CN207106552U - A kind of power plant construction transformer transporting device - Google Patents

A kind of power plant construction transformer transporting device Download PDF

Info

Publication number
CN207106552U
CN207106552U CN201720701364.1U CN201720701364U CN207106552U CN 207106552 U CN207106552 U CN 207106552U CN 201720701364 U CN201720701364 U CN 201720701364U CN 207106552 U CN207106552 U CN 207106552U
Authority
CN
China
Prior art keywords
plate
sliding block
casing
bearing seat
left surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720701364.1U
Other languages
Chinese (zh)
Inventor
王志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taijia Photoelectric Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720701364.1U priority Critical patent/CN207106552U/en
Application granted granted Critical
Publication of CN207106552U publication Critical patent/CN207106552U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

It the utility model is related to a kind of conveying arrangement, more particularly to a kind of power plant construction transformer transporting device.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, labor intensity is small, transformer safety can be conveyed into the power plant construction transformer transporting device that damage is caused without dropping.In order to solve the above-mentioned technical problem, the utility model provides such a power plant construction transformer transporting device, includes bottom plate, wheel, pushing hands, casing, slide rail, the first sliding block, placement plate, cover plate etc.;Wheel is all installed by bolted connection at left and right sides of bottom base plate, support meanss are designed with left and right sides of bottom plate, support meanss are located at left and right sides of wheel, and bottom plate left surface is provided with pushing hands by bolted connection, and pushing hands is to be obliquely installed.Invention achieves it is time saving and energy saving, labor intensity is small, transformer safety can be conveyed into without drop cause damage effect.

Description

A kind of power plant construction transformer transporting device
Technical field
The present invention relates to a kind of conveying arrangement, more particularly to a kind of power plant construction transformer transporting device.
Background technology
Transformer station, change the place of voltage.In order to the electrical energy transportation that power plant issues to place farther out, it is necessary to Voltage raises, and is changed into high-tension electricity, nearby voltage is reduced on demand again to user, the work of this buck/boost comes by transformer station Complete.The capital equipment of transformer station is switch and transformer.Different by scale, small is referred to as electric substation.Transformer station is more than Electric substation.Electric substation:Usually step-down substation of the voltage class in below 110KV;Transformer station:Including various voltage class " boosting, decompression " transformer station.
In the construction of transformer station, essential is exactly the installation of transformer, and transformer installation is required for by more Transformer is moved to installation place by people, and when manually being transported to transformer, waste time and energy, labor intensity it is big, the time one is grown People fatigue and then can cause transformer to drop to cause to damage, thus he needs badly research and development it is a kind of it is time saving and energy saving, labor intensity is small, will can become The power plant construction transformer transporting device for causing damage is transported and then do not fallen out to depressor safely.
The content of the invention
(1) technical problems to be solved
The present invention is to overcome to transformer when manually transporting, waste time and energy, labor intensity it is big, the long people's meeting of time one Fatigue so cause transformer drop cause damage the shortcomings that, the technical problem to be solved in the present invention is to provide a kind of time saving province Power, labor intensity are small, can be conveyed into transformer safety and cause the power plant construction of damage to be filled with transformer transporting without dropping Put.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a power plant construction transformer transporting device, bag Included bottom plate, wheel, pushing hands, casing, slide rail, the first sliding block, place plate, cover plate, handle, sponge block, move up and down device and Support meanss, the bottom base plate left and right sides are all provided with wheel, are designed with propping up at left and right sides of bottom plate by bolted connection Support arrangement, support meanss are located at left and right sides of wheel, and bottom plate left surface is provided with pushing hands by bolted connection, and pushing hands is It is obliquely installed, bottom plate crown center is provided with casing by bolted connection, and right flank middle part is connected by bolt in casing The mode connect is provided with slide rail, and for slide rail in being vertically arranged, slide rail is provided with the first sliding block coordinated with it, the first sliding block and slide rail It is slidably matched, the first sliding block left surface is provided with placement plate by bolted connection, and right flank is provided with and above moved down in casing Dynamic device, the moving parts for moving up and down device are connected with placing plate left surface, and casing top is provided with cover plate, and cover plate is set in level Put, cover plate coordinates with casing, and cover plate crown center is provided with handle by bolted connection, and cover plate is provided among bottom Sponge block.
Preferably, move up and down device and include the second sliding block, the first motor, first bearing seat, screw mandrel, nut and second Bearing block, in casing left surface pass sequentially through from top to bottom bolted mode be provided with the first motor, first bearing seat and Second bearing seat, is connected with screw mandrel between first bearing seat and second bearing seat, screw mandrel top by way of interference connection with Bearing connection in first bearing seat, bearing of the screw mandrel bottom by way of interference connection and in second bearing seat connect, silk Bar is provided with the nut coordinated with it, and nut right flank middle part is installed by bolted connection to be connected with placing plate left surface Connect, be provided with chute in the middle part of left surface in casing, chute is provided between first bearing seat and second bearing seat, in chute and it The second sliding block coordinated, the second sliding block and chute coordinate, the second sliding block right flank by bolted connection with the left of nut Middle face is connected, and in being vertically arranged, the output shaft of the first motor is connected the first motor by shaft coupling with screw mandrel top.
Preferably, support meanss include hydraulic cylinder and block rubber, are all provided with first through hole at left and right sides of bottom plate, left side the One through hole is located at left-hand wheel upper left side, and right side first through hole is located at right-hand wheel upper right side, and the left and right sides is all logical at the top of bottom plate Cross bolted mode and hydraulic cylinder is installed, in being vertically arranged, the expansion link of hydraulic cylinder is located at hydraulic cylinder by first through hole Below bottom plate, the expansion link of hydraulic cylinder is provided with block rubber by bolted connection.
Preferably, fixing device is also included, fixing device includes fixed plate, T-shaped inserted link and the first spring, and cover plate is left Right both sides are all provided with fixed plate by bolted connection, and fixed plate bottom is all laterally provided with the second through hole, the second through hole It is interior to be provided with T-shaped inserted link, the first spring is connected between the T-shaped inserted link medial surface in left side and left side fixed plate left surface, right side is T-shaped to insert Also the first spring is connected between bar medial surface and right side fixed plate right flank, for the first spring housing on T-shaped inserted link, casing is outer left Side surface upper part and right flank top are all provided with slot, and to be symmetrical arranged, slot coordinates slot with T-shaped inserted link.
Preferably, the first travel switch and the second travel switch are also included, slide rail left surface top is connected by screw Mode the first travel switch is installed, the first travel switch is located above the first sliding block, and slide rail left surface bottom passes through screw The mode of connection is provided with the second travel switch, and the second travel switch is located at below the first sliding block, the first travel switch and second Travel switch has circuit to be connected with the first motor.
Preferably, the material for placing plate is stainless steel.
Operation principle:The present apparatus is moved to transformer storeroom by operating personnel by pushing hands and wheel first, then is passed through Handle opens cover plate, startup move up and down device, move up and down device moving parts move up drive place plate it is upward It is mobile, and then drive the first sliding block to move up, when placement plate is moved upward to correct position, closing moves up and down device, Transformer can be lifted and put to placement plate by operating personnel, you can the moving parts that startup moves up and down device moves down, and enters And drive to place plate and move down and recover to original position, closing to move up and down device, cover plate lid is returned by handle, and then sponge block Contacted with transformer, transformer can be moved to infield by operating personnel by pushing hands and wheel, and sponge block makes transformer During transport, it will not be in contact with cover plate and cause to damage.Similarly, when transformer is moved to infield, start Support meanss, support meanss prop up the present apparatus, and then when transformer is taken out again, the present apparatus will not be moved, by above-mentioned Transformer can be taken out and installed by operation.In this way, without manually being put transformer lift to infield with hand, it is time saving and energy saving.
Because moving up and down device includes the second sliding block, the first motor, first bearing seat, screw mandrel, nut and the second axle Bearing, left surface passes sequentially through bolted mode and is provided with the first motor, first bearing seat and from top to bottom in casing Two bearing bracket, is connected with screw mandrel between first bearing seat and second bearing seat, screw mandrel top is by way of interference connection with the Bearing connection in one bearing block, bearing of the screw mandrel bottom by way of interference connection and in second bearing seat connect, screw mandrel The nut coordinated with it is provided with, nut right flank middle part is installed by bolted connection to be connected with placing plate left surface, Chute is provided with the middle part of left surface in casing, chute is provided between first bearing seat and second bearing seat, in chute matches somebody with somebody with it The second sliding block closed, the second sliding block and chute coordinate, the second sliding block right flank by bolted connection with nut left surface Middle part is connected, and in being vertically arranged, the output shaft of the first motor is connected the first motor by shaft coupling with screw mandrel top, works as the present apparatus When being moved to transformer storeroom, and when cover plate is opened, operating personnel can start the rotating forward of the first motor, and the first motor rotates forward Screw mandrel is driven to rotate forward, screw mandrel, which rotates forward, drives nut to move up, and chute play the guiding role with the second sliding block, and nut moves up band Dynamic plate of placing moves up, and slide rail play the guiding role with the first sliding block, when placing plate and being moved upward to correct position, closing the One motor, you can put transformer lift to placement plate.Similarly, when transformer is on placement plate, operating personnel can open Dynamic first motor reversal, and then drive placement plate to be moved upward to correct position, close the first motor, you can take out transformer. In this way, operating personnel are made preferably to take out transformer, simultaneously, moreover it is possible to make transformer preferably in casing.
Because support meanss include hydraulic cylinder and block rubber, first through hole, left side first are all provided with left and right sides of bottom plate Through hole is located at left-hand wheel upper left side, and right side first through hole is located at right-hand wheel upper right side, and the left and right sides all passes through at the top of bottom plate Bolted mode is provided with hydraulic cylinder, and for hydraulic cylinder in being vertically arranged, the expansion link of hydraulic cylinder is located at bottom by first through hole Below plate, the expansion link of hydraulic cylinder is provided with block rubber by bolted connection, when the present apparatus is moved to infield, Operating personnel, which are lumpd, to be started the expansion link of hydraulic cylinder and moves down, and the expansion link of hydraulic cylinder, which moves down, drives block rubber to moving down Dynamic, block rubber moves down to be contacted with ground, and with constantly moving down for hydraulic cylinder, wheel departs from ground, and then hydraulic cylinder The present apparatus is propped up by block rubber, operating personnel can carry out removing processing to transformer.Similarly, when transformer is removed, The expansion link for starting hydraulic cylinder moves up, you can the mobile present apparatus.In this way, transformer can be prevented to be moved when removing, And then prevent that transformer from dropping damage.
Because also including fixing device, fixing device includes fixed plate, T-shaped inserted link and the first spring, cover plate or so Both sides are all provided with fixed plate by bolted connection, and fixed plate bottom is all laterally provided with the second through hole, in the second through hole Provided with T-shaped inserted link, the first spring, the T-shaped inserted link in right side are connected between the T-shaped inserted link medial surface in left side and left side fixed plate left surface Also the first spring is connected between medial surface and right side fixed plate right flank, the first spring housing is on T-shaped inserted link, the outer left side of casing Face top and right flank top are all provided with slot, and to be symmetrical arranged, slot coordinates slot with T-shaped inserted link, and operating personnel draw first Move T-shaped inserted link to be displaced outwardly, the first spring-compressed, and then T-shaped inserted link departs from out of slot, you can remove cover plate, by transformation Device, which is placed on, to be placed on plate.When transformer is located in casing, operating personnel return cover plate lid, T-shaped inserted link are unclamped, because of the first spring Effect, T-shaped inserted link moves inward, and then fixes cover plate in T-shaped inserted link insertion slot.In this way, in transportation, can prevent Only cover plate drops and then prevents exotic from dropping in inlet body and transformer is caused to damage.
Because also including the first travel switch and the second travel switch, side that slide rail left surface top is connected by screw Formula is provided with the first travel switch, and the first travel switch is located above the first sliding block, and slide rail left surface bottom is connected by screw Mode the second travel switch is installed, the second travel switch is located at below the first sliding block, the first travel switch and the second stroke Switch has circuit to be connected with the first motor, and when the first motor rotates forward, nut drives placement plate to move up, and then drives first Sliding block moves up, the first sliding block move up with the first stroke switch contact, and then the first motor is closed, and is also put with regard to explanation Put plate and be in correct position.When the first motor reversal, placement plate, which moves down, drives the first sliding block to move down, the One sliding block is moved down when being contacted with the second travel switch, and the first motor is closed, and also just to place plate recovered to former for explanation Position, transformer are had been positioned in casing.In this way, the first motor is closed without operating personnel, it is time saving and energy saving.
Because the material for placing plate is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of placement plate It is longer.
(3) beneficial effect
Invention achieves it is time saving and energy saving, labor intensity is small, transformer safety can be conveyed into and cause to damage without dropping Bad effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Mark in accompanying drawing for:1- bottom plates, 2- wheels, 3- pushing hands, 4- casings, 5- slide rails, the sliding blocks of 6- first, 7- are placed Plate, 8- cover plates, 9- handles, 10- sponge blocks, 11- move up and down device, 111- chutes, the sliding blocks of 112- second, the electricity of 113- first Machine, 114- first bearing seats, 115- screw mandrels, 116- nuts, 117- second bearing seats, 12- support meanss, 121- first through hole, 122- hydraulic cylinders, 123- block rubbers, 13- fixing devices, 131- fixed plates, the through holes of 132- second, 133-T type inserted links, 134- One spring, 135- slots, the travel switches of 14- first, the travel switches of 15- second.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of power plant construction transformer transporting device, as Figure 1-3, include bottom plate 1, wheel 2, pushing hands 3, casing 4th, slide rail 5, the first sliding block 6, place plate 7, cover plate 8, handle 9, sponge block 10, move up and down device 11 and support meanss 12, bottom Wheel 2 is all installed by bolted connection at left and right sides of the bottom of plate 1, the left and right sides of bottom plate 1 is designed with support meanss 12, Support meanss 12 are located at the left and right sides of wheel 2, and the left surface of bottom plate 1 is provided with pushing hands 3 by bolted connection, and pushing hands 3 is It is obliquely installed, the crown center of bottom plate 1 is provided with casing 4 by bolted connection, and right flank middle part passes through bolt in casing 4 The mode of connection is provided with slide rail 5, and for slide rail 5 in being vertically arranged, slide rail 5 is provided with the first sliding block 6 coordinated with it, the first sliding block 6 are slidably matched with slide rail 5, and the left surface of the first sliding block 6 is provided with by bolted connection places plate 7, right flank in casing 4 Provided with device 11 is moved up and down, the moving parts for moving up and down device 11 is connected with placing the left surface of plate 7, and the top of casing 4 is provided with Cover plate 8, cover plate 8 is in being horizontally disposed with, and cover plate 8 coordinates with casing 4, and the crown center of cover plate 8 is provided with by bolted connection Handle 9, cover plate 8 are provided with sponge block 10 among bottom.
Embodiment 2
A kind of power plant construction transformer transporting device, as Figure 1-3, include bottom plate 1, wheel 2, pushing hands 3, casing 4th, slide rail 5, the first sliding block 6, place plate 7, cover plate 8, handle 9, sponge block 10, move up and down device 11 and support meanss 12, bottom Wheel 2 is all installed by bolted connection at left and right sides of the bottom of plate 1, the left and right sides of bottom plate 1 is designed with support meanss 12, Support meanss 12 are located at the left and right sides of wheel 2, and the left surface of bottom plate 1 is provided with pushing hands 3 by bolted connection, and pushing hands 3 is It is obliquely installed, the crown center of bottom plate 1 is provided with casing 4 by bolted connection, and right flank middle part passes through bolt in casing 4 The mode of connection is provided with slide rail 5, and for slide rail 5 in being vertically arranged, slide rail 5 is provided with the first sliding block 6 coordinated with it, the first sliding block 6 are slidably matched with slide rail 5, and the left surface of the first sliding block 6 is provided with by bolted connection places plate 7, right flank in casing 4 Provided with device 11 is moved up and down, the moving parts for moving up and down device 11 is connected with placing the left surface of plate 7, and the top of casing 4 is provided with Cover plate 8, cover plate 8 is in being horizontally disposed with, and cover plate 8 coordinates with casing 4, and the crown center of cover plate 8 is provided with by bolted connection Handle 9, cover plate 8 are provided with sponge block 10 among bottom.
Move up and down device 11 and include the second sliding block 112, the first motor 113, first bearing seat 114, screw mandrel 115, spiral shell Mother 116 and second bearing seat 117, left surface passes sequentially through bolted mode and is provided with the first electricity from top to bottom in casing 4 Machine 113, first bearing seat 114 and second bearing seat 117, screw mandrel is connected between first bearing seat 114 and second bearing seat 117 115, the top of screw mandrel 115 is connected by way of interference connection with the bearing in first bearing seat 114, and the bottom of screw mandrel 115 passes through The mode of interference connection is connected with the bearing in second bearing seat 117, and screw mandrel 115 is provided with the nut 116 coordinated with it, nut 116 right flank middle parts are installed by bolted connection to be connected with placing the left surface of plate 7, is provided with casing 4 in the middle part of left surface Chute 111, chute 111 are provided with the coordinated with it between first bearing seat 114 and second bearing seat 117, in chute 111 Two sliding blocks 112, the second sliding block 112 coordinate with chute 111, the right flank of the second sliding block 112 by bolted connection with nut Connected in the middle part of 116 left surfaces, for the first motor 113 in being vertically arranged, the output shaft of the first motor 113 passes through shaft coupling and screw mandrel 115 tops connect.
Embodiment 3
A kind of power plant construction transformer transporting device, as Figure 1-3, include bottom plate 1, wheel 2, pushing hands 3, casing 4th, slide rail 5, the first sliding block 6, place plate 7, cover plate 8, handle 9, sponge block 10, move up and down device 11 and support meanss 12, bottom Wheel 2 is all installed by bolted connection at left and right sides of the bottom of plate 1, the left and right sides of bottom plate 1 is designed with support meanss 12, Support meanss 12 are located at the left and right sides of wheel 2, and the left surface of bottom plate 1 is provided with pushing hands 3 by bolted connection, and pushing hands 3 is It is obliquely installed, the crown center of bottom plate 1 is provided with casing 4 by bolted connection, and right flank middle part passes through bolt in casing 4 The mode of connection is provided with slide rail 5, and for slide rail 5 in being vertically arranged, slide rail 5 is provided with the first sliding block 6 coordinated with it, the first sliding block 6 are slidably matched with slide rail 5, and the left surface of the first sliding block 6 is provided with by bolted connection places plate 7, right flank in casing 4 Provided with device 11 is moved up and down, the moving parts for moving up and down device 11 is connected with placing the left surface of plate 7, and the top of casing 4 is provided with Cover plate 8, cover plate 8 is in being horizontally disposed with, and cover plate 8 coordinates with casing 4, and the crown center of cover plate 8 is provided with by bolted connection Handle 9, cover plate 8 are provided with sponge block 10 among bottom.
Move up and down device 11 and include the second sliding block 112, the first motor 113, first bearing seat 114, screw mandrel 115, spiral shell Mother 116 and second bearing seat 117, left surface passes sequentially through bolted mode and is provided with the first electricity from top to bottom in casing 4 Machine 113, first bearing seat 114 and second bearing seat 117, screw mandrel is connected between first bearing seat 114 and second bearing seat 117 115, the top of screw mandrel 115 is connected by way of interference connection with the bearing in first bearing seat 114, and the bottom of screw mandrel 115 passes through The mode of interference connection is connected with the bearing in second bearing seat 117, and screw mandrel 115 is provided with the nut 116 coordinated with it, nut 116 right flank middle parts are installed by bolted connection to be connected with placing the left surface of plate 7, is provided with casing 4 in the middle part of left surface Chute 111, chute 111 are provided with the coordinated with it between first bearing seat 114 and second bearing seat 117, in chute 111 Two sliding blocks 112, the second sliding block 112 coordinate with chute 111, the right flank of the second sliding block 112 by bolted connection with nut Connected in the middle part of 116 left surfaces, for the first motor 113 in being vertically arranged, the output shaft of the first motor 113 passes through shaft coupling and screw mandrel 115 tops connect.
Support meanss 12 include hydraulic cylinder 122 and block rubber 123, and the left and right sides of bottom plate 1 is all provided with first through hole 121, Left side first through hole 121 is located at the upper left side of left-hand wheel 2, and right side first through hole 121 is located at the upper right side of right-hand wheel 2, and bottom plate 1 pushes up Hydraulic cylinder 122 is all installed by bolted connection, hydraulic cylinder 122 is in be vertically arranged, hydraulic cylinder 122 at left and right sides of portion Expansion link is located at the lower section of bottom plate 1 by first through hole 121, and the expansion link of hydraulic cylinder 122 is provided with by bolted connection Block rubber 123.
Embodiment 4
A kind of power plant construction transformer transporting device, as Figure 1-3, include bottom plate 1, wheel 2, pushing hands 3, casing 4th, slide rail 5, the first sliding block 6, place plate 7, cover plate 8, handle 9, sponge block 10, move up and down device 11 and support meanss 12, bottom Wheel 2 is all installed by bolted connection at left and right sides of the bottom of plate 1, the left and right sides of bottom plate 1 is designed with support meanss 12, Support meanss 12 are located at the left and right sides of wheel 2, and the left surface of bottom plate 1 is provided with pushing hands 3 by bolted connection, and pushing hands 3 is It is obliquely installed, the crown center of bottom plate 1 is provided with casing 4 by bolted connection, and right flank middle part passes through bolt in casing 4 The mode of connection is provided with slide rail 5, and for slide rail 5 in being vertically arranged, slide rail 5 is provided with the first sliding block 6 coordinated with it, the first sliding block 6 are slidably matched with slide rail 5, and the left surface of the first sliding block 6 is provided with by bolted connection places plate 7, right flank in casing 4 Provided with device 11 is moved up and down, the moving parts for moving up and down device 11 is connected with placing the left surface of plate 7, and the top of casing 4 is provided with Cover plate 8, cover plate 8 is in being horizontally disposed with, and cover plate 8 coordinates with casing 4, and the crown center of cover plate 8 is provided with by bolted connection Handle 9, cover plate 8 are provided with sponge block 10 among bottom.
Move up and down device 11 and include the second sliding block 112, the first motor 113, first bearing seat 114, screw mandrel 115, spiral shell Mother 116 and second bearing seat 117, left surface passes sequentially through bolted mode and is provided with the first electricity from top to bottom in casing 4 Machine 113, first bearing seat 114 and second bearing seat 117, screw mandrel is connected between first bearing seat 114 and second bearing seat 117 115, the top of screw mandrel 115 is connected by way of interference connection with the bearing in first bearing seat 114, and the bottom of screw mandrel 115 passes through The mode of interference connection is connected with the bearing in second bearing seat 117, and screw mandrel 115 is provided with the nut 116 coordinated with it, nut 116 right flank middle parts are installed by bolted connection to be connected with placing the left surface of plate 7, is provided with casing 4 in the middle part of left surface Chute 111, chute 111 are provided with the coordinated with it between first bearing seat 114 and second bearing seat 117, in chute 111 Two sliding blocks 112, the second sliding block 112 coordinate with chute 111, the right flank of the second sliding block 112 by bolted connection with nut Connected in the middle part of 116 left surfaces, for the first motor 113 in being vertically arranged, the output shaft of the first motor 113 passes through shaft coupling and screw mandrel 115 tops connect.
Support meanss 12 include hydraulic cylinder 122 and block rubber 123, and the left and right sides of bottom plate 1 is all provided with first through hole 121, Left side first through hole 121 is located at the upper left side of left-hand wheel 2, and right side first through hole 121 is located at the upper right side of right-hand wheel 2, and bottom plate 1 pushes up Hydraulic cylinder 122 is all installed by bolted connection, hydraulic cylinder 122 is in be vertically arranged, hydraulic cylinder 122 at left and right sides of portion Expansion link is located at the lower section of bottom plate 1 by first through hole 121, and the expansion link of hydraulic cylinder 122 is provided with by bolted connection Block rubber 123.
Also including fixing device 13, fixing device 13 includes fixed plate 131, the spring 134 of T-shaped inserted link 133 and first, The left and right sides of cover plate 8 is all provided with fixed plate 131 by bolted connection, and the bottom of fixed plate 131 is all laterally provided with second Through hole 132, be provided with T-shaped inserted link 133, the T-shaped medial surface of inserted link 133 in left side and the left surface of left side fixed plate 131 in the second through hole 132 Between be connected with the first spring 134, is also connected between the T-shaped medial surface of inserted link 133 in right side and the right flank of right side fixed plate 131 One spring 134, the first spring 134 are enclosed on T-shaped inserted link 133, and the outer left surface top of casing 4 and right flank top are all provided with slot 135, to be symmetrical arranged, slot 135 coordinates slot 135 with T-shaped inserted link 133.
Also include the first travel switch 14 and the second travel switch 15, the left surface top of slide rail 5 is connected by screw Mode is provided with the first travel switch 14, and the first travel switch 14 is located at the top of the first sliding block 6, and the left surface bottom of slide rail 5 passes through The mode of mode connects for screw is provided with the second travel switch 15, and the second travel switch 15 is located at the lower section of the first sliding block 6, and the first stroke is opened The travel switch 15 of pass 14 and second has circuit to be connected with the first motor 113.
The material for placing plate 7 is stainless steel.
Operation principle:The present apparatus is moved to transformer storeroom by operating personnel by pushing hands 3 and wheel 2 first, then is led to Cross handle 9 to open cover plate 8, startup moves up and down device 11, and the moving parts for moving up and down device 11 moves up drive and put Put plate 7 to move up, and then drive the first sliding block 6 to move up, when placement plate 7 is moved upward to correct position, in closing Transformer can be lifted and put to placement plate 7 by lower mobile device 11, operating personnel, you can start the movement for moving up and down device 11 Part moves down, and then drives to place plate 7 and move down and recover to move up and down device 11 to original position, closing, will by handle 9 Cover plate 8 is covered back, and then sponge block 10 contacts with transformer, and transformer can be moved to by operating personnel by pushing hands 3 and wheel 2 Infield, sponge block 10 make transformer during transport, will not be in contact with cover plate 8 and cause to damage.Similarly, change is worked as When depressor is moved to infield, start support meanss 12, support meanss 12 prop up the present apparatus, and then again take out transformer When, the present apparatus will not be moved, and can take out transformer by aforesaid operations and install.In this way, without manually with hand by transformation Device lift is put to infield, time saving and energy saving.
Because moving up and down device 11 includes the second sliding block 112, the first motor 113, first bearing seat 114, screw mandrel 115th, nut 116 and second bearing seat 117, left surface passes sequentially through bolted mode and is provided with from top to bottom in casing 4 First motor 113, first bearing seat 114 and second bearing seat 117, are connected between first bearing seat 114 and second bearing seat 117 There is screw mandrel 115, the top of screw mandrel 115 is connected by way of interference connection with the bearing in first bearing seat 114, the bottom of screw mandrel 115 End is connected by way of interference connection with the bearing in second bearing seat 117, and screw mandrel 115 is provided with the nut coordinated with it 116, the right flank middle part of nut 116 is installed by bolted connection to be connected with placing the left surface of plate 7, left surface in casing 4 Middle part is provided with chute 111, chute 111 between first bearing seat 114 and second bearing seat 117, be provided with chute 111 and its The second sliding block 112 coordinated, the second sliding block 112 coordinate with chute 111, the side that the right flank of the second sliding block 112 is bolted Formula in the middle part of the left surface of nut 116 with being connected, and for the first motor 113 in being vertically arranged, the output shaft of the first motor 113 passes through shaft coupling It is connected with the top of screw mandrel 115, when the present apparatus is moved to transformer storeroom, and when cover plate 8 is opened, operating personnel can open Dynamic first motor 113 rotates forward, and the first motor 113, which rotates forward, drives screw mandrel 115 to rotate forward, and screw mandrel 115, which rotates forward, drives nut 116 to moving up Dynamic, chute 111 is play the guiding role with the second sliding block 112, and nut 116, which moves up drive, to be placed plate 7 and move up, slide rail 5 and First sliding block 6 play the guiding role, and when placement plate 7 is moved upward to correct position, closes the first motor 113, you can by transformation Device lift is put to placement plate 7.Similarly, when transformer is on placement plate 7, it is anti-that operating personnel can start the first motor 113 Turn, and then drive placement plate 7 to be moved upward to correct position, close the first motor 113, you can take out transformer.In this way, make behaviour Make personnel and preferably take out transformer, simultaneously, moreover it is possible to make transformer preferably in casing 4.
Because support meanss 12 include hydraulic cylinder 122 and block rubber 123, the left and right sides of bottom plate 1 is all provided with first through hole 121, left side first through hole 121 is located at the upper left side of left-hand wheel 2, and right side first through hole 121 is located at the upper right side of right-hand wheel 2, bottom The top of plate 1 left and right sides is all provided with hydraulic cylinder 122 by bolted connection, and hydraulic cylinder 122 is in be vertically arranged, hydraulic cylinder 122 expansion link is located at the lower section of bottom plate 1 by first through hole 121, and the expansion link of hydraulic cylinder 122 is pacified by bolted connection Equipped with block rubber 123, when the present apparatus is moved to infield, the expansion link that operating personnel's caking starts hydraulic cylinder 122 is downward Mobile, the expansion link of hydraulic cylinder 122, which moves down, drives block rubber 123 to move down, and block rubber 123 moves down to be connect with ground Touch, with constantly moving down for hydraulic cylinder 122, wheel 2 departs from ground, and then hydraulic cylinder 122 is filled this by block rubber 123 Put and prop up, operating personnel can carry out removing processing to transformer.Similarly, when transformer is removed, stretching for hydraulic cylinder 122 is started Contracting bar moves up, you can the mobile present apparatus.In this way, transformer can be prevented to be moved when removing, and then prevent transformer Drop damage.
Because also including fixing device 13, fixing device 13 includes fixed plate 131, the spring of T-shaped inserted link 133 and first 134, the left and right sides of cover plate 8 is all provided with fixed plate 131 by bolted connection, and the bottom of fixed plate 131 is all laterally provided with Second through hole 132, be provided with T-shaped inserted link 133, the T-shaped medial surface of inserted link 133 in left side and the left side of left side fixed plate 131 in the second through hole 132 The first spring 134 is connected between side, is also connected between the T-shaped medial surface of inserted link 133 in right side and the right flank of right side fixed plate 131 There is the first spring 134, the first spring 134 is enclosed on T-shaped inserted link 133, and the outer left surface top of casing 4 and right flank top are all provided with Slot 135, to be symmetrical arranged, slot 135 coordinates slot 135 with T-shaped inserted link 133, and operating personnel pull T-shaped inserted link 133 first It is displaced outwardly, the first spring 134 compresses, and then T-shaped inserted link 133 departs from out of slot 135, you can removes cover plate 8, by transformation Device, which is placed on, to be placed on plate 7.When transformer is located in casing 4, operating personnel cover back cover plate 8, unclamp T-shaped inserted link 133, because of The effect of one spring 134, T-shaped inserted link 133 move inward, and then T-shaped inserted link 133 inserts in slot 135 and fixes cover plate 8.Such as This, in transportation, can prevent cover plate 8 from dropping and then prevent exotic drops from causing to damage to transformer into casing 4 is interior.
Because also including the first travel switch 14 and the second travel switch 15, the left surface top of slide rail 5 is connected by screw The mode connect is provided with the first travel switch 14, and the first travel switch 14 is located at the top of the first sliding block 6, the left surface bottom of slide rail 5 The mode being connected by screw is provided with the second travel switch 15, and the second travel switch 15 is located at the lower section of the first sliding block 6, the first row The travel switches 15 of Cheng Kaiguan 14 and second have circuit to be connected with the first motor 113, when the first motor 113 rotates forward, the band of nut 116 Dynamic plate 7 of placing moves up, and then drives the first sliding block 6 to move up, and the first sliding block 6 moves up and the first travel switch 14 Contact, and then the first motor 113 is closed, also just explanation places plate 7 and is in correct position.When the first motor 113 is anti- When turning, placement plate 7, which moves down, drives the first sliding block 6 to move down, and the first sliding block 6 moves down to be connect with the second travel switch 15 When touching, the first motor 113 is closed, and also just explanation placement plate 7 is recovered in situ, and transformer is had been positioned in casing 4. In this way, the first motor 113 is closed without operating personnel, it is time saving and energy saving.
Because the material for placing plate 7 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, and make placement plate 7 uses the longevity Order longer.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

  1. A kind of 1. power plant construction transformer transporting device, it is characterised in that include bottom plate (1), wheel (2), pushing hands (3), Casing (4), slide rail (5), the first sliding block (6), place plate (7), cover plate (8), handle (9), sponge block (10), move up and down device (11) and support meanss (12), bottom plate (1) bottom left and right sides are all provided with wheel (2), bottom plate by bolted connection (1) left and right sides is designed with support meanss (12), and support meanss (12) are located at left and right sides of wheel (2), and bottom plate (1) left surface leads to Cross bolted mode and pushing hands (3) is installed, to be obliquely installed, bottom plate (1) crown center is bolted for pushing hands (3) Mode is provided with casing (4), and casing (4) interior right flank middle part is provided with slide rail (5), slide rail (5) by bolted connection In being vertically arranged, slide rail (5) is provided with the first sliding block (6) coordinated with it, and the first sliding block (6) is slidably matched with slide rail (5), the One sliding block (6) left surface is provided with by bolted connection places plate (7), and casing (4) interior right flank is provided with and moved up and down Device (11), the moving parts for moving up and down device (11) are connected with placing plate (7) left surface, and cover plate is provided with the top of casing (4) (8), cover plate (8) is in being horizontally disposed with, and cover plate (8) coordinates with casing (4), and cover plate (8) crown center is by bolted connection Handle (9) is installed, sponge block (10) is installed among cover plate (8) bottom.
  2. 2. a kind of power plant construction transformer transporting device according to claim 1, it is characterised in that move up and down device (11) the second sliding block (112), the first motor (113), first bearing seat (114), screw mandrel (115), nut (116) and are included Two bearing bracket (117), casing (4) interior left surface pass sequentially through bolted mode and are provided with the first motor from top to bottom (113), first bearing seat (114) and second bearing seat (117), connect between first bearing seat (114) and second bearing seat (117) Screw mandrel (115) is connected to, screw mandrel (115) top is connected by way of interference connection with the bearing in first bearing seat (114), silk Bar (115) bottom is connected with the bearing in second bearing seat (117) by way of interference connection, screw mandrel (115) provided with Its nut (116) coordinated, nut (116) right flank middle part are installed with placing plate (7) left surface by bolted connection Connection, the interior left surface middle part of casing (4) are provided with chute (111), and chute (111) is located at first bearing seat (114) and second bearing The second sliding block (112) coordinated with it is provided between seat (117), in chute (111), the second sliding block (112) is matched somebody with somebody with chute (111) Close, the second sliding block (112) right flank in the middle part of nut (116) left surface by bolted connection with being connected, the first motor (113) in being vertically arranged, the output shaft of the first motor (113) is connected by shaft coupling with screw mandrel (115) top.
  3. A kind of 3. power plant construction transformer transporting device according to claim 2, it is characterised in that support meanss (12) Include hydraulic cylinder (122) and block rubber (123), first through hole (121) is all provided with left and right sides of bottom plate (1), left side first is logical Hole (121) is located at left-hand wheel (2) upper left side, and right side first through hole (121) is located at right-hand wheel (2) upper right side, bottom plate (1) top Hydraulic cylinder (122) is all installed by bolted connection, hydraulic cylinder (122) is in be vertically arranged, hydraulic cylinder at left and right sides of portion (122) expansion link is located at below bottom plate (1) by first through hole (121), and the expansion link of hydraulic cylinder (122) is bolted Mode block rubber (123) is installed.
  4. 4. a kind of power plant construction transformer transporting device according to claim 3, it is characterised in that also include fixation Device (13), fixing device (13) include fixed plate (131), T-shaped inserted link (133) and the first spring (134), and cover plate (8) is left Right both sides are all provided with fixed plate (131) by bolted connection, and fixed plate (131) bottom is all laterally provided with the second through hole (132) T-shaped inserted link (133), left side T-shaped inserted link (133) medial surface and left side fixed plate (131), are provided with the second through hole (132) Be connected with the first spring (134) between left surface, right side T-shaped inserted link (133) medial surface and right side fixed plate (131) right flank it Between be also connected with the first spring (134), the first spring (134) is enclosed on T-shaped inserted link (133), the outer left surface top of casing (4) with Right flank top is all provided with slot (135), and to be symmetrical arranged, slot (135) coordinates slot (135) with T-shaped inserted link (133).
  5. 5. a kind of power plant construction transformer transporting device according to claim 4, it is characterised in that also include first Travel switch (14) and the second travel switch (15), the mode that slide rail (5) left surface top is connected by screw are provided with first Travel switch (14), the first travel switch (14) are located above the first sliding block (6), and slide rail (5) left surface bottom is connected by screw The mode connect is provided with the second travel switch (15), and the second travel switch (15) is located at below the first sliding block (6), and the first stroke is opened Close (14) and the second travel switch (15) has circuit to be connected with the first motor (113).
  6. 6. a kind of power plant construction transformer transporting device according to claim 5, it is characterised in that place plate (7) Material is stainless steel.
CN201720701364.1U 2017-06-16 2017-06-16 A kind of power plant construction transformer transporting device Expired - Fee Related CN207106552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720701364.1U CN207106552U (en) 2017-06-16 2017-06-16 A kind of power plant construction transformer transporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720701364.1U CN207106552U (en) 2017-06-16 2017-06-16 A kind of power plant construction transformer transporting device

Publications (1)

Publication Number Publication Date
CN207106552U true CN207106552U (en) 2018-03-16

Family

ID=61576735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720701364.1U Expired - Fee Related CN207106552U (en) 2017-06-16 2017-06-16 A kind of power plant construction transformer transporting device

Country Status (1)

Country Link
CN (1) CN207106552U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775470A (en) * 2018-06-25 2018-11-09 合肥利元杰信息科技有限公司 A kind of computer base of heat radiating type
CN109050598A (en) * 2018-06-15 2018-12-21 华建海 It is a kind of to be conveniently adjusted type transfer device for instrument and meter
CN109910971A (en) * 2019-04-12 2019-06-21 深圳利都科技有限公司 A kind of OLED material storage transport device of adjustable space anti-extrusion
CN113415326A (en) * 2020-11-27 2021-09-21 深圳市欣晔永顺电子有限公司 Adjustable transportation device for electronic transformer and use method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109050598A (en) * 2018-06-15 2018-12-21 华建海 It is a kind of to be conveniently adjusted type transfer device for instrument and meter
CN108775470A (en) * 2018-06-25 2018-11-09 合肥利元杰信息科技有限公司 A kind of computer base of heat radiating type
CN109910971A (en) * 2019-04-12 2019-06-21 深圳利都科技有限公司 A kind of OLED material storage transport device of adjustable space anti-extrusion
CN113415326A (en) * 2020-11-27 2021-09-21 深圳市欣晔永顺电子有限公司 Adjustable transportation device for electronic transformer and use method thereof
CN113415326B (en) * 2020-11-27 2022-05-13 深圳市欣晔永顺电子有限公司 Adjustable transportation device for electronic transformer and use method

Similar Documents

Publication Publication Date Title
CN107139992A (en) A kind of power plant construction transformer transporting device
CN207106552U (en) A kind of power plant construction transformer transporting device
CN205555525U (en) Automatic change silicon chip collection device
CN105618934B (en) A kind of full automatic solar cell piece laser process equipment
CN207631205U (en) A kind of intensive style electric motor coach electric charging station
CN205846558U (en) A kind of interlocking low voltage cabinet drawer
CN205589877U (en) Online radium carving machine
CN108190481A (en) A kind of solar photovoltaic assembly environmental protection is recycled assembly line
CN207291054U (en) A kind of garbage disposal recycles compression set with scrap iron
CN104375089B (en) Pillar is discharged and test machine and its method discharged battery and tested
CN107553551A (en) A kind of family expenses water supply and drainage plastic tube cutting equipment
CN205200944U (en) Equipment is demolishd to installation of current collection brain mainboard battery and CPU base protecting cover
CN107552469A (en) A kind of electric construction tool equipment for quick washing
CN107089251A (en) A kind of hospital's small sewage treatment equipment high security handling device
CN108393330A (en) A kind of waste and old solar photovoltaic assembly processing system
CN2377018Y (en) Rotary multi-station supersonic cleaning machine
CN206795448U (en) A kind of high reliable sanding apparatus
CN113460922A (en) Lifting device for electric power system detection and lifting method thereof
CN205060069U (en) Fall type box filling machine
CN107055375A (en) It is a kind of to be used for the books rapid wagon loading equipment of cultural medium
CN108393671B (en) Copper bush conveying device for pump chamber copper bush press-fitting integrated machine
CN204368115U (en) A kind of hydraulic tool car
CN205543641U (en) Automatic curved shell fragment and pressure shell fragment machine
CN213444986U (en) Automatic feeding mechanism for assembling electric connector
CN205972632U (en) Novel lift dolly is removed in battery business turn over groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190929

Address after: 313000 Dingtanghe River, Yangnan Village, Nanxun Economic Development Zone, Huzhou City, Zhejiang Province

Patentee after: Zhejiang Taijia Photoelectric Technology Co., Ltd.

Address before: 325002 No. 1 Liming East Road, Lucheng District, Wenzhou City, Zhejiang Province

Patentee before: Wang Zhi Qiang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20200616

CF01 Termination of patent right due to non-payment of annual fee