329U (en) A kind of multi-functional compaction test apparatus
CN211950309U (en) Piling drilling machine with adjustable drill bit limit
CN205224038U (en) Novel play pile pulling device
CN211397444U (en) Split backpack pile driver
CN209586258U (en) A kind of simple drilling rig
CN206844113U (en) Excavator piling machine
CN105970959A (en) Pile driver special for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190705

Address after: 255000 Cao Ercun South, Sibaoshan Office, Zibo High-tech Industrial Development Zone, Shandong Province

Patentee after: Shandong nine strong group Co., Ltd.

Address before: 518000 Huatai District, Futian District, Shenzhen, Guangdong, China 7-461

Patentee before: Feng Xiufen