CN207108284U - Bridge crane mounting tool in a kind of tunnel - Google Patents

Bridge crane mounting tool in a kind of tunnel Download PDF

Info

Publication number
CN207108284U
CN207108284U CN201721158725.9U CN201721158725U CN207108284U CN 207108284 U CN207108284 U CN 207108284U CN 201721158725 U CN201721158725 U CN 201721158725U CN 207108284 U CN207108284 U CN 207108284U
Authority
CN
China
Prior art keywords
crossbeam
fixedly connected
mounting tool
vertical beam
bridge crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721158725.9U
Other languages
Chinese (zh)
Inventor
陈云
刘革
拉海辉
汪五十四
戚海敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Lanzhou Machinery Equipments Co Ltd
Original Assignee
Xinjiang Tianshan Heng He Resource Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Tianshan Heng He Resource Equipment Co Ltd filed Critical Xinjiang Tianshan Heng He Resource Equipment Co Ltd
Priority to CN201721158725.9U priority Critical patent/CN207108284U/en
Application granted granted Critical
Publication of CN207108284U publication Critical patent/CN207108284U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to mounting tool technical field, more particularly to bridge crane mounting tool in a kind of tunnel, it includes the vertical beam of two or so settings, it is fixedly connected with a crossbeam jointly on the top of the vertical beams of two, the both ends of crossbeam are respectively fixedly connected with a cant beam being fixedly connected with vertical beam, floorboard is respectively arranged with the both sides of each vertical beam, the floor of four is located at four angles of same rectangle respectively, the both sides of each vertical beam have been respectively fixedly connected with a diagonal brace, each diagonal brace is fixedly connected with the floor of one, a vertically arranged H-shaped steel is respectively fixedly connected with the floor of two of crossbeam homonymy, a hanger is each provided with the centre of crossbeam and both ends.Bridge crane mounting tool in tunnel provided by the utility model, it is possible to achieve the installation to bridge crane.The frock firmly connects, and is easy to assembly and disassembly, and structure setting is reasonable, goes for limited structure.

Description

Bridge crane mounting tool in a kind of tunnel
Technical field
The utility model belongs to mounting tool technical field, and in particular to bridge crane mounting tool in a kind of tunnel.
Background technology
Bridge crane is installed in tunnel to be needed to set mounting tool, such as following condition of construction:1 is provided with tunnel 60t+60t/10t-10.9m overhead traveling crane bridge machines, tunnel clipping room maximum height (ground to cavern arc apex distance from) is 13.65m, Length is 80m (having bridge machine part), width 9.4m (wide between madial wall).
Utility model content
To solve the deficiencies in the prior art, the utility model provides bridge crane mounting tool in a kind of tunnel.It is logical Cross bridge crane mounting tool in tunnel provided by the utility model, in that context it may be convenient to realize the peace to bridge crane Dress.
Technical scheme provided by the utility model is as follows:
Bridge crane mounting tool in a kind of tunnel, including:The vertical beam of two or so settings, in the vertical beam described in two Top be fixedly connected with a crossbeam jointly, the both ends of the crossbeam, which have been respectively fixedly connected with one and fixed with the vertical beam, to be connected The cant beam connect, floorboard is respectively arranged with the both sides of each vertical beam, the floor described in four is located at same square respectively Four angles of shape, the both sides of each vertical beam have been respectively fixedly connected with a diagonal brace, and each diagonal brace is fixedly connected described in one Floor, a vertically arranged H-shaped steel is respectively fixedly connected with the floor described in two of the crossbeam homonymy, in institute State the centre of crossbeam and both ends and be each provided with a hanger.
Further, the high setting such as vertical beam described in two.
Bridge crane mounting tool in the tunnel provided based on above-mentioned technical proposal, it is possible to achieve to bridge crane Installation.
Further, the beam vertical is in each described diagonal brace.
Further, each vertical beam is fixedly connected by the first connecting plate with the crossbeam respectively.
Further, each cant beam is fixedly connected with the crossbeam and the vertical beam by the second connecting plate respectively.
Further, each vertical beam is fixed on the ground by the 3rd connecting plate respectively.
Above-mentioned technical proposal can realize the firm connection of each structure.
Further, the side hanger at the crossbeam both ends is located at the homonymy of the crossbeam, and the centre among the crossbeam is hung Ear is located at below the middle part of the crossbeam, and the middle hanger is provided with gusset.Specifically, the side hanger position at the crossbeam both ends In the H-shaped steel side.
Bridge crane mounting tool in tunnel provided by the utility model, it is possible to achieve to the peace of bridge crane Dress.The frock firmly connects, and is easy to assembly and disassembly, and structure setting is reasonable, goes for limited structure.
Brief description of the drawings
Fig. 1 is the overall structure diagram of bridge crane mounting tool in tunnel provided by the utility model.
Fig. 2 is the rearview of bridge crane mounting tool in tunnel provided by the utility model.
Fig. 3 is the side view of bridge crane mounting tool in tunnel provided by the utility model.
In accompanying drawing 1,2,3, the structure list representated by each label is as follows:
1st, crossbeam, 2, vertical beam, 3, diagonal brace, 4, floor, the 5, first connecting plate, the 6, second connecting plate, 7, side hanger, 8, tiltedly Beam, 9, middle hanger, 10, gusset, 11, H-shaped steel, the 12, the 3rd connecting plate.
Embodiment
Principle of the present utility model and feature are described below, illustrated embodiment is served only for explaining the utility model, It is not intended to limit the scope of the utility model.
In a detailed embodiment, as shown in Figure 1, 2, 3, bridge crane mounting tool includes left and right two in tunnel The vertical beam 2 of the high settings such as root, it is fixedly connected with a crossbeam 1, the both ends difference of crossbeam 1 jointly on the top of the vertical beam 2 of two A cant beam 8 being fixedly connected with vertical beam 2 is fixedly connected with, is respectively arranged with floorboard 4 in the both sides of each vertical beam 2, four Floor 4 respectively be located at same rectangle four angles, the both sides of each vertical beam 2 have been respectively fixedly connected with a diagonal brace 3, each diagonal brace 3 are fixedly connected with the floor 4 of one, and crossbeam 1 is perpendicular to each diagonal brace 3.
A vertically arranged H-shaped steel 11 is respectively fixedly connected with the floor 4 of two of the homonymy of crossbeam 1, in crossbeam 1 Centre and both ends be each provided with a hanger.The side hanger 7 at the both ends of crossbeam 1 is located at the homonymy of crossbeam 1, among crossbeam 1 in Between hanger 9 be located at below the middle part of crossbeam 1, middle hanger 9 is provided with gusset 10.
Each vertical beam 2 is fixedly connected by the first connecting plate 5 with crossbeam 1 respectively.Each cant beam 8 passes through the second connecting plate 6 respectively It is fixedly connected with crossbeam 1 and vertical beam 2.Each vertical beam 2 is fixed on the ground by the 3rd connecting plate 12 respectively.
The lifting of dolly
1) dolly weighs about 7t certainly, it is contemplated that the weight capacity of I-steel, is taken through adjusting portal frame with 32c I-steel If.In view of dolly will on walking track rotation is in place, maximum rotating diameter is 4338mm, the column inwall spacing of portal frame two 4500mm is designed as, meets that dolly rotation is in place and requires.
2) 10t motor-driven chain hoists are installed on portal frame.
3) check and adjust
Dolly is sling, leaves support 100-200mm, observes whether plane on dolly is in horizontality, Ran Houjian Look into its equipment and be tied, it is reliable that confirmation is tied secure, then is ready for continuing to lift by crane.
4) lift
The girder spacing (interior edge) of bridge machine two is 2854mm, and carriage walking direction body width 2136mm, scheme plan is with small Car direction of travel at ground is placed in the same direction with canal axes, and 10t motor-driven chain hoists lifting dolly passes through between two bridge main beams, directly Carriage walking wheel rim tread is lifted to higher than after carriage walking track to dolly, rotating cart, makes dolly basic above girder Trolley track, then descending at slow speed are directed at, trolley track is then directed at, dolly is positioned on trolley track.Hang in the same way Fill another dolly.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (7)

  1. A kind of 1. bridge crane mounting tool in tunnel, it is characterised in that including:The vertical beam (2) and one of two or so settings Root crossbeam (1), the top of the both ends of the crossbeam (1) respectively with the vertical beam (2) described in two are fixedly connected, the crossbeam (1) Both ends and the corresponding vertical beam (2) between be also fixedly connected with a cant beam (8), the both sides point of two vertical beams (2) A diagonal brace (3) is not fixedly connected with, and the upper end of each diagonal brace (3) is fixedly connected with the vertical beam (2), and its lower end, which is fixed, to be connected A floor (4) is connect, the floor (4) described in four is located at four angles of same rectangle respectively, in the crossbeam (1) homonymy A vertically arranged H-shaped steel (11) is respectively fixedly connected with floor (4) described in two, in the centre of the crossbeam (1) A hanger is each provided with both ends.
  2. 2. bridge crane mounting tool in tunnel according to claim 1, its special this is:Vertical beam described in two (2) high setting such as.
  3. 3. bridge crane mounting tool in tunnel according to claim 2, its special this is:The crossbeam (1) is vertical In each described diagonal brace (3).
  4. 4. bridge crane mounting tool in tunnel according to claim 1, its special this is:Each vertical beam (2) is logical The first connecting plate (5) is crossed to be fixedly connected with the crossbeam (1).
  5. 5. bridge crane mounting tool in tunnel according to claim 1, its special this is:Each cant beam (8) point It is not fixedly connected by the second connecting plate (6) with the crossbeam (1) and the vertical beam (2).
  6. 6. bridge crane mounting tool in tunnel according to claim 1, its special this is:Each vertical beam (2) point Do not fixed on the ground by the 3rd connecting plate (12).
  7. 7. bridge crane mounting tool in tunnel according to any one of claims 1 to 6, its special this is:The crossbeam (1) the side hanger (7) at both ends is located at the homonymy of the crossbeam (1), and the middle middle hanger (9) of the crossbeam (1) is positioned at described The middle part lower end of crossbeam (1), the middle hanger (9) are provided with gusset (10).
CN201721158725.9U 2017-09-11 2017-09-11 Bridge crane mounting tool in a kind of tunnel Expired - Fee Related CN207108284U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721158725.9U CN207108284U (en) 2017-09-11 2017-09-11 Bridge crane mounting tool in a kind of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721158725.9U CN207108284U (en) 2017-09-11 2017-09-11 Bridge crane mounting tool in a kind of tunnel

Publications (1)

Publication Number Publication Date
CN207108284U true CN207108284U (en) 2018-03-16

Family

ID=61588244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721158725.9U Expired - Fee Related CN207108284U (en) 2017-09-11 2017-09-11 Bridge crane mounting tool in a kind of tunnel

Country Status (1)

Country Link
CN (1) CN207108284U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607608A (en) * 2020-11-30 2021-04-06 国网山东省电力公司滨州供电公司 Special mobile crane for high-voltage switch cabinet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607608A (en) * 2020-11-30 2021-04-06 国网山东省电力公司滨州供电公司 Special mobile crane for high-voltage switch cabinet

Similar Documents

Publication Publication Date Title
CN201825671U (en) Hoisting trolley for track plate
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN102267664A (en) Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof
CN110104564A (en) A kind of bridge crane total coating process
CN106892365A (en) A kind of parallel flat-top tower crane of both arms
CN105040591B (en) A kind of positioner of Wavelike steel webplate and its localization method
CN207108284U (en) Bridge crane mounting tool in a kind of tunnel
CN109573851A (en) Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN203247031U (en) Hoisting device for curtain board transporting
CN202879487U (en) Transfer carriage in steel box
CN102795553B (en) Locomotive pre-wiring frame lifting system
CN105540433B (en) One kind tilts installation site overweight equipment hanging method
CN106837376A (en) Bind module turning device for subway tunnel section of jurisdiction
CN208378195U (en) A kind of turnover bracket
CN207497887U (en) A kind of dedicated unit for being used to lift ladle turret
CN206705574U (en) A kind of column crane
CN210710437U (en) Double-vehicle bridge crane
CN201506684U (en) Wheel type hanging beam movable gantry crane
CN208603601U (en) Hang rotary bridge crane
CN212799413U (en) Portable wet joint bottom die hoisting tool car
CN205275058U (en) Monospar gantry crane
CN207293994U (en) One kind building lifting machine
CN208345588U (en) A kind of girder with anti-tipping balancing device
CN212559147U (en) Running gear based on trackless gantry crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190531

Address after: 730060 Hekou South 2-2, Xigu District, Lanzhou City, Gansu Province

Patentee after: SINOHYDRO ENGINEERING BUREAU 4 (LANZHOU) MACHINERY EQUIPMENT CO.,LTD.

Address before: 830038 No. 50 South Second Lane, Tongxin Road, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee before: XINJIANG TIANSHAN HENGHE ENERGY EQUIPMENT CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316