CN207108295U - The interim simple lifting appliance of road construction - Google Patents

The interim simple lifting appliance of road construction Download PDF

Info

Publication number
CN207108295U
CN207108295U CN201721060777.2U CN201721060777U CN207108295U CN 207108295 U CN207108295 U CN 207108295U CN 201721060777 U CN201721060777 U CN 201721060777U CN 207108295 U CN207108295 U CN 207108295U
Authority
CN
China
Prior art keywords
pulley
steel wire
wire rope
arm
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721060777.2U
Other languages
Chinese (zh)
Inventor
路素青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201721060777.2U priority Critical patent/CN207108295U/en
Application granted granted Critical
Publication of CN207108295U publication Critical patent/CN207108295U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Soil Working Implements (AREA)

Abstract

The interim simple lifting appliance of road construction, including the overall support frame in rectangular shape, manually detent mechanism is provided with arm at the top of support frame, hoist engine is provided with support frame on front side of arm, arm right-hand member is rotatably connected to the first fixed pulley, steel wire rope locking member is provided with rear side of arm, arm front side portion is rotatably connected to the second fixed pulley, steel wire rope is wound with hoist engine, the drawing end of steel wire rope sequentially passes through the second fixed pulley, fixed and be scheduled in stand by U-shaped after first fixed pulley and steel wire rope locking member, the hook assembly for hanging weight is provided between the first fixed pulley and steel wire rope locking member on steel wire rope.Each spare and accessory parts of the present utility model use the structure of separable assembled, with with dress, with certain lifting capacity, it can move on construction ground, and install convenient and swift, the utility model sufficiently lower the labor intensity of worker in road construction, improve operating efficiency, and more safe and reliable.

Description

The interim simple lifting appliance of road construction
Technical field
The utility model belongs to technical field of road construction, and in particular to a kind of road construction is filled with interim simple lifting Put.
Background technology
During municipal road construction, due to wanting pre-buried various pipelines under road(Drainpipe, steam heating pipe, natural gas tube Etc.)And inspection shaft, inspection-pit are excavated, this just needs to carry out excavating groove and foundation ditch along road, and worker is in groove and foundation ditch When carrying out construction operation, the worker on ground can deliver construction appliance and construction material into groove and foundation ditch.At present typically all Using manually being operated, not only labor intensity is big for this, and operating efficiency is low, and due to being not provided with preventing around groove and foundation ditch Guardrail, when heavier construction appliance and construction material is delivered downwards, the worker on ground is easily slipped in groove or foundation ditch, With larger potential safety hazard.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided one kind can mitigate labor strength, carry The interim simple lifting appliance of the strong road construction of high workload efficiency, security reliability.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:The interim simple lifting of road construction Device, including it is overall be in rectangular shape support frame, support frame bottom is provided with road wheel, along preceding at the top of support frame Rear is provided with an arm, every support beam at least two support beams, support beam top is provided with along left and right horizontal direction On be provided with one and be used to fix the manual positioning mechanism of arm, front side horizontal is provided with installing plate at the top of support frame, pacifies It is provided with hoist engine in loading board, arm right-hand member is fixedly installed first pulley support, by horizontally disposed on first pulley support First pulley axle be rotatably connected to the first fixed pulley, arm rear lateral portion is being fixedly installed steel wire rope at neighbouring first fixed pulley Locking member, arm front side portion are just fixedly installed second pulley frame on the support frame, by vertically setting on second pulley frame The second pulley axle put is rotatably connected to the second fixed pulley, is provided with stand at the top of support frame on rear side of arm, on hoist engine It is wound with steel wire rope, the drawing end of steel wire rope passes through U after sequentially passing through the second fixed pulley, the first fixed pulley and steel wire rope locking member Shape is fixed and is scheduled in stand, is provided with steel wire rope between the first fixed pulley and steel wire rope locking member for hanging hanging for weight Hook assembly.
The first alignment pin for being used for Anti-rope drop above the first fixed pulley is equipped with first pulley frame.
Hook assembly includes movable pulley, the 3rd pulley yoke and suspension hook, and movable pulley is rotatably connected on by the 3rd pulley spindle On three pulley yokes, the 3rd pulley yoke bottom is provided with two the second alignment pins for being used for Anti-rope drop below the movable pulley, and the 3rd Pulley yoke bottom is fixedly installed flat board in the horizontal direction, is provided with circular hole in the middle part of flat board, suspension hook top is stretched into and is rotatablely connected In circular hole, suspension hook upper end is fixedly installed the limited block above flat board, and limited block is more than circular hole.
Steel wire rope locking member includes U-shaped board, clapboard, the 3rd alignment pin and the 4th alignment pin, top, the bottom of U-shaped board Open with left side, with being fixedly connected on rear side of arm, the 3rd alignment pin is located above the 4th alignment pin the forward upper of U-shaped board, 3rd alignment pin and the 4th alignment pin are along the longitudinal direction horizontal through U-shaped board, distance of the 3rd alignment pin apart from U-shaped board bottom Distance more than the 4th alignment pin apart from U-shaped board bottom, clapboard are in structure wide at the top and narrow at the bottom, and clapboard is extend into U-shaped board And contacted on the left of clapboard with the 3rd alignment pin and the 4th alignment pin top pressure, steel wire rope is worn from bottom to top along U-shaped board inner bottom part U-shaped board is crossed, the rear side of clapboard is contacted by steel wire rope with U-shaped board bottom top pressure, the trailing flank of clapboard and the inwall of U-shaped board It is provided with the anti-skidding form friction pattern that steel wire rope closely crimps.
Manual positioning mechanism includes front vertical plate, back vertical plate, lock nut, handlebar, U-shaped packing ring, lower bearing pin and upper pin, Front vertical plate and back vertical plate are vertically set on support top surface of the beam, front vertical plate and back vertical plate respectively positioned at the front side of arm and rear side, Back vertical plate is rotatably connected to pressing plate by hinge;
The open lower mounting groove in front side, rear side and top is offered among front vertical plate upper end, middle part is opened on front side of pressing plate Provided with the guide groove that top, bottom and front side are open, lower bearing pin through lower mounting groove and is rotatably connected on pressure along the longitudinal direction On plate, the external diameter of lower bearing pin is more than the external diameter of lock nut, radial direction of the lock nut along lower bearing pin through lower bearing pin and with Lower bearing pin is threadedly coupled, and the centre of handlebar leading section offers the open upper mounting groove in bottom and front side, in lock nut In upper mounting groove, upper pin through lock nut and is rotatably connected on handlebar right part, upper pin in left-right direction at end External diameter be less than the external diameter of lock nut, U-shaped packing ring bottom is fixedly connected on pressing plate upper surface and directly over the guide groove, U Penetrating and front side is open above and below type packing ring, and upper mounting groove, the endoporus of U-shaped packing ring, guide groove and lower mounting groove are corresponding in turn to up and down; When lock nut is in plumbness, lock nut is sequentially located at mounting groove, U-shaped packing ring, guide groove and lower peace from top to bottom The inside of tankage, the outline of the leading section of handlebar around upper pin center line from front side surface top to bottom in gradually The reducing globoidal structure of increase, U-shaped bead top are provided with identical and press fit arc corresponding with reducing globoidal structure Groove.
Pressing plate lower surface is provided with several block rubbers for being used to compress arm upper surface;Handle rod rear end is folded upward at shape Into the portion that upwarps, pressing plate upper surface is provided with the elastic pressuring plate that can be horizontally rotated by fastening bolt, and elastic pressuring plate front end is provided with Location hook with upwarping portion's top pressure press fit, Handheld Division is provided with elastic pressuring plate.
It is provided between the front side and support beam upper surface of front vertical plate, between the rear side of back vertical plate and support beam upper surface Stiffener plate.
Support frame lower rearward side is hinged with pedal by hinge, and pedal left bottom is provided with the support vertical with pedal Limiting plate, the lower side edge of support limit plate is in pointed structures, and the height of support limit plate is more than height of the hinge apart from ground, Tilt prop is provided between pedal lower surface and support limit plate;When pedal is flipped up with support frame left contact, Pedal is connected by connecting bolt with support frame.
Using above-mentioned technical proposal, the utility model is in work in use, worker shifts the utility model onto road apply Work area domain, suspension hook are located at the surface of groove or foundation ditch, and arm can be made using square steel tube, and square steel tube avoids rotating, by It is cantilever design in arm front portion, in order that support frame has good stability, connecting bolt is backed out, pedal and support Limiting plate turns over downwards, and the downside pointed structures support of support limit plate places balancing weight or worker on pedal on the ground Stand on pedal, pointed structures can be pierced into subsurface, can so position support frame, avoid road wheel in operation Moved in journey, it is ensured that the stability of lifting, then can suspension hook is mounted into weight(Construction appliance or construction raw material), manipulation volume Machine is raised to transport weight downwards from ground.
One end of steel wire rope is pulled by hoist engine in the utility model, and the other end of steel wire rope passes through U-shaped board, is used One end of steel wire rope through U-shaped board is stuck in stand by one U-shaped card, prevents looseness of steel wire ropes, plays the work of ultimate insurance With, then the 3rd alignment pin and the 4th alignment pin are installed in insertion in U-shaped board, and clapboard is from top to bottom inserted into U-shaped board, Pound the upper end of clapboard downwards using hammer, contacted on the left of clapboard with the 3rd alignment pin and the 4th alignment pin top pressure, wedge shape The rear side of plate is contacted by steel wire rope with U-shaped board bottom top pressure.Because the trailing flank of clapboard and the inwall of U-shaped board are provided with The anti-skidding form friction pattern that steel wire rope closely crimps, steel wire rope stress pull down clapboard, can so make steel wire rope firmly locked.
Arm in the utility model can carry out the regulation of length according to the position of reality, operable fixed manually during regulation Position mechanism, unclamps arm, then move arm in left-right direction.The movable length of arm in place after, then manipulate manual positioning machine Structure locks arm, and specific manipulation process is:Hand-held handle bar is rotated up by rotating shaft of lower bearing pin, when lock nut turn to it is vertical During straight state, handlebar right part is located above U-shaped packing ring, and another hand presses down on pressing plate, makes the rubber of pressing plate lower surface Block presses downwards handlebar,
Then rotary handle bar drives lock nut rotation, because lock nut is threadedly coupled with lower bearing pin, lock nut Rotation just move down the right part of handlebar, when right part and U-shaped washer contacts and the manual rotational handle of handlebar When bar is relatively elaborate, the hand of pressing pressing plate is unclamped, pressing handlebar makes handlebar line centered on upper pin rotate to left down, made Handlebar left end bottom and pressing plate upper surface, because the outline of the right part of handlebar surrounds the center line of upper pin certainly Right upper portion is to left lower in the reducing globoidal structure gradually increased, as handlebar turns left, the right part of handlebar Outline will be by the gradual clamping platen of U-shaped packing ring, several block rubbers that pressing plate lower surface is set will be further tight The upper surface of arm is pressed, so as to which arm is fixed.The last Handheld Division pulled again with hand on elastic pressuring plate, drive elasticity pressure Piece line centered on fastening bolt horizontally rotates, and when touching when upwarping portion of handlebar left end, carries elastic pressuring plate upwards, makes bullet Property tabletting location hook tightly suppress the portion that upwarps of handlebar downwards, so can ensure that handlebar positioning is motionless.
Because U-shaped bead top is provided with identical and press fit deep-slotted chip breaker corresponding with reducing globoidal structure, this One structure really handlebar lock stud in the case of motionless can will not move right and depart from U-shaped packing ring, so that pressing plate is firm Ground presses arm, arm is kept integrative-structure with support frame, so as to play good security reliability.
Stiffener plate plays a part of strengthening bonding strength between front vertical plate, back vertical plate and support beam, it is ensured that positioning arm Reliability.Tilt prop plays a part of strengthening bonding strength between pedal and support limit plate, it is ensured that support limit plate by To the plumbness kept during weight with pedal.
In addition, in order to increase the intensity of arm, i.e. lifting capacity, two square steel tube side-by-sides can be welded as a whole.Certainly, this Sample needs to increase the distance between front vertical plate and back vertical plate to place two square steel tubes.
In summary, the utility model is designed reasonably, simple in construction, each spare and accessory parts use the structure of separable assembled, With with dress, there is certain lifting capacity, can move on construction ground, and install it is convenient and swift, especially for hanging Arm, for the ease of carrying and depositing, it is frequently necessary to dismantle after use, manually detent mechanism is locked and dismantled, no Only security reliability is strong, and quite convenient and swift.In a word, the utility model sufficiently lower the work of worker in road construction Intensity, operating efficiency is improved, and it is more safe and reliable.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the enlarged drawing at A in Fig. 2;
Fig. 4 is the left view of manual positioning mechanism in Fig. 2;
Fig. 5 is B direction views in Fig. 4.
Embodiment
As Figure 1-Figure 5, the interim simple lifting appliance of road construction of the present utility model, including overall is in cuboid The support frame 1 of shape, the bottom of support frame 1 are provided with road wheel 2, and the top of support frame 1 is provided with least along the longitudinal direction Two support beams 3, the top of support beam 3 are provided with an arm 4 along left and right horizontal direction, one are provided with every support beam 3 The individual manual positioning mechanism 5 for being used to fix arm 4, the top front side horizontal of support frame 1 are provided with installing plate 6, set on installing plate 6 Hoist engine 7 is equipped with, the right-hand member of arm 4 is fixedly installed first pulley support 8, passes through horizontally disposed on first pulley support 8 One pulley spindle is rotatably connected to the first fixed pulley 9, and the rear lateral portion of arm 4 is fixedly installed steel wire rope at neighbouring first fixed pulley 9 Locking member 10, the front side portion of arm 4 are fixedly installed second pulley frame 11 above support frame 1, passed through on second pulley frame 11 The second pulley axle vertically set is rotatably connected to the second fixed pulley 12, and the top of support frame 1 is provided with vertical in the rear side of arm 4 Frame 13, steel wire rope 14 is wound with hoist engine 7, the drawing end of steel wire rope 14 sequentially passes through the second fixed pulley 12, the first fixed pulley 9 It is fixed on after steel wire rope locking member 10 by U-shaped card 15 in stand 13, in the first fixed pulley 9 and Steel wire rope lock on steel wire rope 14 The hook assembly for hanging weight is provided between tight part 10.
The first alignment pin 16 for being used for Anti-rope drop above the first fixed pulley 9 is equipped with first pulley frame.
Hook assembly includes movable pulley 17, the 3rd pulley yoke 18 and suspension hook 19, and movable pulley 17 is rotated by the 3rd pulley spindle It is connected on the 3rd pulley yoke 18, the bottom of the 3rd pulley yoke 18 is provided with two and is used for the of Anti-rope drop positioned at the lower section of movable pulley 17 Two alignment pins 20, the bottom of the 3rd pulley yoke 18 are fixedly installed flat board 21 in the horizontal direction, and the middle part of flat board 21 is provided with circular hole, hung The top of hook 19 is stretched into and is rotatably connected in circular hole, and the upper end of suspension hook 19 is fixedly installed the limited block 22 above flat board 21, Limited block 22 is more than circular hole.
Steel wire rope locking member 10 includes U-shaped board 23, clapboard 24, the 3rd alignment pin 25 and the 4th alignment pin 26, U-shaped board 23 Top, bottom and left side it is open, the forward upper of U-shaped board 23 is fixedly connected with the rear side of arm 4, and the 3rd alignment pin 25 is located at The top of 4th alignment pin 26, the 3rd alignment pin 25 and the 4th alignment pin 26 are fixed horizontal through U-shaped board 23, the 3rd along the longitudinal direction Distance of the position pin 25 apart from the bottom of U-shaped board 23 is more than distance of the 4th alignment pin 26 apart from the bottom of U-shaped board 23, and clapboard 24 is presented Narrow structure under width, clapboard 24 is extend into U-shaped board 23 and the left side of clapboard 24 positions with the 3rd alignment pin 25 and the 4th The top pressure of pin 26 contacts, and steel wire rope 14 passes through U-shaped board 23 from bottom to top along the inner bottom part of U-shaped board 23, and the rear side of clapboard 24 passes through steel Cord 14 contacts with the bottom top pressure of U-shaped board 23, and it is tight that the trailing flank of clapboard 24 and the inwall of U-shaped board 23 are provided with steel wire rope 14 The anti-skidding form friction pattern of close crimping.
Manual positioning mechanism 5 includes front vertical plate 27, back vertical plate 28, lock nut 29, handlebar 30, U-shaped packing ring 31, lower pin Axle 32 and upper pin 33, front vertical plate 27 and back vertical plate 28 are vertically set on the top surface of support beam 3, and front vertical plate 27 and back vertical plate 28 divide Not Wei Yu arm 4 front side and rear side, back vertical plate 28 turn 34 by hinge and dynamic be connected with pressing plate 35;
The open lower mounting groove 36 in front side, rear side and top, the front side of pressing plate 35 are offered among the upper end of front vertical plate 27 Middle part offers the open guide groove 37 in top, bottom and front side, and lower bearing pin 32 passes through lower mounting groove 36 simultaneously along the longitudinal direction It is rotatably connected on pressing plate 35, the external diameter of lower bearing pin 32 is more than the external diameter of lock nut 29, and lock nut 29 is along lower bearing pin 32 Radial direction is threadedly coupled through lower bearing pin 32 and with lower bearing pin 32, and the centre of the leading section of handlebar 30 offers bottom and front side Open upper mounting groove 38, the upper end of lock nut 29 are located in upper mounting groove 38, and upper pin 33 is in left-right direction through locking Screw rod 29 is simultaneously rotatably connected on the right part of handlebar 30, and the external diameter of upper pin 33 is less than the external diameter of lock nut 29, U-shaped packing ring 31 Bottom is fixedly connected on the upper surface of pressing plate 35 and directly over guide groove 37, and U-shaped packing ring is penetrating about 31 and front side is open, on Mounting groove 38, the endoporus of U-shaped packing ring 31, guide groove 37 and lower mounting groove are corresponding in turn to about 36;Lock nut 29 is in vertical During state, lock nut 29 is sequentially located at mounting groove 38, U-shaped packing ring 31, guide groove 37 and lower mounting groove 36 from top to bottom Inside, the outline of the leading section of handlebar 30 increase around the center line of upper pin 33 from front side surface top to bottom in gradual Big reducing globoidal structure 39, the U-shaped top of packing ring 31 are provided with corresponding with reducing globoidal structure 39 identical and press fit Deep-slotted chip breaker 40.
The lower surface of pressing plate 35 is provided with several block rubbers 41 for being used to compress the upper surface of arm 4;The rear end of handlebar 30 to On be bent to form the portion of upwarping 42, the upper surface of pressing plate 35 is provided with the elastic pressuring plate 43 that can be horizontally rotated, bullet by fastening bolt 49 The property front end of tabletting 43 is provided with and upwarped the location hook 44 of the top pressure press fit of portion 42, and Handheld Division is provided with elastic pressuring plate 43 45。
Between the front side and the upper surface of support beam 3 of front vertical plate 27, between the rear side of back vertical plate 28 and the upper surface of support beam 3 It is provided with stiffener plate 46.
The lower rearward side of support frame 1 is hinged with pedal 47 by hinge 50, and the left bottom of pedal 47 is provided with and pedal 47 Vertical support limit plate 51, along being in pointed structures 52, the height of support limit plate 51 is more than the lower side of support limit plate 51 Hinge is provided with tilt prop 48 apart from the height on ground between the lower surface of pedal 47 and support limit plate 51;When pedal 47 is upward When being turned to 1 left contact of support frame, pedal 47 is connected by connecting bolt 53 with support frame 1.
In work in use, worker shifts the utility model onto the construction area of road, suspension hook 19 is located at the utility model The surface of groove or foundation ditch, arm 4 can be made using square steel tube, and square steel tube avoids rotating, because the front portion of arm 4 is outstanding Arm configuration, in order that support frame 1 has good stability, connecting bolt 53 is backed out, pedal 47 and support limit plate 51 Turn over downwards, the downside pointed structures 52 of support limit plate 51 are supported on the ground, and balancing weight or worker are placed on pedal 47 Stand on pedal 47, pointed structures 52 can be pierced under ground 54, can so be positioned support frame 1, be avoided road wheel 2 Moved in operation process, it is ensured that the stability of lifting, then can suspension hook 19 is mounted into weight(Construction appliance or construction are former Material), manipulate hoist engine 7 and transport weight downwards from ground.
One end of steel wire rope 14 is pulled by hoist engine 7 in the utility model, and the other end of steel wire rope 14 is through U-shaped Plate 23, one end of the steel wire rope 14 through U-shaped board 23 is stuck in stand 13 with a U-shaped card 15, prevents steel wire rope 14 from loosening, Play a part of ultimate insurance, then the 3rd alignment pin 25 and the 4th alignment pin 26, clapboard are installed in insertion in U-shaped board 23 24 are from top to bottom inserted into U-shaped board 23, pound the upper end of clapboard 24 downwards using hammer, and the left side of clapboard 24 is fixed with the 3rd Position pin 25 and the contact of the top pressure of the 4th alignment pin 26, the rear side of clapboard 24 are contacted by steel wire rope 14 with the bottom top pressure of U-shaped board 23. Because the trailing flank of clapboard 24 and the inwall of U-shaped board 23 are provided with the anti-skidding form friction pattern that steel wire rope 14 closely crimps, steel wire 14 stress of restricting pull down clapboard 24, can so make steel wire rope 14 firmly locked.
Arm 4 in the utility model can carry out the regulation of length according to the position of reality, during regulation it is operable manually Detent mechanism 5, arm 4 is unclamped, then move arm 4 in left-right direction.The movable length of arm 4 in place after, then manipulate manually Detent mechanism 5 locks arm 4, and specific manipulation process is:Hand-held handle bar 30 is rotated up with lower bearing pin 32 for rotating shaft, works as locking When screw rod 29 turns to plumbness, the right part of handlebar 30 presses down on pressing plate positioned at the U-shaped top of packing ring 31, another hand 35, the block rubber 41 of the lower surface of pressing plate 35 is pressed handlebar 30 downwards,
Then rotary handle bar 30 drives lock nut 29 to rotate, because lock nut 29 is threadedly coupled with lower bearing pin 32, The rotation of lock nut 29 just moves down the right part of handlebar 30, when right part and the U-shaped packing ring 31 of handlebar 30 connect Touch and when manual rotational handle bar 30 is relatively elaborate, unclamp the hand of pressing pressing plate 35, pressing handlebar 30 makes handlebar more than 30 Line rotates to left down centered on bearing pin 33, makes the left end bottom of handlebar 30 and the upper surface of pressing plate 35, due to handlebar 30 The outline of right part from right upper portion to left lower is in the change diameter and arc surface knot that gradually increases around the center line of upper pin 33 Structure 39, as handlebar 30 turns left, the outline of the right part of handlebar 30 will gradually compress pressure by U-shaped packing ring 31 Plate 35, several block rubbers 41 that the lower surface of pressing plate 35 is set will further press the upper surface of arm 4, so as to by arm 4 It is fixed.The last Handheld Division 45 pulled again with hand on elastic pressuring plate 43, during driving elastic pressuring plate 43 is with fastening bolt 49 Heart line horizontally rotates, and when touching when upwarping portion 42 of the left end of handlebar 30, carries elastic pressuring plate 43 upwards, makes elastic pressuring plate 43 What location hook 44 tightly suppressed downwards handlebar 30 upwarps portion 42, and it is motionless so to can ensure that handlebar 30 positions.
Because the U-shaped top of packing ring 31 is provided with identical and press fit deep-slotted chip breaker corresponding with reducing globoidal structure 39 40, this structure really the lock stud in the case of motionless of handlebar 30 can will not move right and depart from U-shaped packing ring 31, so that Pressing plate 35 securely presses arm 4, arm 4 is kept integrative-structure with support frame 1, so as to play good security reliability.
Stiffener plate 46 plays a part of strengthening bonding strength between front vertical plate 27, back vertical plate 28 and support beam 3, it is ensured that fixed The reliability of position arm 4.Tilt prop 48 plays a part of strengthening bonding strength between pedal 47 and support limit plate 51, it is ensured that branch Support limiting plate 51 is kept and the plumbness of pedal 47 when by weight.
In addition, in order to increase arm semi-finals degree, i.e. lifting capacity, two square steel tube side-by-sides can be welded as a whole.Certainly, this Sample needs to increase the distance between front vertical plate 27 and back vertical plate 28 to place two square steel tubes.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc. Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality With the protection domain of new technique scheme.

Claims (8)

1. the interim simple lifting appliance of road construction, it is characterised in that:Including the overall support frame in rectangular shape, branch Support base of frame is provided with road wheel, is provided with least two support beams, support beam top at the top of support frame along the longitudinal direction Left and right horizontal direction is provided with an arm, a manual positioning machine for being used to fix arm is provided with every support beam Structure, front side horizontal is provided with installing plate at the top of support frame, is provided with hoist engine on installing plate, and arm right-hand member is fixedly installed the One pulley bracket, the first fixed pulley is rotatably connected to by horizontally disposed first pulley axle on first pulley support, after arm Sidepiece is fixedly installed steel wire rope locking member at neighbouring first fixed pulley, and arm front side portion is just fixedly installed on the support frame There is a second pulley frame, the second fixed pulley is rotatably connected to by the second pulley axle vertically set on second pulley frame, support Frame roof is provided with stand on rear side of arm, and steel wire rope is wound with hoist engine, and the drawing end of steel wire rope sequentially passes through second Fixed and be scheduled in stand by U-shaped after fixed pulley, the first fixed pulley and steel wire rope locking member, on steel wire rope in the first fixed pulley and The hook assembly for hanging weight is provided between steel wire rope locking member.
2. the interim simple lifting appliance of road construction according to claim 1, it is characterised in that:Worn on first pulley frame Provided with the first alignment pin for being used for Anti-rope drop above the first fixed pulley.
3. the interim simple lifting appliance of road construction according to claim 1, it is characterised in that:Hook assembly includes dynamic Pulley, the 3rd pulley yoke and suspension hook, movable pulley are rotatably connected on the 3rd pulley yoke by the 3rd pulley spindle, under the 3rd pulley yoke Portion is provided with two the second alignment pins for being used for Anti-rope drop below movable pulley, and the 3rd pulley yoke bottom is fixed in the horizontal direction Flat board is provided with, circular hole is provided with the middle part of flat board, suspension hook top is stretched into and is rotatably connected in circular hole, the fixed setting of suspension hook upper end There is the limited block above flat board, limited block is more than circular hole.
4. the interim simple lifting appliance of road construction according to claim 1, it is characterised in that:Steel wire rope locking member bag Include U-shaped board, clapboard, the 3rd alignment pin and the 4th alignment pin, the top of U-shaped board, bottom and left side are open, before U-shaped board With being fixedly connected on rear side of arm, the 3rd alignment pin is located above the 4th alignment pin upper lateral part, the 3rd alignment pin and the 4th alignment pin It is more than the 4th alignment pin apart from U-shaped horizontal through U-shaped board, distance of the 3rd alignment pin apart from U-shaped board bottom along the longitudinal direction The distance of plate bottom, clapboard are in structure wide at the top and narrow at the bottom, and clapboard extend into U-shaped board and determined on the left of clapboard with the 3rd Position pin and the contact of the 4th alignment pin top pressure, steel wire rope pass through U-shaped board from bottom to top along U-shaped board inner bottom part, and the rear side of clapboard leads to Cross steel wire rope to contact with U-shaped board bottom top pressure, the trailing flank of clapboard and the inwall of U-shaped board are provided with steel wire rope and closely crimped Anti-skidding form friction pattern.
5. the interim simple lifting appliance of road construction according to claim 1, it is characterised in that:Manual positioning mechanism bag Front vertical plate, back vertical plate, lock nut, handlebar, U-shaped packing ring, lower bearing pin and upper pin are included, front vertical plate and back vertical plate are vertically arranged On support top surface of the beam, front vertical plate and back vertical plate are rotatablely connected positioned at the front side of arm and rear side, back vertical plate by hinge respectively There is pressing plate;
The open lower mounting groove in front side, rear side and top is offered among front vertical plate upper end, middle part offers on front side of pressing plate The open guide groove in top, bottom and front side, lower bearing pin through lower mounting groove and are rotatably connected on pressing plate along the longitudinal direction, The external diameter of lower bearing pin is more than the external diameter of lock nut, and radial direction of the lock nut along lower bearing pin passes through lower bearing pin and and lower bearing pin Threaded connection, the centre of handlebar leading section offer the open upper mounting groove in bottom and front side, and lock nut upper end is located at In upper mounting groove, upper pin through lock nut and is rotatably connected on handlebar right part, the external diameter of upper pin in left-right direction Less than the external diameter of lock nut, U-shaped packing ring bottom is fixedly connected on pressing plate upper surface and directly over guide groove, U-shaped packing ring Upper and lower penetrating and front side is open, and upper mounting groove, the endoporus of U-shaped packing ring, guide groove and lower mounting groove are corresponding in turn to up and down;Lock spiral shell When bar is in plumbness, lock nut is sequentially located at mounting groove, U-shaped packing ring, guide groove and lower mounting groove from top to bottom Inside, the outline of the leading section of handlebar from front side surface top to bottom are in what is gradually increased around the center line of upper pin Reducing globoidal structure, U-shaped bead top are provided with identical and press fit deep-slotted chip breaker corresponding with reducing globoidal structure.
6. the interim simple lifting appliance of road construction according to claim 5, it is characterised in that:Pressing plate lower surface is set There are several block rubbers for being used to compress arm upper surface;Handle rod rear end is folded upward at forming the portion of upwarping, and pressing plate upper surface leads to Cross fastening bolt and be provided with the elastic pressuring plate that can be horizontally rotated, elastic pressuring plate front end is provided with and upwarped portion's top pressure press fit Location hook, Handheld Division is provided with elastic pressuring plate.
7. the interim simple lifting appliance of road construction according to claim 6, it is characterised in that:The front side of front vertical plate with Stiffener plate is provided between support beam upper surface, between the rear side of back vertical plate and support beam upper surface.
8. the interim simple lifting appliance of road construction according to claim 1, it is characterised in that:Behind support frame bottom Side is hinged with pedal by hinge, and pedal left bottom is provided with the support limit plate vertical with pedal, under support limit plate Side edge is in pointed structures, and the height of support limit plate is more than height of the hinge apart from ground, pedal lower surface and support limit Tilt prop is provided between plate;When pedal is flipped up with support frame left contact, pedal passes through connecting bolt and branch Support frame frame connects.
CN201721060777.2U 2017-08-23 2017-08-23 The interim simple lifting appliance of road construction Expired - Fee Related CN207108295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721060777.2U CN207108295U (en) 2017-08-23 2017-08-23 The interim simple lifting appliance of road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721060777.2U CN207108295U (en) 2017-08-23 2017-08-23 The interim simple lifting appliance of road construction

Publications (1)

Publication Number Publication Date
CN207108295U true CN207108295U (en) 2018-03-16

Family

ID=61576720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721060777.2U Expired - Fee Related CN207108295U (en) 2017-08-23 2017-08-23 The interim simple lifting appliance of road construction

Country Status (1)

Country Link
CN (1) CN207108295U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107337110A (en) * 2017-08-23 2017-11-10 黄河科技学院 The interim simple lifting appliance of road construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107337110A (en) * 2017-08-23 2017-11-10 黄河科技学院 The interim simple lifting appliance of road construction
CN107337110B (en) * 2017-08-23 2019-10-22 黄河科技学院 The interim simple lifting appliance of road construction

Similar Documents

Publication Publication Date Title
CN207108295U (en) The interim simple lifting appliance of road construction
CN105649657A (en) U-shaped steel bracket with flexible stable supporting device
CN207108307U (en) The portable boom hoisting of urban viaduct construction in later period
CN107337110A (en) The interim simple lifting appliance of road construction
US6022184A (en) Clamp-on fork lift attachments
US2212696A (en) Tool suspension
CN205445636U (en) U shaped steel support with strutting arrangement is surely tied to flexibility
CN107298393A (en) Urban viaduct construction in later period movable type boom hoisting
CN206899086U (en) The dismounting frock of shock absorber
CN215564699U (en) Reinforcing apparatus based on building structure crossbeam
KR101254193B1 (en) Attachment quick change construction for heavy equipment
CN206984032U (en) Construction lorry
CN208383625U (en) Rotorcraft rotor head test stand
CN210692779U (en) Movable ground wire pile
CN207348867U (en) A kind of Multifunctional aloft-work constructing device for constructing tunnel
CN106786149A (en) Wire outlet driving
CN207727388U (en) A kind of safety device for lifting hood
CN203187294U (en) Hollow block hanger
CN218990134U (en) Hanging bar structure in pile foundation construction process
CN210612725U (en) Horse head safety belt fixing device of oil pumping unit
CN205396068U (en) Vehicle and parking controller assembly thereof
CN205616345U (en) Mechanism of bearing down on one of coiler
CN208151954U (en) A kind of safety device applied to water conservancy construction
CN212704179U (en) Portable high-strength steel wire cloth bending machine
CN109353944A (en) Overturning type foot pedal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20190823