CN207109835U - A kind of steel cap - Google Patents
A kind of steel cap Download PDFInfo
- Publication number
- CN207109835U CN207109835U CN201721109611.5U CN201721109611U CN207109835U CN 207109835 U CN207109835 U CN 207109835U CN 201721109611 U CN201721109611 U CN 201721109611U CN 207109835 U CN207109835 U CN 207109835U
- Authority
- CN
- China
- Prior art keywords
- plate
- wing plate
- bearing plate
- section
- steel cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
It the utility model is related to immersed tube tunnel technical field, more particularly to a kind of steel cap, including shape bearing plate corresponding with immersed tube tube coupling cross sectional shape, the side plate face of the bearing plate is used for and waterstop contact, multiple wing plates for being used to strengthen bearing plate intensity are connected with another lateral plates, multiple wing plates are substantially vertical with the plate face of bearing plate, and extend along bearing plate length direction, by installing multiple wing plates in another board direction of bearing plate, multiple wing plates are vertical with the plate face of bearing plate, and length direction extension of the wing plate along bearing plate, bearing plate is set to be strengthened in its length range, ensure that bearing plate has enough intensity, when by adjacent tube coupling thrusting action load, preferable flatness can be kept, so as to reach good hermetic seal effect.
Description
Technical field
Immersed tube tunnel technical field is the utility model is related to, more particularly to a kind of steel cap.
Background technology
Immersed tunnelling method constructing tunnel, exactly partly latent refute or dry-docking in prefabricated tunnel immersed tube difference transportation by driving to making a reservation for
The docking of position sinking, is longer than the metric space of the pipeline section to make the sinking of final section pipeline section smoothly to leave, the remainder away from
Pipeline section from the sinking docking of space institute is considered as FS final spice.
As depicted in figs. 1 and 2, FS final spice 19 includes tube coupling 1 and tube coupling two to the structure of immersed tube tunnel final joint
192, connected by shear connector 20 between two tube couplings, tube coupling 1 and tube coupling 2 192 are connected the outer of side with adjacent tube coupling 25
Week is provided with toroidal cavity, jack 21 and pushing tow girder 22 is provided with toroidal cavity, the end of pushing tow girder 22 is parallel to pipe
One 191 and the joint face of tube coupling 2 192 are saved, the end face of pushing tow girder 22 is provided with waterstop 23, and waterstop 23 is small perpendicular to pushing tow
The end face of beam 22, the material of the girder front end waterstop 23 is natural rubber, and the end chamfer of girder is fixed on by casting die system
On, waterstop and casting die system are each perpendicular to girder end chamfer.Waterstop encloses along girder end chamfer arrangement one, jack 21
Piston rod on connect pushing tow girder 22, the pushing tow girder 22 is connected to the tube coupling 1 by girder sliding block 24
On the joint face of tube coupling 2 192, waterstop 23 contacts in the presence of pushing tow girder 22 with having installed the adjacent surface of tube coupling 25,
Waterstop 23 realizes binding cavity and extraneous sealing after being sufficiently compressed, the binding cavity draining after being easy to, form dry apply
Work environment.
Before sinking FS final spice, remaining immersed tube tube coupling has installed, and forms the breach for installing FS final spice,
Because seabed has the environmental conditions such as complicated ocean current, other mounted tube couplings intercept greatly equivalent to having built one in seabed
Dam, larger water body flow in indentation, there be present, it is difficult to ensure that zero deflection is docked between FS final spice 19 and adjacent tube coupling 25, cause
Make to deviate between the end face of adjacent tube coupling and waterstop 23.Therefore, how to ensure that waterstop 23 splices with adjacent tube coupling 25,
After FS final spice 19 is installed with adjacent tube coupling 25, the end face that waterstop 23 is smoothly fitted in adjacent tube coupling 25 seals so as to realize
Sealing, turn into the key factor for completing FS final spice installation.
In order to ensure the water-stagnating effect of waterstop, in the end set steel cap of the adjacent tube coupling spliced with FS final spice.Steel
Cap needs to provide a flatness and the minimum end face of construction error, smoothly to realize that waterstop extrudes, realizes FS final spice steel
Load smooth-going is transmitted between shell concrete and adjacent tube coupling reinforced concrete structure, and steel cap needs to bear to produce during pushing tow girder pushing tow
Raw load, and the deflection occurred under pushing tow load does not interfere with the hermetic seal of waterstop, therefore, the knot of steel cap
Structure realizes that hermetic seal plays an important roll to waterstop.
Utility model content
Goal of the invention of the present utility model is:During FS final spice is installed, for the waterstop pair of pushing tow girder
During the steel cap extruding of adjacent tube coupling end, steel cap easily deforms the problem of causing sealing to fail, there is provided a kind of steel cap, the steel
Cap arranges multiple wing plates for being used to supporting and strengthening bearing plate in bearing plate side by setting bearing plate, so as to pressure-bearing
Plate shape makes bearing plate deflection when bearing the load of waterstop transmission small, can keep preferable formation state into support, so as to
Reach the effect of hermetic seal, realize the installation of FS final spice, ensure that construction and installation and construction are smooth.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of steel cap, including shape bearing plate corresponding with immersed tube tube coupling cross sectional shape, bearing plate one side be used for and
Waterstop is contacted, and multiple wing plates for being used to strengthen bearing plate intensity, multiple wing plates and pressure-bearing are connected with another lateral plates
The plate face of plate is substantially vertical, and extends along bearing plate length direction.
Steel cap is arranged on immersed tube tube coupling end, in order that it is contacted with the waterstop of adjacent tube coupling, reaches hermetic seal effect
Fruit, the shape of the bearing plate of steel cap is corresponding with the cross sectional shape of immersed tube tube coupling, so as to realize corresponding splicing.Adjacent tube coupling stops
When water band contacts pushing tow with bearing plate, bearing plate is pressurized and is easy to be deformed, and causes to stitch between waterstop and bearing plate
Gap, loses hermetic seal effect, multiple by installing multiple wing plates in another board direction of bearing plate in this programme
Wing plate is vertical with the plate face of bearing plate, and length direction extension of the wing plate along bearing plate, makes bearing plate equal in its length range
Strengthened, ensure that bearing plate has enough intensity, when by adjacent tube coupling thrusting action load, can keep preferably flat
Face degree, so as to reach good hermetic seal effect.
As preferred scheme of the present utility model, steel cap includes top plate section, top folded plate section, floor section, side wall section and middle wall
Section, wing plate is equipped with each section, the top plate section, pushes up the wing plate of folded plate section, floor section and side wall section including positioned at the side that meets water
Outer wing plate and the interior wing plate positioned at driving side, be also equipped with middle wing plate between the outer wing plate and interior wing plate, form E font knots
Structure, the wing plate of the middle wall section include the interior wing plate positioned at gallery side and the outer wing plate positioned at runway side, form portal structures.
At each section(Except middle wall section)Arrangement includes the wing plate of outer wing plate, middle wing plate and interior wing plate in the plate face of bearing plate, makes
Each wing plate forms E-shaped structure with bearing plate, so as to form preferable support to bearing plate, it is all obtained in both sides and middle part
Strengthen, effectively avoid each section of bearing plate from deforming.
Because waterstop is circular layout a circle along tube coupling end, waterstop is not set in the position of middle wall section, because
This, the wing plate of middle wall section only includes outer wing plate and interior wing plate, so that the steel cap of middle wall section coats the armored concrete of tube coupling,
With other each section of integral structures of steel hat.
As preferred scheme of the present utility model, outer stiffener is connected between the outer wing plate and middle wing plate.Set outer
Stiffener, outer wing plate and middle wing plate are fixed and supported, so as to further strengthen the intensity of bearing plate, avoid its generation
Deformation, so as to influence the connection between waterstop.
As preferred scheme of the present utility model, interior stiffener is provided between the middle wing plate and interior wing plate, including even
Connect stiffener in the first of wing plate and interior wing plate, and put more energy into second for connecting stiffener in adjacent two piece first
Plate.Stiffener in setting, internal wing plate and middle wing plate are fixed and supported, so as to further strengthen the intensity of bearing plate,
Avoid it from deforming, so as to influence the contact between waterstop, stiffener in stiffener and second is set in first, the two
With middle wing plate and the integral structure of inner wing plate shape, make its intensity higher, connection is more firm.
As preferred scheme of the present utility model, weldering nail is installed on the wing plate, the weldering nail is separately mounted to outer wing
The backboard water surface, two plate faces of middle wing plate and interior wing plate are in wing centre section plate face.Steel cap is arranged on the end of immersed tube tube coupling, in order that
Steel cap is more firm in the armored concrete connection of tube coupling main body, the installation weldering nail on wing plate, for increasing steel cap and concrete
Between adhesion, the problem of effectively preventing from steel cap from occurring to loosen, depart from etc. to influence the splicing of two tube couplings.
As preferred scheme of the present utility model, steam vent is offered on the interior stiffener and outer stiffener, in steel cap
Top plate section, the outer wing plate for pushing up folded plate section and middle wing plate, which are provided with, to vibrate hole and steam vent, steel cap floor section interior wing plate and in
Vibrate hole and steam vent also are provided with wing plate.Steam vent is set, chamber is poured inside steel cap for being discharged during casting concrete
The air of body, slurries is full of the inside cavity space of steel cap, vibrate hole and steam vent are set, can ensure that concreting matter
Amount, ensures that concrete fills up the internal cavity of steel cap.
Further, the steam vent on interior stiffener and outer stiffener 10 is arranged in stiffener, wing plate and bearing plate
Junction, take this mode, be easy to concrete to fill up, reach closely knit, seamless degree.
As preferred scheme of the present utility model, sealing steel disc is disposed with the bearing plate, the sealing steel disc is positioned at outer
Between wing plate and middle wing plate and almost parallel with outer wing plate, the sealing steel disc is formed along the circle of bearing plate length direction extension one
Whole coil structures corresponding with immersed tube section configuration.
Steel cap is arranged on the end of immersed tube tube coupling, and the cavity formed between bearing plate and wing plate is used for casting concrete, by
More or less gap be present in angle position of the concrete between bearing plate and wing plate, cause outside seawater along steel cap and tube coupling
Joint area penetrated into from gap, and then cause immersed tube to seep water, in order to prevent this phenomenon, by outer wing plate and wing centre section
Sealing steel disc is set between plate, effectively prevents outside seawater from penetrating into, ensureing the connecting portion of steel cap and tube coupling will not seep water
Phenomenon, the safe operation of immersed tube later stage is played an important role.
Further, the quantity of the sealing steel disc is twice, and twice sealing steel disc is arranged in parallel, the sealing steel disc table
Face is coated with cold galvanizing coating, coating layer thickness 80um.
As preferred scheme of the present utility model, steel cap outer surface is coated with solderable covered with erosion shield, inner surface
Property priming paint, the outer surface includes pressure-bearing surface, the upstream face of outer wing plate and the runway side of interior wing plate of bearing plate, it is described in
Surface includes another plate face of bearing plate, outer wing plate and interior wing plate, and middle wing plate, outer stiffener and interior stiffener it is all
Plate face.
Aforesaid way is taken, can significantly extend the service life of steel cap, makes its life-span and the projected life phase of immersed tube
When can play a role in a long time, influence its use the problem of such as will not be damaged, corrode.
As preferred scheme of the present utility model, it is also equipped with being used to steel cap being solidly connected with concrete anchor on the steel cap
Dowel, the dowel is located on the wing plate mounting surface of bearing plate.
Dowel is set on steel cap, for completing tensioning with bar connecting, makes to produce between steel cap and immersed tube tube coupling and in advance should
Power, realize effective connection between steel cap and immersed tube tube coupling.
Further, the dowel is welded on bearing plate by embedded sleeve barrel.
As preferred scheme of the present utility model, top plate section, top folded plate section, floor section and the side wall section of the bearing plate
On overhanging wing plate is installed, the overhanging wing plate extends along bearing plate outer face, and plate face flushes, the overhanging wing plate and outer wing plate
Between be provided with overhanging web.
Overhanging wing plate is set, the plate face width of bearing plate can be increased, when guarantee is connected with adjacent tube coupling, on adjacent tube coupling
Waterstop can be bonded with bearing plate, reach hermetic seal effect.During due to safe immersed tube under water, by the shadow of seawater surge
Ring, be extremely difficult to more accurately dock between two adjacent tube couplings, cause waterstop to entirely fall within bearing plate, in order to
Avoid waterstop from being fitted in completely on bearing plate, overhanging wing plate is set, widen the plate face width of bearing plate, so as to solve
Above mentioned problem, waterstop is set to be fully mounted on the bearing plate of steel cap.
The overhanging web connects overhanging wing plate and outer wing plate simultaneously, and overhanging web is right perpendicular to outer wing plate and bearing plate
Overhanging wing plate forms support and fixed.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, by installing multiple wing plates in the plate face of bearing plate, multiple wing plates are vertical with the plate face of bearing plate, and wing plate
Extend along the length direction of bearing plate, bearing plate is strengthened in its length range, ensure that bearing plate has enough
Intensity, when by adjacent tube coupling thrusting action load, preferable flatness can be kept, so as to reach good hermetic seal effect
Fruit;
2nd, the installation weldering nail on wing plate, for increasing the adhesion between steel cap and concrete, effectively prevents steel cap from occurring
Loosening, disengaging etc. influence the problem of two tube couplings splicings;
The 3rd, steam vent is set, pour the air of cavity inside steel cap for being discharged during casting concrete, fill slurries
The inside cavity space of full steel cap, sets vibrate hole and steam vent, can ensure that concrete pouring quality, ensure that concrete fills up steel
The internal cavity of cap;
4th, by setting sealing steel disc between outer wing plate and middle wing plate, effectively prevent outside seawater from penetrating into, ensure steel cap
It will not be had water leakage with the connecting portion of tube coupling, the safe operation of immersed tube later stage is played an important role.
Brief description of the drawings
Fig. 1 is the structural representation of immersed tube tunnel final joint.
Fig. 2 is the partial enlarged drawing at F in Fig. 1.
Fig. 3 is the structural representation of steel cap of the present utility model.
Fig. 4 is the sectional view of the line A-A along Fig. 3.
Fig. 5 is the sectional view of the A '-A ' lines along Fig. 3.
Fig. 6 is the sectional view of the line B-B along Fig. 3.
Fig. 7 is the sectional view of the B '-B ' lines along Fig. 3.
Fig. 8 is the sectional view of the line C-C along Fig. 3.
Fig. 9 is the sectional view of the C '-C ' lines along Fig. 3.
Figure 10 is the sectional view of the line D-D along Fig. 3.
Figure 11 is the sectional view of the D '-D ' lines along Fig. 3.
Figure 12 is the sectional view of the E-E lines along Fig. 3.
Figure 13 is the sectional view of the E '-E ' lines along Fig. 3.
Marked in figure:1- bearing plates, 101- pressure-bearing surfaces, 2- top plate sections, 3- tops folded plate section, 4- floor sections, 5- side wall sections, 6-
Middle wall section, 7- outer wing plates, wing plate in 8-, wing plate in 9-, the outer stiffeners of 10-, stiffener in 11- first, 12- weldering nails, 13- exhausts
Hole, 15- sealing steel discs, 16- dowels, the overhanging wing plates of 17-, the overhanging webs of 18-, 19- FS final spices, 191- tube couplings one, 192- pipes
Save two, 20- shear connectors, 21- jack, 22- pushing tow girders, 23- waterstops, 24- sliding blocks, the adjacent tube couplings of 25-, 26- left lateral cars
Road, 27- right lanes, 28- gallerys.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this
Utility model, it is not used to limit the utility model.
Embodiment
As shown in Fig. 3-13, steel cap includes shape bearing plate 1 corresponding with immersed tube tube coupling cross sectional shape, the bearing plate 1
Side plate face be used for and waterstop contact, multiple wing plates for being used to strengthen bearing plate intensity are connected with another lateral plates, it is more
The individual wing plate is substantially vertical with the plate face of bearing plate 1, and extends along the length direction of bearing plate 1.
In the present embodiment, the shape of steel cap is corresponding with the cross sectional shape of immersed tube tube coupling, including top plate section 2, top folded plate section 3,
Floor section 4, side wall section 5 and middle wall section 6, top plate section 2 and floor section 4 are arranged in a left side for both sides up and down, top plate section 2 and floor section 4
Right both sides are side wall section 5, are connected between side wall section 5 and top plate section 2 using top folded plate section 3, and three encloses to form substantially rectangular shape,
Wall section 6 in two sections is connected at the middle part of top plate section 2 with floor section 4, so as to form left lateral track 26 and right lane 27, during two save
It is gallery 28 between wall section 6.
The pressure-bearing surface 101 of bearing plate 1 is used for and the waterstop of adjacent tube coupling contacts, and another plate face is used to arrange wing plate,
The top plate section 2, the wing plate of folded plate section 3, floor section 4 and side wall section 5 is pushed up including the outer wing plate 7 positioned at the side that meets water and positioned at driving
The interior wing plate 8 of side, middle wing plate 9 is also equipped between the outer wing plate 7 and interior wing plate 8, forms E-shaped structure, the middle wall section 6
Wing plate include positioned at the side of gallery 28 interior wing plate 8 and the outer wing plate 7 positioned at runway side, formed portal structures.
At each section(Except middle wall section)Arrangement includes the wing plate of outer wing plate, middle wing plate and interior wing plate in the plate face of bearing plate, makes
Each wing plate forms E-shaped structure with bearing plate, so as to form preferable support to bearing plate, it is all obtained in both sides and middle part
Strengthen, effectively avoid each section of bearing plate from deforming.
Because waterstop is circular layout a circle along tube coupling end, waterstop is not set in the position of middle wall section, because
This, the wing plate of middle wall section only includes outer wing plate and interior wing plate, so that the steel cap of middle wall section coats the armored concrete of tube coupling,
With other each section of integral structures of steel hat.
As one of which preferred embodiment, outer stiffener 10 is connected between the outer wing plate 7 and middle wing plate 9,
Outer stiffener 10 is set, outer wing plate 7 and middle wing plate 9 are fixed and supported, so as to further strengthen the strong of bearing plate 1
Degree, avoids it from deforming, so as to influence the connection between waterstop.
Further, interior stiffener, including wing plate 9 and inner wing in connection are provided between the middle wing plate 9 and interior wing plate 8
Stiffener 11 in the first of plate 8, and for connecting stiffener 11 in adjacent two piece first second in stiffener(Do not show in figure
Go out), stiffener in setting, internal wing plate 8 and middle wing plate 9 are fixed and supported, so as to further strengthen the strong of bearing plate 1
Degree, avoids it from deforming, and so as to influence the connection between waterstop, sets in first stiffener in stiffener and second,
The two makes its intensity higher with middle wing plate and the integral structure of inner wing plate shape, and connection is more firm.
As one of which preferred embodiment, weldering nail 12 is installed on wing plate, the weldering nail 12 is separately mounted to outer
On the plate face face of the middle side of wing plate 9, steel cap is arranged on immersed tube for the back side of wing plate 7,9 two plate faces of middle wing plate and interior wing plate 8
The end of tube coupling, in order that steel cap is more firm in the armored concrete connection of tube coupling main body, installation weldering nail, is used on wing plate
Increase the adhesion between steel cap and concrete, effectively prevent steel cap from asking for two tube coupling splicings of the influences such as loosening, disengaging occurs
Topic.
As a kind of embodiment therein, steam vent 13 is offered on the interior stiffener and outer stiffener 10, in steel
Crown plate section 2, the outer wing plate 7 of top folded plate section 4 and middle wing plate 9 are provided with vibrate hole and steam vent, in the inner wing of steel cap floor section 4
Vibrate hole and steam vent also are provided with plate 8 and middle wing plate 9, steam vent is set, for being discharged during casting concrete in steel cap
Portion pours the air of cavity, slurries is full of the inside cavity space of steel cap, sets vibrate hole and steam vent, can ensure that concrete
Pouring quality, ensure that concrete fills up the internal cavity of steel cap.
Further, the steam vent on interior stiffener and outer stiffener 10 is arranged in stiffener, wing plate and bearing plate 1
Junction, take this mode, be easy to concrete to fill up, reach closely knit, seamless degree.
As one of which preferred embodiment, sealing steel disc 15 is disposed with bearing plate 1, the sealing steel disc 15 is located at
Between outer wing plate 7 and middle wing plate 9 and almost parallel with outer wing plate 7, the sealing steel disc 15 extends one along the length direction of bearing plate 1
Circle, form whole coil structures corresponding with immersed tube section configuration.
Steel cap is arranged on the end of immersed tube tube coupling, and the cavity formed between bearing plate 1 and wing plate is used for casting concrete, by
Gap more or less be present in angle position of the concrete between bearing plate 1 and wing plate, cause outside seawater along steel cap and pipe
The joint area of section penetrates into from gap, and then causes immersed tube to seep water, in order to prevent this phenomenon, by the He of outer wing plate 7
Sealing steel disc 15 is set between middle wing plate 9, and bottom and the bearing plate 1 of sealing steel disc 15 are connected as a single entity, and its top is into concrete
Portion extends, and so as to be connected as a single entity with concrete, sealing steel disc 15 can not be bypassed by so allowing for seawater, and then effectively prevent outside
Seawater penetrates into, and ensures the connecting portion of steel cap and tube coupling and will not have water leakage, the safe operation of immersed tube later stage is played important
Effect.
Further, the quantity of the sealing steel disc 15 is twice, and twice sealing steel disc 15 is arranged in parallel, the water-stopping steel
The surface of piece 15 is coated with cold galvanizing coating, coating layer thickness 80um.
As one of which embodiment, covered with erosion shield, inner surface is coated with solderability bottom for steel cap outer surface
Paint, the outer surface includes pressure-bearing surface 101, the upstream face of outer wing plate 7 and the runway side of interior wing plate 8 of bearing plate 1, described
Inner surface includes another plate face of bearing plate 1, outer wing plate 7 and interior wing plate 8, and middle wing plate 9, outer stiffener 10 and interior puts more energy into
All plate faces of plate.
Aforesaid way is taken, can significantly extend the service life of steel cap, makes its life-span and the projected life phase of immersed tube
When can play a role in a long time, influence its use the problem of such as will not be damaged, corrode.
As a kind of embodiment therein, it is also equipped with the steel cap for steel cap and concrete anchor to be solidly connected
Dowel 16, the dowel 16 are located on the wing plate mounting surface of bearing plate 1, and dowel 16 is set on steel cap, is used for and bar connecting
Tensioning is completed, makes to produce prestressing force between steel cap and immersed tube tube coupling, realizes effective connection between steel cap and immersed tube tube coupling.
Further, the dowel 16 is welded on bearing plate 1 by embedded sleeve barrel.
As one of which preferred embodiment, top plate section 2, top folded plate section 3, floor section 4 and the side of the bearing plate 1
Overhanging wing plate 17 is installed, the overhanging wing plate 17 extends along the outer face of bearing plate 1, and plate face flushes, the overhanging wing in wall section 5
Overhanging web 18 is provided between plate 17 and outer wing plate 7.
Overhanging wing plate 18 is set, the plate face width of bearing plate 1 can be increased, when guarantee is connected with adjacent tube coupling, adjacent tube coupling
On waterstop can be bonded with bearing plate 1, reach hermetic seal effect.During due to safe immersed tube under water, by seawater surge
Influence, be extremely difficult to more accurately dock between two adjacent tube couplings, cause waterstop to entirely fall within bearing plate,
In order to avoid waterstop can not be fitted on bearing plate completely, overhanging wing plate is set, widens the plate face width of bearing plate, so as to
Solve the above problems, waterstop is fully mounted on the bearing plate of steel cap.
The overhanging web 18 connects overhanging wing plate 17 and outer wing plate 7 simultaneously, and overhanging web 17 is perpendicular to outer wing plate 7 and holds
Pressing plate 1, support is formed to overhanging wing plate 17 and is fixed.
Overhanging wing plate 17 is fixed and added when bearing plate 1 is connected with overhanging wing plate 17, and by overhanging web 18
By force, equally it is disposed with erosion shield on the overhanging wing plate 17 and overhanging web 18.
The present embodiment by installing multiple wing plates in another board direction of bearing plate, multiple wing plates and bearing plate
Plate face is vertical, and length direction extension of the wing plate along bearing plate, bearing plate is strengthened in its length range, ensures to hold
Pressing plate has enough intensity, when by adjacent tube coupling thrusting action load, can keep preferable flatness, good so as to reach
Good hermetic seal effect.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (10)
1. a kind of steel cap, it is characterised in that including shape bearing plate corresponding with immersed tube tube coupling cross sectional shape, the bearing plate one
Face is used for and waterstop contact, and multiple wing plates for being used to strengthen bearing plate intensity, multiple wings are connected with another lateral plates
Plate is substantially vertical with the plate face of bearing plate, and extends along bearing plate length direction.
2. steel cap according to claim 1, it is characterised in that steel cap includes top plate section, top folded plate section, floor section, side wall
Section and middle wall section, are equipped with wing plate on each section, and the top plate section, top folded plate section, the wing plate of floor section and side wall section include position
Outer wing plate in the side that meets water and the interior wing plate positioned at driving side, are also equipped with middle wing plate, shape between the outer wing plate and interior wing plate
Into E-shaped structure, the wing plate of the middle wall section includes the interior wing plate positioned at gallery side and the outer wing plate positioned at runway side, is formed
Portal structures.
3. steel cap according to claim 2, it is characterised in that outer put more energy into is connected between the outer wing plate and middle wing plate
Plate.
4. steel cap according to claim 3, it is characterised in that put more energy into being provided between the middle wing plate and interior wing plate
Stiffener in the first of wing plate and interior wing plate in plate, including connection, and for connecting of stiffener in adjacent two piece first
Stiffener in two.
5. steel cap according to claim 2, it is characterised in that weldering nail is provided with the wing plate, the weldering nail is pacified respectively
Mounted in outer wing plate back side, two plate faces of middle wing plate and interior wing plate in wing centre section plate face.
6. steel cap according to claim 4, it is characterised in that offer exhaust on the interior stiffener and outer stiffener
Hole, in steel crown plate section, push up provided with vibrate hole and steam vent on the outer wing plate and middle wing plate of folded plate section, in steel cap floor section
Vibrate hole and steam vent also are provided with wing plate and middle wing plate.
7. steel cap according to claim 2, it is characterised in that sealing steel disc is disposed with the bearing plate, the water-stopping steel
Piece is between outer wing plate and middle wing plate and almost parallel with outer wing plate, and the sealing steel disc extends one along bearing plate length direction
Circle, form whole coil structures corresponding with immersed tube section configuration.
8. steel cap according to claim 4, it is characterised in that steel cap outer surface is covered with erosion shield, inner surface spray
Solderability priming paint is scribbled, the outer surface includes pressure-bearing surface, the upstream face of outer wing plate and the runway side of interior wing plate of bearing plate
Face, the inner surface include another plate face of bearing plate, outer wing plate and interior wing plate, and middle wing plate, outer stiffener and Nei Jia
All plate faces of strength plate.
9. the steel cap according to one of claim 2-8, it is characterised in that be also equipped with the steel cap be used for by steel cap with
The dowel that concrete anchor is solidly connected, the dowel are located on the wing plate mounting surface of bearing plate.
10. the steel cap according to one of claim 2-8, it is characterised in that the top plate section of the bearing plate, top folded plate section,
Overhanging wing plate is installed in floor section and side wall section, the overhanging wing plate extends along bearing plate outer face, and plate face flushes, described outer
Stretch and overhanging web is provided between wing plate and outer wing plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721109611.5U CN207109835U (en) | 2017-08-31 | 2017-08-31 | A kind of steel cap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721109611.5U CN207109835U (en) | 2017-08-31 | 2017-08-31 | A kind of steel cap |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207109835U true CN207109835U (en) | 2018-03-16 |
Family
ID=61574287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721109611.5U Expired - Fee Related CN207109835U (en) | 2017-08-31 | 2017-08-31 | A kind of steel cap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207109835U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111906466A (en) * | 2020-07-31 | 2020-11-10 | 广船国际有限公司 | Construction method of immersed tube tunnel end steel shell |
-
2017
- 2017-08-31 CN CN201721109611.5U patent/CN207109835U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111906466A (en) * | 2020-07-31 | 2020-11-10 | 广船国际有限公司 | Construction method of immersed tube tunnel end steel shell |
CN111906466B (en) * | 2020-07-31 | 2022-04-05 | 广船国际有限公司 | Construction method of immersed tube tunnel end steel shell |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018028087A1 (en) | Box-type pipeline with circumferential obtuse angle connection | |
CN105544373B (en) | A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges | |
CN109763424B (en) | Fully-precast concrete anti-collision guardrail and construction method | |
CN105971827A (en) | Transfer ring beam for concrete cylinder and steel cylinder combined tower and construction method thereof | |
CN107100644A (en) | A kind of Shield-bored tunnels longitudinal rigidity reinforcing structure and its construction method | |
CN108396778A (en) | A kind of construction method in precast assembly tunnel | |
CN111364517A (en) | Waterproof connection structure for prefabricated comprehensive pipe gallery connector | |
CN203684458U (en) | Flexibly-connected concrete prefabricated panel structure | |
CN207109835U (en) | A kind of steel cap | |
CN207079627U (en) | A kind of assembled underground pipe gallery member connecting structure | |
CN103061357A (en) | Connection joint between basement base plate and underground diaphragm wall | |
CN110644538A (en) | Basement side wall extra front and back pouring belt periphery protection structure | |
CN108547316B (en) | Double-layer corrugated steel structure for underground comprehensive pipe gallery | |
CN207892046U (en) | A kind of PC shear walls connection structure | |
CN106284742A (en) | Half column frame antidetonation faced wall and manufacture method | |
CN111455856B (en) | Construction method for applying prestress on bridge deck in hogging moment area of steel-concrete composite bridge | |
CN110080393B (en) | Public building assembled steel structure | |
CN108560585B (en) | Basement outer wall full assembly structure and construction method thereof | |
CN105863135A (en) | Mounting node for external wall panel | |
CN105040855A (en) | Assembled prefabricated shear wall welding end plate and horizontal steel combination connecting device | |
CN205205647U (en) | Prefabricated segment formula concrete bridge's bottom plate joint construction | |
CN206941658U (en) | The double water sealing structures of concrete extension joint | |
CN210946495U (en) | Combined bridge deck structure of steel-UHPC prefabricated slab | |
CN208701926U (en) | A kind of external wall waterproof and thermal insulation structure | |
CN208996739U (en) | A kind of prefabricated side box culvert structure of shield method double track tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180316 |
|
CF01 | Termination of patent right due to non-payment of annual fee |