CN207109740U - A kind of dam bank ruggedized construction - Google Patents

A kind of dam bank ruggedized construction Download PDF

Info

Publication number
CN207109740U
CN207109740U CN201721121680.8U CN201721121680U CN207109740U CN 207109740 U CN207109740 U CN 207109740U CN 201721121680 U CN201721121680 U CN 201721121680U CN 207109740 U CN207109740 U CN 207109740U
Authority
CN
China
Prior art keywords
masonry
original
dirt
native
gsz
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721121680.8U
Other languages
Chinese (zh)
Inventor
赵可兴
魏强
王涛
郭宗明
刘长城
郭瑞
王强
毕贞利
郭阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721121680.8U priority Critical patent/CN207109740U/en
Application granted granted Critical
Publication of CN207109740U publication Critical patent/CN207109740U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Retaining Walls (AREA)

Abstract

Emergency flood fighting technical field is the utility model is related to, more particularly to a kind of dam bank ruggedized construction, IPC code is E02B 3/12.Bank ruggedized construction in dam of the present utility model, including increasing masonry, cement-grouting consolidation body, dirt induration, concrete cover, top GSZ, turf and Xin Ji soil, increase the top that masonry is located at original masonry, cement-grouting consolidation body is located at the joint portion of original masonry and original base soil;Dirt induration is located at the native stone joint portion for increasing masonry and new and old base soil, and top GSZ is arranged on the top of new base soil, and turf is arranged on the top of top GSZ, and concrete cover, which is arranged on, increases masonry and dirt induration top.Bank ruggedized construction in dam of the present utility model, without large scale equipment during construction, a line flood control worker can rapid construction.

Description

A kind of dam bank ruggedized construction
Technical field:
Emergency flood fighting technical field is the utility model is related to, more particularly to a kind of dam bank ruggedized construction, IPC international monopolies point Class-mark is E02B 3/12.
Background technology:
Conduct, dangerous section and the bank-protection works in the northern river such as the Yellow River, the base soil as dam bank main body is typically all by locality Loam compacting fill and form, only wrapped up in upstream face with placed rockfill, cost is relatively low.The loam that the north is built a dam, it is consolidated Power and impact resistance are far smaller than southern clay, and under the long period of soaking, impact in middle long water level, the base soil of native stone joint portion can quilt Current are washed in a pan away from placed rockfill gap;Rainy season continuous rainfall can also be let out from the top of dam bank under native stone joint portion, by soil The base soil of stone joint portion washes away from placed rockfill gap.A large amount of losses of base soil, make dam bank main body that depression, deformation occur, lead Cause dam shore pier to sting, the dangerous situations such as thorax of bursting, if trimming is reinforced not in time, whole dam bank can be caused to be squashed.
Utility model content:
The purpose of this utility model, which is to provide, a kind of to be used to rebuild the dam bank for base soil scour wastage occur The structure of reinforcing, technical scheme is as follows used by the utility model:
A kind of dam bank ruggedized construction, including increase masonry, cement-grouting consolidation body, dirt induration, concrete cover, top soil Work grid, turf and Xin Ji soil, wherein, the masonry of increasing is laid dry stone structure, described to increase block positioned at original masonry top The vertical section of body is right-angled trapezium, and the bottom width for increasing masonry is bigger 0.5m than the top width of original masonry;Institute State the joint portion that cement-grouting consolidation body is located at original masonry and original base soil;The new base soil is arranged on original base soil top;It is described Dirt induration vertical section is " L " shape, positioned at the native stone joint portion for increasing masonry base soil native and new with original base, thickness 0.4 Rice;The top GSZ is arranged on the top of the new base soil, and the turf is arranged on the top GSZ top, The concrete cover increases masonry and the dirt induration top described in being arranged on.
Bank ruggedized construction in dam of the present utility model, simple in construction, low cost, without large scale equipment, a line flood control during construction Worker can rapid construction.Its innovative point is mainly reflected in following aspects:(1), between original masonry and original base soil Cement injection mortar, consolidation is filled into the space of original soil stone binding site, effectively prevent scour of the middle long water level to base soil;(2) Fill 1: 4 dirt between the new native stone binding site that masonry and Xin Ji soil formed is increased, when can effectively prevent great flood or To the scour of new base soil during continuous rainfall;(3) GSZ is set at the top of new base soil, turf is laid on GSZ, Both the impact resistance at the top of dam bank had been improved, the survival rate of turf has been improved again, has beautified environment.
Brief description of the drawings:
Fig. 1:Bank ruggedized construction schematic diagram in dam of the present utility model
In figure, 1 is original masonry, and 2 is increase masonry, and 3 be cement-grouting consolidation body, and 4 be dirt induration, and 5 be coagulation earth mulch Plate, 6 be top GSZ, and 7 be turf, and 8 be original base soil, and 9 be new base soil, and 10 be root Shitai County, 11 for new base it is native with it is original Base soil line of demarcation.
Embodiment:
Referring to Fig. 1, bank ruggedized construction in dam of the present utility model, including increase masonry 2, cement-grouting consolidation body 3, dirt induration 4th, concrete cover 5, top GSZ 6, turf 7 and Xin Ji soil 9, increase masonry 2 and be located at original top of masonry 1, it is and original Masonry 1 is all same placed rockfill structure, and the masonry 2 and the vertical section of original masonry 1 increased all is right-angled trapezium, described The bottom width for increasing masonry 2 is bigger 0.5m than the top width of original masonry 1.The cement-grouting consolidation body 3 is located at original block The native stone joint portion of body 1 and original base soil 8, the mortar injection prepared by accelerated cement, consolidation are formed, and can effectively prevent native stone The base soil scour of joint portion is lost in.
The new base soil 9 is arranged on native 8 tops of original base, and forming using local loam compaction in layers is filling new base soil 9 Before, should be native loose with the plane of original base soil 8 at original base soil line of demarcation 11 by new base, to improve the combination of the new and old soil body.
The vertical section of the dirt induration 4 is " L " shape, positioned at the soil for increasing masonry 2 and original base 8 and Xin Ji of soil soil 9 Stone joint portion, thickness are 0.4 meter, are filled and tamped and formed by 1: 4 dirt (i.e. the mass ratio of lime and soil is 1: 4).
The top GSZ 6 is arranged on the top of the new base soil 9, and the turf 7 is arranged on the top geotechnique The top of grid 6, the concrete cover 5, which is arranged on, described increases masonry 2 and the top of dirt induration 4.
In the bottom of original masonry 1, side is provided with root Shitai County 10 near water, for erosion control mulch.
Bank ruggedized construction in dam of the present utility model, it can be carried out after scour destruction occurs in dam bank by a line flood control troop Construction, without large-scale construction equipment, and required material is all the standing flood control material in flood control warehouse, and construction is quick, low cost, can be with It is widely used in river, reservoir, Hu Bo dam bank to reinforce.

Claims (1)

1. a kind of dam bank ruggedized construction, it is characterised in that including increasing masonry (2), cement-grouting consolidation body (3), dirt induration (4), concrete cover (5), top GSZ (6), turf (7) and new base are native (9), wherein, the masonry (2) of increasing is dry Stone-laying structure, positioned at the top of original masonry (1), the vertical section for increasing masonry (2) is right-angled trapezium, described to increase masonry (2) bottom width is bigger 0.5m than the top width of original masonry (1);The cement-grouting consolidation body (3) is located at original masonry (1) joint portion of (8) native with original base;The new base native (9) is arranged on native (8) top of original base;The dirt induration (4) Vertical section be " L " shape, positioned at the native stone joint portion for increasing masonry (2) and original base native (8) and new base soil (9), thickness For 0.4 meter;The top GSZ (6) is arranged on the top of the new base native (9), and the turf (7) is arranged on the top The top of portion's GSZ (6), the concrete cover (5), which is arranged on, described increases masonry (2) and the dirt induration (4) Top.
CN201721121680.8U 2017-09-01 2017-09-01 A kind of dam bank ruggedized construction Expired - Fee Related CN207109740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721121680.8U CN207109740U (en) 2017-09-01 2017-09-01 A kind of dam bank ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721121680.8U CN207109740U (en) 2017-09-01 2017-09-01 A kind of dam bank ruggedized construction

Publications (1)

Publication Number Publication Date
CN207109740U true CN207109740U (en) 2018-03-16

Family

ID=61586824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721121680.8U Expired - Fee Related CN207109740U (en) 2017-09-01 2017-09-01 A kind of dam bank ruggedized construction

Country Status (1)

Country Link
CN (1) CN207109740U (en)

Similar Documents

Publication Publication Date Title
CN104164851B (en) The construction method of the ecological flexible mud-rock flow blocking dam of gabion arch
RU2274749C1 (en) Method for land reclamation in the case of land corruption by opened deposit development
CN103643672A (en) Vacuum preloading foundation treatment construction method
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN106759104A (en) Ecological slope protection structure and construction method
CN106930231A (en) A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN104234061A (en) Reinforced ecological concrete revetment and construction method thereof
CN108193648A (en) Plasticity panel homogeneous dam
CN207469269U (en) A kind of hydraulic engineering High strength geogrid structure class ecological revetment
CN204151796U (en) A kind of reinforcement eco-concrete bank protection
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN207862857U (en) A kind of bank protection structure of harbour
CN110080232A (en) A kind of deep basal pit earth-filling method of underground high water level
CN109098191A (en) A kind of depth cheats method for reinforcing side slope of paddling suddenly
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN108385612A (en) A kind of construction method of the good concrete protecting face plate of stability
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN207109740U (en) A kind of dam bank ruggedized construction
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN107542059B (en) A method of it repairing base soil flow and loses buttress
CN205171454U (en) Ecological bank protection
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20180901